Testing 320 kv HVDC XLPE Cable System

Similar documents
A6.6 9 th International Conference on Insulated Power Cables A6.6

High-Voltage Test Techniques

REPORT OF PERFORMANCE TIC

Type Test of a 145 kv Termination Type TS 145-II

USING DAMPED AC VOLTAGES

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

VSD cables in. Working with. industrial & automation applications

Insulation Co-ordination For HVDC Station

All the standards referred to the most current issue, including all amendment supplements. as of the date of the bid.

This Certificate consists of 75 pages in total.

Modelling of Sf6 Circuit Breaker Arc Quenching Phenomena In Pscad

A Study on Lightning Overvoltage Characteristics of Grounding Systems in Underground Distribution Power Cables

Standard Technical Specifications for Electrical Works CABLES AND ACCESSORIES. 11 kv XLPE-Insulated Three-Core Underground Cables

AORC Technical meeting 2014

High Voltage Engineering

Underground System Design TADP 547

Power Engineering II. High Voltage Testing

Investigation of skin effect on coaxial cables

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV

HVDC Transmission. Michael Muhr. Institute of High Voltage Engineering and System Performance Graz University of Technology Austria P A S S I O N

Fault location on power cables. Fault location on power cables

Electric Stresses on Surge Arrester Insulation under Standard and

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS

CHAPTER 2. v-t CHARACTERISTICS FOR STANDARD IMPULSE VOLTAGES

Integrated Electro-optic Sensor based Transient Voltage Measuring System and its Applications

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Statistical Characteristics of Partial Discharge Caused by Typical Defects in Cable Joint under Oscillating Voltage

AMENDMENT NO. 1 SEPTEMBER IS (Part 1) : 2001/IEC (1991) SURGE ARRESTORS

EE 1402 HIGH VOLTAGE ENGINEERING

ASTA TEST REPORT NO: HEATSHRINK TERMINATIONS 3 CORE 12kV PILC AND XLPE

Modeling and Analysis of a 3-Phase 132kv Gas Insulated Substation

76 / 132 (145) kv 1x1200 mm 2 CU/XLPE/CWS/AL/HDPE

KEYWORDS: Impulse generator, Pspice software, spark gap, Power transformer, Hardware.

High voltage engineering

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI[" FGRCTVOGPV"QH"GNGEVTKECN"GPIKPGGTKPI" VGG"246"JKIJ"XQNVCIG"GPIKPGGTKPI

Transient Data Acquisition System, TAS 4-40 Potential-free measurement of fast rise pulses:

Investigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

RESULTS OF EXPERIMENTAL HIGH CURRENT IMPULSE 4/10 s OF METAL OXIDE VARISTORS ZINC IN THE HIGH VOLTAGE 220KV SURGE ARRESTER

Generation of Sub-nanosecond Pulses

Comparison of switching surges and basic lightning impulse surges at transformer in MV cable grids

AORC Technical meeting 2014

Analysis of MOV Surge Arrester Models by using Alternative Transient Program ATP/EMTP

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models

DIELECTRIC HEATING IN INSULATING MATERIALS AT HIGH DC AND AC VOLTAGES SUPERIMPOSED BY HIGH FREQUENCY HIGH VOLTAGES

Insulation Test System

Stress Analysis of HVDC Circuit Breakers for Defining Test Requirements and its Implementation

TECHNICAL SPECIFICATION

Switching Restrikes in HVAC Cable Lines and Hybrid HVAC Cable/OHL Lines

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit.

Investigation of Inter-turn Fault in Transformer Winding under Impulse Excitation

Basics of Partial Discharge. Prepared for 2015 Phenix RSM Meeting January 2015

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS

Practical aspects of PD localization for long length Power Cables

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

High Voltage Engineering

CIGRE- AORC Technical Meeting 2016 and International Conference on Global Trends in the Development of Power T&D System including Smart Grid

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit.

Abstract. 1 Introduction

I P I OUT R L. Applications. Standards. N 52.D ; Page 1/8

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING UNIT I

3.2 Measurement of high voltages

HV AC TESTING OF SUPER-LONG CABLES

7P Series - Surge Protection Device (SPD) Features 7P P P

CIGRE SC B1 Colloquium on H.V. Insulated Cables New Delhi (India) on Oct. 2017

Pre location: Impulse-Current-Method (ICE)

High-Voltage Test and

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

Return to Session BREAKDOWN CAUSED BY ABRUPT DC-VOLTAGE GROUNDING OF XLPE CABLE INSULATION ABSTRACT KEYWORDS INTRODUCTION

