Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 92 3 3,0 $2,,9 Addition 9 2, $29,3 SITE $,29 Campus Total 9,92 $3,, Category: Building Exterior Entrance Entrance Control - Audio and Video EA 2 Exterior Doors - Exterior Steel Door 3 EA $,2 Exterior Doors - Transom Lite 9 EA $2, Exterior Stairs - Concrete 2 LF $3,3 Ramp Handrail - Steel_Ramp Handrail 0 LF $ Ramps - Concrete 0 LF $,02 Foundation Lighting Roof System Foundation - Masonry LF $, Foundation - Masonry 30 LF Superstructure - Steel with Clay Tile Arch 3,0 SF Exterior Lighting - Parapet or Roof Mounted EA $2,0 Exterior Lighting - Parapet or Roof Mounted EA $2,3 Exterior Lighting - Wall Mounted EA $,0 Exterior Lighting - Wall Mounted EA $2,30 Coping - Metal LF $, HAMMOD Page of 9 Assessment Date: /2/
Category: Building Exterior Roof System Coping - Stone LF $,09 Coping - Stone LF $9,9 Coping - Terra Cotta LF $3,0 Coping - Terra Cotta 99 LF $, Coping - Terra Cotta 9 LF $,30 Downspouts - Exterior Downspouts LF $3,3 Downspouts - Exterior Downspouts LF $,93 Downspouts - Interior Downspouts 0 LF $, Parapet - " - 30" Height 0 LF $2, Parapet - " - 30" Height 0 LF $,2 Parapet - Parapet < " Height LF $,3 Parapet - Parapet < " Height LF $,3 Parapet - Parapet > 30" 0 LF $, Parapet - Parapet > 30" 2 LF $,2 Roof - Modified Bitumen 00 SF $2,30 Roof - Modified Bitumen,2 SF $0,2 Roof - PVC Membrane 00 SF $, Roof - PVC Membrane 0,0 SF $3, Roof Structure - Steel / Metal Deck/ Concrete Topping 9, SF Walls Windows Cornice - Cast Stone LF $,0 Exterior Walls - Brick 00 SF $,2 Exterior Walls - Brick 2,0 SF $,02 Exterior Walls - Prefabricated Metal Panel Wall,0 SF $,3 Exterior Walls - Stone-Cast SF $32 Exterior Walls - Stone-Cast 2,0 SF $,2 Exterior Walls - Stone-Cut SF $3 Exterior Walls - Stucco,22 SF $, Guard - Guards perforated,30 SF $23,39 Guard - Guards wire guard 0 SF $, Lintels - Brick LF Lintels - Steel 9 LF $,22 Windows - Louver SF $3 Windows - Sash Aluminum Double-pane, SF $33,9 HAMMOD Page 2 of 9 Assessment Date: /2/
Category: Building Exterior Building Exterior Subtotal: $3,0 Category: Electrical System Emergency System Automatic Transfer Switch EA $0 Emergency A/C Power - Corridors and Stairs,3 SF $2,29 Emergency A/C Power - Gym,9 SF $2,22 Emergency Battery Packs - Multipurpose Room EA $3 Exit Signs - Corridors and Stairs EA 2 $9,9 Security System - CCTV 3,0 SF $,3 Security System - Intrusion Detection 3,0 SF $9,0 Main Service Power Distribution Independent Electrical Service for emergency power EA $2,92 Main Electrical Service - 0 to 3000 A //3PH EA $0, PA System 3,0 SF $2,32 Lighting and Power Panels - 00 A EA $299 Lighting and Power Panels - Above 00 A EA $, Lighting and Power Panels - Above 00 A 9 EA $,3 Main Distribution Panels - 00-00 amp EA $2 Main Distribution Panels - Greater than 00 amp 2 EA $,0 Electrical System Subtotal: $,0 Category: Safty System Fire Alarm Fire Alarm Panel EA $9, Fire Alarm_System 3,0 SF $2,0 Safty System Subtotal: $9,9 HAMMOD Page 3 of 9 Assessment Date: /2/
