THE STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION

Similar documents
Appendix B. Keene NH

MIPSYCON GRID RESILIENCY. David Flaten Electric Distribution Standards November 10, 2015

Customer Requirements RF Antenna Installations

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

Appendix 6-F: Electric and Magnetic Field Study Report

Example Plans: Business Signs (Not For Construction)

ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT

Xcel Energy Storm Simulation in conjunction with EPRI Spring IEEE/PES July 2015 Dave Flaten and Betsy Coppock

Technical and Economic Assessment of Upgrading a Double-circuit 63kV to a Single-circuit 230kV Transmission Line in Iran

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

ELEVATION CERTIFICATE Important: Follow the instructions on pages 1-9.

PRELIMINARY PLAT CHECK LIST

Fatima Michael college of Engineering and Technology

RELEASE OF JOINT FORM DEED OF CONSERVATION EASEMENT AND AGREEMENT

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

APPLICATION FOR SITE PLAN REVIEW

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF RUSSEL D. JOHNSON

Site Plan/Building Permit Review

The Variable Threshold Neutral Isolator (VTNI)

Informing Healthy, Durable, and Energy and Resources Efficient Homes

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

ELEVATION CERTIFICATE

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

Raise Structures an Additional 5 to 20 Feet

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Application for Site Plan Review

Operating Standards Attachment to Development Application

Legal Description & Site Plan Requirements and Layouts

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

FTMG kV Transmission Line Steel Pole Bid June 1, 2017 Response to Bidders Questions

Northern Pass. Transmission Project: Visual Simulations. The THE NORTHERN PASS SM. MAY 2011_v2

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

SUBDIVISION PLAT APPLICATION

City of Keizer Floodplain/Greenway Development Application

N02 N03 OFFICE BUILDING PARKING DECK B73340 SHEET

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

1.1 GENERAL RECORD DRAWING REQUIREMENTS

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION

CONCEPT REVIEW GUIDELINES

City of Massillon Site Plan Checklist

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

TABLE of CONTENTS ############################# Revised Rule Revised Rule 91.3-B 14. Revised Rule 92.1-F(2). 15

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

Conceptual, Preliminary and Final Site Plan Review in Holladay City

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ) ) ) ) ) ) ) ) ) APPLICATION

Colorado PUC E-Filings System

SOUTH COLLEGE STREET EAST STONEWALL STREET OFFICE BUILDING PARKING DECK N02 N03 N01 PETITION # B73340

5.7 Plan Documentation and Supporting Information.

SURVEYOR S REPORT VERTICAL CONTROL FOR CONSTRUCTION C-44 PROJECT

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Minor Site Plan Application and Checklist Land Disturbing Activities

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

INTRODUCTION. General Design Criteria o (include charts from Section 2 of TSS) Functional Criteria o (from TSS section 3) Accessibility and Layout

POST-CONSTRUCTION ELECTRIC & MAGNETIC FIELD MONITORING PLAN GREATER SPRINGFIELD RELIABILITY PROJECT AND THE MANCHESTER TO MEEKVILLE JUNCTION PROJECT

Introduction to Aerial Photographs and Topographic maps (Chapter 3)

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Determining Crossing Conductor Clearance Using Line-Mounted LiDAR. J. C. MCCALL, P. SPILLANE, K. LINDSEY Lindsey Manufacturing USA

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

GUIDELINES FOR MEASURING BUILDING HEIGHT

PROCEDURAL HISTORY. Application Filed: July 29, Notice of Hearing: September 6, Hearing Held: September 27, 1996

List of Figures. List of Forms

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

DECK PERMIT APPLICATION PACKET

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition)

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER ELECTRIC AND MAGNETIC FIELDS

Bipole III Transmission Project

Pole Line Hardware. Heavy-Duty Spool Rack (200 A) No. of Wires. Anti-Vibration Kit for Spool Rack. Heavy-Duty Spool Rack (400 A) No.

INSTALLATION INSTRUCTIONS CHAIN-LINK FENCE AND GATE

1. Land survey Work. 2. Civil and Structural engineering services.

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

Location of Structure on Site

CITY OF PALMDALE COUNTY OF LOS ANGELES, CALIFORNIA ORDINANCE NO. 1415

Details on the N2CKH/NNN0WWL 2Mhz Delta Loop Antenna

On-Line Windows/Doors Permit Plan Review Package Without 25% Protection Exemption

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

A Report on the Ground Penetrating Radar Survey 205 Little Plains Road Southampton, NY

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION. 7:00 P.M. 494 Main Street AGENDA

Alabama Standards of Practice for Surveying

DEP 2008 ELECTRIC AND MAGNETIC FIELDS CHAPTER ELECTRIC AND MAGNETIC FIELDS

Signs of End of Life FM Antennas and Transmission Line Systems

SITE PLAN APPLICATION - PLANNING COMMISSION

SVRA ARCHITECTURAL PERMIT

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

CITY OF MUSKEGO DRAFTING STANDARDS

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

City of Palmetto Florida

Town of Holly Springs Sign Installation Packet

Transcription:

