3 W Raven St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 928 3,30 $3,2,3 Addition 99, $28,9 Addition 2 202 3 2,38 $923,2 SITE $9,9 Campus Total 90,99 $,8,2 Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $02 Exterior Doors - Exterior FRP Door 8 EA $,0 Exterior Doors - Exterior Stainless Steel Door 2 EA $,092 Exterior Doors - Exterior Steel Door 3 EA $,2 Exterior Doors - Overhead Rolling/ Garage Door EA $,33 Exterior Doors - Transom Lite EA $33 Exterior Doors - Transom Lite 2 EA Exterior Stairs LF Exterior Stairs - Concrete 20 LF $,3 Exterior Stairs - Stone LF $8 Power Door Operator and Controls EA Stair Handrail - Steel_Stair Handrail 2 LF $208 Foundation Foundation - Concrete 20 LF $3,88 Foundation - Concrete 930 LF Superstructure - Concrete,30 SF OAHA Page of 2 Assessment Date: //20
Building: Main Category: Building Exterior Lighting 3 W Raven St Chicago, IL 03 Exterior Lighting - Parapet or Roof Mounted 2 EA $,38 Exterior Lighting - Wall Mounted 0 EA $2,88 Roof System Walls Windows Cell Tower EA $3 Chimney - Brick Chimney- Concrete/ Mortar Liner 0 LF $,09 Chimney - Brick Chimney- Concrete/ Mortar Liner 9 LF $,9 Coping - Metal 3 LF $2,3 Coping - Terra Cotta, LF $,03 Downspouts - Exterior Downspouts 8 LF $2 Downspouts - Interior Downspouts LF $,28 Parapet - " - 30" Height 388 LF $,02 Parapet - Parapet < " Height 8 LF $3,80 Parapet - Parapet > 30" 0 LF $,2 Parapet - Parapet > 30" 3 LF $23,33 Roof - Asphalt Gravel Ballast 3 SF $,3 Roof - Metal SF $2,9 Roof - Modified Bitumen 23,9 SF $98,3 Roof Structure - Concrete 82 SF $,8 Roof Structure - Concrete 2,092 SF Cheek-Wall - Stone 8 SF $,23 Cornice - Terra Cotta 90 LF $2, Exterior Walls - Brick 2 SF $9 Exterior Walls - Brick 2,22 SF $82,28 Exterior Walls - Stone-Cast SF $202 Exterior Walls - Terra Cotta SF $8 Exterior Walls - Terra Cotta 3,30 SF $22, Curtain wall - Louver 2 SF $3 Guard - Guards perforated SF $,99 Guard - Guards wire guard SF $9 Lintels - Steel LF $ Lintels - Stone 38 LF Lintels - Terra Cotta 92 LF Skylite - Glass Single-Pane 2 SF $, Skylite - Glass Single-Pane 83 SF $,98 OAHA Page 2 of 2 Assessment Date: //20
Building: Main Category: Building Exterior Windows 3 W Raven St Chicago, IL 03 Windows - Casement Steel 8 SF $3,92 Windows - Sash Aluminum,3 SF $,98 Building Exterior Subtotal: $,33,89 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA $8,200 Emergency A/C Power - Auditoium and Aisle Lighting 2,290 SF $,22 Emergency A/C Power - Corridors and Stairs 9,38 SF $2,88 Emergency A/C Power - Gym 3,08 SF $,22 Emergency Battery Packs - Auditoium and Aisle Lighting 2 EA $,8 Exit Signs - Auditoium EA 2 $3,23 Exit Signs - Corridors and Stairs 3 EA 2 $,09 Exit Signs - Gym 2 EA 2 $, Security System - CCTV 2,38 SF $,339 Security System - Intrusion Detection 2,38 SF $,290 Main Service Power Distribution Independent Electrical Service for emergency power EA $8,99 Main Electrical Service - 200 A 20/2/3PH EA $39,03 PA System 2,38 SF $8,038 Lighting and Power Panels - 00 A EA $,89 Lighting and Power Panels - 00 A 3 EA $89 Lighting and Power Panels - Above 00 A 8 EA $3,9 Main Distribution Panels - 0-00 amp EA $3,9 Electrical System Subtotal: $28,98 Building: Main Category: Safty System OAHA Page 3 of 2 Assessment Date: //20