Category: Mechanical System Air Conditioning Chemical Pot Feeder EA Chiller-Air Cooled-Screw Type-Roof Mounted - Less the 0 tons 2 EA Condensing Unit- Roof Mounted - Less than tons 2 EA Glycol Feed EA Pipes - Chilled Water Pipe- Galvanized 00 LF Pressure Fill System EA Air Handling Systems Air Handling Unit- Built Up- Single Zone- Steam Coils and Chilled Water Coils - 00 - EA $3, 00 cfm Air Handling Unit- Built Up-Multi Zone- Steam Coils - 00-00 cfm EA $,3 Air Handling Unit- Built Up-Multi Zone- Steam Coils - 00-000 cfm EA $0,003 Air Intake 3 EA $,29 Auxiliaries - 00-00 cfm 2 EA $, Auxiliaries - 00-000 cfm EA $,3 Outdoor Return Fans- Air Handling Unit Type - 000-000 CFM EA $,0 Return Duct Work - Masonry and Ducts- Missing or Existing Shaft 00 LF $2,3 Zone Dampers 2 EA $0, Boiler Systems Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - - 0 HP 2 EA $3,033 Chemical Feed System EA $3,0 Combustion Dampers 2 EA $,0 Condensate Pump 2 EA $3,392 Feed Water Pumps and Tank EA $3,0 on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - - 0 HP 2 EA $3,033 Piping - Condensate Pipe- Steel LF $2 Piping - Steam Pipe- Steel LF $2 Steam Traps 3 EA $,02 Heat Exchangers Heat Exchanger - Steam to Hot Water Shell Type EA $,3 Heating Devices Radiators - Hot Water 3 EA $33 Unit Heater - Hot Water EA $,32 Wall Heater - Electric 2 EA $2, Wall Heater - Electric 3 EA $ Mechanical Plumbing Condenser Pump - Less than 0 3 EA $3, HAMMOD Page of 9 Assessment Date: /2/
Category: Mechanical System Mechanical Plumbing Hot Water Pump - 0 - HP 2 EA $32, Hot Water Pump - Less than 0 EA $, Hydronic Supply and Return - Steel 0 LF $, Temperature Control Ventilation DDC System 3,0 SF $2,9 Pneumatic System 3,0 SF $9,339 Thermostats - DDC 2 EA $,3 Thermostats - DDC 9 EA Thermostats - Pneumatic 2 EA $, Exhaust Fans- Roof Mounted - 0-000 CFM EA $92 Exhaust Fans- Roof Mounted - 00-00 CFM 2 EA $, Roof Mounted Duct Work 0 LF $,9 Mechanical System Subtotal: $,30,32 Category: Plumbing System Hot Water Gas Heater - 0000-300000 BTU/HR EA $30 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 3,0 SF $,2 Domestic Piping-Cold Water Horizontal Lines 3,0 SF $9,23 Domestic Piping-Cold Water Risers 3,0 SF $,0 Domestic Piping-Hot Water from Risers to Fixtures 3,0 SF $,99 Domestic Piping-Hot Water Horizontal Lines 3,0 SF $,0 Domestic Piping-Hot Water Return Lines 3,0 SF $,9 Domestic Piping-Hot Water Return Risers 3,0 SF $,9 Sanitary Piping 3,0 SF $3,3 Storm Piping 3,0 SF $33,23 Vent Piping 3,0 SF $2,0 Pumps - Domestic Booster Pump-Simplex EA $, HAMMOD Page of 9 Assessment Date: /2/
