CABLE-RAIL A B B C C PARTS LIST DESCRIPTION SECTION C-C DIMENSION UNITS. Displayed: Millimeters Vista. 1:20 ASSEMBLY DRAWING Cable Railing

Similar documents
DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

INSTALLATION INSTRUCTIONS Aluminum Railing System

PORCH COMPANY PVC PANEL AND DECKORATOR RAILING

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

WHY LANG ALUMINUM RAILING SYSTEM?

PVC Fencing Install Instructions

NOTES 3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL. (42" Height shown, 54" Height Similar) TABLE 1 - RAILING MEMBERS ALTERNATIVE BOTTOM &

Open Up Your View With CABLE SYSTEMS

20,00 20,00 3,00 TYP. R5,00 1,00 TYP. R3,00 TYP. 2X 4,00 THRU 1,00 TYP. 10,00 10,00 (5,00) 10,00 10,00 19,00 7,00 4,50 THRU R15,00 12,00

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

Residential & Industrial Fence

POST INSTALL INSTRUCTIONS

Cable Railing Kit Application Guide

ATLANTIS RAIL Contact Information

Welding Thunder 2015 Fold-and-Go Picnic Table

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES

Horizontal Cable Systems

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

March 1, Fax:

Horizontal Cable Systems

INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS

ALUMINUM PEDESTRIAN/BICYCLE RAILING

Door Hinges Drill-in Hinges

IMPORTANT: Read all sections before you start

IIHS LATCH Measurement Tool Set Drawings REV1. iihs.org

Fortress Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL FORTRESS RAIL ORDERS

INSTRUCTIONS INSTRUCCIONES CONSIGNES

NORTH STAR 4-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Ultimate Flip Lever Astragal Prehanger Installation Instructions

GMRS YAGI. By: Jeffrey Bail - N1BMX

Illustrated Price Catalog US 2018

Machining Services. Plastic Panels Cut to Length Service. Wire Panels Shearing Service

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

The Nantucket Legacy Arbor

Ultimate Push Button Astragal Prehanger Installation Instructions

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

ADI CABLE RAILING FOR METAL. AS&D TM Aluminum Railing. Solutions TM Aluminum Railing

INSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2

Installation and Assembly: Full Service Video Wall Mount

SECTION 19: Endwood Fusion Welded Gate Installation Guide

Multi-Point Astragal Prehanger Installation Instructions

DME Final Project Brief Project Summary

LCD TV WALL MOUNT INSTALLATION INSTRUCTIONS. DUAL Swing Arm (RFWD-110) WARNING

Installation Instructions for Fortress Pure View Railing Panels with Universal (UB) Brackets and Iron Posts

K15.12 ROLLENBAND K15 DOORS

No screws, no glue just add your Raspberry Pi filling!

RAILING. Installation Guide

INSTALLATION INSTRUCTIONS Small Flat Panel Height-Adjustable, Extended Pitch Swing Arm Wall Mount Model KWE-110

Ford Pick Up Rear leaf Spring Kit Installation Instructions

NOTES. 3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL (42" Height shown, 54" Height Similar) TABLE 1 - RAILING MEMBERS

EASY-IN POOL STEP SYSTEM NE132

TUR DOORS SHOWER DOORS

Cottage Picket Gate. 6 in in in in

Safety Glasses Work Gloves Chop Saw with Cutting Disk. Half Round File Pencil Marker


BB1068 / BB1099 SERIES

Franklin Mills Stackable Movable Lateral Instructions

ARCHITECTURAL HARDWARE & ACCESSORIES

Make your railing view friendly with the original stainless steel cable infill for wood, metal, and composite-sleeved wood railing.

Installing AZEK Evolutions Rail

Cable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Top Support Kit: (x2) - 2 Top Supports. Quantities are per bench

Tools & Materials Needed

Now available at participating Feeney (2/14) AF# A. Stores. 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

Simple Woodworking: Outdoor Pitch Chair

Create cable assemblies to fit your style

DOCK WEDGE - STANDARD

RETRACTABLE SCREEN ASSEMBLY AND INSTALLATION INSTRUCTIONS. SINGLE OUTSWING (Retro) / (Full-Size) STEP 1: REVIEW & CHECK FIG.

Contact Information. Telephone (508) Toll Free (800) Fax (508) Web Address

Tools & Materials Needed

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

Tools & Materials Needed

Installation Guide. Cabinet Surface Mount for Single Display

ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013

INSTALLATION MANUAL. 2. Check with local utility companies for locations of underground cables or pipe lines.

GATE INSTALLATION. Tools & Materials Needed. peakproducts.com. Self-drilling screw. Lag bolt

COMPOSITE RAILING INSTALLATION

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

INSTALLATION MANUAL. 2. Check with local utility companies for locations of underground cables or pipe lines.

