Standard Test Procedures Manual

Similar documents
Woven Steel Wire Fence Type-47. Under the state specification for fencing, ASTM A 116 is called out.

(Issued 1 Sept. 1971) CRD-C METHOD OF TEST FOR VERIFYING MACHINES FOR USE IN FLEXURAL STRENGTH TESTS OF CONCRETE MATTRESSES

DRAFT TANZANIASTANDARD

Discipline Mechanical Testing Issue Date Certificate Number T-2218 Valid Until Last Amended on

Fluid Sealing Association

PORTABLE PULL TESTER

Product Guide Specification

Procedure for Wrench Calibration and Snug Tightening

Mechanical Vice Grips. Mechanical Wedge Action Grips

City of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

TEST PROCEDURE FOR DYNAMIC PULL-THROUGH PERFORMANCE OF ROOFING MEMBRANES OVER FASTENER HEADS OR FASTENERS WITH METAL BEARING PLATES

Installation Instructions for Solar Snow Pad (SSP-T-3)

Technical Training International Textiles Training September 2018 Ellen Roaldi Instructor

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z

Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the grade A325 structural bolt.

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Flat crush of corrugating medium (CMT test)

HC Hydraulic Expansion Chucks

The Bombay Textile Research Association, L. B. S. Marg, Ghatkopar (West), Mumbai, Maharashtra. Discipline Mechanical Testing Issue Date

Rhino Packing Gland Tool

Standard Specification for Copper-Clad Steel Wire for Electronic Application 1

--> Buy True-PDF --> Auto-delivered in 0~10 minutes. GB/T Translated English of Chinese Standard: GB/T

Procedure for Testing Direct Tension Indicators (DTI) Assemblies

Introduction to the development of FEFCO Testing Methods for corrugated board and boxes

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

SECTION CHAIN LINK FENCING AND GATES

Mueller Gas Products. Mueller H17800 Curb Stop Tee No Blo Curb Stop Tee Weld x Weld 1440 PSI

Evaluation of In-Pavement Light Fixture Designs and Performance

This specification describes the minimum requirements for piping systems for the following service:

Fisher 667 Diaphragm Actuators Size 80 and 100

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NSCL Z

TCX51 Professional Tire Changer

SAFETY PRECAUTIONS GENERAL INFORMATION

Certificate of Accreditation

CADET Line Boring Machine And Accessories Catalogue

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

PART MATERIALS. Section Fencing Materials. Description

Powers Controls No. 3 Pneumatic Damper Actuator

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.

Vhu. Universal Boring Heads Vhu 2 1/8, 3 1/8, 4 7/8, 6 ¼. Vhu. Instruction Manual No.:

Interference Fits Interference Fits Reference Lecture 15 Notes

VERIFYING THE ACCURACY OF WIRE CLOTH SIEVES

Pipe Restrainers series C Restrainers for use on IPEX Bionax AWWA CI OD C909 PVCO Pipe with MJ or Push-On Fittings

Product #: Product #:

FACULTY OF ENGINEERING DESIGN AND PRODUCTION ENGINEERING DEPARTMENT. Credit Hour System Metrology Lab 1 MDP 240. Sine Bars. Metrology laboratory

DISTRIBUTION VAULT 8' x 14' x 9'-4" DEEP TRAFFIC FLAT WALL WITH 5' x 8' OPENING

B-Too Drilling and Tapping Machine Instruction and Maintenance Manual

11-1/4 OD at Transition Point. Microcosmic. 4th and Brannan Street Platform Station Project. Elevation. Moto Ohtake 2014

Discipline Mechanical Testing Issue Date Certificate Number T-1114 Valid Until Last Amended on - Page 1 of 10

LESSON 15 TESTING OF TEXTILE FABRICS

HBS-AP ASSEMBLING INSTRUCTIONS

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

TCX53 Performance Tire Changer

SUBMITTAL HEAVY-DUTY HD NO-HUB COUPLINGS

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back

MP918B UL Listed Damper Actuator

Certificate of Accreditation

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

TOOLING COMPONENTS. Clamping Kits Step Blocks & Kits Driver Studs Bolts, Screws Nuts, Washers...

Standard Test Method for Pilling Resistance and Other Related Surface Changes of Textile Fabrics: Brush Pilling Tester 1

Technical T-A & GEN2 T-A GEN3SYS APX. Revolution & Core Drill. ASC 320 Solid Carbide. AccuPort 432. Page CONTENTS. Set-up Instructions 256

GEOTEXTILE INS TALL ATION GUIDE

ONE-LOK Series SLC/SLCE Pipe Restraint for AWWA C909 PVC Pipe

Installation instructions for FC17 Forward Controls for Triumph Rocket III Roadster

Model: 3-IN-1/1067x1.5 Model: 3-IN-1/1320x1.5

2002 ADDENDUM to the 1997 NDS and PRIOR EDITIONS

This specification describes the minimum requirements for piping systems for the following service:

Proposal for new standard. Determination of interface friction between painted parts. Orientation. p. 1 (15) Draft1, Revised

Punching 3/16" diameter round hole in up to 3/16" thick (flat strip metal).

Clamps. Preformed Clamping Systems. Clamps. Band-It. Band-It

PIPE/CONDUIT SUPPORTS

FURNITURE LABORATORY METAL FRAMING SYSTEM. For additional information and help in planning contact Mott Manufacturing.

CHEMINSTRUMENTS LABORATORY DRAWDOWN COATER LC-100 OPERATING INSTRUCTION

Introduction: The T30069 Center Punch Tool installs BAND-IT 3/8" and 5/8", 201 Stainless Steel and Galvanized Carbon Steel clamps.

