INTERNAL LININGS INSTALLATION GUIDE

Similar documents
CEILINGS INSTALLATION GUIDE

4256HM JAMES HARDIE MONOLITHIC CLADDING

rondo exangle drywall finishing sections

INSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd

pacific build supply ltd

Duralam Wall Linings. Installation Guide. Duralam 6mm Compact Laminate Wall Panelling Installation Guide

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Installation Instructions

UCO Vistabord Fixing Manual

Horizontal Shaft Wall

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS

September 10, 2009 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

Wall Installations. Chapter 16 Wall Installations 16. 1

Installation Instructions

Installation Guide. Versilux Lining INTERIORS

Installation Instructions Palladium Square Edge Panels

Series Sloped glazed Curtain wall. Installation Instructions

INSTALLATION MANUAL STORAGE

HeatBoard Joisted Floor System

Balustrade Systems / Installation Instructions

INSTALLATION INSTRUCTIONS

How to Install Elite Bayside Beadboard

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

The WANZ Guide to Window Installation

STEEL FRAMING WEATHERBOARD SYSTEM

DESIGN AND INSTALLATION GUIDE

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

Installation Instructions

How to repair a wall or ceiling FREE

9.0 PS Pacbld Sidings

Gyproc Proflex Access Panels - Installation Guidance Notes

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

Make every component count.

Plasterboard Ceiling Systems

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

The Passive Fire Protection Handbook

Shaft Wall SYSTEMS 210 INSTALLATION 211. Shaft Wall systems are fire rated non-load bearing walls used for shafts and service ducts.

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

Chapter 17 - Porch Trim

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

RhinoArt Decor Polystyrene Mouldings

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

JAMES HARDIE RIGID AIR BARRIERS

WET AREA PANELLING. Designer Walls. Fast

WORK METHODS FOR THE RENOVAID WOOD RENOVATION SYSTEM

Contents. Multi Functions Board

Wet Area Panelling. Linear Series

installation manual m y w a l l a r t. c o m

WOODWORKS Walls. Installation Instructions WALL

Installation Manual for Thermo Panel

Installation instructions: Elements Vulcan+ Newport Hector Cladding

LuxCore Installation Instructions

Balustrade System Installation - Cambridge & Huntington

DESIGN AND INSTALLATION GUIDE

Method of Build 1. Fire. Sound

Installation Instructions

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

How To Install Windows: Nail-Fin Application

Platinum Swing Panel Installation Instructions

Brick, blockwork and concrete walls are also suitable providing the surfaces are flush without excessively wide mortar joints.

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

METAMORPHOSIS INSTALLATION GUIDE

BioPrism Solid Surface

Rondo exangle. Drywall Finishing Sections. for interior applications only revised: april 2008

Installation Instructions Stainless Steel Wall Panels

Series Advanced and alternate. Installation Instructions

plasterdesign trade range cornice

Cobra X Q Construction Tips Construction: Bel y pan

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

SLIM TRIM MOULDING INSTALLATION METHODS

WARNING. Not suitable for children under 36 months Contents

BBS Rusticated & Splaycut Cavity System

Jabiru Aircraft. Fit Ailerons

Installation Instructions

Installation Instructions

Installation Guide. PineRidge Lining INTERIORS

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

TRESSES INSTALLATION GUIDE

Column and Beam Fire Protection SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator

Vanity Installation Instructions

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

General Installation Guidelines

IMPORTANT: This product cannot perform its intended function if not properly installed.

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5QS


Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Installation Guide. ExoTec TM Facade Panel And Fixing System COMMERCIAL

Nanton Grain Mill Assembly

COMMERCIAL VISUAL INDEX LOBBIES COMMERCIAL VISUAL INDEX NURSE S STATIONS. General Safety. General Safety. Kitchens

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Transcription:

Your partner in building solutions INTERNAL LININGS INSTALLATION GUIDE

General remarks on This installation guide is to be used in conjunction with: specifications Architects specific details Pacific Build Supply Corporate Folder Pacific Build Supply Eterpan linings can be used for structural bracing. For more information refer Pacific Build Supply Bracing Manual. This guide covers the use ofeterpanand europanlining in internal wall applications. The methods selected for this guide are based on experience from sites & have proven to give the best results. The sequence of the work steps as well as their implementation may vary more or less due to different building situations. Further details are available in the Pacific Build Supply folder or from the website www.pbs.co.nz

Preliminary checks Ensure that new / existing support framing is suitable. NZS3602 Timber and wood-based products for use in buildings for timber treatment allowable moisture content NZS 3604 Timber framed buildings Framing studs to be provided at 600mm centres max. and noggings at 1200 centres max. The minimum size for steel stud framing shall be 64mm deep x 35mm wide and 0.55 BMT, steel sections shall be suitably coated to comply with NZBC durability requirements. For tiled wall applications it is recommended to use 0.75mm BMT steel framing. Ensure eterpan& europansheets are stored flat on a flat surface, covered and kept dry. CURVED RADII Min. Radius Framing Centres 6.0mm thickness 5000mm 400mm 9.0mm thickness 7000mm 400mm

Products eterpan Refined or europan sheets for Internal Linings. For exposed fixings use 40mm x 10g SS screws with SS 10g cup head washers. Or use No 8 x 40mm Surefastscrews for countersunk fixings (eterpanrefinedonly). 40 x 2.8mm SS clouts for nail fixing, available in 5kg packs (eterpanrefinedonly). Sika Nailbond PREMIUM, Sika primer -3N for adhesive fix. Or BostikPanelTackHM, Primer MSP, Primer SX and double sided tape for adhesive fix. BostikSAFEFIX Sealant, available in 330 ml or 600 ml sausage. PE Foam tape, 48mm x 1.6mm Plaster Flushing Sytems. Aluminum sockets 0.7mm x 70mm and 9 x 6mm Foam tapes for expressed joints. 70mm x 30m roll PVC Duct tape. For separation between dissimilar materials. 3m PVC Joint moldings in 4.5mm, 6.0mm & 9.0mm sizes. 3m PVC Control Joint moldings.