I Pr I P I OUT R L. Applications. Standards

The relationship between operating maintenance and lightning overvoltage in distribution networks based on PSCAD/EMTDC

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

MEASUREMENT OF THE INTERNAL INDUCTANCE OF IMPULSE VOLTAGE GENERATORS AND THE LIMITS OF LI FRONT TIMES

Earthing of Electrical Devices and Safety

Investigation of PD Detection on XLPE Cables

Prediction of Transient Transfer Functions at Cable-Transformer Interfaces

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017

Simulation of characteristics of impulse voltage generator for testing of equipment using MATLAB Simulink

MEDIUM & HIGH VOLTAGE

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl

Analysis of lightning performance of 132KV transmission line by application of surge arresters

24 th International Conference on Electricity Distribution Glasgow, June Paper 0881 ABSTRACT STATE OF THE ART INTRODUCTION ECOTAP VPD

EXTREMELY LOW MAGNETIC FIELD (ELMF) XLPE INSULATED CABLES, TYPE N2XY/FR1 0.6/1 KV

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN

The Lightning Event. White Paper

ANALYSIS OF FAULTS INTERRUPTED BY GENERATOR

Choosing the right Pico Technology active differential probe

150 kj Compact Capacitive Pulsed Power System for an Electrothermal Chemical Gun

Application guide. Cable fault location in LV, MV and HV underground cable networks. Practical experience. Author: Tobias Neier, Ing.

Tab 2 Voltage Stresses Switching Transients

Maximum Lightning Overvoltage along a Cable due to Shielding Failure

DISCONTINUED PRODUCT FOR REFERENCE ONLY COMPLEMENTARY OUTPUT POWER HALL LATCH 5275 COMPLEMENTARY OUTPUT POWERHALL LATCH FEATURES

Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages

I P. /dt. di p V S+ Applications. Standards. 1) IEC ed1.0: 2007; IEC : ed1.0: 2012

شركة الوقت للكهرباء والمقاوالت ذ.م.م.

ABSTRACT 1 INTRODUCTION

SWITCHING OVERVOLTAGES IN A 400-KV CABLE SYSTEM

DC Chopper Based Test Circuit for High Voltage DC Circuit Breakers

Transcription:

Testing 320 kv HVDC XLPE Cable System H. He, W. Sloot DNV GL, KEMA Laboratories Arnhem, The Netherlands Abstract Two unique test requirements in testing of a high- voltage direct- current (HVDC) cable system compared to that of a high- voltage alternate- current (HVAC) cable system exist: a specified maximum temperature drop across the insulating layer of a cable ( θ!"# ) and a superimposed impulse withstand test. This work focuses on these two topics based on practical testing experience. The temperature difference θ!"# (excluding the semiconducting screens) is provided by a cable manufacturer depending on an insulating material (e.g. XLPE: cross- linked polyethylene) and a cable design. This temperature difference needs to be maintained in a specified limit during a stead state of a load cycle. In practice, it is not possible to measure θ!"# directly. By applying of heat transfer theory, a simple formula is introduced to calculate θ!"#. A superimposed impulse withstand test is essential for a HVDC cable system to be qualified for two different HVDC converter technologies, which are Line Commutated Converter (LCC) and Voltage Source Converter (VSC). In this paper, a laboratory test set- up is presented for switching/lightning impulse (SI/LI) voltage superimposed on a HVDC voltage. A universal divider is introduced to measure the combined stresses for a HVDC cable system. Keywords High- voltage; testing; HVDC cable system; thermal stress; impulse withstand; sphere gap Introduction In a HVAC cable, the electric field distribution depends on capacitances which are dominated by the permittivity of the insulation material. This permittivity is rather stable with temperature, therefore a specified θ!"# is not required for a HVAC cable testing. Contrary to a HVAC cable, the field distribution in a HVDC cable is determined by the resistivity of the insulation material. Furthermore, this resistivity varies greatly with temperature, which results in the need to control the temperature difference θ!"# during the thermal stresses represented by the load cycle in a test[1],[2]. A HVDC cable in operation experiences SI/LI overvoltage as well, which is superimposed onto a DC service voltage. In order to simulate the in- service condition, there a switching surge and a lightning transient superimposed on an operating DC voltage is a standard requirement. This paper describes a test circuit with two separated test systems (a DC generator and an impulse generator), which were connected to each other with a test cable system located in between. The test cable system consists of three pieces of HVDC XLPE cable (50 m in total) assembled with two outdoor terminations and two joints. A major complexity is to prevent damage of each high voltage test system due to the presence of the other. Therefore, a sphere gap was installed to block DC voltage from the impulse generator; a damping impedance set was protecting the DC generator from very fast transients.