Pneumatics x x x x x 80 std. 80 x x 160. Pneumatic Joining Plates. Pneumatic End Plates

ASSEMBLY INSTRUCTIONS

Keypad Lock Retrofit Kit for Follett REF Undercounter Refrigerator P/N

CANOPY SYSTEMS PAGE 1 OF 14

Jiminy Picket Vinyl Gate REALLY. Important stuff to know about installing your WamBam gate

IPA FITTINGS FOR REHAU NORDIC DESIGN A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

Installation and Assembly: Flat Panel Pull-out Swivel Wall Mount

ARABIAN Railing Systems

IPA FITTINGS FOR ALUPLAST NORD-LINE A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

2013 Feeney (2/14) # B. Aluminum Railing Systems

Sutton Screened in Awning / Porch

Peeping Tom Vinyl Gate REALLY. Important stuff to know about installing your WamBam gate

NOTE THAT THE HANDLE IS BELOW THE LOCK BASE

Instruction Manual. The Clear Choice! Aluminum Railing. Stainless Railing. Cable Railing. Trellis Systems. Maintenance Free. 316 Stainless Steel

Kai Installation Instructions

Cottage Picket Gate A S S E M B LY I N S T R U C T I O N S

Guide to Cable Railings

Part No. Thread Size B Design Load Approx. Wt./100 A in. (mm) Lbs. (kn) Lbs. (kg)

Transcription:

PRODUCT FMILY DRWING # Displayed: Millimeters Vista :0 SSEMLY DRWING Cable Railing NOTES: () UILDING GENERL CONTRCTOR ND DESIGNER RE RESPONSILE FOR PROVIDING DEQUTE CKING ND CKING CONNECTION IN DECK STRUCTURE FOR CONNECTION OF THE LUMINUM GURDRIL SYSTEM DETILED IN THESE DRWINGS. () WHEN MOUNTING TO CQ TRETED WOOD, ENSURE THT CQ COMPTILE FSTENERS RE USED. () REFER TO THE TH EDITION PROUILT ND VIST DESIGN MNULS FOR CCEPTLE ND LYOUTS. () THE LUMINUM GURDRIL CONFIGURTION REPRESENTED ON THIS DRWING IS IN COMPLINCE WITH THE PPLICLE REQUIREMENTS OF 0 NTIONL UILDING CODE OF CND (NC) 0/ 0/ 0 0/ 0/ 0 ITEM PRTS LIST DESCRIPTION SQURE TOP RIL DJUSTLE CLE CONNECTOR " STINLESS STEEL CLE IN POUND TENSION " END POST SSEMLY ND TO TOP CHNNEL W/ () - # X " SCREWS ND TO OTTOM CHNNEL W/() - # X " PN HED SCREWS OTTOM RIL.0.0 " - MID POST SSEMLY ND TO TOP RIL W/ () - # X " SCREWS ND TO OTTOM CHNNEL W/ () - # X " PN HED SCREWS " CORNER POST SSEMLY ND TO TOP RIL W/ () - # X " SCREWS ND TO OTTOM CHNNEL W/ () - # X " PN HED SCREWS C C PICKET SPCER SUPPORT LEG INTERMEDITE CLE SUPPORT SPCING ETWEEN CLE SUPPORTS OR ETWEEN CLE SUPPORT ND POST NOT TO EXCEED MM. STIR RIL (- " X - ") PICKET GSKET SECTION - SECTION - SECTION C-C 0/ 0/ 0 0/ 0/ 0 0/ 0/ 0 DTE: pril, 0 PRT NME: Vista Level Cable Railing EST. WEIGHT. Lbs. N/ Kg. N/ CLE-RIL

