W Roosevelt Rd Chicago, IL 8 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 99,3 $,8,8 Addition 93, $,8 SITE $33, Campus Total 8,8 $3,, Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $,3 Exterior Doors - Exterior Steel Door EA $3,83 Exterior Doors - Exterior Steel Door EA $,9 Exterior Doors - Side lite EA $,38 Exterior Doors - Store Front EA $, Exterior Doors - Transom Lite EA $3,33 Exterior Stairs - Concrete LF $, Stair Handrail - Steel_Stair Handrail LF $3, Stair Handrail - Steel_Stair Handrail LF $3 Foundation Lighting Roof System Foundation - Concrete 33 LF $,8 Foundation - Concrete 93 LF Superstructure - Concrete,3 SF Exterior Lighting - Wall Mounted EA $, Chimney - Metal Flue LF $, CHALMERS Page of Assessment Date: /8/
Building: Main Category: Building Exterior Roof System W Roosevelt Rd Chicago, IL 8 Coping - Metal 8 LF $, Downspouts - Interior Downspouts LF $,8 Roof - Asphalt Gravel Ballast, SF $3, Roof Structure - Concrete, SF Walls Windows Canopy - Concrete/ Stucco 8 SF $, Exterior Walls - Brick,83 SF $,39 Curtain wall - Glazed Double Pane,9 SF $88,838 Curtain wall - Insulated Panel 8 SF 3 $8,3 Curtain wall - Insulated Panel SF Curtain wall - Insulated Panel SF Curtain wall - Insulated Panel 3, SF $3, Guard - Guards perforated,88 SF $3,88 Lintels - Steel LF $ Windows - Casement Aluminum Double-pane SF $3,3 Windows - Casement Aluminum Double-pane 98 SF $,3 Building Exterior Subtotal: $,,9 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA $8 Emergency A/C Power - Corridors and Stairs,9 SF $3,3 Emergency A/C Power - Gym 3,8 SF $, Emergency A/C Power - Lunchrooms,99 SF $9 Exit Signs - Corridors and Stairs 8 EA $,93 Exit Signs - Gym EA $, Security System - CCTV,3 SF $,3 Security System - Intrusion Detection,3 SF $,3 Main Service Main Electrical Service - to 3 A /8/3PH EA $,8 PA System,3 SF $38,9 CHALMERS Page of Assessment Date: /8/
Building: Main Category: Electrical System Power Distribution W Roosevelt Rd Chicago, IL 8 Lighting and Power Panels - A EA $98 Lighting and Power Panels - Above A EA $,98 Main Distribution Panels - - amp EA $,388 Main Distribution Panels - - amp EA $, Transformers - /8 - /8 EA $, Electrical System Subtotal: $3,93 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA $, Fire Alarm Strobe Lights,3 SF $,8 Fire Alarm_System,3 SF $,83 Safty System Subtotal: $, Building: Main Category: Mechanical System Air Conditioning Air Handling Systems Chemical Pot Feeder EA $, Chiller-Air Cooled-Scroll Type-Roof Mounted - - tons EA $,3 Chiller-Air Cooled-Scroll Type-Roof Mounted - Less than tons EA $3,9 Glycol Feed EA $98 Pipes - Chilled Water Pipe- Copper LF $ Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - - EA $8,9 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - Greater EA $9, than 3, cfm Air Intake EA $,9 Auxiliaries - - cfm EA Auxiliaries - Greater than 3, cfm EA Fan Coil Unit- Celing Mounted - Electric EA $3,9 CHALMERS Page 3 of Assessment Date: /8/
