Operating & Maintenance Instructions 25 Injection Moulding Machine

Similar documents
Trade of Toolmaking. Module 5: Press Tools, Jigs & Fixtures, Mouldmaking Unit 10: Mould Assembly Phase 2. Published by

Extrusion. Process. The photo below shows a typical thermoplastic extruder.

The Virgo/Libra Steam Engine

Operating & Maintenance Instructions 280 Hot Wire Sculptor

Mold Design. 5. Mold Structure. Bong-Kee Lee School of Mechanical Engineering Chonnam National University

Injection moulding BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS FACULTY OF MECHANICAL ENGINEERING DEPARTMENT OF POLYMER ENGINEERING

OPERATING AND MAINTENANCE MANUAL FLEXI MULTI-MOULDER (HAND FEED)

Operating & Maintenance Instructions 320 Dome Blowing Unit

TITAN-BIT KEY-CUTTING MACHINE INSTRUCTION MANUAL

M4 Foot Operated Underpinner Instruction Manual

Trade of Toolmaking. Module 5: Press Tools, Jigs & Fixtures, Mouldmaking Unit 7: Injection Moulds Phase 2. Published by

Injection moulding. Introduction. Typical characteristics of injection moulded parts

Injection moulding BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS FACULTY OF MECHANICAL ENGINEERING DEPARTMENT OF POLYMER ENGINEERING

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

DESIGN AND DEVELOPMENT OF FAMILY INJECTION MOULD FOR INNOVATIVE PLASTIC IN AND INNOVATIVE PLASTIC OUT

JVice Care and Maintenance Thanks for purchasing a Jvice. If properly looked after your Jvice will give a lifetime of tying pleasure.

UNPACK & ASSEMBLY. Done! CAUTION! THE MILL WILL BE VERY HEAVY - GET ASSISTANCE Pepe Tools.

Molded Parts and Mold Design

ETCHING PRESS MANUAL

CHAPTER 5: MOULDING PROCESS

Factors to Consider in Plastic Molded Design

Multiflex. Trouble Shooting Guide. Thermoplastic Elastomers. Injection molding. Extrusion. Overmolding. Trouble Shooting Guide

DO35 MAINTENANCE INSTRUCTIONS

INJECTION MOULDING OF PLASTICS INJECTION MOULDING

Installation Manual Porter Road, Sarasota FL fax

Single punch tablet press. Operation Instruction

Design Guidelines for Injection Molding

Design of Singe Impression Injection Mould for Lower Bearing Cover

Mechanical Frappe Press

UNPACKING. Thank you for purchasing the Manual Capsule Filling Machine from KARISHMA PHARMA MACHINES.

LX1 Maintenance Manual for Model LX1B. Table of Contents 1. GENERAL DISASSEMBLY, ASSEMBLY AND ADJUSTMENT COMPONENTS...

CARL HANSER VERLAG. Herbert Rees. Mold Engineering 2nd edition

MBM Sprint 3000 Booklet Maker

FBX1104P FBX1104 FBX1106P FBX1106

Foster KeenCut SteelTrak Substrate Cutter

6043 DESIGN AND TECHNOLOGY

30 LITRE MINI CEMENT MIXER. Model CCM50 Part No OPERATING & MAINTENANCE INSTRUCTIONS

UNPACK & ASSEMBLY. Done! CAUTION! THE MILL WILL BE VERY HEAVY - GET ASSISTANCE Pepe Tools.

Custom Pendant- Hardwire Assembly and Installation Instructions

CHAPTER 4: METAL CASTING PROCESS

Intellipaper Testing Machine Manual

8 Drawer Chest. Assembly Instructions - Please keep for future reference. 002 xx 4537

ILFORD SPORTSVIEW PROJECTOR INSTRUCTION BOOK

3D Printing with the Lulzbot 4 Alyssa Schwartz on 7/2/2018

CHAPTER FIVE Polymer Forming

VARIABLE SPEED WOOD LATHE

University of Arizona College of Optical Sciences

SUBMITTED BY: MANEET KOHLI ROLL NO.

8-Ton Manual Splitter OWNER S MANUAL

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward.

WARNING. Read and become familiar with this manual BEFORE operating unit.

S E L E C T I O N. Arm Curl. User manual

Playground Assembly Instructions

INSTRUCTION MANUAL. Single language version and parts diagrams can be down loaded from

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

-- Gym Glide -- (Recreational Game Standard) Installation Instructions

UNDERPINNERS CS 88 & CS 89 FOOT-OPERATED PNEUMATIC. Technical and User Manual. Version 1 au 12 / 01. Cassese / Communication

Maintenance Information

The Ensat self-tapping threaded

...thoroughly tried and tested!

Midwest RDH Handpiece Repair Procedure

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Vanity Installation Instructions

Installation Instructions

MatterHackers. How to Install an E3D v6 HotEnd on a Lulzbot. Upgrade your TAZ with a shiny new E3D hotend. Written By: Ryan Lutz

Operators Manual (Manual A)

The Ensat self-tapping threaded insert...

