Updated information on 26 industries discharging effluents in Ganga river between Kannauj and Varanasi inspected in September 2010

Similar documents
Mercury Minimization Plan City of Otsego

TOBERMORY SEWAGE LAGOON

Groundwater and Surface Water Monitoring Report, Third Quarter 2004

Advancement in Distillation Technology A Green way to Sustainability. Prasanna Deshpande

The ETV Program in Korea Feb. 6 Contents Background Operation ETV Program Status Effectiveness of ETV Program

Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology

Pre-Construction, Construction, and Post- Construction Monitoring Report for Greenland Meadows for July October 2010

INDUSTRIAL FABRICS Dewatering Systems. TenCate Geotube Dewatering Technology

Sludge dewatering. Wolfgang Stump Öko-control GmbH; Burgwall 13a; D Schönebeck

CURRICULUM- VITAE. Married. Name of the Board/ University

Strategic NPDES Permitting The What, the Why and the How E2S2 Symposium 16 June 2010

Zero Spent Wash Discharge Technologies

Software as a Medical Device (SaMD)

Appendix F Surface Water and Sediment Monitoring Results

Appendix-1. Project Design Matrix (PDM)

INDUSTRIAL FABRICS. Geotube Dewatering Technology. Dewatering Systems. Geosynthetics. Protective & Outdoor Fabrics. Aerospace Composites

Listing Report: AB Reissue Date: 01/21/16 This report is subject to annual review

Industrial Research & Consultancy Centre. Between

STUDIES OF NONWOVEN FABRICS FOR WATER FILTRATION

Environmental Working Group. Monthly Report

Monthly Release of Industrial Production Statistics (IPS) Bangladesh Bureau of Statistics (BBS) March/2014 Issue 09

Swastik Technocast Limited

Village of Glenview Appearance Commission

Revision of BS10175:2001. The proposed changes. SCI Consultation Event July 14, Richard Owen

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Recreation Facility Hours

January/2014 Issue 07

Molds & technologies. die. casting. molds

A/C Change-Out Permit Guidelines - Residential

THIS REPORT CONTAINS ASSESSMENTS OF COMMODITY AND TRADE ISSUES MADE BY USDA STAFF AND NOT NECESSARILY STATEMENTS OF OFFICIAL U.S.

TECHNICAL SPECIFICATION OF LT SHACKLE BOLT (G. I. BOLT) WITH NUT AND SPRING WASHER

National Radio Channels. PPM measurement October 2017

BN 7329 / 6476 : 0513 ADITYA

ISO Environmental Technology Verification

Fee: Received By: Date: Application #:

CASMB ENVIS Estuaries, Mangroves, Coral Reefs & Lagoons. Major achievements of CASMB ENVIS Centre ( )

Industrial R&D in India a few insights ( to )

Wednesday, October 19, :19 AM

Dr B Chandrasekaran. Director, CSIR-CLRI

You may review a blank copy of the application form by clicking on this pdf link. *Last Name *First Name Middle *Position Title.

Preparation of requirements. Part I Notification principles and time schedule

PHS Community Services Society Doc. Date Text Additional detail provided:

Aquaculture Regulation CHAPTER ONE Purpose, Scope, Legal Basis, and Definitions

NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013

BEFORE THE NATIONAL GREEN TRIBUNAL, PRINCIPAL BENCH, NEW DELHI

COMMUNICATION OF ENGAGEMENT (COE) FOR UNITED NATIONS GLOBAL COMPACT. October 01, 2014 to October 24, 2016

Dewatering Case Study Rotary Press Versus Screw Press

2. There was no sign on or near Freeman Smith # D-1 SWD well or battery. This is a violation of Part II A. 3. of the permit.

Brief Summary For Proposed SRA Scheme at Village Majas & Mogra, Mumbai, Maharashtra By M/s. Omkar Ventures Pvt. Ltd.

Using the PI System to Create a Smart Campus that Optimizes Energy and Water Operations

A Brief Introduction to the Regulatory Environment of Medical Device Supervision. CFDA Department of Legal Affairs Liu Pei

Dyed Acrylic Fibre Prospects in Asia

Praj Industries Limited. Q2 and H1 FY17 Results. Praj Industries Ltd

Weather and Environmental Services - QMS Manual

Scotian Basin Exploration Project - Aspy D11 CEAA Condition #

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Number of Projects (Completed/ In progress)

CORPORATE GOVERNANCE REPORT

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Advantages of Powder Coating vs. Wet Paint

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13.