Building: Main Category: Mechanical System Air Handling Systems W Roosevelt Rd Chicago, IL 8 Indoor Return Fans- Centrifugal Squirrel Cage - - CFM EA $,8 Indoor Return Fans- Centrifugal Squirrel Cage - Greater than CFM EA $, Zone Dampers EA $9,98 Boiler Systems Heat Exchangers Heating Devices Mechanical Plumbing Temperature Control Ventilation Boiler Auxiliary- on Condensing Hot Water - - 3 MBH EA $,93 Chemical Pot Feeder EA $ Combustion Dampers EA $88 Glycol Feed System EA $39 on Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - - 3 MBH EA $,99 Heat Exchanger - Water to Water Plate Type EA Unit Heater - Hot Water EA $3, Chilled Water Pump - Less than EA $, Hot Water Pump - Less than EA $,9 Hot Water Pump - Less than EA $, Hydronic Supply and Return - Copper LF $, Hydronic Supply and Return - Galvanized LF $83,9 DDC System,3 SF $3, Thermostats - DDC EA $89 Thermostats - DDC EA Exhaust Fans- Indoor - - 8 CFM EA $9 Exhaust Fans- Roof Mounted - - CFM EA $,8 Mechanical System Subtotal: $8,3 Building: Main Category: Plumbing System CHALMERS Page of Assessment Date: /8/
Building: Main Category: Plumbing System Hot Water W Roosevelt Rd Chicago, IL 8 Gas Heater - - 3 BTU/HR EA $3 Hot Water Storage Tank_Gas - - Gallons EA $,3 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures,3 SF $,38 Domestic Piping-Cold Water Horizontal Lines,3 SF $3,9 Domestic Piping-Cold Water Risers,3 SF $, Domestic Piping-Hot Water from Risers to Fixtures,3 SF $8,9 Domestic Piping-Hot Water Horizontal Lines,3 SF $, Domestic Piping-Hot Water Return Lines,3 SF $8,3 Domestic Piping-Hot Water Return Risers,3 SF $8,3 Sanitary Piping,3 SF $,9 Storm Piping,3 SF $9,8 Vent Piping,3 SF $38,3 Pumps - Ejector-Duplex EA $,9 Pumps - Sump-Duplex EA $,3 Plumbing System Subtotal: $3,88 Building: Main Category: Classrooms Art Room ( rooms) Casework LF $,3 Ceiling - Exposed 8 SF $,3 Ceiling - Exposed 9 SF Doors - Side-lite 3 SF $ Doors - Transom Window SF $ Doors - Wood Doors inclu hw EA Floor - Tile 9 SF $,99 Floor - Tile/Sheet,9 SF $,3 Instructional Surface 8 LF $9 Lighting - Pendent/Surface EA $, Lighting - Pendent/Surface EA Marker Board 3 LF $8 Marker Board LF CHALMERS Page of Assessment Date: /8/
Building: Main Category: Classrooms Art Room ( rooms) W Roosevelt Rd Chicago, IL 8 Storage/ Closet 8 SF $8 Walls - Concrete Block,89 SF $, Work Sink EA $39 Computer Lab (3 rooms) Kindergarten (3 rooms) AC Units EA $,8 AC Units EA $9 Casework LF $,89 Ceiling - Exposed, SF $,9 Ceiling - Exposed 9 SF Doors - Side-lite SF $ Doors - Transom Window SF $ Doors - Wood Doors inclu hw 3 EA $93 Floor - Carpet 88 SF $,88 Floor - Tile, SF $3,8 Lighting - Pendent/Surface EA $, Lighting - Pendent/Surface EA Marker Board 8 LF Marker Board LF Storage/ Closet 9 SF $, Walls - Concrete Block,8 SF $,33 Walls - Masonry, SF $3,9 Wireless System EA $3 Wireless System EA AC Units EA $9 Casework 8 LF $, Ceiling - Exposed 8 SF $,9 Ceiling - Exposed,88 SF Doors - Side-lite 8 SF $8 Doors - Transom Window 39 SF Doors - Wood Doors inclu hw 3 EA $93 Floor - Tile,88 SF $, Floor - Tile/Sheet 8 SF $8 Lighting, Lighting - Pendent/Surface EA $,8 Lighting - Pendent/Surface EA CHALMERS Page of Assessment Date: /8/
