GV Standard PitchVent

Similar documents
GV Standard Pitchglaze

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

GV Standard Three Wall Box

GV Standard Sliding Over Roof Installation Instruction Manual

GV Standard Skyhatch Installation Instruction Manual

GV Standard Free Standing Box

Curium 19H Installation Instructions & Parts List

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

The Leka System Installation Guide

Curium 19.4H Installation Instructions & Parts List

Guardian warm roof conversion system. Installation Guide

NEW equinox INSTALLATION GUIDE Issue

Dubnium 11 Installation Instructions & Parts List

Installation. ng Kitt

NEW equinox INSTALLATION GUIDE Issue

FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)

Gallium 03 Installation Instructions & Parts List

Installation guide for 20/20

Potting Store Assembly Instructions

Installation Instructions of HomeTech Fakro Skylights

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

Xenon 05 Installation Instructions & Parts List

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

Radon 07 Installation Instructions & Parts List

8x4 SpaceSaver Garden Shed Assembly Manual

Installation Guide GRP Dormer

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Deauville Installation Guide

Platinum Swing Panel Installation Instructions

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

B A T H R O O M G L A S S

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

Frameless Fixed Panel Slider

equinox INSTALLATION GUIDE Issue CONTENTS If in doubt at any stage BE SAFE WHEN WORKING AT HEIGHT

Multi-layer Insulation Blanket for

Corner Potting Store Assembly Instructions

METAL BLINDS. Deluxe GETTING STARTED OPTIONAL HARDWARE. A few simple tools are required: STANDARD HARDWARE

YWY M08 The new VELUX solution

DUTCH GABLE FREESTANDING CARPORT

FRAMELESS GLASS FENCING DIY GUIDE

Liniar Window. installation guide

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

TRISO-SUPER 10 Installation Guidelines

Deauville Installation Guide

Installation Guide. Bi-fold Doors

To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call From outside the UK Call

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Portofino Installation Guide

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Frameless Inline Door With Return QCI5263

Portofino Case2 Installation Guide

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Installation - Sub Cills

Installation guide. Step-by-step instructions

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Sectional Door Installation Instructions

Frameless Hinged Door Enclosure. These instructions must be left with the user. Installation Guide W2-B

Shingle Installation Guide

N/A. General Instructions 14/01/2014. For Assistance Please Contact Customer Care on Overlap Cladding. Solid Sheet Roof.

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Before fitting door, check opening size and squareness of timber frame. The door is made smaller to give correct clearance within the frame.

N/A. General Instructions. For Assistance Please Contact Customer Care on Overlap Cladding. Solid Sheet Roof. No Windows.

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

Installation Instructions for Vista Air Vertically Folding Walls

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

8x12 SpaceMaker Garden Shed Assembly Manual

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

INFINITE RANGE - HINGE DOOR

Unit No. 6150, 7150 Deluxe Framed Sliding Tub/Shower Enclosure

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Installation Guide. WarmCore. Folding Sliding door system. Glass Packing. Pre-Installation. Removing the Existing Door.

Installation Guide. Frameless Sliding Door - Alcove. These instructions must be left with the user

tile redi redi DOOR Redi Swing SERIES: CONFIGURATION: MOUNTING PACKAGE:

Multi-layer Insulation Blanket for

Hinge Door + Side Panel

ASS 70 FD folding / sliding door. Installation Guide

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Eagle clad double-hung window installation instructions

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

INFINITE RANGE - CENTRE FOLDING DOOR

Installation Instructions

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

Greenhouse Assembly Instructions

TUB SHOWER Framed Sliding Enclosure

Hinge Door + One Inline Panel

START HERE BEFORE YOU BEGIN FIG 1 STEP 2

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

392CV SERIES Stickstall

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

WARNING. Not suitable for children under 36 months Contents

PROFESSIONAL PITCHED ROOFING ANCILLARIES

Series Sloped glazed Curtain wall. Installation Instructions

SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

Transcription:

GV Standard PitchVent Installation Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.