1500HD Assembly & Operation Manual 1500 lb. Capacity Motorcycle Lift

Example 33, Three-Plate Injection Mold with Stripping Device for a Precision Magazine

PRS Retro Z-Axis Installation

CHAINSAW SHARPENER MODEL: ECSS-1

Assembly Instructions. Beta Prusa DualX 3D Printer

Tooling Approving Report

REC Series Rack Installation Guide

Virutex Edge Banders Operating Manual Model EB25

D E S I G N A N D M A N U F A C T U R E : C O U R S E M A T E R I A L

Part 7 Assembling the X axis

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

Electric Staple/Nail Gun

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

FOLDING MACHINE PF-45A OPERATOR MANUAL 1. FUNCTION

Javelin Integra Inspired Design Precision Engineering

ENGLISH (Original instructions) INSTRUCTION MANUAL. Shear Wrench 6922NB DOUBLE INSULATION. IMPORTANT: Read Before Using.

SERVICE MANUAL AND PARTSLIST

ABM International, Inc. Navigator Assembly Manual

Installing flat panels on the MPL15 wall mount

Mould Precision Co., Ltd

LED MIRROR CABINETS 3612-L-6560

x 43 Wood Lathe

Mustang RTR Rear Diffuser Splitter Assembly Installation Instructions CDC#

FBX-PA-2AC. Third edition : April No

B235 Mobius Sconce Page 1 of 6

Mobile Weapons Storage System Specifications

Stall warner - retrofit installation - XS

CONTENTS PRECAUTIONS BEFORE STARTING OPERATION PREPARATION FOR OPERATION CAUTIONS ON USE OPERATION

600mm COMPOUND MITRE SAW ASSEMBLY INSTRUCTIONS. MODEL NO: MBS600D Part No: GC05/12

accidents which arise due to nonobservance and the safety information herein. SPECIFICATIONS

The wick in your heater needs replacing if, after repeated cleanings, any of the following conditions still exist:

Titan Aero Assembly. Titan Aero Assembly. Learn to assemble your Titan Aero. Written By: Gabe S e3d-online.dozuki.

MM750 Installation Instructions

Transcription:

Operating & Maintenance Instructions 25 Injection Moulding Machine Table of Contents 1. Health and Safety Information... 2 2. Upon Receipt... 2 3a. Temperature Controller Settings (Brainchild Controller)... 4 3b. Temperature Controller Settings (Panasonic Controller)... 4 4. Mould Clamp... 5 5. To prepare for use... 9 6. Shutdown and Changing Colours... 13 7. Design requirements and tips for the design of an injection Moulding die... 13 8. Mould Specifications... 14 9. Standard Material Choices... 15 10. Electrical Supply and Connection... 16 11. Connection Diagram... 17 1

1. Health and Safety Information Hot Surfaces Surfaces of the 25 Injection Moulding Machine may become hot in use. Please take care when using the machine, in particular around the nozzle at the end of the heater barrel. The 25 Injection Moulding Machine is intended for the injection moulding of thermoplastic materials which can be moulded at temperatures under 200 C. Do not use materials with a moulding temperature over 200 C. Do not attempt to mould materials with a flash point under 200 C. Always check the MSDS of any material prior to using it in the 25 Injection Moulding Machine. If you are in any doubt as to the source and characteristics of a material that you wish to use in the 25 Injection Moulder, seek advice before loading it into the machine. 2. Upon Receipt Unpack carefully and fit the rack guard immediately, if not already fitted, using the 2 x M4 screws provided.! WARNING! There is a trapping hazard between the teeth of the rack and the top rack bush until the rack guard is fitted! The capstan handle assembly is fitted to the machine as follows: 1. Remove the M6 socket head screw from the pinion shaft on the upper right hand side of the machine 2. Remove the securing tape from the key in the pinion shaft 3. Fit the capstan handle assembly, ensuring that the key is still in position. 2

4. Secure the capstan assembly using the M6 socket head screw. It is recommended that the machine be firmly secured to a work top using M10 or similar. The ideal work top height is approximately 850mm as it will be necessary for the operator to see into the loading hopper. Your machine may have some evidence of residual material in the region of the injection nozzle. This will be from testing prior to dispatch and will purge during the first few operations. 3

3a. Temperature Controller Settings (Brainchild Controller) Switch on the machine and the temperature controller will illuminate. The upper display coloured red shows the actual temperature of the injection barrel and the lower green display is the set temperature, which needs to be set by the operator. Press and hold the up or down button as appropriate to adjust the set temperature. Press the up or down button once makes one digit illuminate more brightly. Press again to scroll the bright digit. Press and hold to increase/decrease the value. 3b. Temperature Controller Settings (Panasonic Controller) Switch on the machine and the temperature controller will illuminate. The upper display shows the actual temperature of the injection barrel and the lower display is the set temperature, which needs to be set by the operator. To adjust the set temperature, press the Mode button on the controller. Adjust the temperature as required using the and buttons. Press Mode to save the new set temperatures. 4