PRODUCT FMILY DRWING # Displayed: Millimeters Vista :0 SSEMLY DRWING Stair Railing NOTES: () UILDING GENERL CONTRCTOR ND DESIGNER RE RESPONSILE FOR PROVIDING DEQUTE CKING ND CKING CONNECTION IN DECK STRUCTURE FOR CONNECTION OF THE LUMINUM GURDRIL SYSTEM DETILED IN THESE DRWINGS. () WHEN MOUNTING TO CQ TRETED WOOD, ENSURE THT CQ COMPTILE FSTENERS RE USED. () REFER TO THE TH EDITION PROUILT ND VIST DESIGN MNULS FOR CCEPTLE ND LYOUTS. () THE LUMINUM GURDRIL CONFIGURTION REPRESENTED ON THIS DRWING IS IN COMPLINCE WITH THE PPLICLE REQUIREMENTS OF 0 NTIONL UILDING CODE OF CND (NC) DETIL '' OTTOM RIL & OTTOM STIR POST C C SECTION -.0 D D E DESIGN MNUL E DISTNCE NOT TO EXCEED 0/ 0/ 0 * SEE NOTE () SECTION - 0/ 0/ 0 DETIL '' TOP RIL & TOP STIR POST ITEM PRTS LIST DESCRIPTION SQURE TOP RIL DJUSTLE CLE CONNECTOR " STINLESS STEEL CLE IN POUND TENSION " TOP STIR POST SSEMLY ND TO TOP CHNNEL W/ () - # X " SCREWS ND TO OTTOM CHNNEL W/ () - # X " PN HED SCREW OTTOM RIL " - OTTOM STIR POST SSEMLY ND TO TOP CHNNEL W/ () - # X " SCREWS ND TO OTTOM. CHNNEL W/ () - # X " PN HED SCREW " MID STIR POST SSEMLY ND TO TOP ND OTTOM CHNNEL W/ () - # X /" PN HED SCREW PICKET SPCER SUPPORT LEG INTERMEDITE CLE SUPPORT SPCING ETWEEN CLE SUPPORTS OR ETWEEN CLE SUPPORT ND POST NOT TO EXCEED MM. STIR RIL (- " X - ") PICKET GSKET..0 SECTION C-C CUTTING INSIDE WE.0 TYP.. TYP..0 TYP.. TYP. STIR SSEMLY STIR RIL PROFILE 0/ 0/ 0 SECTION D-D 0/ 0/ 0 SECTION E-E 0/ 0/ 0 DTE: pril, 0 PRT NME: Vista Stair Cable Railing EST. WEIGHT. Lbs. N/ Kg. N/ CLE-RIL

: CONNECTION DRWING PRODUCT FMILY Displayed: Millimeters Vista DRWING # Connections -/- THRED TPPED HOLES SPCED @.mm EVENLY 0/ 0/ 0 () - # X /" PN HED SCREW 0/ 0/ 0 C D DETIL 'C' CLE CONNECTOR CONNECTION SECTION - 0/ 0/ 0 END POST CONNECTION E DETIL '' OTTOM RIL & END POST PRT ILL OF MTERILS P SquareTop Rail djustable Cable Connector /" Stainless Steel Cable /" Cable End Post P ottom Rail () - # X " PH SELF-DRILLING SCEW () - # X /" PN HED SCREW Qty. Cut N/ N/ N/ N/ N/ 0/ 0/ 0 0/ 0/ 0 DETIL '' TOP RIL & END POST () - # X " PH SELF-DRILLING SCEW () - # X " PH SELF-DRILLING SCEW CLE SSEMLY DETIL 'E' LEG & CLE SUPPORT CONNECTION PRT ILL OF MTERILS Qty. Cut PRT ILL OF MTERILS Qty. Cut /" Cable 0 Corner Post N/ P Picket Gasket N/ P0 Level Picket Spacer N/ P0 Support Leg N/ /" X /" Cable Support N/ DTE: EST. WEIGHT. Lbs. N/ DETIL 'D' OTTOM RIL & CORNER POST pril, 0 PRT NME: Vista Cable Railing System Kg. N/ () - # X " PH SELF-DRILLING SCREW CLE-RIL

Displayed: NTS Millimeters FRICTION DRWING PRODUCT FMILY Vista DRWING # V-M Top weld is on the inside. Weld Locations 0/ 0/ 0 R. Part. 0/ 0/ 0 DETIL - R..0... 0/ 0/ 0. Raw Material: /" x /" luminum Flat ar. lloy: 0 T-.... 0/ 0/ 0 DETIL -. Ø. 0. 0.0. 0.0 Screw Holes Hole.0 Ø..0...0. Drain holes are located under all channel sleeves..0 Weld top sleeve on from outside, and grind flush.. Screw Holes are to be punched on each side of sleeve with centers " offset from each other. 0/ 0/ 0 PRT ILL OF MTERILS V /" Cable Post V Sleeve Retail Top Rail V Sleeve Retail Channel V /" ase Plate /" (" x ") PRT ILL OF MTERILS 0. 0.0 V Square Sleeve Cap N. 0.0 V # x " Flat Head Screw N. 0.0 V # x /" Pan Head Screw N N N PRT N N N ILL OF MTERILS DTE: Name pril, 0 PRT NME: " Cable End Post EST. WEIGHT. Lbs. N/ Kg. N/