Thermal physical model List of symbols Q, heat transfer rate (heat flow), W; θ!, θ!", θ!,θ!", θ!, θ!"#, temperature of conductor, conductor screen, insulation, insulation screen, sheath and ambient, C; θ!", θ!, θ!", temperature drop across conductor screen, insulation and insulation screen respectively, K; θ!!!", temperature difference from conductor to insulation screen, K; T!", T!, T!", thermal resistance of conductor screen, insulation, insulation screen respectively, K m/w; T!, thermal resistance in total from metal sheath to over sheath, K m/w; T!", thermal resistance of external thermal insulation material, K m/w; Consequently, a temperature difference arises across the cable. The temperature distribution inside the cable can be either measured by thermocouples or calculated by a numerical model. Figure 1 is shown a diagram of an equivalent thermal circuit for a cable. Figure 1: Diagram of an equivalent thermal circuit for a cable Temperature difference across conductor screen, insulation and insulation screen is calculated as θ!" = θ! θ!" = QT!" (1) θ! = θ!" θ! = QT! (2) θ!" = θ! θ!" = QT!" (3) θ!" and θ! were measured directly by thermocouples. So overall temperature difference from conductor to insulation screen is θ!!!" = θ!" θ! = Q(T!" + T! + T!" ) (4) Based on Eq.(2) and Eq. (4), T! (5) θ! = θ!!!" T!" +T! +T!"

In conclude, Eq.(5) is the simple formula for the calculation of θ!"#. Oobviously, the surrounding plays also a role, thus the main temperature drop in a cable is between the cable surface (sheath) and environment (θ! θ!"# ). In order to control θ! within the limit of θ!"#, external thermal insulation material (e.g. plastic bubble) is applied to minimize the influence of environment. This thermal insulation material helps to adjust T!" based on different cable design and surrounding condition. Load cycle and temperature measurement In order to monitor the thermal environment of HVDC cable system, thermocouples were placed at more than 20 different locations on a reference cable and a test cable in total. The reference cable should be installed in close proximity with the test cable to ensure an equal thermal environment [3]. The conductor temperature of the reference cable (based on rated maximum θ!, e.g. 70 C) was monitored to guide the same current applied to the test cable simultaneously. By applying Eq.(5), the specified Δθ!"# was calculated and monitored during the load cycle. A typical 24 hours load cycle is shown in Figure 2. Figure 2: Diagram of a typical 24 hours load cycle Figure 3 and Figure 4 schematically demonstrate the cable cross- section (e.g. 2500mm 2 ) and the locations of the measured temperature respectively. 60 insulation screen temperature θ is 2 3 conductor temperature θ c 1 4 6 5 insulation screen temperature θ is Figure 3: A cross- section overview of cable construction

CABLE SYSTEM Termination A- side Termination B- side (thermally insulated) Pos. 1 Pos. 15 Pos. 2 Pos. 14 Pos. 3 Pos. 13 Pos. 12 Pos. 11 Pos. 4 Ambient 1 ( 0,2 m) Ambient 2 ( 2 m) Heating transformers Ambient 4 ( 0,2 m) Pos. 10 Pos. 5 Pos. 6 Pos. 7 Pos. 8 Pos. 9 Joint 2 Joint 1 REFERENCE CABLE (thermally insulated) Connection left, 1 Ambient 3 ( 0,2 m) Connection right, 1 Thermal insulation Connection right, 2 Connection left, 2 Sheath, bare Sheath, thermally insulated Conductor 1, 2 and 3 Insulation screen, positions 1-6 Figure 4: Locations of the measured temperature Experimental setup An experimental setup included a DC generator, an impulse generator and a test object, which was a 320kV DC cable system including HVDC XLPE cable (copper conductor and XLPE insulation, nominal capacitance of 0,26µF/km), two outdoor oil terminations and two premoulded joints with shield interruption. A schematic test circuit and a photo of a real test setup are shown in Figure 5 and Figure 6 respectively. Each test system was equipped its own divider in order to measure DC voltage (Divider 1 in Fig. 5) and SI/LI (Divider 3 in Fig. 5) respectively. A combined divider (Divider 2 in Fig. 5) was applied to measure the superimposed withstand voltage subjected directly to the test object. A pair of spheres (diameter of 0,5 m, SG2 in Fig. 5) was installed in vertical position, the lower sphere directly fixed to the outdoor terminations. The DC generator was also connected to the lower sphere with the protection water resistor (10 MΩ, R1 in Fig. 5) and the blocking impedance (35 mh, L1 in Fig. 5) in between. The upper sphere was separated from the lower sphere and the cable by an air gap and connected to the impulse generator. The surge arrestor (A1 in Fig. 5 ) was installed for extra protection of the DC generator.