Building: Main Category: Safty System Fire Alarm 3 W Raven St Chicago, IL 03 Fire Alarm Panel EA $, Fire Alarm Strobe Lights,30 SF $2,8 Fire Alarm_System,30 SF $29,2 Safty System Subtotal: $,98 Building: Main Category: Mechanical System Air Handling Systems Air Handling Unit- Built Up- Single Zone- Steam Coils - 800-000 cfm EA $3,00 Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - 200-3000 cfm EA $,9 Air Intake 2 EA $,9 Auxiliaries - 200-3000 cfm EA $, Auxiliaries - 800-000 cfm EA $2,908 Reheat Boxes - Reheat Boxes with Steam Coil EA $,38 Return Duct Work - Indoor- Vertical Shaft and Ducts 200 LF Zone Dampers EA $3,329 Boiler Systems Heating Devices Temperature Control Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - - 00 HP 2 EA $9,0 Chemical Feed System EA $,08 Chemical Feeder EA $,08 Combustion Dampers 2 EA $,0 Condensate Pump EA $2,02 Feed Water Pumps and Tank EA $2, on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - - 00 HP 2 EA $9,0 Piping - Condensate Pipe- Steel 0 LF $,89 Piping - Steam Pipe- Steel 0 LF $,3 Steam Traps 2 EA $32,82 Fin Tube - Steam 200 LF $,888 Radiators - Steam 3 EA $833 Unit Heater - Steam EA $909 Pneumatic System,30 SF $32,3 OAHA Page of 2 Assessment Date: //20
Building: Main Category: Mechanical System Temperature Control 3 W Raven St Chicago, IL 03 Thermostats - Pneumatic 2 EA Ventilation Exhaust Fans- Roof Mounted - 0-8000 CFM 2 EA $,8 Exhaust Fans- Roof Mounted - 00-00 CFM EA $,2 Exhaust Fans- Roof Mounted - Less than 00 CFM EA $,92 Mechanical System Subtotal: $29,8 Building: Main Category: Plumbing System Hot Water Gas Heater - Less than 0000 BTU/HR EA $30 Hot Water Storage Tank_Gas - 20-00 Gallons EA $8 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures,30 SF $3,08 Domestic Piping-Cold Water Horizontal Lines,30 SF $88,290 Domestic Piping-Cold Water Risers,30 SF $8,93 Domestic Piping-Hot Water from Risers to Fixtures,30 SF $33,28 Domestic Piping-Hot Water Horizontal Lines,30 SF $8, Domestic Piping-Hot Water Return Lines,30 SF $2, Domestic Piping-Hot Water Return Risers,30 SF $29,2 Sanitary Piping,30 SF $,9 Storm Piping,30 SF $3,32 Vent Piping,30 SF $,08 Pumps - Domestic Booster Pump-Simplex EA $2, Pumps - Sump-Duplex EA $,38 Pumps - Sump-Simplex EA $ Plumbing System Subtotal: $3,930 Building: Main Category: Classrooms OAHA Page of 2 Assessment Date: //20
Building: Main Category: Classrooms Kindergarten ( room) 3 W Raven St Chicago, IL 03 AC Units EA Casework 2 LF Ceiling - Plaster/Drywall,82 SF $,090 Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile,82 SF $2,8 Lighting - Pendent/Surface 22 EA Marker Board 2 LF $ Walls - Plaster/Drywall SF $2 Walls - Plaster/Drywall,893 SF $,22 Pre School ( room) AC Units EA Ceiling - Plaster/Drywall 8 SF $2,928 Chalk Board 2 LF $8 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA $30 Floor - Wood 8 SF $,9 Lighting - Pendent/Surface EA Marker Board 2 LF Storage/ Closet 20 SF $ Walls - Plaster/Drywall,3 SF $,23 ( rooms) AC Units 2 EA $2,3 AC Units 3 EA Casework 8 LF $3,990 Ceiling - Plaster/Drywall 9 SF $2 Ceiling - Plaster/Drywall,9 SF $,00 Chalk Board 2 LF $8 Doors - Transom Window 288 SF $,8 Doors - Wood Doors inclu hw 32 EA $9,32 Floor - Tile 22 SF $,80 Floor - Wood 22 SF $0,2 Floor - Wood 0,2 SF $,33 Lighting - Pendent/Surface 22 EA Marker Board 23 LF Storage/ Closet SF $,283 OAHA Page of 2 Assessment Date: //20