Building: Main Category: Classrooms Kindergarten (3 rooms) W Roosevelt Rd Chicago, IL 8 Marker Board LF $ Marker Board 8 LF Storage/ Closet 38 SF $, Walls - Concrete Block 3,99 SF $,8 Work Sink EA $8 Music Room ( room) Casework 3 LF $99 Ceiling - Exposed 9 SF $,33 Doors - Side-lite 8 SF $3 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $3 Floor - Tile 9 SF $,99 Lighting - Pendent/Surface EA Marker Board LF Storage/ Closet SF $9 Walls - Concrete Block, SF $3, ( rooms) Science Classroom ( room) Casework 38 LF $9, Ceiling - Exposed,98 SF $,8 Ceiling - Exposed,9 SF Doors - Side-lite 3 SF $3,9 Doors - Transom Window 98 SF $3,3 Doors - Wood Doors inclu hw EA $, Floor - Tile,88 SF $,3 Floor - Tile/Sheet 8 SF $3,8 Floor - Tile/Sheet,8 SF $,3 Lighting - Pendent/Surface EA $8,3 Lighting - Pendent/Surface 8 EA Marker Board LF $,8 Marker Board 9 LF Storage/ Closet 9 SF $, Walls - Concrete Block,8 SF $,8 Casework LF $ Ceiling - Exposed 88 SF $, Doors - Side-lite 8 SF $3 CHALMERS Page of Assessment Date: /8/
Building: Main Category: Classrooms Science Classroom ( room) W Roosevelt Rd Chicago, IL 8 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $3 Floor - Tile 88 SF $,8 Lighting - Pendent/Surface EA Marker Board LF Storage/ Closet SF $9 Walls - Concrete Block,8 SF $3,3 Classrooms Subtotal: $3,93 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Exposed,3 SF $3,3 Doors - Side-lite SF $9 Doors - Steel Doors incl hw EA $3 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $3, Floor - Carpet 8 SF $,8 Floor - Concrete Epoxy/ Painted 8 SF $8 Floor - Tile/Sheet, SF $,3 Lighting - Pendent/Surface EA $3,3 Power Distribution 3 EA $,9 Storage/ Closet 38 SF $, Walls - Concrete Block,98 SF $, Gymnasia Ceiling - Exposed 3,8 SF $, Doors - Steel Doors incl hw EA $, Floor - Wood 3,8 SF $, Lighting - Metal Halide/Sodium Vapor 38 EA $,8 Sound System EA $, Stage SF $,9 Stage Lift EA $, Stage Lighting System EA $,39 Walls - Concrete Block,38 SF $,89 CHALMERS Page 8 of Assessment Date: /8/
Building: Main Category: Rooms (Other Than Classrooms) Library W Roosevelt Rd Chicago, IL 8 Casework LF $,9 Ceiling - Exposed,3 SF $,9 Doors - Wood Doors inclu hw EA Floor - Carpet,3 SF $,8 Lighting - Pendent/Surface 8 EA $3,9 Walls - Concrete Block, SF $, MDF_IDF Doors - Steel Doors incl hw EA $3 Finishes SF $, Ventilation and Cooling EA $,8 Mechanical/ Service Rooms Boiler Room, SF $, Interior Stairs LF $8 Janitor's Closet SF $, Mechanical/ Service Rooms,9 SF $, Storage Room 9 SF $,3 Restroom Accessories, SF $, Accessories 3 SF Ceiling - Exposed, SF $, Ceiling - Exposed 3 SF Ceiling - Lay-in SF $ Ceiling - Plaster/Drywall 9 SF $39 Doors - Wood Doors inclu hw EA $3, Floor - Concrete Epoxy/ Painted 9 SF $3 Floor - Tile 3 SF $ Floor - Tile 3 SF $ Floor - Tile Ceramic/ Porcelain,3 SF $,9 Floor - Tile/Sheet SF $ Floor Drain EA $,3 Hand Dryer 8 EA $,8 Lavatory EA $,39 Lavatory EA Lighting - Lay-in EA $9 Lighting - Pendent/Surface 3 EA $, Lighting - Wall Mounted EA $3 CHALMERS Page 9 of Assessment Date: /8/