Figure 5: Schematic view of the test circuit for superimposed impulse test of DC cable system Figure 6: Photograph of the test set- up of a 320kV DC cable system Test procedure Accurate measurement of voltage waveforms and self- ignition of sphere gap are the two essential aspects for a superimposed impulse test. By means of a sphere gap, this gap must ignite at a certain level and transfer the SI/LI to the cable system. The gap distance has to be considered and adjusted. Under the same polarity of two voltages (e.g. + UDC and + USI, a unipolar stress), the breakdown voltage of the sphere gap (Ubd unipolar = UDC USI UDC, thus USI 2 UDC), in contrary to a bipolar stress (e.g. + UDC and USI), the voltage (Ubd bipolar = UDC ( USI) UDC, thus absolute USI 0). Therefore under the bipolar stress, there is not critical for breakdown the air gap; however under the unipolar stress, it is a complex procedure due to the Ubd unipolar. Furthermore, this calibration steps are necessary to avoid overshot of the test object [4]. The distance of sphere gap needs to be adjusted corresponding with the calibration of impulse voltages from low scales (50%, 65% and 80% of the test voltage) up to full scale (100% of the test voltage).

Analysis of measured results The three measured voltages were obtained with three dividers D1, D2, D3 (see Fig.5) during the testing. The DC voltage measured by the Divider 1 via a digital voltage meter and the full scale of DC voltage should be 320kV. The SI/LI voltages were overserved by the Divider 3 and the peak voltages should be 710kV and 740kV respectively (see Fig.7). DC voltage superimposes with same polarity of SI is shown in Figure 8. It is further found that DC voltage superimposes with opposite polarity SI and LI in Figure 9 and Figure 10 respectively. Figure 7: Representations of the switching impulses waveforms measured by Divider 3 Figure 8: The unipolar stress (U DC and U SI ) measured by Divider 2 Figure 9: The bipolar stress (U DC and U SI ) measured by Divider 2 Figure 10: The bipolar stress (U DC and U LI ) measured by Divider 2

In Figure 7, the Divider 3 measured a spike in front of the SI wave shape, which is the time delay of the protection sphere gap, it was until over the breakdown voltage, then sphere gap was conducting and the cable system was connected at that moment to the impulse generator. It is observed in Figure 8, a systematic DC offset error occurs during the tests. The Divider 2 was calibrated by DC voltage and Impulse voltages respectively. For combined voltages, a correction factor is needed (i.e. a factor of 0,78). This offset leads to a difference of peak voltages of impulses measured by Divider 3 and Divider 2. It is noticed that, once the arc between the spheres was ignited, the voltage on the cable system followed the voltage at the terminal of the impulse generator. Thus the voltage on the cable system in extreme short time (hundreds or thousands of µs) discharged via impulse generator to extinguish voltage of the arc (visible in graphs), then it would take short recover time (few hundreds of ms) to recharge to the DC voltage (invisible in graphs due to limitation of data collection). In the meantime, the protection resistors sustained the full difference of impulse voltage and DC test voltage. Conclusions The calculation of Δθ!"# is obtained based on heat transfer method. In order to maintain a constant surface temperature of the cable, needed to guarantee a specified Δθ!"#, the practice methods are to control load current through conductor, maintain constant ambient temperature or apply the external thermal insulation material. A proper test setup using a sphere gap has been developed for the application of SI/LI superimposed on a DC voltage. The correct gap adjustment is essential for unipolar stress condition, otherwise under certain circumstances, the high- frequency oscillations might occur. Further experimental work will focus on a method of controlling cable sheath temperature, and developing a new three- channel software with extended data capture time (up to recover time of DC voltage). Furthermore, a protection capacitor is another alternative of a sphere gap to realize the superimposed withstand test. References [1] Cigre 496: Recommendations for Testing DC Extruded Cable Systems for Power Transmission at a Rated Voltage up to 500kV, April 2012. [2] IEC 62895 Edition 1.0: 2017-05: High voltage direct current(hvdc) power transmission Cables with extruded insulation and their accessories for rated voltages up to 320 kv for land applications Test methods and requirements. [3] E. Pultrum, W. Sloot, J. Fernandez, R. P. P. Smeets, High- voltage cable testing: type test experiences and new insights into pre- qualification, CEPSI, 2016. [4] IEC 60060-1 Edition3.0: 2010-09: High- voltage test techniques Part 1: General definitions and test requirements.