Category: Plumbing System Plumbing System Subtotal: $3,2 Category: Classrooms Computer Lab ( room) AC Units EA $9 Ceiling - Plaster/Drywall 0 SF $2,90 Doors - Transom Window 2 SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Wood 0 SF $,922 Lighting - Pendent/Surface EA Marker Board 30 LF $3 Storage/ Closet SF $3 Walls - Plaster/Drywall,3 SF $3,92 Faculty Lounge ( room) Kindergarten ( room) Pre School ( room) AC Units EA $9 Ceiling - Plaster/Drywall 30 SF $, Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 30 SF $30 Lighting - Pendent/Surface EA $9 Marker Board 0 LF $2 Walls - Plaster/Drywall 9 SF $2,39 AC Units EA $9 Ceiling - Plaster/Drywall 90 SF $3,9 Doors - Transom Window 2 SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 90 SF $9 Lighting - Pendent/Surface EA Storage/ Closet 3 SF $9 Walls - Plaster/Drywall,0 SF $, AC Units EA $9 Ceiling - Plaster/Drywall SF $,92 Chalk Board LF $,3 HAMMOD Page of 9 Assessment Date: /2/
Category: Classrooms Pre School ( room) (9 rooms) Doors - Transom Window 2 SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet SF $ Lighting - Pendent/Surface 2 EA Storage/ Closet 3 SF $9 Walls - Plaster/Drywall,0 SF $3,32 AC Units 0 EA $,9 Ceiling - Plaster/Drywall,0 SF $2,2 Chalk Board LF $,3 Doors - Transom Window 0 SF $,29 Doors - Wood Doors inclu hw 9 EA $2,09 Floor - Wood,0 SF $3,29 Lighting - Pendent/Surface EA $,3 Lighting - Pendent/Surface 2 EA Marker Board LF $, Storage/ Closet 23 SF $3,0 Walls - Plaster/Drywall 2,3 SF $3,29 Classrooms Subtotal: $3,9 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 2 EA $3,2 AC Unit EA $9 Ceiling - Plaster/Drywall 2, SF $,09 Doors - Steel Doors incl hw 2 EA 2 Doors - Transom Window SF Doors - Wood Doors inclu hw EA $,0 Floor - Tile/Sheet,29 SF $, Floor - Wood 2 SF $,0 Lighting - Lay-in EA Lighting - Pendent/Surface EA $3 Lighting - Pendent/Surface EA HAMMOD Page of 9 Assessment Date: /2/
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Power Distribution EA $2,9 Power Distribution EA Storage/ Closet 2 SF $,9 Walls - Concrete Block 2 SF $3 Walls - Plaster/Drywall,9 SF $2, Work SInk EA $0 Gymnasia Ceiling - Plaster/Drywall,9 SF $,22 Doors - Steel Doors incl hw EA $, Floor - Tile/Sheet,9 SF $,99 Lighting - Pendent/Surface EA Main Floor Seating 322 EA $,00 Stage 0 SF Stage Curtain EA Stage-Stairs - Asphalt LF Storage/ Closet SF $,0 Walls - Plaster/Drywall 3,90 SF $0,3 Walls - Structural Glazed Tile,900 SF $,9 Mechanical/ Service Rooms Boiler Room,90 SF $3, Coal Room 0 SF $, Interior Stairs LF Janitor's Closet 0 SF $3 Mechanical/ Service Rooms SF $,9 Storage Room 30 SF Restroom Accessories 93 SF $,9 Accessories 2 SF Ceiling - Plaster/Drywall 30 SF $3, Ceiling - Plaster/Drywall SF $2,30 Doors - Wood Doors inclu hw EA $2,0 Floor - Concrete 29 SF $ Floor - Concrete Epoxy/ Painted SF $2 Floor - Tile Ceramic/ Porcelain 30 SF $,9 Floor - Tile Ceramic/ Porcelain 0 SF $ Floor - Tile/Sheet 2 SF $2 HAMMOD Page of 9 Assessment Date: /2/