Building: Main Category: Rooms (Other Than Classrooms) Restroom W Roosevelt Rd Chicago, IL 8 Partitions EA $,3 Showers EA $3 Urinals 9 EA $3, Walls - Concrete Block, SF $,3 Walls - Plaster/Drywall SF $8 Walls - Structural Glazed Tile,9 SF $9,93 Walls - Vinyl Coated Gypsum Panel 9 SF $9 Water Closet EA $9, Water Closet EA Rooms (Other Than Classrooms) Subtotal: $38,39 Building: Main Category: Building Interior Corridor Ceiling - Exposed,9 SF $,3 Ceiling - Plaster/Drywall 8 SF $, Doors - Steel Doors incl hw EA $,8 Drinking Fountains - Double Fountain EA $,8 Floor - Concrete Epoxy/ Painted 8 SF $3 Floor - Tile Ceramic/ Porcelain,9 SF $3, Floor - Tile/Sheet 8,98 SF $,8 Lighting - Pendent/Surface 88 EA $,93 Stairs - Concrete Stairs 3 LF $9 Walls - Concrete Block 8,8 SF $,9 Walls - Structural Glazed Tile, SF $,8 Safety Stairs Security Cameras EA $9 Ceiling - Exposed 38 SF $99 Floor - Tile/Sheet SF $83 Handrails 8 LF $,9 Lighting - Pendent/Surface EA $8 Lighting - Wall Mounted EA $9 Stairs - Concrete LF $98 CHALMERS Page of Assessment Date: /8/
Building: Main Category: Building Interior Stairs W Roosevelt Rd Chicago, IL 8 Walls - Concrete Block 88 SF $,8 Walls - Structural Glazed Tile, SF $8,3 Vertical Conveyance Wheelchair Lift - Platform Lift EA $,9 Building Interior Subtotal: $,9 Total Building Cost $,8,8 Building: Addition Category: Building Exterior Entrance Entrance Control - Audio and Video EA $ Exterior Doors - Side lite EA $,3 Exterior Doors - Store Front EA $3, Exterior Doors - Store Front EA $,9 Exterior Doors - Transom Lite 3 EA $9 Power Door Operator and Controls EA Foundation Lighting Roof System Foundation - Concrete LF $, Foundation - Concrete 39 LF Superstructure - Concrete, SF Exterior Lighting - Wall Mounted EA $8 Exterior Lighting - Wall Mounted EA $ Coping - Metal LF $8,83 Downspouts - Exterior Downspouts 8 LF $,8 Downspouts - Interior Downspouts 8 LF $,9 Roof - Asphalt Gravel Ballast,3 SF $9,98 Roof - Modified Bitumen 33 SF $,8 Roof - Modified Bitumen SF $39 Roof Structure - Concrete,3 SF CHALMERS Page of Assessment Date: /8/
Building: Addition Category: Building Exterior Roof System W Roosevelt Rd Chicago, IL 8 Roof Structure - Steel / Metal Deck/ Concrete Topping 3 SF Walls Windows Exterior Walls - Brick 3,9 SF $,3 Curtain wall - Glazed Double Pane, SF $, Curtain wall - Insulated Panel SF 3 $,33 Curtain wall - Insulated Panel SF Curtain wall - Insulated Panel 83 SF $9,3 Curtain wall - Louver SF $8 Guard - Guards perforated SF $,9 Lintels - Steel LF Windows - Casement Aluminum Double-pane 3 SF $,389 Building Exterior Subtotal: $,3 Building: Addition Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs,9 SF $9 Emergency A/C Power - Lunchrooms,99 SF $9 Exit Signs - Corridors and Stairs EA $,9 Exit Signs - Lunchroom EA $99 Security System - CCTV, SF $3,39 Security System - Intrusion Detection, SF $,98 Main Service Power Distribution PA System, SF $,8 Lighting and Power Panels - A EA $98 Lighting and Power Panels - Above A 3 EA $,9 Electrical System Subtotal: $9,388 Building: Addition CHALMERS Page of Assessment Date: /8/