THE STATE OF NEW HAMPSHRE BEFORE THE PUBLC UTLTES COMMSSON PETTON OF PUBLC SERVCE COMPANY OF NEW HAMPSHRE FOR LCENSE TO CONSTRUCT AND MANTAN ELECTRC LNES OVER AND ACROSS THE NUBANUST BROOK TN THE TOWN OF PETERBOROUGH, NEW HAMPSHRE. TO THE PUBLC UTLTES COMMSSON: Public Service Company of New Hampshire ( PSNH ), a public utility engaged in the generation, transmission, distribution and sale of electricity in the State of New Hampshire, hereby petitions the Public Utilities Commission ( Commission ), pursuant to RSA 371:17, for a license to construct and maintain electric lines over and across the public waters of the Nubanusit Brook in the Town of Peterborough, New Hampshire, and in support of its petition states as follows: 1. n order to meet the reasonable requirements of service to the public, P SNH is proposing to construct a new three-phase 34.5 kv distribution line, designated as the 31 3X4 circuit, in Peterborough, New Hampshire. The new line will help to accommodate the growth in demand and to obtain a greater level of reliability in the Peterborough area. 2. The new line will cross the Nubanusit Brook along the east side of Wilder Street, a Town of Peterborough public roadway, within the street right of way. 3. The location of the proposed crossing is shown on the attached location map, marked as Exhibit 1. 4. The design and proposed construction of the crossing is shown on the attached PSNH Distribution Business Plan and Profile Drawing entitled 31 3X4 LNE 35.4 KV, NUBANUST BROOK CROSSNG, PETERBOROUGH, NEW HAMPSHRE, marked as Exhibit 2. 5. The required technical information provided in this petition is based on the 27 National Electrical Safety Code ( NESC ) C2-27. 6. The proposed crossing will occur between two new wood single pole structures to be set and located approximately 221 feet apart. The proposed structure on the north side of the Nubanusit Brook, #2, will be a tangent structure constructed with a class 3, 45 foot tall pole. Pole #2 will be southern pine with a 1 crossarm and insulators. The proposed structure on the south side of the Brook, #3, will be a tangent structure constructed with a class 3, 45 foot tall pole. Pole #3 will be southern pine with a 1 crossarm and insulators. The line will be built with open wire construction as depicted in Exhibit 3, PSNH Construction Standard DTR 1.21 1, 35 KV MGY and Below Crossarm Construction, Three-Phase Tangent and Small Corner. The three

conductor wires will be 1/ ACSR (6/1 stranding) and the neutral wire will also be 1/ ACSR (6/1 stranding). The conductors and neutral wires will be sagged using the NESC Heavy Loading condition ( F, 4 pounds psf wind loading, A radial ice) with a maximum tension of 2, lbs under that load. 7. The flood water elevation for the Nubanusit Brook is based on information from the Flood nsurance Rate Map ( FRM ), Town of Peterborough, New Hampshire, Hillsborough County, Panel 4 of 12, Community Panel Number 3311 4 A, effective date May 1, 198 issued by the U.S. Department of Housing and Urban Development. The 1-year flood elevation for this location is approximately 862 feet. These elevations are based on the National Geodetic Vertical Datum of 1929 (NGVD 29). For the purpose of this petition, the more conservative 1 year flood elevation was used as the basis for design of the conductor clearance. 8. The area of the Nubanusit Brook as defined by NESC (note 19 to Table 232-1) is less than 6.7± acres. This was calculated by measuring the size of the limit of flood zone A as shown on the FRM for the largest one mile stretch of the brook that includes the project area. 9. The project is not located within the special wind region identified in Figure 25-2(e) of the NESC. 1. Using the above design criteria, the maximum sags of the phase and neutral wires and minimum clearances for the crossing have been determined and designed as follows: A. NESC Heavy, Phase Wire The maximum sag on the phase wires under this condition is 3.5. The minimum clearance to land is 32.6. The minimum clearance to the 1 year flood level is 46.4. B. Minus 2 F, Phase Wire The maximum sag on the phase wires under this condition is.6. The minimum clearance to land is 35.5. The minimum clearance to the 1 year flood level is 49.3. C. 212 F, Phase Wire - The maximum sag on the phase wires under this condition is 3.2. The minimum clearance to land is 32.8. The minimum clearance to the 1 year flood level is 46.7. D. NESC Heavy, Neutral Wire The maximum sag on the neutral wire under this condition is 3.5. The minimum clearance to land is 26.2. The minimum clearance to the 1 year flood level is 4.1. E. Minus 2 F, Neutral Wire The maximum sag on the neutral wire under this condition is.6. The minimum 2