NATIONAL GOOD LABORATORY PRACTICE (GLP) COMPLIANCE MONITORING AUTHORITY APPLICATION FORM

Investigation i of potentially contaminated sites - Code of Practice. Richard Owen Ove Arup & Partners Limited

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types):

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA

R&D PROJECTS

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M OCTOBER 7, 2013

ChE 441. Paper Grades and Properties

This specification describes the general requirements for Engineering Services provided to Vale.

INTERNATIONAL. Medical device software Software life cycle processes

Nemko Canada Inc., 303 River Road, R.R. 5, Ottawa, Ontario, Canada, K1V 1H2

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

Overview and Version 3.1.0

Industrial X-ray Tube KL

BKS TEXTILES PRIVATE LIMITE. Fairtrade certified by Flocert

R & D PROJECTS

Counterfeit Cores and the Importance of Supply Chain Management. Micrometals, Inc. IBM 2005 Power and Cooling Symposium

TRANSMITTER MODEL: KAS-2030M

MEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Caroline County Public Utilities Rate Increase Effective August 1, 2018

Resting pulse After exercise Resting pulse After exercise. Trial Trial Trial Trial. Subject Subject

Swiss precision technology for top Swiss quality

Lead-free solder pot contamination

Ionospheric regional forecasting using statistical method for GPS application

Minimum Wage in Gujarat w.e.f October 1, 2015 to March 31, 2016

Yorkville Seasoned MLP Investment Team Recognized Experts

BOARD OF TECHNICAL EDUCATION, UTTAR PRADESH Question Paper Account for Special Back Paper Examination (December Exam)

占 'W"'l 1 剖 "'l1~ 制的 ~

August 23, Gary Savage Faith Energy, LLC. P. O. Box 894 Shreveport, LA

ASX SETTLEMENT PROCEDURE GUIDELINES

R & D Projects

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

2008 Course Programs Schedule

LEE COUNTY TRAUMA SERVICES DISTRICT BOARD OF DIRECTORS MEETING. Thursday, February 11, 2016

TABLE OF CONTENTS FOREWORD... 3 INTRODUCTION SCOPE NORMATIVE REFERENCES... 4

NOTICE OF BOARD MEETING & WORKSHOP

CURRICULUM MAP. Course/ Subject: Principles of Technology Grade: Month: Sept-Oct (Communication) Enduring Understanding

Transcription:

Updated information on 26 industries discharging effluents in Ganga river between Kannauj and Varanasi inspected in September 2010 S. No. Industry Category Date of Effluent quality, mg/l (except ph) Effluent standards Followup action Industries found closed during September 2010 1 1 Mustang Leathers, Unnao Tannery 7 th Sep 2010 The unit was not 2 2 Zam Zam Tanners, Unnao Tannery 7 th Sep 2010 The unit was not 3 3 Arif Tanners, Unnao Tannery 7 th Sep 2010 The unit was not 4 4 Triveni Structures Ltd., Fabrication / 18 th Sep 2010 The unit was not Galvanizing 5 5 Indian Telephone Industries Fabrication / 15 th Sep 2010 The unit was not Ltd., Galvanizing 6 6 Deys Medical Pvt. Ltd, Pharmaceutical 16 th Sep 2010 The unit was not Letter dated 11 th October 2010 was written to the unit for minor improvements. Unit inspected again on 3 rd Feb 2011 and found closed. Letter dated 26 th April 2011was written to the UPPCB for minor improvements in the Unit. UPPCB has informed in Aug 2011 that closure order of the unit has been suspended for 3months. closed closed The water polluting galvanizing section was informed not for last 8 years The Unit was directed to take certain action vide letter dated 11.10.2010. The unit was reinspected on 09.12.2010 and found operational and the treated effluent was meeting the prescribed standards. The unit was again directed to take corrective action on the minor deficiencies observed. The unit informed action taken vide letter dated 10.02.2011 7 7 Hindustan Laboratories Ltd., Chemical 18 th Sep 2010 The Unit was directed to take certain action vide letter dated 11.10.2010. The unit was reinspected on 09.12.2010 and again found nonoperational. The unit was again directed to take corrective action on the minor deficiencies observed, before resuming operation.