Category: Safty System Fire Alarm W Roosevelt Rd Chicago, IL 8 Fire Alarm Strobe Lights, SF $,9 Fire Alarm_System, SF $,8 Safty System Subtotal: $9, Building: Addition Category: Mechanical System Heating Devices Cabinet Heaters - With Hot Water Coil 9 EA $3,89 Wall Heater - Electric EA $8 Temperature Control Unit Ventilation Ventilation DDC System, SF $8,833 Thermostats - DDC EA Unit Ventilators- Floor Mounted- Dual Temperature Coils (Hot/Chilled) Water 8 EA $9,939 Exhaust Fans- Indoor - Less than CFM EA $9 Exhaust Fans- Roof Mounted - - 8 CFM EA $9 Exhaust Fans- Roof Mounted - - CFM EA $,8 Mechanical System Subtotal: $3,8 Building: Addition Category: Plumbing System Piping Domestic Piping-Cold Water from Risers to Fixtures, SF $,93 Domestic Piping-Cold Water Horizontal Lines, SF $,8 Domestic Piping-Cold Water Risers, SF $,9 Domestic Piping-Hot Water from Risers to Fixtures, SF $,8 Domestic Piping-Hot Water Horizontal Lines, SF $,9 Domestic Piping-Hot Water Return Lines, SF $,38 Domestic Piping-Hot Water Return Risers, SF $,38 Sanitary Piping, SF $,8 Storm Piping, SF $9,99 CHALMERS Page 3 of Assessment Date: /8/
Building: Addition Category: Plumbing System Piping W Roosevelt Rd Chicago, IL 8 Vent Piping, SF $,9 Plumbing System Subtotal: $,9 Building: Addition Category: Classrooms Office ( room) (3 rooms) AC Units EA $,8 Casework LF $ Ceiling - Splined 8 SF $ Chalk Board LF $, Doors - Side-lite 8 SF $3 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $3 Floor - Tile 8 SF $, Lighting - Pendent/Surface EA Marker Board LF Storage/ Closet SF $9 Walls - Concrete Block, SF $3,38 Casework 8 LF $,9 Ceiling - Splined, SF $,98 Doors - Side-lite SF $93 Doors - Transom Window 3 SF $ Doors - Wood Doors inclu hw 3 EA $93 Floor - Tile, SF $,8 Lighting - Pendent/Surface 3 EA Marker Board 8 LF Storage/ Closet 88 SF $38 Walls - Concrete Block 3, SF $,3 Work Sink EA $8 Store Room ( room) Casework LF $ Ceiling - Splined 8 SF $ Doors - Side-lite 8 SF $3 CHALMERS Page of Assessment Date: /8/
Building: Addition Category: Classrooms Store Room ( room) W Roosevelt Rd Chicago, IL 8 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $3 Floor - Tile 8 SF $, Lighting - Pendent/Surface EA $,8 Marker Board LF Storage/ Closet 8 SF $8 Walls - Concrete Block, SF $3,38 Classrooms Subtotal: $,93 Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Splined SF $ Floor - Tile SF $3 Lighting - Pendent/Surface EA Power Distribution EA Walls - Concrete Block 83 SF $83 Kitchen Ceiling - Splined 9 SF $ Floor - Tile 9 SF $, Lighting - Pendent/Surface EA Serving Line 8 LF Walls - Concrete Block 8 SF $, Lunch & Multipurpose Room Mechanical/ Service Rooms Ceiling - Splined,99 SF $,33 Doors - Wood Doors inclu hw EA Floor - Tile,99 SF $3,98 Lighting - Pendent/Surface EA Walls - Concrete Block,3 SF $,8 Storage Room 9 SF $, Restroom Accessories 8 SF $, CHALMERS Page of Assessment Date: /8/