202-INST v1.0 19/02/2018 Page 2 of 27 Contents Section Description Page Contents 2 Introduction 3 Pre-Installation 4 Installation 8 Manual Crank PitchVent Setup 21 Chain Actuated PitchVent Setup 25 Interior Finishing 26 Conformity 27

202-INST v1.0 19/02/2018 Page 3 of 27 Introduction Delivery The product should arrive on site in undamaged packaging consisting of sterling board edge protection and polyfoam to protect the glass. The complete package should be securely wrapped using Glazing Vision branded packing tape. A separate box containing the installation hardware should be received, and also a second package containing the flashing kit if specified. Please inspect the packaging and unit and advise Glazing Vision within 48 hours from signing the receipt of your delivery of any damage or shortfall. Standard Installation Hardware Enclosed within the hardware box for each unit you should find the following: Stainless steel round head woodscrews Plastic packers (various sizes) Polybutyl tape Low modulus silicone (8mm diameter) Flashing Kit If a flashing kit is specified, the following items should also be included: Lead sheet Roofing underlay Polybutyl tape Head flashing (150mm wide) Cill flashing (450mm wide) Lead for soakers (450mm wide) Head apron (1m wide) Jamb aprons (1m wide) (50mm wide)

202-INST v1.0 19/02/2018 Page 4 of 27 Pre-Installation Please ensure all pre-installation checks are carried out prior to commencing installation. CAUTION! These products can be very heavy. Due consideration should be given to getting the product onto the roof safely and extreme care taken during installation. Pre-Installation Roof Checks After checking you have received the required installation hardware and product(s) it is important to ensure that the area of installation is suitably prepared. The area surrounding the aperture should be clear to provide safe access during the installation works. Note that even though this product is mechanically fixed into the roof structure from the inside, it will be necessary to work on the outside and therefore suitable provisions should be made for safe handling of the product, including all relevant PPE and safety systems for working at heights if required. The supporting rafters and horizontal trimmers, or alternative support frame for the product, should be checked for specification and dimensional accuracy. The aperture should be prepared as described below prior to installation. Preparation of the roof prior to installation will vary depending on roof type and roofing materials. A few common scenarios are included in this manual. Please follow the applicable steps for your configuration. Glazing Vision strongly recommends a dry run (without any silicone or polybutyl) before committing to the final installation. Sales Drawings Sales drawings should accompany this installation manual. If you do not have them then do not continue the installation without them. Sales drawings can be obtained by downloading them from our website (www.glazingvision.co.uk/resources) or by contacting Glazing Vision. The following pages on preparation of the roof recommend the relevant sales drawings for each installation type. Study them carefully before beginning the installation.

202-INST v1.0 19/02/2018 Page 5 of 27 Preparation of the Roof Standard Installation Typically for cold-roof construction the product will sit directly upon the outside of the rafters. Sales drawings: Installation: 202-ASS-002 Fixing dimensions: 202-ASS-001 Supporting trimmer Product to sit on face of rafters and trimmers Supporting rafter Fig. A Example of standard installation When preparing rafters, consider how the ends of the battens will be supported at the jambs of the product. Study the sales drawings of the product carefully when designing the size of the aperture. Figure A is for illustrative purposes only and may not be suitable for your installation. CAUTION! These products can be very heavy. Glazing Vision strongly recommends that a structural engineer is consulted when designing the structure(s) that will support the product and the surrounding roof. Nothing in this manual constitutes a structural proposal. Before continuing onto the installation instructions: The rafters and horizontal trimmers that will support the product should be complete and in place. The surrounding roof should not yet be felted or battened, this will be covered in the installation instructions.

202-INST v1.0 19/02/2018 Page 6 of 27 Preparation of the Roof Sunken Installation Typically for cold-roof construction with thin roofing materials, such as slate the product will sit on the outside of a separate frame sunken below the outside level of the rafters. Sales drawings: Installation: 202-ASS-003 Fixing dimensions: 202-ASS-001 Product to sit on face of sunken frame Secondary frame sunken below the level of the rafters Secondary fillet - see sales drawing Fig. B Example of sunken installation Study the sales drawings of the product carefully when designing the size of the main aperture and secondary sunken frame. Figure B is for illustrative purposes only and may not be suitable for your installation. CAUTION! These products can be very heavy. Glazing Vision strongly recommends that a structural engineer is consulted when designing the structure(s) that will support the product and the surrounding roof. Nothing in this manual constitutes a structural proposal. Before continuing onto the installation instructions: The sunken frame that will support the product, and the surrounding rafters and horizontal trimmers, should be complete and in place. The surrounding roof should not yet be felted or battened, this will be covered in the installation instructions.

