Andrew Carnegie Elementary School

Similar documents
Marcus Moziah Garvey Elementary School

Jackie Robinson Elementary School

Amos Alonzo Stagg Elementary School

Everett McKinley Dirksen Elementary School

Philip Rogers Elementary School

Wendell Smith Elementary School

Jonathan Burr Elementary School

Langston Hughes Elementary School

EPIC Academy High School

John Milton Gregory Elementary School

Alexander Graham Bell Elementary School

Robert Fulton Elementary School

Charles N Holden Elementary School

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Morton School of Excellence

Architecture, Construction, and Engineering Technical Charter

Daniel S Wentworth Elementary School

University of Chicago Charter - Carter G Woodson

John Spry Elementary Community School

George Washington Elementary School

Disney II Magnet School

John Harvard Elementary School of Excellence

Richard J Oglesby Elementary School

Disney II Magnet High School

University of Chicago Charter - NKO

Academy for Global Citizenship Elementary School

Rufus M Hitch Elementary School

William Penn Elementary School

Cyrus H McCormick Elementary School

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

George W Tilton Elementary School

Walt Disney Magnet Elementary School

Urban Prep Academy for Young Men - West

Arthur E Canty Elementary School

Arthur A Libby Elementary School

Joseph E Gary Elementary School

North Lawndale College Prep Charter - Collins

Norman A Bridge Elementary School

George Washington High School

John Hancock College Preparatory High School

Phoenix Military Academy High School

John L Marsh Elementary School

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

John F Kennedy High School

Brian Piccolo Elementary Specialty School

Henry H Nash Elementary School

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Multicultural Academy of Scholarship

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Amandla Charter High School

Legacy Charter Elementary School

Theodore Roosevelt High School

Richard T Crane Medical Preparatory HS

Betty Shabazz Intl Charter - DuSable Leadership

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

William Howard Taft High School

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

James Shields Middle School 2611 W 48th St Chicago, IL 60632

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

James Otis Elementary School 525 N Armour St Chicago, IL 60642

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

OCPS Submittal Register for Product Data and Shop Drawing Reviews

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

U of I Facilities Standards Updates for 2017

CS2.0 COVER SHEET VOL. 2

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy Metal Canopy CHIMNEY Brick Chimney - Concrete/ Mortar Liner 1 2 3 4 5 6 72 GRE 6 38 1 2 3 4 5 6 BLU 5 14 20 7 7 172 SF $4,870 38 SF $915 $5,785 34 LF $87,087 $87,087 Assessment Date: 9/19/2012 Page 1 of 16

DOORS Exterior Steel Door Store Front Door Transom Lite 1 2 3 4 5 6 GRE 6 9 7 GRE 7 10 GRE 7 6 9 EA $2,973 10 EA 6 EA $2,973 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio and Video Ramp Handrails Stair Handrails Stone Stairs 1 2 3 4 5 6 7 44 72 GRE 6 34 GRE 7 1 GRE 6 49 7 GRE 6 2 216 LF $15,444 34 LF $4,740 49 LF 17 LF 2 LF $358 $20,542 FOUNDATION Concrete Foundation 1 2 3 4 5 6 7 GRE 6 653 459 1,112 LF $101,690 $101,690 LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted LINTELS 1 2 3 4 5 6 1 8 7 1 $5,506 18 EA $3,861 $9,367 Lintels - Steel 1 2 3 4 5 6 7 GRE 7 1,027 1,027 LF Assessment Date: 9/19/2012 Page 2 of 16