Industries complying norms during September 2010 8 1 IFFCO, Phulpur Fertilizer 14 th Sep 2010 14 th Sep 2010 TSS: 33 Ammonical Nitrogen: 22.5 9 2 Mirza International Ltd. Unnao Tannery 8 th Sep 2010 7 th Sep 2010 TSS: 63 BOD: 12.6 COD: 82 Ammonical Nitrogen: 75 The unit utilizes treated effluent for horticulture purpose and is complying with prescribed norms. achieving norms Industries requiring minor improvement during October 2010 10 1 Sangam Structures Ltd., 11 2 Kisan Sahkari Chini Mills Ltd, Farukhabad, U.P. (Sugar Mill) 12 3 Firoz Gandhu Thermal Power Project, Unchahar 13 4 Reliance Industries Ltd. (Unit I), Naini, Electroplating 16 th Sep 2010 The unit was not. Sugar Mill 14 th Sep 2010 The unit was not due to noncrushing season. The unit was reinspected on 1 st Feb 2011. Eff. quality on 1 st Feb 2011 ph 5.61 BOD: 526 COD: 751 Power Plant Sep 2010 Sept. 2010 ph : 6.79 TSS : BOD : 1 COD : 8 Manmade fibre 14 th Sep 2010 14 th Sep 2010 TSS: 47 BOD: 6.5 COD: 69 ph The unit was found not. Letter dated 11 th October 2010 was written to the unit for minor improvements. The unit was not in Sep 2010 due to noncrushing season. Letter dated 11 th October 2010 was written to the unit to ensure certain actions before start of operation in crushing season. The unit was reinspected on 1 st Feb 2011 and found not complying standards. CPCB issued direction on 10 th May 2011 u/s 5 of the EPA. The unit has submitted the compliance report vide letter dt. 31 st May 2011 stating that the unit has closed production since 11 th April 2011. The unit will be inspected in the coming crushing season for the verification of the directions. The unit was complying standards and ash pond overflow was not observed. Letter dated 6 th October 2010 was written for installation of ash water recirculation system. The unit was complying standards. The unit has been asked to maximize the reuse of treated effluent.

14 5 Reliance Industries Ltd. (Unit II), Naini, Manmade fibre 14 th Sep 2010 14 th Sep 2010 TSS: 15 BOD: 9.1 COD: 49 15 6 Ekta Dairy Pvt. Ltd., Dairy 16 th Sep 2010 16 th Sept. 2010 ph : 8.12 TSS : 61 BOD : 7.9 COD : 41 16 7 Shri Lakshmi Cotsyn Lt., UPSIDC I.A., Malvan, 17 8 A.R. Polymers Pvt., Ltd., 18 9 Dugdh Utpadak Sahkari Sangh Ltd., 15 th Sep 2010 15 th Sept. 2010 ph : 8.26 TSS : 68 BOD : 9.5 COD : 87 15 th Sep 2010 15 th Sept. 2010 ph : N/A TSS : N/A BOD : N/A COD : N/A Dairy 15 th Sep 2010 15 th Sept. 2010 ph : 7.6 TSS : 10 COD : 58 BOD : 12.5 Industries issued directions for closure after September 2010 19 1 Rahman Industries Ltd., Unnao Tannery 7 th Sep 2010 7 th Sep 2010 TSS: 538 BOD: 54 COD: 321 Chromium: 4.2 20 2 Bharat Pumps & Compressors Ltd., Engineering unit 9 th June 2011 TSS: 86 BOD: 29.4 7 th Sep 2010 7 th Sep 2010 TSS: 5, 12, 4 BOD: 3.8, 2.7, 150 5.59 5.59 150 The unit was complying standards. The unit has been asked to maximize the reuse of treated effluent. The unit was complying standards. Letter dated 11 th October 2010 was issued to the unit for minor improvements. Letter dated 11 th October 2010 was issued to the unit for minor improvements. The unit was found closed during. Further, the unit informed vide letter dated 3 rd February 2011 that it is removing machineries etc. after closer order issued by UPPCB. The Unit meets effluent standards. Letter dated October 11, 2010 send to the unit for minor improvements. Closure directions issued on 11 th Oct 2010. Unit inspected again on 16 th Nov 2010 and modified directions for certain actions issued on 1 st Dec 2010. Unit inspected again on 9 th June 2011 and modified directions for regular compliance issued on 9 th Aug 2011 Closure directions issued on 11 th Oct 2010. Unit represented by letter dated 19 th October 2010 that water used only for cooling purpose. Unit was