202-INST v1.0 19/02/2018 Page 7 of 27 Preparation of the Roof Raised Installation Typically for warm-roof construction the product will sit on a frame built up from the rafters. Sales drawings: Installation: 202-ASS-004 Fixing dimensions: 202-ASS-001 Product to sit on face of spacers Spacers added to raise the product away from the rafters Fig. C Example of raised installation When preparing rafters, consider how the insulating sarking and the ends of the battens will be supported at the jambs of the product. Study the sales drawings of the Product carefully when designing the size of the aperture and spacers. Figure C is for illustrative purposes only and may not be suitable for your installation. CAUTION! These products can be very heavy. Glazing Vision strongly recommends that a structural engineer is consulted when designing the structure(s) that will support the product and the surrounding roof. Nothing in this manual constitutes a structural proposal. Before continuing onto the installation instructions: The raised frame that will support the product, and the surrounding rafters and horizontal trimmers, should be complete and in place. The insulating sarking (the insulation installed outside the rafters) and the counter-battens of the surrounding roof should be complete and in place. The surrounding roof should not yet be felted or battened, this will be covered in the installation instructions.

202-INST v1.0 19/02/2018 Page 8 of 27 Installation Instructions Before committing to installation, Glazing Vision strongly recommends that a dry run is completed of the installation process, without using silicone. Note that the installation shown here is a standard installation, using tiles at 120mm gauge. Other installations differ superficially, but the installation process is similar. Fig. D Example of standard installation (duplication of Fig. A) All of the images in this guide are diagrammatic. They should be used as a reference only, and may not be a true representation of your installation. Ensure that you have read and understood the entire installation instructions section before starting. Glazing Vision strongly recommends that the installation is carried out by competent roofers and lead workers.

202-INST v1.0 19/02/2018 Page 9 of 27 Step 1. Install, trim and finish the roofing underlay (felt or membrane) Trim and then fold the underlay back on itself as shown The underlay should be folded back on the structure that will support the product see sales drawing If desired, a layer of silicone can be used to seal the cut edge down If a sunken installation is used, the secondary fillet should be underneath the underlay see sales drawing Cut edge of underlay folded back Fig. 1 Roofing underlay installed and prepared Step 2. Install the cill tilting fillet Install a tilting fillet as shown (not supplied) - Glazing Vision recommends that a hardwood or treated softwood fillet is used Fix the fillet to the rafters Consider the distance required between the cill of the Product and the fillet (fig. 2 gap A) see sales drawing Gap A Cill fillet (primary) Fig. 2 Cill tilting fillet installed

202-INST v1.0 19/02/2018 Page 10 of 27 Step 3. Prepare and install the cill flashing Place the cill flashing as shown Use the cill flashing supplied as part of the flashing kit (if specified), otherwise use code 4, nominally 1.8mm thick flashing lead The flashing should be at least 300mm longer than the external width of the product and should be installed centrally The flashing should lap under the cill of the product by at least 50mm Apply silicone underneath the flashing, and if required fix the flashing in place using brass or stainless steel tacks (not supplied) Cill flashing Flashing length Fig. 3 Cill flashing in position Step 4. Place and fix the product in position These products can be very heavy. Due consideration should be given to getting the product onto the roof safely and extreme care taken during installation. Before attempting to lift the product, please check that the yellow transport plate(s) are securely attached to the product. If the product is an electric variant (eg. chain actuated), be mindful of the cable and ensure that it is not damaged. Note that the cable needs to be on the inside of the building. If fixing to a support structure made from a material other than wood, ensure the correct type of screws or fixings have been sourced prior to this step Apply a continuous loop of 8mm diameter polybutyl (supplied) to the underside of the product (fig. 4a) Lay a large, continuous bead of silicone (supplied) onto the underlay approximately 65mm from the internal aperture (fig. 4b) Using masking tape, tape the plastic packers (supplied) along the jambs and cill (fig. 4c), ensuring that the product will sit centrally in the aperture there should be a nominal 10mm gap on all sides (filled with packers) Place the product over the aperture (fig. 4d) Positioning the packers as needed, to ensure that the product is centrally positioned, fix the product into place using the appropriate fixings (woodscrews supplied) (fig. 4e) - if doing a dry fit, screws through some of the fixing holes into the rafters can be used to temporarily hold the product in place If required, using the product fixing holes as a guide, drill a pilot hole for each screw prior to fixing Once fixed in place, remove any excess polybutyl and/or silicone from around the edge of the product

202-INST v1.0 19/02/2018 Page 11 of 27 If performing a dry run, the position of the product can be marked and the product removed. The installation can then be begun. If using any temporary fixing screws, do not remove any that are holding the product in position until all of the other screws have been installed. Polybutyl see sales drawing Fig. 4a Continuous polybutyl loop on the underside of the product Silicone approx. 65mm from aperture on all sides Fig. 4b Continuous silicone bead on top of underlay