PARAPET Coping - Stone Parapet 16" to 30" Height 1 2 3 4 5 6,123 7 47 976 1,123 LF 1,123 LF $30,522 $30,522 ROOF SYSTEM EPDM/ Synthetic Rubber Roof Interior Downspouts Modified Bitumen Roof Roof Structure: Concrete 1 2 3 4 YEL 4 427 5 6 GRE 6 324 GRE 6 8,726 25,119 7 GRE 7 33,845 427 SF $8,243 324 LF 33,845 SF $280,750 33,845 SF $288,993 SUPERSTRUCTURE Concrete Metal Deck/Concrete Topping 1 2 3 4 5 6 7 GRE 7 44,610 GRE 7 18,100 44,610 SF 18,100 SF WALLS Brick Prefabricated Metal Panel Wall Stone - Cast 1 2 3 4 5 6 7 GRE 6 96 80 18,717 9,852 GRE 7 198 GRE 6 390 646 28,745 SF $132,716 198 SF 1,036 SF $27,885 $160,601 WINDOWS Window - Guards perforated Windows - Casement Aluminum Double-pane Windows - Sash Aluminum Double-pane 1 2 3 4 5 6 7 GRE 7 3,431 GRE 7 173 GRE 7 6,295 3,431 SF 173 SF 6,295 SF Assessment Date: 9/19/2012 Page 3 of 16

EXTERIOR $707,559 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency generator below 60 KW natural gas - Outdoor Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Public Announcement System Security System - Intrusion detection MAIN SERVICE 1 2 3 4 5 6 GRE 6 87,470 GRE 6 5,078 5 GRE 6 3 BLU 5 12 12 YEL 4 16 GRE 6 62,710 GRE 6 62,710 7 $1,430 87,470 SF $37,525 5,078 SF $2,687 15 EA $1,609 3 EA $322 $7,508 24 EA $13,951 16 EA $14,872 62,710 SF $37,664 62,710 SF $58,289 $175,855 Main Electrical service 2000 A 120/240/3PH 1 2 3 4 5 6 7 GRE 7 1 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 120/240-120/208 1 2 3 4 5 6 7 17 6 GRE 6 2 GRE 7 4 BLU 5 1 1 GRE 7 1 24 EA $17,589 2 EA $2,860 4 EA 2 EA $6,578 $27,027 Assessment Date: 9/19/2012 Page 4 of 16

ELECTRICAL $202,882 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller PUMP ROOM ASSEMBLY 1 2 3 4 5 6 GRE 6 62,710 GRE 6 41,400 7 62,710 SF $22,419 41,400 SF $50,322 $2,145 $74,886 1 2 3 4 5 6 7 Fire Pump 50-75hp BLU 5 1 $16,874 $16,874 SPRINKLER SYSTEM Wet Sprinkler System FIRE PROTECTION 1 2 3 4 5 6 7 GRE 7 18,100 18,100 SF $91,760 MECHANICAL AIR CONDITIONING Condensing - Roof Mounted 31 to 50 tons Condensing - Roof Mounted 11 to 20 tons Condensing - Roof Mounted less than 5 tons Window A/C 1 2 3 4 5 BLU 5 1 ORA 2 1 6 BLU 5 1 4 7 $17,875 $12,870 $858 5 EA $3,003 $34,606 Assessment Date: 9/19/2012 Page 5 of 16

AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Hot Water 12,001 to 20,000 cfm Air intake for all Air Handling s except built up AHU Fan Power Box With Hot Water Coil Make Up Air - Indoor Mounted - Electric less than 6,000 cfm Return Fans - Indoor 10,001 to 20,000 CFM Roof Top - Multi Zone - Gas-Heating 10 to 20 tons Roof Top - Single Zone - Gas-Heating less than 5 tons Variable Air Volume (VAV) Box With Hot Water Coil 1 2 3 4 5 BLU 5 1 6 7 GRE 6 2 2 YEL 4 10 BLU 5 1 BLU 5 1 YEL 4 2 $24,310 4 EA $2,860 10 EA $38,610 $7,150 $2,431 $24,310 $1,430 2 EA $6,578 $107,679 BOILER SYSTEMS Boiler Assembly - Steam - Flexible Tube Boiler 76-100 HP Boiler Auxiliary - Steam Boiler 76-100 HP Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Glycol Feed System 1 2 3 4 5 6 GRE 6 2 GRE 6 2 7 GRE 7 1 ORA 3 1 BLU 5 1 2 EA $14,014 2 EA $4,004 $5,577 $19,305 $1,087 $43,987 HEAT EXCHANGERS Heat Exchanger - Steam to Hot Water Shell Type 1 2 3 4 5 6 7 GRE 7 1 HEATING DEVICES Cabinet Heaters With Hot Water Coils Cabinet Heaters With Steam Coils Radiators - Hot Water 1 2 3 4 5 6 GRE 6 2 7 GRE 7 3 2 EA $1,001 $501 3 EA Assessment Date: 9/19/2012 Page 6 of 16

