General Guidelines:

Similar documents
PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

Free Standing Frame and Canopy

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Roll In W/L Dock PAGE 1

Boat Lift Canopy Frame Assembly Instructions

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

ASSEMBLY INSTRUCTIONS

Cottage Style Dock Instructions

User Instructions Multiline Otter Scoreboard Caddy Assembly

TREX REVEAL RAILING Installation Instructions

ELEVEN COLLABORATIVE. CONFERENCE TOPS Assembly Instructions

Aluminum Lake Truss Dock Instructions

Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419)

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

43107 Rhino Jerry Can Holder Rhino Jerry Can Holder - Horizontal

SHOREMASTER DOCK SECTIONS Instructions and Safety Tips

Playground Assembly Instructions

Tip In Dock Instructions 2016 Design

CTTR Tire Rack Required tools

JK Rear Inner Fenders

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Desk/Wall-Mount Rack

Sunrise Deck Assembly Instructions for Kingston Left

MAG-CONV Basic, 48, 48R & Midline Front Mount

PolyDock MAY RESULT IN PERSONAL INJURY OR DEATH AND WILL INVALIDATE THE

Installation Instructions for the AlphaDeck Staging System

Leveling Foot RB210. Leg Extender RLT66

Installation Instructions - Model V4JSD 1

floe dock steps for roll-in and sectional docks

The Queen Quilter Professional Quilters Kit Frame

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

PROVEN WORLDWIDE SNORKEL FOR CHEVY COLORADO NEW PRODUCT

Standard 25 Wide Structure

Locker Pedestal Installation Instructions

TREX SIGNATURE (FORMERLY REVEAL) RAILING Installation Instructions

FLOE DOCK STEPS FOR ROLL-IN AND SECTIONAL DOCKS

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Assembly Instructions

Oxford Stalls Installation Instructions

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

Spiral Slide

Continuous Handrail Kit Installation Instructions

Pathway Stair System For use with the Pathway Modular Ramp System, as freestanding stair, or with other structures.

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

General Array Layout Sketch

Installation Instructions for. Handrail Component System

PO BOX 130 CLEAR LAKE, MN

Assembly Aid. One of the packages contains the required bolts, washers and nuts for final assembly

Transit Connect Full/Half Installation Instructions

The Festival Assembly Instructions

SUT-1000CLC ASSEMBLY REQUIREMENTS

MPA-9000 Universal Ceiling Projector Mount Kit

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

INSTRUCTION BOOKLET #C20

TABLE OF CONTENTS REQUIRED TOOLS

HIGH RISE Portable Restroom Assembly Instructions

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

SwingSafe Swing-Away Mailbox Support Diagram

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

FLOE quick attach & standard sectional dock and leg kits

Aluminum Lake Truss Dock Instructions

TREX REVEAL RAILING Installation Instructions

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

Katerack Wagon Shelving System

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Dream Fabric Frame Assembly Instructions

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

Clopay Models 835/837 Sliding Door System Installation Guide

Medium HoneyBadger Chase Rack Installation Instructions

Assembly Instructions for 12x16 Floating Dock

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

Trak-Slider Instructions

BOX-117 E-Z-Go RXV Utility Box Mounting Kit Installation Instructions

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

411 West Congress St., Maple Lake, MN Toll Free

Rear Katerack Installation Instructions

Section 1 Safety working at height

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

ASSEMBLY OF THE KNOCKED-DOWN LADDERS: 8 to 12 STEPS STANDARD TOP AND SAFELOCK REQUIRED TOOLS

KIT ASSEMBLY INSTRUCTIONS

EASY POOL STEP (NE113)

ATLANTIS RAIL Contact Information

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

MONKEY BARS OVERHEAD RACK INSTALLATION

Franklin Mills Stackable Movable Lateral Instructions

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Modular XP Ramp Assembly Manual

INSTALLATION INSTRUCTIONS

Dura-Lock Roof System

Low Headroom Rear Mount TorqueMaster

BLEACHER ASSEMBLY INSTRUCTIONS

Post & Rail Crossbuck

Transcription:

ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please read through entire instructions before starting. Please visit for step-by-step video instructions and more information. General Guidelines: Wear protective gloves and appropriate safety glasses when assembling the Patriot Dock. The maximum unsupported span for Patriot Aluminum Dock Frames is 16 feet, in the water or while in storage. The dock is designed to carry a maximum of 500 pounds over any 4 ft x 4 ft part of the deck and a maximum of 1000 pounds between supports spaced 16 feet apart. Always support outside corners and use additional supports in high traffic areas or where greater loads are expected. Please see the recommended support locations depicted below. Never push or pull the aluminum dock with a winch, ATV or vehicle. Always remove decking panels and raise pipes not supported by wheels when pulling the frame in or out of the water. Docks are not to be left in freezing water. All dock surfaces can be slippery when wet. Please use caution when stepping or walking on any dock surface. The dock should have no unsupported span greater than 16 feet while in use or while in storage. Never leave the lake end of the dock unsupported. Always support corners of the Patio platform. Roll-in kits should be installed at the very end of the dock for best stability. Additional posts may be required if rollin kits are installed at locations other than what is recommended. Always assemble the dock frame so there is a 4 ft. Truss End Rail (PN 10803) every 4 feet and at both ends of the dock. Patio sections must be closed on both ends using the 4 ft. Truss End Rail. Install flat Transition Plates when connecting two 8 ft. frame assemblies (bottom only). Transition Plates are not required at joints with support legs. Patriot docks are modular allowing for the flexibility to add length or change the configuration as desired. Additional parts may be required for certain configurations. Tools Required: 1/2, 9/16 and 3/4 Wrenches or ratchet w/ sockets, mallet Recommended Tools: Cordless Impact wrench / drill with above socket sizes, work gloves, safety glasses