Building: Addition Category: Rooms (Other Than Classrooms) Restroom W Roosevelt Rd Chicago, IL 8 Ceiling - Plaster/Drywall SF $98 Ceiling - Splined 8 SF $3 Doors - Wood Doors inclu hw EA $, Floor - Tile Ceramic/ Porcelain 8 SF $,8 Floor Drain EA $,3 Hand Dryer 8 EA Lavatory 8 EA $, Lighting - Pendent/Surface 8 EA Partitions 8 EA $,3 Urinals EA $,3 Walls - Structural Glazed Tile 88 SF Water Closet EA $ Water Closet EA Rooms (Other Than Classrooms) Subtotal: $3,38 Building: Addition Category: Building Interior Corridor Ceiling - Lay-in 38 SF $, Ceiling - Splined,9 SF $, Doors - Store Front 8 EA $9, Doors - Wood Doors include hw EA $, Drinking Fountains - Double Fountain EA $ Floor - Tile Ceramic/ Porcelain SF $,8 Floor - Tile/Sheet,83 SF $998 Lighting - Lay-in EA $ Lighting - Pendent/Surface EA $,98 Walls - Structural Glazed Tile, SF $, Stairs Ceiling - Splined SF $3 Floor - Tile SF $ Handrails 8 LF $,9 Lighting - Pendent/Surface EA $9 Lighting - Wall Mounted EA $8 CHALMERS Page of Assessment Date: /8/
Building: Addition Category: Building Interior Stairs W Roosevelt Rd Chicago, IL 8 Stairs - Tile LF $ Walls - Structural Glazed Tile,9 SF $,9 Vertical Conveyance Elevator - Elevator- Roped Holeless Hydraulic EA $9,38 Building Interior Subtotal: $, Total Building Cost $,8 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin EA $, Civil/ Drainage - Catch Basin 3 EA Civil/ Drainage - Site Drain EA $,39 Civil/ Drainage - Site Manhole EA Fencing - Chain Link LF $3,3 Fencing - ew Standard Ornamental 38 LF $, Benches EA $3 Landscape - Grass 9,99 SF $8,3 Landscape - Hardscape- Asphalt SF $, Landscape - Hardscape- Concrete 9 SF $98 Landscape - Hardscape- Concrete 3 SF $3,9 Landscape - Hardscape- Pavers, SF $, Parkway trees EA $,8 Parkway trees EA Planting Beds/ Area SF $ Play Area - Asphalt/ Hardscape 9,8 SF $,8 Retaining Wall - Concrete SF $,89 Trash Receptacles EA $3 CHALMERS Page of Assessment Date: /8/
W Roosevelt Rd Chicago, IL 8 SITE Category: Site Parking Lot Playground Sidewalks Signage Concrete Curbs 3 LF $38 Surface - Asphalt 8,8 SF $, Trash Enclosure - Chain Links 88 SF $,3 Vehicular Screening 9 LF $,39 Equipment - Pre K 3- EA $,9 Equipment - School Age - EA $,3 Surface - Poured Surface, SF $3, Sidewalks - Internal Walks LF $8 Sidewalks - Internal Walks LF $,3 Sidewalks - Perimeter Sidewalks, SF $3,98 Sidewalks - Perimeter Sidewalks, SF $3,88 Flag Pole - Flag Pole EA $,3 Marquee - Free Standing Back lighted w/ LED EA Monument - Building Mounted Cut Letter Sign EA Site Subtotal: $33, Total Site Cost $33, Campus Total ² ³ $3,, ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions CHALMERS Page 8 of Assessment Date: /8/
Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. W Roosevelt Rd Chicago, IL 8 Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. CHALMERS Page 9 of Assessment Date: /8/
W Roosevelt Rd Chicago, IL 8 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Art Room Computer Lab Computer Lab Computer Lab Kindergarten Kindergarten Kindergarten Music Room Science Classroom Art Room Computer Lab Computer Lab Computer Lab Kindergarten Kindergarten Kindergarten st Floor st Floor st Floor nd Floor nd Floor st Floor st Floor st Floor nd Floor st Floor st Floor st Floor st Floor st Floor st Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor 3 9 3 3 3 8 9 3 9 3 3 3 8 9 8 9 8 88 9 8,, 9 88 88 88 8 8 9 88 88 9 99 8 99 88 88 8 88 3 3 3 9 8 8 8 8 8 8 8 8 8 8 Addition Office Store Room nd Floor st Floor nd Floor nd Floor nd Floor 8 8 8 8 8 8 8 8 8 CHALMERS Page of Assessment Date: /8/