Building: Main Category: Classrooms ( rooms) Rehabilitation under progress ( room) Science Classroom ( room) 3 W Raven St Chicago, IL 03 Walls - Plaster/Drywall 2 SF $,30 Walls - Plaster/Drywall 8,93 SF $2,2 Work Sink EA $39 Casework 8 LF Ceiling - Plaster/Drywall 22 SF Doors - Transom Window 8 SF Doors - Wood Doors inclu hw 2 EA Floor - Wood 22 SF Lighting - Pendent/Surface EA Marker Board LF Storage/ Closet SF Walls - Plaster/Drywall,229 SF AC Units EA Ceiling - Plaster/Drywall 9 SF Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw 2 EA 2 Floor - Wood 9 SF Lighting - Pendent/Surface 22 EA Marker Board 20 LF Walls - Plaster/Drywall,38 SF Work Sink 2 EA Classrooms Subtotal: $238,8 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 3 EA $,8 AC Unit EA Ceiling - Lay-in 302 SF $90 Ceiling - Plaster/Drywall, SF $,92 Doors - Transom Window 2 SF $ Doors - Wood Doors inclu hw 9 EA $2,09 OAHA Page of 2 Assessment Date: //20
Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 3 W Raven St Chicago, IL 03 Floor - Carpet 3 SF $98 Floor - Tile 3 SF $9 Floor - Tile Ceramic/ Porcelain SF $2 Floor - Tile Ceramic/ Porcelain 22 SF $8 Floor - Wood,000 SF $,00 Lighting - Pendent/Surface 2 EA Power Distribution 3 EA $,9 Storage/ Closet 28 SF $203 Walls - Plaster/Drywall SF $ Walls - Plaster/Drywall,09 SF $,30 Work SInk EA $08 Auditorium & Theater Gymnasia Balcony Seating EA $3,0 Ceiling - Plaster/Drywall 2,290 SF $9,092 Doors - Wood Doors inclu hw EA $3,3 Doors - Wood Doors inclu hw EA $,20 Floor - Carpet 3 SF $,2 Floor - Tile 3 SF $39 Floor - Tile,2 SF $3,33 Lighting - Pendent/Surface 3 EA $,22 Lighting - Wall Mounted EA $,33 Main Floor Seating 3 EA $,0 Sound System EA $0,2 Stage SF $2,2 Stage Curtain 8 EA Stage Lighting System 2 EA $, Stage-Stairs - Tile 0 LF $93 Storage/ Closet 98 SF $ Walls - Plaster/Drywall,00 SF $2,3 Ceiling - Plaster/Drywall 3,08 SF $,9 Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw 2 EA 2 Floor - Wood 3,08 SF $2,2 Lighting - Pendent/Surface 8 EA Scoreboards EA $2,2 OAHA Page 8 of 2 Assessment Date: //20
Building: Main Category: Rooms (Other Than Classrooms) Gymnasia 3 W Raven St Chicago, IL 03 Walls - Plaster/Drywall 3,80 SF $0,2 Walls - Structural Glazed Tile,92 SF $,0 Library AC Unit EA $,982 Casework LF $,3 Ceiling - Plaster/Drywall, SF $,8 Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw 2 EA 2 Floor - Carpet, SF $2,99 Lighting - Pendent/Surface 2 EA Storage/ Closet SF $ Walls - Plaster/Drywall 2,32 SF $,88 Mechanical/ Service Rooms Air Intake Plenums 30 SF $8 Air Tunnel 2,800 SF $,33 Boiler Room,80 SF $28,2 Coal Room 2 SF $3,0 Crawl Space - Unfinished,2 SF $28,02 Interior Stairs LF $ Janitor's Closet 83 SF $,339 Janitor's Closet 323 SF $2,3 Mechanical/ Service Rooms 2,33 SF $,29 Storage Room 33 SF $,09 Storage Room 90 SF $3, Vaults 80 SF $, Restroom Accessories 2,3 SF $2, Ceiling - Plaster/Drywall 2,3 SF $8, Doors - Transom Window 99 SF $, Doors - Wood Doors inclu hw EA $, Doors - Wood Doors inclu hw 2 EA $,22 Floor - Tile Ceramic/ Porcelain SF $,28 Floor - Tile Ceramic/ Porcelain 2,303 SF $,8 Floor Drain EA $, Hand Dryer 9 EA $2,00 Lavatory 8 EA $,3 OAHA Page 9 of 2 Assessment Date: //20