202-INST v1.0 19/02/2018 Page 12 of 27 Fig. 4c Tape plastic packers along jambs and cill Product sits on top of flashing and silicone Fig. 4d Place product centrally into aperture Use as many/few packers as required Fig. 4e Fixing detail (from inside)

202-INST v1.0 19/02/2018 Page 13 of 27 Step 5. Silicone the sides and fixings Run a continuous thick fillet of silicone (supplied) along the entire length of the head, the cill and both jambs Continuous fillet of silicone around all sides Fig. 5 Sides siliconed Whilst still wet, excess silicone can be cleaned from the product by spraying on a small amount of soapy water and wiping with a cloth or paper towel. Step 6. Apply the polybutyl tape to the jambs Apply 50mm polybutyl tape (supplied as part of flashing kit if specified, otherwise use approx. 1.5mm double-sided butyl tape) to the full length of the gutter lip on both jambs (sides) Apply polybutyl to full length of gutter lip Fig. 6a Polybutyl tape applied to jambs

202-INST v1.0 19/02/2018 Page 14 of 27 Lay polybutyl tape over gutter lip Fig. 6b Polybutyl tape applied to jamb Step 7. Place the jamb aprons in position Place the jamb aprons (use the roofing underlay supplied as part of the flashing kit if specified, otherwise use roofing underlay of at least 1m in width) in position The apron should be at least 150mm longer than the external span of the product The bottom edge of each apron should lap over the cill flashing and should align with the bottom edge of the product cill The aprons may be tacked in position to the rafters/counter-battens below Bottom edge of jamb apron to align with cill edge of product and overlap cill flashing Difference of at least 150mm Approx. 1m wide Length of jamb apron Fig. 7a Jamb aprons positioned

202-INST v1.0 19/02/2018 Page 15 of 27 Jamb apron folded around gutter lip Fig. 7b Jamb apron adhered to polybutyl tape Step 8. Install the head tilting fillet Install a tilting fillet as shown (not supplied) - Glazing Vision recommends that a hardwood or treated softwood fillet is used Fix the fillet to the rafters Head fillet Fig. 8 Head tilting fillet installed

202-INST v1.0 19/02/2018 Page 16 of 27 Step 9. Install the head flashing Install the head flashing (use the lead flashing supplied as part of the flashing kit if specified, otherwise use code 4, nominally 1.8mm thick lead) The flashing should be at least 300mm longer than the external width of the product and should be installed centrally Head flashing Fig. 9a Head flashing installed Head flashing tucked into head gutter of product Fig. 9b Head flashing installed

202-INST v1.0 19/02/2018 Page 17 of 27 Step 10. Install the head apron Place the head apron (use the roofing underlay supplied as part of the flashing kit if specified, otherwise use roofing underlay of at least 1m in width) in position The apron should cover the tops of both jamb aprons entirely The bottom edge of the apron should lap over the head flashing by at least 50mm, and the top edge should lap under the underlay of the roof by at least 50mm If the underlay supplied/recommended does not reach, then a second piece should be used as an intermediary, lapped over the original piece and lapped under the underlay of the roof The head apron must be lapped into the roof underlay as described in this step. See also the sales drawing. Head apron lapped over head flashing Fig. 10 Head apron installed Step 11. Batten the roof Batten up to the cill - in addition to normal considerations, consider how the tiles/slates will fit around the product when determining the gauge of the battens The battens should be fixed in place ready for tiling/slating Batten to either side of the product and then batten the roof above the product Fig. 11 Battens installed

202-INST v1.0 19/02/2018 Page 18 of 27 Step 12. Prepare the lead soakers The soakers should tuck approximately 100mm between the tiles/slates, should fold under the gutter of the product and should overlap by at least 50mm (fig. 12a) Use the flashing lead supplied as part of the flashing kit if specified, otherwise use code 4, nominally 1.8mm thick lead. Fig. 12a Example of installed soakers Fig. 12b Example of soaker Glazing Vision strongly recommends that the manufacture and installation of soakers is carried out by a competent lead-worker. Fig. 12a is presented only as an example. The soakers described in fig. 12b may not be suitable for your roof.