Displayed: NTS Millimeters FRICTION DRWING PRODUCT FMILY Vista DRWING # V-M () Weld Locations 0/ 0/ 0 0/ 0/ 0 DETIL -.. 0/ 0/ 0 0/ 0/ 0 0/ 0/ 0.... DETIL -. Ø. 0. 0.0. 0.0 Hole.0 Ø..0..0..0.0. Screw Holes are to be punched on each side of sleeve with centers " offset from each other. Drain holes are located under all channel sleeves.. Screw Holes PRT ILL OF MTERILS V /" Post Retail V Sleeve Retail Top Rail V Sleeve Retail Channel V /" ase Plate /" (" x ") PRT ILL OF MTERILS 0..0 0.0 0.0 V # x " Flat Head Screw N. 0.0 V # x /" Pan Head Screw N N N PRT N N ILL OF MTERILS DTE: Name pril, 0 PRT NME: " Cable Mid Post EST. WEIGHT. Lbs. N/ Kg. N/

Displayed: NTS Millimeters FRICTION DRWING PRODUCT FMILY Vista DRWING # V-M () Weld Locations 0/ 0/ 0 0/ 0/ 0 DETIL -.. 0/ 0/ 0 0/ 0/ 0 0/ 0/ 0. () Welds Locations Corner Sleeve To Post.. DETIL - 0. 0.0. 0.0 Hole.0 Ø..0..0..0... Ø.... Screw Holes. Screw Holes are to be punched on each side of sleeve with centers " offset from each other. Drain holes are located under all channel sleeves. PRT ILL OF MTERILS V /" Cable Post V Sleeve Retail Top Rail V Sleeve Retail Channel V /" ase Plate /" (" x ") PRT ILL OF MTERILS 0.. 0.0 0.0 V # x " Flat Head Screw N. 0.0 V # x /" Pan Head Screw N N N PRT N N ILL OF MTERILS DTE: Name pril, 0 PRT NME: " 0 Cable Corner Post EST. WEIGHT. Lbs. N/ Kg. N/

Displayed: FRICTION DRWING PRODUCT FMILY DRWING # Displayed: : Millimeters Vista V-M Post Cap R. Hand Rail Cut-Out 0/ 0/ 0. 0/ 0/ 0. SECTION -. +/- 0..0 CUTTING INSIDE WE 0. 0. 0.0. 0.0 0/ 0/ 0 ottom Rail Cut-Out. +/- 0..0 0/ 0/ 0 SECTION -..0. 0/ 0/ 0. Drain hole is located under rail cut-outs..0 +/- 0..0 CUTTING INSIDE WE Unmarked Radiuses. PRT ILL OF MTERILS V /" Cable Post /" Post Cap V # x " Flat Head Screw V /" ase Plate /" (" x ") PRT 0. 0.0. 0.0 N N N N ILL OF MTERILS PRT ILL OF MTERILS DTE: Name pril, 0 PRT NME: " Cable tm. Stair Post EST. WEIGHT. Lbs. N/ Kg. N/

Displayed: : Millimeters FRICTION DRWING PRODUCT FMILY Vista DRWING # V-M Ø. Ø. Two holes.mm offset from the centerline..0 0/ 0/ 0 0/ 0/ 0 0/ 0/ 0 ottom Rail Hole R... Part V. +/- 0. () /" Holes Spaced.0mm Evenly 0.0 00. 0.0...0 0..0 Stair Post Connector Fastened to Post Using # x " FH Tek Screw. Fastened To Connector Using - /" x /" Pin..... Drain holes are located under all channel sleeves. 0/ 0/ 0 0/ 0/ 0 PRT ILL OF MTERILS QTY. Cut PRT ILL OF MTERILS QTY. Cut PRT ILL OF MTERILS QTY. Cut " Retail Post 00. 0.0 V # x " Flat Head Tek Screw N/ N DTE: pril, 0 V " Stair Post Connector N N V /" Stair Connector Channel.0 0.0 Name V # x " Flat Head Screw N N V /" x /" Stainless Steel Pin.0 N PRT NME: V0 " ase Plate (" x ") N N EST. WEIGHT. Lbs. N/ Kg. N/ Cable Stair Mid Post

Displayed: FRICTION DRWING PRODUCT FMILY DRWING # Displayed: : Millimeters Vista V-M Post Cap 0/ 0/ 0 0/ 0/ 0 R. Hand Rail Cut-Out. 0/ 0/ 0. SECTION -.0 CUTTING INSIDE WE 0. 0. 0.0. 0.0 0/ 0/ 0 ottom Rail Cut-Out. +/- 0. +/- 0.. +/- 0..0 SECTION -.0 CUTTING INSIDE WE. 0/ 0/ 0 +/- 0..0 +/- 0....0 Drain hole is located under rail cut-outs. Unmarked Radiuses. PRT ILL OF MTERILS V /" Cable Post /" Post Cap V # x " Flat Head Screw V /" ase Plate /" ( " X ") PRT 0. 0.0 N N N N ILL OF MTERILS PRT ILL OF MTERILS DTE: Name pril, 0 PRT NME: " Cable Top Stair Post EST. WEIGHT. Lbs. N/ Kg. N/