HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT

Similar documents
TECHNICAL INFORMATION Traffic Template Catalog No. TT1

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Plan Preparation Checklist

Driver Education Classroom and In-Car Curriculum Unit 3 Space Management System

DIVISION PAVEMENT MARKINGS AND MARKERS

MODULE 10: INTELLIGENT TRANSPORTATION SYSTEMS: SMART WORK ZONES LESSON 1: WORK ZONE SAFETY

REVIEW TOPICS CEEN 2320 FINAL EXAM

Traffic Line Painting and Other Pavement Markings

PUBLICATION 213. Think Safety First

SYMBOL DESCRIPTION TRAFFIC CONTROL SIGN TYPE III BARRICADE = IMPACT ATTENUATOR STRIPING KEY TRIANGLE - PAINT PLASTIC MARKING 1ST DIGIT WIDTH 4" OR 8"

DESIGN ALTERNATIVE NO. 1 - PRECAST CONCRETE ARCH STRUCTURE FOR 17TH STREET BRIDGE REHABILITATION

ESD 4.0 Quick Start Lessons

MAINTENANCE OF TRAFFIC &

Guidelines on the Use of Portable Traffic Signals (PTS)

Section 7 Specification 7.2 Painted Roadway Lines TABLE OF CONTENTS

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute

SPECIAL PROVISION TO SPECIAL SPECIFICATION Reflectorized Pavement Markings with Retroreflective Requirements

Appendix D Answers To Chapter Review Questions

SEQUENTIAL WARNING LIGHT SYSTEM FOR WORK ZONE LANE CLOSURES Paper No

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

Maintenance of Traffic sequence of operations including any phasing and detour maps;

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

2018 District 1 Highway Construction Program

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

INDEX TO CLAUSES PART 1 - GENERAL

Collin Castle. NOCoE Regional Forum Session 1: Innovation and Emerging Technologies September 13th, 2016

Survey Data and TOPO Checklist

King Mill Lambert DRI# 2035 Henry County, Georgia

60" 3pt Pine Straw Rake

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

Noise walls Some Noise Facts

Introduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5.

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Jointing Rural Intersections

IN THE COURT OF APPEALS OF IOWA. No / Filed December 28, Appeal from the Iowa District Court for Polk County, Eliza J.

X-Tension TM Guardrail End Terminal

TRAFFIC ENGINEERING SAB3843. CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN

Show all your work for full credit!! Reference ODOT

Connected Vehicles and Maintenance Operations

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

Chapter 8 PRE-INSTALLATION PROCEDURES COMMON TO ALL SYSTEMS

MODEL 7000 BEVEL-MILL

The Shoppes at Forney Crossings

Portable Signals: INDOT Design Guidance and Specifications

This page is intentionally left blank

DESIGN PUBLIC HEARING

LOG TRUCK SAFETY ALERT

Pavement Markings Under Wet Night Road Conditions. A Comparison of 2 Beads in Grooved High Build Waterborne on I-215I

Safeguarding Machinery

2-in-1 AIR TANK AND BEAD BLASTER OWNER S MANUAL

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

LA DOTD s Nighttime Standards for Construction Operations. Presented by: Tom Ervin Traffic Solutions, Inc.

CONNECTED VEHICLE-TO-INFRASTRUCTURE INITATIVES

Improving Work Zone Safety Utilizing a New Mobile Proximity Sensing Technology

State Road A1A North Bridge over ICWW Bridge

Focus Group Participants Understanding of Advance Warning Arrow Displays used in Short-Term and Moving Work Zones

Close-Range Photogrammetry for Accident Reconstruction Measurements

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Complete Streets & PPM to FDM Update

Chicken Coop OWNER S MANUAL

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

HABITAT FOR HUMANITY WORK CREW SAFETY: Construction Safety Policy

Sliding Door Kit

Roadway Glare & Reflection Technical Data

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

SAFETY AND OPERATING MANUAL. Hedge Trimmer WG205E WG206E WG207E WG208E

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Automated Machine Guidance

Contractor Shingle Recycling Qualification

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

DEVELOPMENT PLAN CHECKLIST

Chicken Coop OWNER S MANUAL

Revision of the EU General Safety Regulation and Pedestrian Safety Regulation

Jointed Precast Concrete Pavement

California Driver Handbook - Tra ic Controls

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

ROUND TOP RV SHELTER

X-350 Guardrail End Terminal

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis

SKT-SP Tangent Terminal

HGV TRAFFIC CONTROL PLATE

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Diamond Knowledge Base. Inductive Loop Guide. Introduction

Evaluation of Roadside Wrong-Way Warning Systems with Different Types of Sensors

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1

Installation Manual for Gate Guard

Update: July 20, 2012

C. For cold-applied tape, the pavement temperature shall be at least 70 F.

Ohio Department of Transportation Office of Traffic Engineering July 17, 2009

X-TENSION 350 Guardrail End Terminal Tangent and Flared

48" Wide Landscape Rake

Chapter 23. Signing and Pavement Marking Plans

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

Proposed Watertown Plank Road Interchange Evaluation Using a Full Scale Driving Simulator

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

Impact Wrench MODEL TW1000. WARNING: For your personal safety, READ and UNDERSTAND before using. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE.