Support Locations Standard Pipe Lengths: < 16 = 4 pipe 17-32 = 6 pipe 33 + = 8 pipe Parts List PN10800 Aluminum Frame 4 x8 1. (2) 4 Truss End Rail 2. (1) Left Side Rail 3. (1) Right Side Rail 4. (1) Connecting Rail 5. (1) Short SHORE END Center Support Tube (47 ) 6. (1) Long LAKE END Center Support Tube (48 ) 7. (1) 8 Diagonal Brace (8 x 1 x 1 angle) (not shown) 8. (1) Transition plate (17.5 x 1.5 flat bar) (not shown) Assembly Hardware A. (20) 3/8-16 x 1.25 Bolt B. (2) 3/8-16 x 1.5 Bolt C. (22) 3/8-16 Nut Lake End Shore End

Patriot Dock Assembly Helpful Hints for Patriot Dock Assembly: 1. Visit for step-by-step photo and video instructions under the Instructions and FAQ sections. 2. Each frame section is NOT built individually. Each additional section is attached and built off of the previous section. 3. Do not tighten any bolts until the frame or frames are fully assembled. 4. The 4 ft. Truss End Rail and Connecting Rail (Items 3 and 4) always fit inside the vertical angles of the 8 Side Rails. 5. Use the shorter 3/8 16 X 1.25 bolts (Item A) for all joints except the center of the Connecting Rail (Item 4), where the two 3/8 16 X 1.50 bolts are used (Item B). Frame Assembly Steps (diagrams on page 4 and 5): Layout all the 4 x 8 ft frame components on level ground. Orient the components so the Short Center Support Tube (Item 5) is on the shore end of the frame and the Long Center Support Tube (Item 6) is on the lake end of the frame. See drawings for reference. Starting with the shore end of the frame, loosely bolt the 4 ft Truss End Rail (Item 1) to the Left and Right Side Rails (Item 2 and 3) using the 3/8 x1.25 bolt and nut. Note: The lip on the side rails face upward. Notice the orientation of the center vertical angle on the Side Rails, this determines Left and Right sides. Bolt the second 4 ft Truss End Rail (Item 1) at the center of the two Side Rails. Bolt the Short Center Support Tube between the two End Rails on the shore end of the frame. Do not install the 3/8 nuts until after the next step. Bolt the Long Center Support Tube between the middle 4 Truss End Rail (Item 1) and Connecting Rail (Item 4) using the 3/8 x 1.25 long bolts. Wait to install 3/8 nuts until after next frame section has been joined to the first. Connect the next 4 x 8 ft frame by fitting the two Side Rails and 4 ft Truss End Rail into the bolts from the previous step and install the 3/8 nuts to fasten the joint. See drawings on next page. Finish attaching the remaining 4 x 8 ft frames by repeating steps above. Repeat until the entire straight frame is assembled. Lastly, install the loose 4 ft Truss End Rail (Item 1) to the lake end of the straight length dock frame (shown in red on next page). Tighten all bolted connections throughout the dock assembly. Rotate dock frame on its side or prop up frame on blocks to install Transition Plates (Item 8) and 8 ft Diagonal Braces (Item 7) in the holes on the bottom of the assembled frames. The Transition Plates strengthen the connection between 4 x 8 ft connecting frames. The Diagonal Braces are installed under each 8 ft frame, alternating directions on each frame. The braces will form a Z type pattern under the frame to control swaying. If your dock has a Patio or L configuration, preassemble the 4 x 8 frame and connect to the straight dock section using six 3/8 x 1.25 bolts and nuts. Pipe or Jack Supports (see page 6 for illustrations): Fasten Jack Supports or Pipe Supports to the frame, making sure there is no span greater than 16 ft. between supports. Pipe: Pipe Holders mount to the 1/2 holes in the vertical angles of the Side Rails. Insert pipe through Pipe Holder to desired height. Fasten Foot Plates to the bottom and add the pipe cap to the top. For Roll in pipe docks, install axle convertor (L-shaped unit) to the bottom of the vertical pipes. The Axle Converter should be oriented to that the closed sleeve accepts the vertical pipe and the through sleeve accepts the axle pipe. Orientate the L brackets inward. Feed horizontal axle pipe (6 for straight docks and 8 for patio docks) through both Axle Converter brackets. Add wheels and secure with stop clamps. Drill up to four 3/8 holes on one side of each wheel, at any of the 4 dimple locations, so wheel fills with water. Screw Jacks: Screw Jacks bolt to the frame using the 3/8 holes near each vertical angle on the Side Rails. Add Drop Leg to jack and set to desired height. For Roll in Jack Docks, simply mount the aluminum axle to the bottom of the jack (do not use Drop Leg components when attaching the axle), add the wheel and secure in place. Jack fenders (PN10886) are installed last using two 3/8 x3.5 bolts/nuts. Add Decking: Drop in 4 x 4 decking panels after dock assembly is in the water and the height is adjusted. If you purchased aluminum dock panels, install adhesive backed rubber to the top of the side rails and the center of the frame before installing the deck panels. Use the optional Deck Locker or add your own locking screws, bolts or zip ties to fasten the decking panels to the frame using the single hole in the stringers (poly and aluminum decking) if desired. Remove decking before moving the dock frame out of the water for storage. Stack and cover the decking for protection in the off season.