4. Mould Clamp (a) Opening and closing Open the mould clamp by pulling the lever upwards. After moulding, some pressure may be requested to do this. Close the mould by pushing the lever downwards until it clicks over centre. (b) Adjusting for different mould sizes. The mould clamp can be adjusted for different sizes of mould using the hand wheels on the right of the machine. Adjust for a firm over centre resistance and lock the setting using the locking hand wheel. Once close to the correct setting a very small amount of adjustment will have a considerable effect to the clamping force required. Too little clamping force and the incoming material will force the mould apart. Too much clamping force will make opening the mould difficult. 5

(c) Adjusting the nozzle position When changing moulds, it may be necessary to adjust the nozzle position, so that it aligns with the entry hole in the injection moulding tool. Adjust as follows. 1. Slacken the 4 M8 bolts using a 13mm spanner. 2. Slide the entire heating assembly so that the nozzle aligns with the tool. 6

3. Check alignment by pushing nozzle onto mould using the capstan handle. 4. Secure the 4 M8 bolts. 7

(d) Stripper Plate The mould clamp is fitted with a stripper plate, to actuate any ejector pins fitted into the injection moulding tool. When the mould clamp is opened fully, the stripper plate moves forward, pushing onto any ejector pins that protrude from the centre of the tool. 8

5. To prepare for use Switch on the machine and set the temperature. Fit a mould and adjust the mould clamp as described in section 4. Raise the injection ram fully up and feed granules into the hopper. The granules will spill into the injection barrel. Continue feeding until the granules are 6-10mm (1/4-1/2 ) from the top of the barrel. DO NOT FILL ABOVE THIS POINT AS SURPLUS GRANULES WILL BE WASTED AND MAY MELT ONTO THE HEATED PARTS OF THE MACHINE BELOW Feeding granules in to the hopper Allow the granules to heat up fully. For a first run, this may takes 5-8 minutes. After this, top up the granules after each moulding, so that the material at the bottom of the ram is always hot. Close the mould using the mould clamp. 9

Smoothly but firmly rotate the capstan to inject the molten plastic into the mould. When the mould is full, the resistance on the handle will increase significantly. Should you continue to push at this stage, you will see the mould begin to open under the pressure. Hold the pressure for approx 10 seconds. This allows the material in the runner to freeze, preventing the pressurised plastic forcing back out of the mould. 10

Return the capstan to its rest position, with the ram raised. Refill the hopper ready for the next injection. Doing this at this stage provides a useful dwell, to allow the moulding to cool. Release the mould clamp. If the tool is fitted with an ejector, lift the handle fully to eject the part. 11

Inspect the part If the moulding has a flash on the lower part, either the mould clamp is too loose, or the pressure applied to the capstan was too high. If the moulding is incomplete, either the pressure applied to the capstan was too low, or the mould was cold. It can take a few consecutive runs to warm the mould, especially for parts with thin sections. If the surface of the part is rippled, the mould is too cold. When this occurs, the hot plastic hits the cold mould and freezes. The molten core of plastic then rolls over the frozen skin. This repeats, giving the rippled effect. 12

6. Shutdown and Changing Colours When the session is finished do not add further granules, simply switch off and allow the machine to cool. The residual material in the barrel and valve at the injection point will be reheated when next used. If it is required to change colours the new material can purge the old material out without a mould in place. This may seem wasteful but it is standard practice and the easiest way of changing colours. There is normally no need to dismantle the machine for cleaning. 7. Design requirements and tips for the design of an injection Moulding die 1. Make the outer shape of the mould to the dimensions in Part 8. It can be round or square. 2. A draft angle of no less than 1 should be applied to any vertical faces of the mould. 3. The plastic will contract quite significantly as it cools. Therefore, if you put most of the female detail on the right (non-ejector) side of the mould, and most of the male detail on the left (ejector) side of the mould, the part will tend to shrink away from the right side, and grip the ejector side. This makes ejection of the part much easier. 4. The feed hole should be around 5mm in diameter, with a countersink to accept the nozzle. 5. Mould sections should be approx 2-8mm in thickness. Large variations in thickness may cause different shrinkages and distort the completed part. 13

8. Mould Specifications 14

9. Standard Material Choices Material Suggested Moulding Temp Comments Polyethylene 180 C Polypropylene 190 C Polystyrene 180 C Low temperature and moulding force required. Polyethylene is a soft and fairly pliable material once moulded. This is easy to mould and provides a firm moulding. Our standard material is 20% talc filled for rigidity. Polystyrene produces a rigid and more brittle moulding than the other materials. Be aware that styrene can give off fumes at higher temperatures, so a well ventilated area should always be used. 15

10. Electrical Supply and Connection! IMPORTANT! The wires in this mains lead are coloured in accordance with the following code: General USA Green & Yellow Earth Green Blue Neutral White Brown Live (Hot) Black General The green and yellow wire must be connected to the terminal marked with the letter E, or the earth symbol, or coloured green and yellow or green. The blue wire must be connected to the terminal marked with the letter N, or coloured blue or white. The brown wire must be connected to the terminal marked with the letter L, or coloured brown or red. USA (115V) The green wire must be connected to the green pin (the largest). The white wire must be connected to the silver pin. The black wire must be connected to the brass pin. Warning - read instructions before installation and use. If in doubt about electrical supply or connection refer to your supplier or consult a qualified electrician. 16

11. Connection Diagram 17