DUMP N GO MODEL PV 212 JOHN DEERE

Deep Creek Canyon US Highway 12

Transcription:

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT Case ID: MI Date of Investigation Respondent Employer Information 1. Is the employer the primary contractor or a subcontractor working at the site? Victim Information 2. What was victim s occupation at time of incident? 01. Primary 02. Subcontractor 01. Laborer 02. Flagger 03. Equipment Operator 04. Truck driver 05. Mechanic 06. Foreman/Supervisor 07. Engineer 08. Other (specify) 3. Was the victim performing a task that was not a part of their normal work duties/tasks? 4. Was this the victim s normal occupation? (Go to Q6) 03. Other (specify) (Go to Q6) 5. What was the victim s normal occupation? 01. Laborer 02. Flagger 03. Equipment Operator 04. Truck driver 05. Mechanic 6. Was anyone within direct visual or verbal contact with victim at the time of the incident? 7. Was this direct contact maintained for safety purposes? 8. How familiar was the victim with the task being performed at the time of the incident? 9. How often did victim do this task? (if variable amounts, ask about the month prior to the incident) (Go to Q8) (Go to Q8) 01. Not familiar 02. Somewhat familiar 01. First time ever? 02. Less than once per week 03. About once per month 04. Sporadically (during a month) 05. One or more times per week 06. Foreman/Supervisor 07. Engineer 08. Other (specify) 03. Very familiar 06. Daily or almost daily 07. Monthly 08. Other 10. Unknown 1 of 9

11. How long had it been since the task was last performed by the victim? 10a. Notes: 01. < 1 week before incident 02. > 1 week before incident 03. 1 month before incident 04. 6 months to 1 year before incident 05. 1 year before incident 06. Other Incident Information 12. The victim s work area at the time of the incident was: (Circle all that apply) 13. The victim s work area at the time of the incident was: (Circle all that apply) 2 of 9 01. Usual work area 02. Unfamiliar work area 03. Limited Access work area 04. Restricted work area 05. Unauthorized work area 06. Authorized work area 01. Dry 02. Wet 03. Frost/ice/snow covered 04. Cluttered 05. Damaged or worn 06. Other (Specify) 07. Other (specify) 14. Activity of coworker: 01. No coworker 02. Working with victim 03. Working on separate task 04. Other (specify) 15. Was the incident a result of: 01. Motorist intrusion into work zone 02. Occurred entirely within the work zone (no intrusion) 03. Other (specify) 16. When the incident occurred, victim was a: 01. Worker on foot 02. Vehicle Driver (auto, light truck, etc) 03. Equipment Operator 04. Vehicle Passenger 05. Other (specify) 17. Identify the type of vehicle incident: 01. Worker struck by vehicle 02. Worker caught between vehicle and stationary object 03. Worker caught under vehicle 04. Worker caught between 2 vehicles, both moving 05. Worker caught between 2 vehicles, 1 moving, 1 stationary 06. Other (specify) 18. At what point during the construction project did the incident occur? 01. Before work began 02. First week of work 03. First month of work 04. Between 1 and 6 months of work 05. Between 6 and 12 months of work 06. Over 1 year of work 07. First day of work

19. Complete the chart below for each vehicle involved in the incident. A. Car/Pickup (not associated with construction activities) J. Backhoe/Excavator B. Bus K. Crane C. Tractor-trailer L. Dump truck D. Front end loader M. Forklift E. Concrete mixer N. Scraper F. Paving machine O. Trencher G. Grader Q. Skid-Steer I. Bulldozer R. Other (specify) 18a. Identify if the vehicle involved in the incident was a traffic vehicle or construction vehicle/equipment 18b. Identify each vehicle involved in the incident using the above list 18c. Was vehicle/equipment being ridden/operated properly? (e.g. a passenger on a piece of equipment not made for a passenger) Vehicle # 1 Vehicle # 2 Vehicle # 3 01. Traffic 03. Traffic 05. Traffic 02. Construction 04. Construction 06. Construction 9a. Unknown 9b. Unknown 9c. Unknown 0 18d. Date of last inspection 01. / / 02. NA 03. Unknown 18e. Passed or failed inspection 01. Passed 02. Failed Circle all safety failures 18f. Seatbelts 01. Broken 18g. Brakes 01. Broken 18h. Emergency parking brakes 01. Broken 18i. Back-up alarm 01. Broken 18j. Horn 01. Broken 18k. Single external rear mirror 01. Broken 04. Yes 05. No 06. NA 0 04. / / 05. NA 06. Unknown 03. Passed 04. Failed 07. Yes 08. No 99. NA 0 07. / / 08. NA 0 05. Passed 06. Failed 3 of 9