Category: Rooms (Other Than Classrooms) Restroom Floor Drain 2 EA $2, Lavatory EA $2,23 Lighting - Lay-in EA Lighting - Pendent/Surface EA $9 Lighting - Pendent/Surface EA Lighting - Wall Mounted 3 EA Partitions 3 EA $3,0 Urinals 3 EA $,00 Walls - Concrete Block 0 SF $2,2 Walls - Plaster/Drywall 2 SF $3,99 Walls - Plaster/Drywall 2,230 SF $, Walls - Structural Glazed Tile SF $2,029 Water Closet EA $,2 Rooms (Other Than Classrooms) Subtotal: $32,0 Category: Building Interior Corridor Ceiling - Plaster/Drywall,3 SF $,33 Doors - Wood Doors include hw EA $2,0 Drinking Fountains - Double Fountain EA $2,0 Floor - Tile/Sheet,3 SF $3,0 Lighting - Pendent/Surface EA Walls - Plaster/Drywall 2, SF $3,9 Safety Stairs Security Cameras EA $2,3 Ceiling - Plaster/Drywall, SF $, Floor SF Floor - Asphalt 00 SF $3, Handrails 0 LF $3,3 Lighting - Pendent/Surface 2 EA Stairs - Asphalt 0 LF $, Walls - Plaster/Drywall,2 SF $,33 HAMMOD Page 9 of 9 Assessment Date: /2/
Category: Building Interior Stairs Building Interior Subtotal: $3, Total Building Cost $2,,9 Category: Building Exterior Entrance Exterior Doors - Exterior Steel Door EA $ Exterior Doors - Side lite EA $ Foundation Lighting Roof System Walls Windows Foundation - Masonry 22 LF Superstructure - Steel 2, SF Exterior Lighting - Parapet or Roof Mounted 9 EA $,29 Chimney - Brick Chimney- Stainless Steel Liner LF $3,0 Chimney - Brick Chimney- Stainless Steel Liner 3 LF $33, Coping - Stone 3 LF $2,3 Downspouts - Interior Downspouts 0 LF $2,9 Parapet - " - 30" Height 3 LF $,32 Roof - Modified Bitumen 0,9 SF $0, Roof Structure - Steel / Metal Deck/ Concrete Topping 0,9 SF Exterior Walls - Brick 0 SF $23 Exterior Walls - Brick, SF $3,2 Exterior Walls - Stone-Cast 0 SF $,3 Exterior Walls - Stone-Cut 0 SF $,39 Guard - Guards perforated,23 SF $, Lintels - Brick 0 LF Lintels - Steel 9 LF $, Windows - Sash Aluminum Double-pane, SF $3,99 HAMMOD Page 0 of 9 Assessment Date: /2/
Category: Building Exterior Windows Building Exterior Subtotal: $23,2 Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs 3,3 SF $,009 Emergency Battery Packs - Lunchrooms EA $3 Exit Signs - Corridors and Stairs EA 2 $2,2 Exit Signs - Lunchroom EA 2 $2,2 Security System - CCTV 2, SF $,3 Security System - Intrusion Detection 2, SF $, Main Service Power Distribution Independent Electrical Service for emergency power EA $2,92 PA System 2, SF $,00 Lighting and Power Panels - 00 A EA $299 Lighting and Power Panels - Above 00 A EA $,9 Main Distribution Panels - Less than 00 amp EA $03 Electrical System Subtotal: $30,2 Category: Safty System Fire Alarm Fire Alarm_System 2, SF $2,09 Safty System Subtotal: $2,09 Category: Mechanical System HAMMOD Page of 9 Assessment Date: /2/
Category: Mechanical System Air Conditioning Condensing Unit- Roof Mounted - Less than tons EA Air Handling Systems Heating Devices Mechanical Plumbing Temperature Control Ventilation Outdoor Return Fans- Air Handling Unit Type - 000-000 CFM EA $,0 Cabinet Heaters - With Hot Water Coil 2 EA 9 Radiators - Hot Water EA $,39 Hydronic Supply and Return - Galvanized 0 LF $, Pneumatic System 2, SF $,399 Thermostats - Pneumatic 3 EA Exhaust Fans- Roof