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

SECTION MANHOLES

METHOD OF TEST FOR DETERMINATION OF THE SEVERITY OF A SEGREGATED ASPHALT PAVEMENT SURFACE

Standard Specification for Fence Fittings 1

MS25 OPERATION MANUAL

Introduction: The T30069 Center Punch Tool installs BAND-IT 3/8" and 5/8", 201 Stainless Steel and Galvanized Carbon Steel clamps.

Assembly Instructions

H2-50 Hydrogen Generator Field Update

FABRICATION MANUAL CCM Copper Composite You discover why ALPOLIC Copper composite material (CCM) is the building material of the future as soon as

This specification describes the minimum requirements for piping systems for the following service:

LPK1550 Hydraulic Crimping Tool 15-ton

ME 333 MANUFACTURING PROCESSES-II SPECIAL PURPOSE METAL FORMING PROCESSES

3 Emergency Breakaway Coupling

Replacement of Pitch Link Retainer and Service Improvement of the Pitch Control System. Effectivity: Helicopters manufactured prior to January, 1981

Square Wheel Belt Grinder Models: 4103, 4106, and 4126AC

Extensive cable management on a footprint that fits on a 24-inch floor tile.

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. NORTHSTAR CALIBRATION, INC th Place NW Owatonna, MN John Moorhouse Phone:

Certificate of Accreditation

In normal joints, the clamping force should equal the working load. In gasketed joints, it should be sufficient to create a seal.

This specification describes the minimum requirements for piping systems for the following service:

25000 Series Lo-T TM Butterfly Control Valve Instructions

SURFACE VEHICLE STANDARD

.84M Ku-Band Rx/O Antenna System

JARVIS. Model BR-3 Blade Reconditioner ... EQUIPMENT TABLE OF

Transcription:

STP 215-4 Standard Test Procedures Manual GEOTEXTILE & GEOGRIDS BURST STRENGTH - BALL BURST TEST 1. SCOPE 1.1. Description of Test This method describes the procedure for determining the bursting strength of woven fabrics by forcing a steel ball through a clamped area of fabric. 2. APPARATUS AND MATERIALS 2.1. Equipment Required 3. PROCEDURE 2.1.1. Compression testing machine (CBR machine). 2.1.2. A ring clamp mechanism having an internal diameter of 44.45 ± 0.2 mm (Figure 1) and means of support so as to keep it raised at least 25 mm. 2.1.3. A polished steel ball 25.4 ± 0.02 mm in diameter that can be pressed against the fabric in the opening of the clamping mechanism by means of a plunger or rod. 3.1. Sample Preparation Using a circular template 12.5 cm in diameter, mark and cut out ten samples of the fabric from random areas so as to be representative of the entire sample. No sample shall be taken nearer than 20 cm from the edge of the roll. 3.2. Test Procedure Place the sample in the ring clamp as flat as possible with no wrinkles or tension and tighten the clamp. Centre the ball on the sample and set the assembly in the CBR machine. Operate the machine at top speed but no more than 300 mm/min until the fabric is ruptured by the steel ball (Figure 2). Read and record the bursting pressure of the fabric from the CBR machine dial. : 1993 05 18 Page 1 of 4

GEOTEXTILE & GEOGRIDS BURST STRENGTH - BALL BURST TEST 4. RESULTS AND CALCULATIONS 4.1. Collection of Test Results Suggested format for laboratory recording: GEOTEXTILE TESTING MASS Type & trade name of material Project Sample No. 1 2 3 4 5 6 7 8 9 10 Ave. Force (lbs) 1 psi = 6.895 kpa Burst Strength (kpa) 4.2. Calculations The burst strength is expressed in kpa and is determined by the formula: Force (lbs) x 6.895 X-Section of the Sphere The cross section of the sphere is calculated by: πd 4 4.3. Reporting Results π(1 ) = 0.785 inches 4 2 2 2 The burst strength shall be reported as the average of ten samples of any given material tested. Page: 2 of 4 : 1993 05 18

GEOTEXTILES & GEOGRIDS 5. ADDED INFORMATION 5.1. References ASTM D7910-64 CGSB CAN2-4.2-M77 5.2. General BURST STRENGTH - BALL TEST For some heavier fabrics, the clamping ring may have to be tightened down with a series of six screws in the area of the grooves. It will be necessary to puncture six holes in the fabric. 5.3. Figures : 1993 05 18 Page: 3 of 4

GEOTEXTILE & GEOGRIDS BURST STRENGTH - BALL BURST TEST Page: 4 of 4 : 1993 05 18

GEOTEXTILES & GEOGRIDS APPROVAL SHEET New Revision X of Previous Document 86-04-30 Effective : - - Description of Revision (Reason for Revision): - Format of test procedure updated. BURST STRENGTH - BALL TEST Review/Implementation Process: Reviewed by the Materials Section of the Technical Standards and Policies Branch. Other Manuals/Policies Affected: Nil Follow Up/Training Required: Nil Comments/Concerns/Implications (Budget/Environment/Stakeholders): Prepared and Recommended by D. MacLeod 93-05-18 Materials Standards Engineer Approval Recommended by R.A. Widger - - Senior Materials Engineer Approval Recommended by A.R. Gerbrandt - - Dir., Technical Standards & Policies Br. Approved by D.G. Metz - - Assistant Deputy Minister, Infrastructure Electronic File Updated - - Update Mailed - - : 1993 05 18 Page: 5 of 4