Radiators - Steam Heater - Electric Wall Heater - Electric MECHANICAL PLUMBING YEL 4 12 GRE 7 2 4 12 EA $16,817 2 EA 5 EA $1,441 $19,760 Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized 1 2 3 4 5 BLU 5 2 6 BLU 5 500 300 7 GRE 7 200 BLU 5 800 300 2 EA $18,876 800 LF $18,325 200 LF 1,100 LF $42,242 $79,444 TEMPERATURE CONTROL 1 2 3 4 5 6 7 Direct Digital Control (DDC) System BLU 5 18,100 18,100 SF $90,591 Thermostats - Direct Digital Control (DDC) YEL 4 41 1 42 EA $38,667 $129,258 UNIT VENTILATION 1 2 3 4 5 6 7 Ventilators - Steam YEL 4 24 24 EA $377,520 $377,520 VENTILATION Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL 1 2 3 4 YEL 4 2 5 6 BLU 5 2 4 GRE 6 6 ORA 2 1 7 2 EA $8,580 6 EA $5,491 6 EA $944 $26,884 $41,899 $834,152 Assessment Date: 9/19/2012 Page 7 of 16

PLUMBING HOT WATER Hot Water Heater - Electric less than 50 KW Hot Water Heater - Gas 150,000-300,000 BTU/HR PIPING 1 2 3 ORA 3 1 4 5 6 YEL 4 1 1 7 $11,211 2 EA $27,027 $38,238 Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping 1 2 3 4 5 6 7 GRE 6 41,400 18,100 GRE 6 41,400 18,100 YEL 4 41,400 18,100 YEL 4 41,400 18,100 YEL 4 41,400 18,100 GRE 6 41,400 21,310 YEL 4 41,400 3,210 18,100 ORA 3 41,400 GRE 6 41,400 21,310 GRE 6 41,400 21,310 GRE 6 41,400 21,310 59,500 SF $7,104 59,500 SF $13,616 59,500 SF $11,727 59,500 SF $21,792 59,500 SF $25,344 62,710 SF $36,705 62,710 SF $87,021 41,400 SF $47,362 62,710 SF $25,457 62,710 SF $19,537 62,710 SF $14,801 $310,465 PUMPS 1 2 3 4 5 6 7 Domestic Booster Pump duplex BLU 5 2 2 EA $31,460 $31,460 PLUMBING $380,164 Assessment Date: 9/19/2012 Page 8 of 16

INTERIOR ADMINISTRATIVE SUITES Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Terrazzo Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile 1 2 3 4 5 6,430 GRE 6 251 1,172,142 GRE 6 288,423 2 7 GRE 6 20 1 GRE 6 5,090 GRE 6 2,834 12 1,430 SF $3,067 1,423 SF $4,740 1,142 SF $1,633 288 SF $1,631 1,423 SF $2,035 12 SF $9 21 SF $14 5,090 SF $14,557 2,834 SF $6,687 112 SF $801 $35,174 CORRIDOR Ceiling - Lay-In Ceiling - Plaster/Drywall Ceiling - Splined Flooring Terrazzo Flooring Tile/ Sheet Lighting - Lay-In Lighting - Pendant/ Surface Stair Handrails Stairs - Terrazzo Student Lockers Walls - Concrete Block Walls - Masonry Walls - Plaster/Drywall Walls - Structural Glazed Tile 1 2 3 4 5 6 GRE 6 4,263 7 GRE 6 7,348 305 GRE 6 870 GRE 7 7,284 GRE 6 5,502 GRE 6 4,568 GRE 6 8,218 00 160 GRE 7 129 GRE 6 588 GRE 6 9,038 164 GRE 7 164 GRE 6 4,085 GRE 6 7,632 4,263 SF $9,144 7,653 SF $20,805 870 SF $1,866 7,284 SF 5,502 SF $7,868 4,568 SF $3,266 8,218 SF $5,876 260 LF 129 LF 588 EA $84,084 9,202 SF $25,849 164 SF 4,085 SF $9,639 7,632 SF $54,569 $222,965 Assessment Date: 9/19/2012 Page 9 of 16

DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Transom Window 1 2 3 4 5 6 7 4 23 05 GRE 6 30 56 5 37 EA $3,964 105 EA $29,730 86 SF $558 15 SF $279 $34,530 DRINKING FOUNTAINS Double Fountain Single Fountain Single Water Cooler 1 2 3 4 5 6 7 2 3 EA $658 $386 $615 $1,659 GYMNASIUM / AUDITORIUM Ceiling - Splined Flooring - Tile/Sheet Lighting - Lay-In Scoreboards Sound System Stage Curtain Stage Platform Walls - Concrete Block Walls - Structural Glazed Tile KITCHEN Ceiling - Splined Flooring - Tile/Sheet 1 2 3 4 5 6 GRE 6 2,983 GRE 6 2,983 2 GRE 6 2 GRE 6 700 GRE 6 2,608,738 1 2 3 4 5 6 GRE 6 775 GRE 6 775 7 7 2,983 SF $27,727 2,983 SF $4,266 12 SF $9 $2,076 $5,005 2 EA $18,876 700 SF $2,973 2,608 SF $22,377 1,738 SF $12,427 $95,735 775 SF $2,217 775 SF $1,108 Assessment Date: 9/19/2012 Page 10 of 16

Lighting - Pendant/Surface Wall - Concrete Block Wall - Structural Glazed Tile LIBRARY Flooring Tile/ Sheet Lighting - Pendant/ Surface LOCKER/SHOWER ROOM Lockers LUNCHROOM 0 GRE 6 300 GRE 6 900 1 2 3 4 5 6,228 GRE 6 30 1 2 3 4 5 6 2 7 7 10 SF $7 300 SF $858 900 SF $6,435 $10,625 1,228 SF $1,756 30 SF $21 $1,777 12 EA $589 $589 Ceiling - Exposed Flooring - Tile/Sheet Lighting - Pendant/Surface Serving Line Wall - Structural Glazed Tile 1 2 3 4 5 6 7 GRE 7 2,095 GRE 6 2,095 3 GRE 7 5 GRE 7 2,425 2,095 SF 2,095 SF $2,996 13 SF $9 5 LF 2,425 SF $3,005 MDF/IDF Finishes Ventilation and Cooling 1 2 3 4 5 6 7 67 112 GRE 6 2 279 SF $568 2 EA $2,803 $3,371 Assessment Date: 9/19/2012 Page 11 of 16

MECHANICAL/SERVICE ROOMS Boiler Room Crawl Space - Unfinished Janitor's Closet Mechanical/Service Rooms Storage Room 1 2 3 4 5 6,095 GRE 6 22,073 GRE 6 4 7 GRE 6 724 737 GRE 6 305 1,095 SF $5,167 22,073 SF $41,665 4 SF $19 1,461 SF $3,417 305 SF $1,439 $51,707 STAFF RESTROOM Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Terrazzo Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Structural Glazed Tile Water Closet 1 2 3 4 5 6 7 GRE 6 2,250 82 GRE 6 82 07 2,149 3 2 07 GRE 7 737,140 GRE 6 354 GRE 6 4 2 12 10 3 GRE 6 2 4 23 19 7 GRE 6 9 3 GRE 6 502 2,549 GRE 6 2,282 2,555 23 13 2,332 SF $17,375 82 SF $176 2,256 SF $6,691 15 EA $3,904 107 SF $505 737 SF 1,140 SF $2,902 354 SF $506 6 EA $868 23 EA $6,321 4 SF $4 29 SF $31 27 EA $3,979 12 EA $3,346 3,051 SF $11,080 4,837 SF $16,316 37 EA $10,410 $84,413 Assessment Date: 9/19/2012 Page 12 of 16