5.8 COD: 39, 28, 34 O&G: 13.5, <5, inspected on 15 th July Nov 2011. The unit is to be inspected again to verify compliance. 21 3 J.S. International Unnao Slaughter house 22 4 Shri Lakshmi Cotsyn Limited, Village and Post Aung, Industries issued directions for certain actions after September 2010 23 1 Banthar Industrial Pollution Control Company (CETP) Tanneries CETP 89 th Sep 2010 89 th, Sep. 2010 ph : 8.20 TSS : 936 COD : 1193 BOD : 260 15 th Sep 2010 15 th Sept, 2010 ph : 8.01 TSS : 104 mg/l COD : 5 mg/l BOD : 121 mg/l 8 th & 9 th Sep 2010 8&9 th Sep 2010 TSS: 54 BOD: 139 COD: 412 6 th Jan 2011 TSS: 277 BOD: 156.5 COD: 581 21 st July 2011 TSS: 54 BOD: 12.8 COD: 291 50 5.590 Based on the, direction for closer was issued vide CPCB s letter dated October 12, 2010. Upon receiving the proposal for upgradation of treatment plant, the unit was allowed to operate at % of capacity vide CPCB s letter dated December 3, 2010. During of the unit on January 6, 2011 the unit was found not. The unit has been again inspected on June 9, 2011. As per the report the industry is meeting effluent standards. Based on the unit was issued direction for closer vide CPCB s letter dated October 12, 2010. The unit vide its letter dated November, 2010 informed that necessary modifications in treatment plant have been carried out and requested CPCB to withdraw the direction. The unit was inspected on January 6, 2011 for verification of claims made by them. Vide letter dated February 9, 2011 CPCB permitted the unit to start production. The unit has been inspected on July 27, 2011 and the report indicated that the unit is meeting the standards. Directions for certain actions issued on 11 th Oct 2010. CETP reinspected on 6 th Jan 2011 and modified directions issued on 18 th April 2011. CETP has been inspected again on 21 st July 2011 and the CETP is found nearly complying the norms.

24 2 Sadaf Enterprises Pvt. Ltd., Unnao 25 3 Kisan Sahkari Chini Mills Ltd, Farukhabad, U.P. (Distillery) Industries issued showcause notice after September 2010 26 1 Unnao Distillery & Breweries Ltd., Unnao Tannery 7 th Sep 2010 7 th Sep 2010 TSS: 1057 BOD: 38 COD: 229 9 th June 2011 TSS: 40.3 COD: 67.5 Distillery 14 th Sep 2010 (closed since 22.01.2009) The unit was not. The unit has a facility to utilize effluent in biocompost making. Distillery 8 th Sep 2010 8 th Sep 2010 TSS: 7854 BOD: 12700 COD: 44847 TDS: 60135 N.A. (The unit has a facility to utilize effluent in biocompost making) 8 th Sep 2010 RO reject disposal on land not allowed April 2011 N.A. (The unit is operating a facility to utilize effluent in biocompost making) Directions for certain actions issued on 11 th Oct 2010. Unit inspected again on 9 th June 2011 and modified directions for regular compliance issued on 22 nd March 2011 The unit was found not. The unit has three lagoons of 39,000 kl for storage of spent wash. Rain water was found stagnant in the lagoons. CPCB issued direction on 11 th Oct 2010 u/s 5 of the EPA, 1986 to ensure certain actions before restart of operation. The unit has been inspected again on 01.02.2011 and found closed. The unit is not since last two years. The unit was found disposing concentrated spent wash reject of RO plant on land due to failure of MEE in Sep 2010. This was in violation of guidelines. CPCB issued showcause notice dated 11.10.2010 under section 5 of the Environment (Protection) Act, 1986. The unit replied vide its letters dated 4 th and 16 th Nov 2010 and 23 rd March and 4 th April 2011. Observing utilization of effluent in biocompost making and installation of MEE and successful trial of incineration of RO reject, the unit has been issued modified direction on 03.05.2011 for regularly achieving zero effluent discharge either through concentrationincineration system or through co in cement kiln/furnaces of thermal power plants/steel plants. The unit submitted a compliance status vide letter dt. 28.05.2011. CPCB has asked the unit to submit latest compliance status. The unit is to be inspected again to verify compliance.