Building: Main Category: Rooms (Other Than Classrooms) Restroom 3 W Raven St Chicago, IL 03 Lighting - Pendent/Surface 2 EA Partitions EA $ Partitions 3 EA $0,392 Urinals EA $,3 Urinals EA $,0 Walls - Plaster/Drywall,3 SF $2,0 Walls - Structural Glazed Tile SF $ Walls - Structural Glazed Tile 2,30 SF $,28 Water Closet 38 EA $2, Rooms (Other Than Classrooms) Subtotal: $3,23 Building: Main Category: Building Interior Corridor Ceiling - Plaster/Drywall SF $8 Ceiling - Plaster/Drywall 9,39 SF $8,0 Doors - Transom Window 8 EA $30 Doors - Wood Doors include hw 2 EA 2 Drinking Fountains - Double Fountain EA $2,0 Floor - Terrazzo 2,3 SF $9,93 Floor - Tile/Sheet,038 SF $3,82 Lighting - Pendent/Surface 89 EA Student Lockers - One Tier 82 EA $2,08 Student Lockers - One Tier 2 EA $23,80 Walls - Plaster/Drywall SF $0 Walls - Plaster/Drywall,8 SF $3,00 Walls - Structural Glazed Tile,8 SF $2,80 Safety Stairs Camera Viewing Station EA $83 Security Cameras EA $ Ceiling - Plaster/Drywall 30 SF $ Ceiling - Plaster/Drywall 820 SF $,00 Floor - Terrazzo 8 SF $, OAHA Page 0 of 2 Assessment Date: //20
Building: Main Category: Building Interior Stairs 3 W Raven St Chicago, IL 03 Handrails 38 LF $3,328 Lighting - Lay-in 8 EA Lighting - Pendent/Surface 8 EA Stairs - Terrazzo 92 LF $,82 Walls - Masonry 2, SF $8,33 Walls - Plaster/Drywall 0 SF $2 Walls - Plaster/Drywall 2,3 SF $, Vertical Conveyance Elevator - Elevator- Roped Holeless Hydraulic EA $9,238 Building Interior Subtotal: $2,30 Total Building Cost $3,2,3 Building: Addition Category: Building Exterior Entrance Exterior Doors - Exterior FRP Door 2 EA $,23 Exterior Doors - Exterior Steel Door EA $8 Exterior Doors - Store Front 2 EA $,092 Exterior Doors - Transom Lite EA $33 Exterior Stairs - Concrete LF $,308 Ramp Handrail - Steel_Ramp Handrail 0 LF $20 Ramps - Concrete 30 LF $,0 Stair Handrail - Steel_Stair Handrail 32 LF $2 Foundation Lighting Roof System Foundation - Concrete 30 LF Superstructure - Steel, SF Exterior Lighting - Wall Mounted 3 EA $3, Chimney - Metal Flue 20 LF $3,3 Coping - Clay Tile 23 LF $,8 OAHA Page of 2 Assessment Date: //20
Building: Addition Category: Building Exterior Roof System 3 W Raven St Chicago, IL 03 Coping - Stone 20 LF $8,3 Downspouts - Interior Downspouts LF $,882 Parapet - " - 30" Height 3 LF $8,898 Roof - EPDM/ Synthetic Rubber, SF $,23 Roof Structure - Steel / Metal Deck/ Concrete Topping, SF Walls Windows Canopy - Metal 9 SF $2,09 Exterior Walls - Brick,233 SF $30,98 Exterior Walls - Prefabricated Metal Panel Wall 20 SF $,33 Exterior Walls - Stone-Cast SF $,08 Clerestory - Glass Double-Pane 02 SF $9 Curtain wall - Glazed Double Pane 80 SF $2,08 Curtain wall - Louver 2 SF $3 Lintels - Steel 00 LF Windows - Casement Aluminum Double-pane SF $, Building Exterior Subtotal: $,3 Building: Addition Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs,088 SF $32 Emergency A/C Power - Lunchrooms 2,998 SF $, Emergency Battery Packs - Corridors and Stairs 2 EA $ Emergency Battery Packs - Lunchrooms 2 EA $ Exit Signs - Corridors and Stairs 2 EA $299 Exit Signs - Lunchroom EA $99 Security System - CCTV, SF $,22 Security System - Intrusion Detection, SF $,390 Main Service Power Distribution PA System, SF $, Lighting and Power Panels - 00 A EA $299 OAHA Page 2 of 2 Assessment Date: //20