Mounted - 0-000 CFM EA $92 Exhaust Fans- Roof Mounted - 00-00 CFM EA $92 Roof Mounted Duct Work 0 LF $,9 Type II Exhaust Hood- Warming Kitchen EA 2 $9,9 Mechanical System Subtotal: $33,2 Category: Plumbing System Piping Domestic Piping-Cold Water Horizontal Lines 2, SF $,2 Domestic Piping-Hot Water Horizontal Lines 2, SF $,03 Domestic Piping-Hot Water Return Lines 2, SF $3,0 Sanitary Piping 2, SF $9, Storm Piping 2, SF $,3 Vent Piping 2, SF $,09 Plumbing System Subtotal: $, Category: Classrooms HAMMOD Page 2 of 9 Assessment Date: /2/
Kindergarten (3 rooms) Casework 0 LF $2,0 Ceiling - Lay-in 2,3 SF $,3 Chalk Board LF $,3 Doors - Wood Doors inclu hw 3 EA $903 Floor - Tile/Sheet 2,3 SF $2,3 Lighting - Lay-in EA Marker Board 0 LF $ Storage/ Closet SF $ Walls - Concrete Block,92 SF $,2 Walls - Plaster/Drywall,02 SF $2,9 Work Sink EA $39 Other Instructional Use ( room) ( rooms) Ceiling - Lay-in 0 SF $, Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 0 SF $0 Lighting - Lay-in 3 EA Walls - Concrete Block SF $,9 Casework 32 LF $3,33 Ceiling - Lay-in,0 SF $, Doors - Wood Doors inclu hw EA $,0 Floor - Tile/Sheet,0 SF $,0 Lighting - Lay-in EA $2,2 Lighting - Lay-in 90 EA Marker Board LF $2, Student Lockers - One Tier 0 EA $,2 Walls - Concrete Block,0 SF $,2 Work Sink EA $39 Vacant ( room) Ceiling - Lay-in,90 SF $3, Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile/Sheet,90 SF $,9 Lighting - Lay-in 3 EA Marker Board LF $2 Walls,2 Classrooms Subtotal: $,3 HAMMOD Page 3 of 9 Assessment Date: /2/
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in 390 SF $, Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 390 SF $390 Lighting - Lay-in 2 EA Power Distribution EA $,00 Walls - Plaster/Drywall 2 SF Kitchen Ceiling - Plaster/Drywall, SF $,02 Doors - Hardware 2 EA $23 Doors - Wood Doors inclu hw EA $30 Floor - Tile Quarry, SF $2,3 Lighting - Lay-in EA Serving Line 22 LF Storage/ Closet 0 SF Walls - Concrete Block,2 SF $3,3 Lunch & Multipurpose Room Mechanical/ Service Rooms Ceiling - Lay-in 2,3 SF $,33 Doors - Hardware EA $ Floor - Tile/Sheet 2,3 SF $2, Lighting - Lay-in 9 EA Walls - Concrete Block,2 SF $3,3 Interior Stairs 2 LF $2 Janitor's Closet 3 SF Mechanical/ Service Rooms,330 SF $9,29 Storage Room 39 SF $99 Storage Room SF Restroom Accessories SF $,9 Accessories 3 SF Ceiling - Lay-in 3 SF $ Ceiling - Plaster/Drywall,023 SF $3,0 Doors - Hardware EA $22 Doors - Wood Doors inclu hw EA $2,0 Floor - Concrete SF $3 HAMMOD Page of 9 Assessment Date: /2/