Step 1: sheet fixing FLUSH JOINTS (eterpan Refined only) Ensure a 6mm building tolerance gap is provided at the floor and ceiling junctions with Pacific Build Supply Internal Linings Fix sheets from centre out ensuring sheets are level. Control joints; vertical control joints at 7.2m centre intervals general applications. Control joints; Horizontal control joints at intermediate floors and 5.4m intervals Control joints required to coincide with seismic or construction joints. All edges of the sheets have to be supported by a stud or nogg. Ensure 1 2mm gap between sheets at vertical, horizontal, internal and external corner joints.

Step 2: sheet fixing layout EXPRESSED JOINTS (eterpan Refined and europan) No specific sheet lay out required for expressed joints. Fix sheets from centre out For timber framing min. 70mm wide timber required for expressed joints For metal channel framing, two channels required for expressed joints. Expressed joints required at changes in direction All edges of the sheets have to be supported by a joist or nogg.

Step 3: Further sheet joint options PVC jointers Butt joint

Step 3: Further sheet joint options Cover batten Control joint

Step 4: Fix Sheets option 1: countersunk fixing Cut eterpan Refined, drill & countersink holes for screw fixed applications. Screw or clout fix eterpanrefinedsheets @ max. 200mm crsto timber framing.

Step 4: Fix Sheets option 1: countersunk fixing Ensure minimum edge clearance of 12 mm for fixings through eterpan sheets. Contact adhesive can be used to intermediate nogs instead of screws.

Step 4: Finishing for eterpan Refined Clean & prepare screw holes ready for filling. Fill screw holes with Nuplex Epoxy Furring cream and scrape flush. (Don t over apply Epoxy) Flush off PAL contract filler. Sand screw holes smooth and flush Plaster finishing to joints with Eterstop joint flushing and finishing compound or similar approved product Use paper joining tapes for internal applications and mesh tapes for external soffits

Step 4: Fix Sheets option 2: featured fixings Cut eterpan Refined or europan. Pre-drill holes. Screw the sheets using SS screws and 10G cup washers. When installing Pictura, use a protective fixing tool on the drilling machine (see picture).

Step 4: Fix Sheets option 2: featured fixings Ensure minimum edge clearance of 12 mm for eterpanrefinedand 25 mm for or europansheets. Contact adhesive can be used to intermediate nogs instead of screws.

Cavity on aluminium rails Step 4: Fix sheets option 3: Concealed fixing with glue CONDITIONS Glue can be used to bond PBS fibre cement sheets onto timber or steel framing. Bonding surfaces must be primed and adhesives applied under dry conditions, with no rain or condensation on sheets or rails. Air temperature should not be lower than +5 degrees C or greater than 30 degrees C, humidity must not exceed 90% Prime the timber framing to be glued with SIMSON Primer SX Black Apply with a clean dry cloth or brush. Allow to dry for at least 10 minutes but no longer than 6 hours Divide cladding into sections to allow sufficient drying time for primers & not to leave tapes or adhesives exposed for too long.

Cavity on aluminium rails Step 4: Fix sheets option 3: Concealed fixing with glue Cut & dry fit the fibre cement sheet. Detail cut edges and dust off. Apply SimsonMSP Primer50mm around sheet perimeter and to stud lines where glue will make contact. Simson Q primer required for Etercolor Apply with brush or roller. SimsonMSP Primermust dry for at least 60 minutes but no longer than 6 hours or recoating is necessary. Simson Q primer must dry for 120minutes. NOTE: with NATURA, NATURA PRO, PICTURA, TEXTURA & ETER-COLOR sand the glue lines on the sheet back aggressively with 80g dry sandpaper before priming.

Cavity on aluminium rails Step 4: Fix sheets option 3: Concealed fixing with glue Double sided adhesive HDPE foam tape 3mm x 8 mm Apply vertically & horizontaly without interruption. Cut with a sharp knife. Do not remove the protection foil from the tape at this point. NOTE: the tape has three functions: To hold the sheet up whilst the glue cures (retain sheer weight on packers) To stop glue oozing into the expressed joint To maintain 3.0mm integrity to glue line (tape must be applied to the timber to the center of the sheet to stop glue being depressed)

Cavity on aluminium rails Step 4: Fix sheets option 3: Concealed fixing with glue Apply Simson Paneltack HM without interruption holding caulking gun at right angles to the frame with the triangular notch trailing Apply a continuous 9.0mm x 9.0mm triangular bead to all studs & noggs where foam tape is installed. Install prefinished sheets as per step 5. SimsonPrimer P to Face of framing Simson Primer MSP to Back face of board

Cavity on aluminium rails Step 5: Structural Adhesive Fix fit the sheets NOTE: It is essential to fit the panels within 10 minutes of applying the PaneltackHM to prevent skin formation on the adhesive. Remove the protective covering off the double sided tape. Support the sheer weight of the sheet with shim or block. Position base of the sheet to glue line. In a hinging motion lean sheet onto the 9.0mm triangular bead of glue. Check sheet position before applying pressure to the panel to ensure bonding to the adhesive tape. Brace if necessary to achieve a flat and uniform surface or use temporary screw fixing until the PaneltackHM adhesive has cured. Use PVC 10mm spacers to achieve a consistent negative detail