Building: Addition Category: Electrical System Power Distribution 3 W Raven St Chicago, IL 03 Lighting and Power Panels - Above 00 A EA $9 Electrical System Subtotal: $8,3 Building: Addition Category: Safty System Fire Alarm Fire Alarm Strobe Lights, SF $,93 Fire Alarm_System, SF $2,2 Safty System Subtotal: $, Building: Addition Category: Mechanical System Air Handling Systems Make Up Air Unit- Roof Mounted- Gas Heating - Less than 000 cfm EA $22,2 Heating Devices Temperature Control Unit Heater - Electric 2 EA $ Pneumatic System, SF $2,88 Thermostats 2 EA Mechanical System Subtotal: $2,9 Building: Addition Category: Plumbing System Piping Domestic Piping-Cold Water Horizontal Lines, SF $,33 Domestic Piping-Hot Water Horizontal Lines, SF $,00 Domestic Piping-Hot Water Return Lines, SF $2 Sanitary Piping, SF $,93 Storm Piping, SF $, OAHA Page 3 of 2 Assessment Date: //20
Building: Addition Category: Plumbing System Piping 3 W Raven St Chicago, IL 03 Vent Piping, SF $3,30 Plumbing System Subtotal: $,3 Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in 98 SF $29 Doors - Steel Doors incl hw EA $30 Floor - Concrete Epoxy/ Painted 98 SF $2 Lighting - Lay-in EA Power Distribution 2 EA $,20 Walls - Concrete Block 3 SF $,029 Kitchen Ceiling - Lay-in 98 SF $2,09 Floor - Terrazzo 98 SF $,2 Lighting - Lay-in EA Walls - Concrete Block, SF $,808 Lunch & Multipurpose Room Mechanical/ Service Rooms Ceiling - Exposed 8 SF $3 Ceiling - Exposed 2,9 SF $,2 Ceiling - Lay-in SF $83 Ceiling - Lay-in 382 SF $, Doors - Steel Doors incl hw EA $,80 Floor - Terrazzo 382 SF $83 Floor - Tile 2,998 SF $,9 Lighting - Lay-in EA $ Lighting - Lay-in EA Lighting - Metal Halide/ High Pressure Sodium EA $3 Lighting - Wall Mounted EA Serving Line LF $893 Walls - Concrete Block, SF $3, Air Tunnel,200 SF $,30 OAHA Page of 2 Assessment Date: //20
Building: Addition Category: Rooms (Other Than Classrooms) Restroom 3 W Raven St Chicago, IL 03 Accessories 39 SF $2,92 Ceiling - Lay-in 9 SF $20 Ceiling - Plaster/Drywall 20 SF $8 Doors - Steel Doors incl hw EA $,20 Floor - Concrete Epoxy/ Painted 9 SF $3 Floor - Terrazzo 20 SF $ Floor Drain 3 EA $3, Hand Dryer 2 EA $ Lavatory 3 EA $99 Lighting - Lay-in EA $ Lighting - Lay-in EA Partitions 3 EA $89 Urinals EA $33 Walls - Concrete Block, SF $3,22 Water Closet EA $,3 Rooms (Other Than Classrooms) Subtotal: $8,92 Building: Addition Category: Building Interior Corridor Ceiling - Lay-in,88 SF $3,8 Doors - Side-lite 28 EA $8 Doors - Store Front EA $,833 Drinking Fountains - Double Fountain EA $33 Floor - Tile Quarry 00 SF $29 Floor - Tile/Sheet,088 SF $9 Lighting - Lay-in EA Walls - Concrete Block 80 SF $23 Walls - Plaster/Drywall 80 SF $3 Safety Security Cameras 3 EA $82 Building Interior Subtotal: $,2 OAHA Page of 2 Assessment Date: //20