VERTICAL CONVEYANCE Elevator - Machine Roomless VOCATIONAL SHOP Work Sink INTERIOR ROOM CASEWORK Casework CEILING 1 2 3 4 5 6 1 2 3 4 5 6 7 1 2 3 4 5 6 GRE 6 771 7 7 7 $17,160 $17,160 17 EA $6,564 $6,564 $569,275 771 LF $27,563 $27,563 Lay-In/Drop Plaster/Drywall 1 2 3 4 5 6 7 GRE 6 6,294 544 7,963 792 6,838 SF $13,501 18,755 SF $50,860 $64,361 CHALK BOARD 1 2 3 4 5 6 7 Chalk Board YEL 4 591 591 LF $71,836 $71,836 CLASSROOM Science Lab Elements 1 2 3 4 5 6 7 GRE 7 1 1 SF Assessment Date: 9/19/2012 Page 13 of 16

FLOOR Tile/Sheet 1 2 3 4 5 6 7 GRE 6 24,516 1,077 25,593 SF $35,058 $35,058 LIBRARY_CEILING Plaster/Drywall LIBRARY_WALL Concrete Block LIGHTING Lay-In Pendant/Surface MARKER BOARD 1 2 3 4 5 6,228 1 2 3 4 5 6,455 1 2 3 4 5 6 GRE 6 96 GRE 6 461 7 7 7 1,228 SF $3,477 $3,477 1,455 SF $4,161 $4,161 96 EA $6,864 46 $32,962 $39,826 Marker Board 1 2 3 4 5 6 7 80 161 341 LF $5,148 $5,148 WALL Concrete Block Plaster/Drywall 1 2 3 4 5 6 7 GRE 6 26,613 1,977,865 28,590 SF $76,113 1,865 SF $4,400 $80,514 Assessment Date: 9/19/2012 Page 14 of 16

ROOM $331,944 SITE CIVIL/DRAINAGE Catch Basin Site Manhole 1 2 3 4 5 6 7 GRE 7 8 GRE 7 7 8 EA 7 EA FENCING Ornamental Iron LANDSCAPE 1 2 3 4 5 6 2 1,929 7 1,941 LF $38,677 $38,677 Benches Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas Trash Receptacles 1 2 3 4 5 6 GRE 6 9 GRE 6 3,794 GRE 6 9,071 1 GRE 6 5,194 7 GRE 7 2 9 EA $2,124 3,794 SF $1,519 9,071 SF $17,122 1 $3,146 5,194 SF 2 EA $23,911 PARKING LOT Asphalt Concrete Concrete Curbs Trash Compactor Trash Enclosure 1 2 3 4 5 YEL 4 16,063 2,076 6 GRE 6 4,366 GRE 6 206 7 GRE 7 1,248 18,139 SF $143,699 4,366 SF 206 LF $1,243 $3,575 1,248 SF $148,517 Assessment Date: 9/19/2012 Page 15 of 16

PLAYGROUND Playground Equipment - Combo 3-12 Playground Surfacing - Square Rubber Mats 1 2 3 4 5 6 7 GRE 7 1 YEL 4 2,459 2,459 SF $54,504 $54,504 SIDEWALKS Perimeter Sidewalks 1 2 3 4 5 6 7 GRE 6 6,340 1,239 7,579 SF $11,967 $11,967 SIGNAGE Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 1 2 3 4 5 6 7 GRE 7 1 $277,576 $3,395,311 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 9/19/2012 Page 16 of 16