Category: Rooms (Other Than Classrooms) Restroom Floor - Tile Ceramic/ Porcelain 909 SF $,92 Floor - Tile/Sheet SF $ Floor Drain 2 EA $2, Lavatory 0 EA $3,9 Lighting - Lay-in EA $9 Lighting - Lay-in EA Lighting - Pendent/Surface EA $2 Lighting - Pendent/Surface 2 EA Partitions EA $, Partitions EA Student Lockers - One Tier 9 EA $3 Urinals EA $2,0 Walls - Concrete Block,2 SF $3, Walls - Masonry 22 SF $ Walls - Plaster/Drywall SF $2,23 Walls - Structural Glazed Tile 9 SF $2,90 Water Closet EA $,2 Rooms (Other Than Classrooms) Subtotal: $90,2 Category: Building Interior Corridor Ceiling - Lay-in 3,099 SF $9,30 Doors - Side-lite EA Doors - Steel Doors incl hw 2 EA 2 Doors - Steel Doors incl hw 2 EA Doors - Transom Window EA Drinking Fountains - Single Fountain EA $2 Drinking Fountains - Triple Fountain EA Floor - Tile/Sheet SF $3 Floor - Tile/Sheet 3,093 SF $, Lighting - Lay-in 33 EA Walls - Concrete Block 92 SF $2,09 Walls - Plaster/Drywall 2,0 SF $9,9 Walls - Structural Glazed Tile,3 SF $,30 HAMMOD Page of 9 Assessment Date: /2/
Category: Building Interior Corridor Safety Stairs Security Cameras 2 EA $3 Ceiling - Lay-in 22 SF $ Floor - Terrazzo 30 SF $3,90 Handrails 0 LF Lighting - Lay-in EA Stairs - Terrazzo 9 LF $ Walls - Structural Glazed Tile, SF $3,99 Building Interior Subtotal: $3,302 Total Building Cost $29,3 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin EA $2,0 Civil/ Drainage - Catch Basin 2 EA $2, Civil/ Drainage - Site Manhole EA $3,9 Civil/ Drainage - Site Manhole EA $, Fencing - Chain Link 0 LF $3, Fencing - ew Standard Ornamental LF $,3 Fencing - Old Standard Ornamental LF $,33 Fencing - Old Standard Ornamental 2 LF $0, Landscape - Grass 2,22 SF $,93 Landscape - Hardscape- Concrete 3,292 SF $,99 Parkway trees 2 EA $,92 Planting Beds/ Area 29 SF $3 Play Area - Asphalt/ Hardscape SF $ Play Area - Asphalt/ Hardscape, SF $0,39 HAMMOD Page of 9 Assessment Date: /2/
SITE Category: Site Landscape Parking Lot Playground Sidewalks Signage Retaining Wall - Concrete 0 SF $3 Retaining Wall - Concrete 330 SF $,3 Concrete Curbs 3 LF $9 Surface - Asphalt SF $2,9 Surface - Asphalt, SF $2,9 Surface - Concrete 0 SF $,33 Trash Enclosure - Chain Links,300 SF $22,0 Equipment - School Age -2 EA $3, Surface - Poured Surface 2, SF $, Sidewalks - Internal Walks LF $,2 Sidewalks - Perimeter Sidewalks 0,3 SF $2,39 Flag Pole - Flag Pole EA $, Marquee - Building Mounted Back Lighted w/ LED EA Site Subtotal: $,29 Total Site Cost $,29 Campus Total ² ³ $3,, ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. HAMMOD Page of 9 Assessment Date: /2/
Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. HAMMOD Page of 9 Assessment Date: /2/
Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Computer Lab Faculty Lounge Kindergarten Pre School Kindergarten Library st Floor st Floor st Floor st Floor st Floor st Floor 300 02 0 2 3 30 302 303 30 30 0 Rest Room Kind. Library 0 02 03 0 2 3 0 30 90 0 0 0 0 0 0 0 0 0 0 0 2 0 90 0 0 0 0 0 0 0 0 0 0 0 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Addition Kindergarten Kindergarten Kindergarten Other Instructional Use Vacant Other Instructional Use st Floor st Floor 23 2 0 9 2 22 Girls play room n/a n/a Engine Room n/a n/a n/a n/a n/a n/a A 90 00 0 0 00 00 00 0,90 3 9 9 0 2 3 2 0 2 2 2 2 2 2 3 0 0 0 0 0 0 0 0 0 0 0 HAMMOD Page 9 of 9 Assessment Date: /2/