3 W Raven St Chicago, IL 03 Total Building Cost $28,9 Building: Addition 2 Category: Building Exterior Entrance Entrance Control - Audio and Video 2 EA $,3 Exterior Doors 3 EA Exterior Doors - Exterior FRP Door 2 EA $,23 Exterior Doors - Store Front EA $3,2 Exterior Doors - Transom Lite EA $, Power Door Operator and Controls EA Foundation Lighting Roof System Walls Windows Foundation - Concrete LF Superstructure - Steel 2,38 SF Exterior Lighting - Wall Mounted EA $,33 Chimney - Metal Flue LF $8,0 Coping - Metal 3 LF $2,29 Downspouts - Exterior Downspouts 2 LF $2,00 Downspouts - Interior Downspouts 3 LF $2,09 Parapet - Parapet > 30" 9 LF $2, Roof - EPDM/ Synthetic Rubber 3,00 SF $2,39 Roof - Modified Bitumen,09 SF $, Roof Structure - Steel / Metal Deck/ Concrete Topping,29 SF Canopy - Metal 830 SF $9,02 Exterior Walls - Brick 8,903 SF $9,83 Exterior Walls - Prefabricated Metal Panel Wall,8 SF $39,09 Curtain wall - Glazed Double Pane 2 SF $802 Curtain wall - Glazed Double Pane,333 SF $,9 Guard - Guards perforated 3 SF $ Lintels - Steel 3 LF $3,99 Windows - Casement Aluminum Double-pane SF $, OAHA Page of 2 Assessment Date: //20
Building: Addition 2 Category: Building Exterior 3 W Raven St Chicago, IL 03 Building Exterior Subtotal: $38,000 Building: Addition 2 Category: Electrical System Emergency System Automatic Transfer Switch EA $8 Emergency A/C Power - Corridors and Stairs 3,3 SF $9 Emergency A/C Power - Students Toilets 990 SF $38 Emergency Battery Packs - Corridors and Stairs 2 EA $,03 Emergency Battery Packs - Students Toilets EA $80 Exit Signs - Corridors and Stairs EA $2,39 Main Service Power Distribution Independent Electrical Service for emergency power EA $2,92 Main Electrical Service - 200 A 20/208/3PH EA $,08 Lighting and Power Panels - 00 A EA $299 Lighting and Power Panels - Above 00 A EA $3,9 Main Distribution Panels - 0-00 amp EA $28 Electrical System Subtotal: $22,289 Building: Addition 2 Category: Safty System Fire Alarm Fire Alarm Strobe Lights 2,38 SF $8,3 Fire Alarm_System 2,38 SF $,882 Fire Pump Controller EA $,823 Pump Room Assembly Sprinkler System Fire Pump - 2-0 hp EA $,8 Jockey Pump EA $8 Sprinkler Heads 2,38 SF Sprinkler Piping 2,38 SF $,3 OAHA Page of 2 Assessment Date: //20
Building: Addition 2 Category: Safty System Sprinkler System 3 W Raven St Chicago, IL 03 Wet Sprinkler System 2,38 SF $,290 Safty System Subtotal: $3,90 Building: Addition 2 Category: Mechanical System Air Conditioning Condensing Unit- Roof Mounted - Less than tons EA $3,33 Air Handling Systems Boiler Systems Heating Devices Mechanical Plumbing Temperature Control Air Handling Unit-Package Single Zone- Outdoor Roof Mounted- Hot Water and DX Cooling EA $3,30 Coils - Greater than 30,000 cfm Air Intake EA Auxiliaries - Greater than 30,000 cfm EA Fan Coil Unit- Celing Mounted - Electric EA $820 VAV Box 8 EA $,02 Zone Dampers 8 EA $,99 Boiler Auxiliary- Condensing Hot Water - 00-000 HP EA $2, Chemical Pot Feeder EA Condensing- Hot Water Boiler - 00-000 MBH EA $998 Glycol Feed System EA Hot Water Pump 2 EA $8 Cabinet Heaters - With Hot Water Coil EA $2,2 Fin Tube - Hot Water 0 LF $99 Radiator Panels - Hot Water 8 EA $2,222 Unit Heater - Electric EA $28 Unit Heater - Hot Water 3 EA $83 Hydronic Supply and Return - Copper 0 LF DDC System 2,38 SF $3,99 Thermostats - DDC 23 EA OAHA Page 8 of 2 Assessment Date: //20