DO NOT assemble frames individually. Join frames together while assembling. Assembly hardware passes through the lake end of the first frame and through the shore end of the next frame. The 4 Truss End Rail on the lake face of the dock (marked in red) is not included in the PN10800 Frame Assembly. Lake Shore ABOVE: Top view of two frames being joined together. Assembly bolts pass through all aluminum components being joined together. See diagram on next page for further joint details, including Diagonal Brace and Transition Plate installation. After straight run of pier is assembled, patio sections can be added. Assemble patio section completely. Bolt parallel to straight pier using six 3/8 bolts. Terminal ends of completed pier are always to be finished with a 4 Truss End Rail (shown in red).

The Diagonal Braces and Transition Plates share the same mounting holes and assembly bolts. The Diagonal Braces should alternate direction on each frame, creating a zig-zag pattern.

Jack Supports Pipe Supports 1/2 Bolts Install Post Bracket using two 1/2 bolts. (included with Post Bracket) Install Aluminum Jack using four 3/8 bolts. Add Drop Leg or Axle attachment. Install optional fender to the Jack using two of the alternate mounting holes. Loosen set bolts, install 1-1/2 i.d. schedule 40 support pipes and add Pipe Caps and either Foot Plate bases or the axle components. Support Locations Shore end of assembled dock rests on and is supported by the shoreline. Optional Shore Ramps are available. Corners of patio sections need supports.

Stationary and Rolling Supports NOTE: There must be no more than a 16 ft. span between supports! For stationary post supports, loosen set screws on Post Bracket and insert pipe. Add Foot Plate base and Pipe Cap then set to desired height and tighten set screws on Post Bracket. Be sure to level the dock to complete the installation process. For stationary Screw Jack supports, assemble the Drop Leg base by inserting vertical tube into the flat base and install 1/2 bolt. Insert vertical tube into Screw Jack opening, set height and install 1/2 bolt. To install the Jack Axle attachment, slide Jack Axle over traveling tube of the Screw Jack and install 1/2 bolt. Install wheel onto Jack Axle and secure in place. NOTE: Drop Leg components are not used in conjunction with the Jack Axle attachment. For pipe axle assembly, install Axle Converter pieces to a set of vertical support pipes (the shorter, closed off leg of Axle Converter receives the vertical pipe). Install axle pipe (6 ft. pipe used with 4 ft. wide docks and 8 ft. pipe used with 8 ft. wide docks) through the horizontal leg of the Axle Converter pair. Add wheels and secure in place with Wheel Stop Clamps. Wheels are orientated outward on 4 ft. wide docks. Wheels are oriented inward on 8 ft. wide docks.

Decking Installation Lastly, after the dock has been assembled completely, installed in the water and leveled throughout, then the pier is ready for the decking to be installed. The most efficient way to set the decking in place is to start at the shore end of the dock and set each panel in place, working towards the lake end. Removal is the opposite of installation. When installing Aluminum Deck Panels, first apply the adhesive backed Rubber Insulator to the aluminum frames. The Rubber Insulator is installed down the length of the 8 Side Rails and down the length of the Center Support Tubes. (Only used with aluminum deck) The Rubber Insulator is not to be installed in the direction of the 4 ft. width, only lengthwise. After Rubber Insulator is applied, the Aluminum Decking can be set in place. Optional Deck Lockers can be installed on the panel to secure the decking to the frame. *Sold Separately* When assembling the poly decking, lay out the 1 x4 poly deck boards parallel to each other creating the 4 x4 shape. Spacing of each 1 x4 poly deck board is approximately 5/8. Spacing is pre-determined by hole placement. Place aluminum stringer onto the deck boards and line up holes in the stringer with the pre-drilled holes in the poly deck boards. Secure stringer with 1 long pan head screws PN10867: Deck Locker Use the optional Deck Locker to secure the 4x4 poly deck panel onto the dock frame. *Sold Separately* Stringer 11-3/4 The Cedar Deck Panel is simply set in place. The cedar panels are sold untreated and can be installed as is. To extend the service life of the cedar deck, a water repellant stain can be applied. The Cedar Decking does not utilize a deck locker mechanism but it is recommended that the panels be secured to the frame in some capacity. (zip-ties are commonly used)