clearance to land is 29.2. The minimum clearance to the 1 year flood level is 42.9. F. 12 F, Neutral Wire - The maximum sag on the neutral wire under this condition is 2.3. The minimum clearance to land is 27.5. The minimum clearance to the 1 year flood level is 41.3. G. Minimum Clearance. Phase Wire NESC heavy conditions (item A above), results in the minimum clearance for phase conductors. The minimum clearances expected under those conditions are 32.6 to land and 46.4 to the 1 year flood level. The required minimum clearance from the phase wires to land based on NESC Table 232-1.2 is 18.5. The required minimum clearance from phase wire to the water surface for a 1 year flood based on NESC Table 232-1.7.a, is 2.5. The crossing design as proposed exceeds the NESC requirements. H. Minimum Clearance, Neutral Wire NESC heavy conditions (item D above), results in the minimum clearance for the neutral wire. The minimum clearances expected under that condition is 26.2 to land and 4.1 to the 1 year flood level. The required minimum clearance from the neutral to land based on NESC Table 232-1.2 is 15.5. The required minimum clearance from phase wire to the water surface for a 1 year flood based on NESC Table 232-1.7.a, is 17.5. The crossing design as proposed exceeds the NESC requirements.. Minimum Phase to Neutral Clearance The conditions which would result in the minimum clearance between these lines is a winter condition with the phase wires at NESC Heavy Loading (item A above) and the neutral at - 2 F (item E above). This could occur after an ice storm if the neutral shed ice before the conductors. Under those conditions the phase to neutral clearance would be 3.4. Based on NESC Table 235-6 section 2a, the minimum clearance should be 23. inches (1.92 feet). 11. There are no NHDES or NHDOT permits necessary specifically for the construction of this crossing. 12. The proposed crossing has been designed and will be constructed, maintained and operated by PSNH in accordance with the NESC C2-27. 13. The poles at this crossing are both to be located within the public street right-of-way, for which PSNH has been granted a pole license from the Town of Peterborough, license #36-585. 3

14. PSNH submits that the license petitioned for herein may be exercised without substantially affecting the rights of the public in the public waters of the Nubanusit Brook. Minimum safe line clearances above the water surface and affected shorelines will be maintained at all times. The use and enjoyment by the public of the Nubanusit Brook will not be diminished in any material respect as a result of the overhead line crossing. WHEREFORE, PSNH respectfully requests that the Commission: a. Find that the license petitioned for herein may be exercised without substantially affecting the public rights in the public waters which are the subject of this petition; b. Grant PSNH a license to construct and maintain electric lines over and across the public waters of the Nubanusit Brook in Peterborough, New Hampshire, as specified in the petition; and c. ssue an Order Nisi and orders for its publication. /J, Dated at Manchester this -1 day of April, 29. Respectfully submitted, PUBLC SERVCE COMPANY OF NEW HAMPSHRE By ts istopheifj. Aliwarden Senior Couisel, Legal Department PSNH Energy Park 78 North Commercial Street Manchester, NH 311 (63) 634-2459

WA TER CROSSNG LOCA TON 933.15,, e a \ o 1., C ). U, - c C, C) -1 * 1 S.1. DRM DMS.- Q), U Public Service of New Hampshire 313X4.- System Projects LNE NUBANUST * WEST H:1 =2 ± 34.5 WATER 5T KV CROSSNG PETERBOROUGH, ON 1t 4/15/9 NH NO. EXHBT 1

313X4 UNE, POLE #2 221 i/o ACSR 6/1 SHOVft -2O F 313X4 UNE, POLE #3 46.4 4.1 32.6 26.2 1/ ACSR 6/1 SHOWN o 212 F 1/ ACSR 6/1 SHOWN NESC HEAVY i/o ACSR o 2F i/o ACSR 12O F i/o ACSR o NESC HEAVY 6/1 SHOWN 6/1 SHOWN 6/1 SHOWN NEW 313X4 LNE EXS11NG DSTRBU11ON LNE 313X4 UNE, 1 YEAR FLOOD BOUNDARY (EL 862±) CD S]iz_ 221 E - - / / \ 313X4 LNE POLE #2 PLAN SCALE: 1 =loo 313X4 LNE POLE #3 _1 EL 862± 1 rear FLOOD LEEL NUBANUST BROOK SCALE: PROFLE 1 =loo HORZ. 1 VERT. 1 5 1 GRAPHC SCALE ( N FEET ) 1 inch = 1 ft. 2 4... - Public Service T)itrbutio DUS of New Rampahire DUS DUS D 313X4 LNE 34.5 KV NUBANUST BROOK CROSSNG PETERBOROUGH, NEW HAMPSHRE 1t NO. AS SHOWN 3/2/9 L..OF..z EXHBT 2

STRUCTURE LMT Cl F 13 82 d DO NOT USE for 27.6 kv UGY Refer to Section 11 Note. For the visetop insulator the range in feet of pull of a corner when installing a conductor in the top position is as follows: /O ACSR bare and covered, 9; 336.4 Al bare and covered, 5; and 556.5 Al bare and covered, 4. ORGNAL 5124/89 APPROVED 35 Ky MGY AND BELOW - CROSSARM CONSTRUCTON THREEPHASE TANGENT AND SMALL CORNER 11/2/99 NORTHEAST UTLTES CONSTRUCTON STANDARD DTR 1.211 6 Exhibit 3