Building: Addition 2 Category: Mechanical System Ventilation 3 W Raven St Chicago, IL 03 Exhaust Fans- Indoor - 00-00 CFM EA $92 Exhaust Fans- Roof Mounted - 0-8000 CFM EA $92 Exhaust Fans- Roof Mounted - 00-00 CFM 3 EA $, Exhaust Fans- Roof Mounted - Less than 00 CFM EA $,8 Mechanical System Subtotal: $,39 Building: Addition 2 Category: Plumbing System Hot Water Gas Heater - 0000-300000 BTU/HR 2 EA $20 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 2,38 SF $,892 Domestic Piping-Cold Water Horizontal Lines 2,38 SF $,9 Domestic Piping-Cold Water Risers 2,38 SF $,3 Domestic Piping-Hot Water from Risers to Fixtures 2,38 SF $3,8 Domestic Piping-Hot Water Horizontal Lines 2,38 SF $,3 Domestic Piping-Hot Water Return Lines 2,38 SF $3,9 Domestic Piping-Hot Water Return Risers 2,38 SF $3,9 Sanitary Piping 2,38 SF $22,3 Storm Piping 2,38 SF $2,3 Vent Piping 2,38 SF $,2 Pumps - Domestic Booster Pump-Duplex EA $,9 Plumbing System Subtotal: $93, Building: Addition 2 Category: Classrooms Computer Lab ( room) Casework 2 LF $82 Ceiling - Exposed,3 SF $2,0 Doors - Steel Doors incl hw 2 EA 2 OAHA Page 9 of 2 Assessment Date: //20
Building: Addition 2 Category: Classrooms Computer Lab ( room) (9 rooms) 3 W Raven St Chicago, IL 03 Floor - Tile,3 SF $2,9 Lighting - Pendent/Surface 2 EA Marker Board 32 LF Storage/ Closet 9 SF $ Walls - Plaster/Drywall 2,00 SF $,2 Wireless System EA $32 Casework 2 LF $,90 Ceiling - Exposed 3, SF $,09 Ceiling - Lay-in 3,00 SF $9,309 Doors - Steel Doors incl hw 9 EA $2,09 Floor - Tile, SF $,2 Lighting - Lay-in EA Lighting - Pendent/Surface EA $,88 Lighting - Pendent/Surface 3 EA Marker Board 2 LF Storage/ Closet 2 SF $22 Walls - Concrete Block 98 SF $2,808 Walls - Plaster/Drywall,000 SF $39,32 Classrooms Subtotal: $9,9 Building: Addition 2 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Exposed 39 SF $90 Ceiling - Lay-in SF $2,32 Doors - Steel Doors incl hw 2 EA 2 Floor - Tile,2 SF $2, Lighting - Pendent/Surface 2 EA Power Distribution 0 EA $2,29 Power Distribution 22 EA Storage/ Closet 9 SF $ Walls - Plaster/Drywall 3,92 SF $9,38 OAHA Page 20 of 2 Assessment Date: //20
Building: Addition 2 Category: Rooms (Other Than Classrooms) MDF_IDF Mechanical/ Service Rooms 3 W Raven St Chicago, IL 03 AC Unit EA $9 Doors - Steel Doors incl hw EA $30 Ventilation and Cooling EA $,8 Janitor's Closet 33 SF $93 Mechanical/ Service Rooms 2,89 SF $20, Restroom Accessories,290 SF $,898 Ceiling - Lay-in 300 SF $90 Ceiling - Plaster/Drywall 990 SF $3,2 Doors - Steel Doors incl hw 3 EA $903 Floor - Tile 9 SF $208 Floor - Tile Ceramic/ Porcelain,9 SF $2,29 Floor Drain EA $, Hand Dryer EA $3, Lavatory EA $,9 Lighting - Lay-in EA Partitions 0 EA $2,99 Showers 2 EA $23 Urinals EA $,3 Walls - Concrete Block 3,2 SF $9,28 Water Closet EA $,0 Rooms (Other Than Classrooms) Subtotal: $,98 Building: Addition 2 Category: Building Interior Corridor Ceiling - Lay-in 2, SF $, Ceiling - Plaster/Drywall 98 SF $,093 Doors - Side-lite 3 EA $,03 Doors - Steel Doors incl hw 8 EA $2,8 Doors - Store Front EA $,29 Doors - Transom Window 2 EA $,3 Drinking Fountains - Double Fountain EA $33 OAHA Page 2 of 2 Assessment Date: //20