202-INST v1.0 19/02/2018 Page 19 of 27 Step 13. Tile the roof and install soakers Before tiling, take the opportunity to check the weathering (overlap) of the aprons and flashings and to check the silicone sealing the jambs. Tile up to the batten below the product Fold and boss the cill flashing into final position Tile to either side of the product, installing the soakers Tile above the product - Glazing Vision recommends that eaves tiles are used immediately above see sales drawing Fig. 13a Cill tiled and cill flashing finished Fig. 13b Jambs tiled and soakers installed

202-INST v1.0 19/02/2018 Page 20 of 27 Eaves tiles are recommended for use immediately above the product Fig. 13c Roof tiled above the head Do not apply any interior finishes yet. To set up mechanisms go to the following pages: For a manual crank PitchVent, refer to page 21. For a chain actuated PitchVent, refer to page 25.

202-INST v1.0 19/02/2018 Page 21 of 27 Manual Crank PitchVent Setup Before continuing, please check the type of product that is being fitted is a manual crank PitchVent, and that installation onto the roof has been completed correctly. Step 1. Remove the transportation plate Check both the external and internal areas surrounding the product for obstructions that may prevent the product from opening, or could cause damage to the product Working from inside the building, remove the yellow transportation plate from the cill (fig. 14a) Fig. 14a Transportation bracket removed Step 2. Attach the brackets for the spindle Attach the base bracket and spacer (supplied) to the base frame of the product using the supplied screws (these are the same as the ones removed in the previous step) ensure that the parts are correctly orientated (fig. 14b) Attach the lid bracket (supplied) to the lid frame of the product using the supplied screws ensure that the bracket is correctly orientated (fig. 14c) Fig. 14b Base bracket attached

202-INST v1.0 19/02/2018 Page 22 of 27 Fig. 14c Lid bracket attached Step 3. Connect the spindle The collar will probably have to be wound all the way to the top (against the shoulder) before attaching the spindle to the brackets, as when the lid is closed the glass will be in the way Attach the spindle to the base bracket using the supplied fixings ensure that it is correctly orientated (fig. 14d) Attach the spindle to the lid bracket o If not already done, rotate the wide part of the spindle downwards until it hits the spindle collar (fig. 14e) o Making sure that the shoulder of the spindle sits hard against the collar, unscrew a small length of the inner spindle, until it can connect to the lid bracket (fig. 14f) o Connect the spindle to the lid bracket using the supplied fixings (fig. 14g) Fig. 14d Spindle connected to base bracket

202-INST v1.0 19/02/2018 Page 23 of 27 Fig. 14e Wind the spindle downwards Fig. 14f Raise the smaller part

202-INST v1.0 19/02/2018 Page 24 of 27 Fig. 14g Spindle attached to lid bracket Step 4. Finishing up Once everything has been fully attached, check product functionality by completely opening and closing the product at least once Interior finishes can now be applied (see page 27 and refer to relevant sales drawing) consider the internal finishes carefully and ensure that they will not interfere with the mechanism

202-INST v1.0 19/02/2018 Page 25 of 27 Chain Actuated PitchVent Setup Before continuing, please check the type of product that is being fitted is a chain actuated PitchVent, and that installation onto the roof has been completed and done correctly. Step 1. Remove the transportation plates Check both the external and internal areas surrounding the product for obstructions that may prevent the product from opening, or could cause damage to the product Check also that the cable and framework has not been damaged Working from inside the building, remove the two yellow transportations plates (one on either side) Insert the small blanking caps (supplied) into the fixing holes for the transportation plates Fig. 15a Transportation brackets removed Fig. 15b Blanking caps inserted Step 2. Wire the product in Using the wiring diagram (202-ASS-009) for reference (if not supplied, please contact Glazing Vision before proceeding), wire in the product and any switches and/or optional extras Step 3. Finishing up Once everything has been fully wired in, switch on the power and check product functionality by completely opening and closing the product at least once Interior finishes can now be applied (see page 26 and refer to relevant sales drawing)

202-INST v1.0 19/02/2018 Page 26 of 27 Interior Finishing Glazing Vision does not specify the finishes permitted except for the following stipulations: The finish must be built up to the internal dimension of the product see sales drawings No interior metal component (for example edging strips for plastering) may touch any part of the product framework that is the outer colour (RAL 7015 grey as standard) Nothing should be fixed directly to the product Contravention of either of these stipulations will severely undermine the thermal efficiency of the product. Fig. E Example section detail of a double glazed unit with standard installation

202-INST v1.0 19/02/2018 Page 27 of 27 Conformity EN 14351-1:2006+A2:2016 For more, refer to the separate declaration of performance documentation, or see the marking affixed to the Product.