Building: Addition 2 Category: Building Interior Corridor 3 W Raven St Chicago, IL 03 Drinking Fountains - Triple Fountain 2 EA $88 Floor - Tile Quarry 30 SF $,00 Floor - Tile/Sheet 3,3 SF $,0 Lighting - Lay-in 2 EA Lighting - Pendent/Surface 28 EA Stairs - Terrazzo LF $ Student Lockers - One Tier 283 EA $2,22 Walls - Concrete Block,0 SF $,33 Walls - Masonry 20 SF $38 Walls - Plaster/Drywall 20 SF $3,92 Safety Stairs Vertical Conveyance Security Cameras 8 EA $3,93 Ceiling - Lay-in 0 SF $, Floor - Concrete 22 SF $33 Handrails 2 LF $,3 Lighting - Pendent/Surface 0 EA Stairs - Concrete 2 LF $2,23 Walls - Concrete Block,22 SF $2,3 Elevator - Elevator- Machine Roomless EA $9,238 Building Interior Subtotal: $9,0 Total Building Cost $923,2 SITE Category: Site Athletic Civil/Drainage Dug out 2 EA $3,8 Surface - atural 3,2 SF $,0 Civil/ Drainage - Catch Basin EA $,3 OAHA Page 22 of 2 Assessment Date: //20
3 W Raven St Chicago, IL 03 SITE Category: Site Civil/Drainage Fencing Landscape Parking Lot Playground Sidewalks Civil/ Drainage - Site Drain 3 EA $93 Civil/ Drainage - Site Manhole 9 EA $3,3 Fencing - Chain Link 2 LF $,8 Fencing - Chain Link 98 LF $,8 Fencing - ew Standard Ornamental,2 LF $,89 Benches 8 EA $3, Landscape - Grass 3,08 SF $,030 Landscape - Hardscape- Asphalt,2 SF $3, Landscape - Hardscape- Concrete,90 SF $0,0 Parkway trees 2 EA $,28 Parkway trees 8 EA Planting Beds/ Area 3, SF $,009 Play Area - Asphalt/ Hardscape,3 SF $8,20 Retaining Wall - Concrete 0 SF $9,3 Retaining Wall - Masonry SF $ Trash Receptacles EA $,8 Walking Path - Crushed Stone 8 SF $,029 Concrete Curbs 320 LF $,09 Interior Plantings LF $3,9 Lighting - Pole Mounted 8 EA $,20 Pavers 9,08 SF $0, Surface - Asphalt,33 SF $3,8 Trash Compactor EA Trash Enclosure - Masonry 88 SF $3, Vehicular Screening LF $3,9 Equipment - Combo 3-2 EA $,092 Surface - Poured Surface 3,0 SF $2,2 Sidewalks - Internal Walks 8 LF $3,928 Sidewalks - Internal Walks 8 LF $0,3 Sidewalks - Perimeter Sidewalks 0 SF $,2 OAHA Page 23 of 2 Assessment Date: //20
3 W Raven St Chicago, IL 03 SITE Category: Site Sidewalks Signage Sidewalks - Perimeter Sidewalks,982 SF $3,3 Flag Pole - Flag Pole EA $, Monument - Sign-Lighted EA Site Subtotal: $9,9 Total Site Cost $9,9 Campus Total ² ³ $,8,2 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. OAHA Page 2 of 2 Assessment Date: //20
3 W Raven St Chicago, IL 03 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Kindergarten Pre School Rehabilitation under progr Science Classroom Kindergarten st Floor st Floor st Floor st Floor st Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 0 0 03 0 0 20 203 20 20 20 208 30 303 30 30 30 30 308 20 20/2 0 0 03 0 0 20 203 20 20 20 208 30 303 30 30 30 30 308 20 20,82 8 20 20 2 22 22 22 22 22 22 22 22 22 22 22 22 22 22 9 0 0 0 0 0 2 2 2 2 3 0 8 9 9 0 2 0 28 3 0 0 0 22 22 22 22 22 9 0 20 20 3 3 20 2 8 0 88 88 88 0 0 0 0 Addition 2 Computer Lab Computer Lab st Floor 2 9 22 2 2 28 29 220 22 2 9 22 2 2 28 29 220 222,3 3 8 8 8 8 8 8 2 22 22 22 22 22 22 22 2 8 02 0 0 0 0 3 3 2 2 8 8 8 8 0 OAHA Page 2 of 2 Assessment Date: //20