18l. Dual external rear mirrors 01. Broken 18m. Reverse lights 01. Broken 18n. Rollover protective structures (ROPS) 01. Broken 18o. Other (specify) 01. Broken 20. Which construction activity was the victim doing at the time of the incident? 01. Site clearing/excavating 02. Milling 03. Rough grading 04. Fine grading 05. Paving 06. Installing signs, lights, guardrails 07. Painting stripes 08. Maintenance activities (mowing, repainting, litter pickup, etc) 09. Other (Specify) 9 21. What was the type of work zone? 01. Lane closure 02. Lane shift/crossover 03. Work on shoulder or median 04. Intermittent or moving work 05. Other (Specify) 9 22. Was there an established traffic control plan? 01. External Only 02. Internal Only 03. Both 20a. Notes on traffic control plan 04. Neither 05. NA 23. Identify the type(s) of traffic control device(s) being used at the location of the incident. (Circle all that apply) 01. None (Go to Q24) 02. Flagger 03. Detour signs 04. Cones, tubes or drums 05. Barricades 06. Vertical panels 07. Pilot car 08. Advance warning signs 09. Other (specify) 9 4 of 9

24. Were any of the traffic control devices not working properly? 23a. Notes on malfunctioning traffic control devices: (Go to Q24) (Go to Q24) 25. In what section of the construction work zone did the incident occur? 26. What was the posted speed limit OUTSIDE the work zone? 27. What was the posted speed limit INSIDE the work zone? 28. Identify the types of lighting and marking devices used (if applicable) at the time of the incident: 01. Advance warning area 02. Transition area 03. Buffer area 04. Activity area 05. Termination area 06. Not in work zone 07. Other (specify) 01. <20 mph 02. 20-40 mph 03. 40-50 mph 04. 50-60 mph 01. <20 mph 02. 20-40 mph 03. 40-50 mph 04. 50-60 mph 05. >60 mph 06. No posted speed 07. NA 05. >60 mph 06. No posted speed 07. NA 01. Retro-reflective sheeting/buttons 02. Temporary raised pavement markers 03. Reflective paint 04. Battery operated lights 05. Roadside delinators 06. Electric lights 07. Advanced warning arrow panels 08. Lanterns 09. Other (specify) 10. NA 9 29. On what type of roadway did the incident occur? 01. Rural 2-lane 02. Urban artery 03. Other urban streets 04. Rural or Urban multi-divided or undivided highway 05. Intersection 06. Freeway 07. Country road 08. Other (specify) 30. Type of roadway Junction: 01. Non-intersection 02. Intersection 03. Driveway/Alley 04. Overpass 05. Entrance/Exit ramp 06. Railroad crossing 07. Worker crosswalk 08. Bridge 09. Other (specify) 9 5 of 9

31. Total number of open travel lanes entering the construction area? 01. One lane 02. Two lanes 03. Three or more lanes 32. Location of incident 01. Roadway 02. Shoulder 03. Median 04. Roadside 33. Describe the traffic flow conditions at the time of incident 34. Describe the roadway alignment at the work zone 01. Straight 02. Curved 35. Describe the normal roadway profile 01. Level 02. Grade 03. Hill crest 36. Describe the normal roadway surface 01. Concrete 02. Black top tar 03. Brick or block 04. Slag, gravel or stone 37. Describe the weather conditions at the time of the incident? 38. Describe the roadway surface conditions at time and location of the incident 39. Describe the lighting conditions at the time of the incident 38. Other Incident Details: 04. Other (specify) 05. Parking Lane 06. Other (specify) 01. Not physically divided 02. Divided highway, median strip without traffic barriers 03. Divided highway with traffic barriers 04. One-way traffic 05. Other (specify) 03. Other (specify) 04. Sagging 05. Other (specify) 05. Dirt 06. Other (specify) 01. Clear 02. Cloudy/Rain 03. Sleet/Snow 04. Snow 05. Rain/Fog 06. Blowing sand, dirt or snow 07. Smog/Smoke 08. Other (specify) 01. Dry 02. Wet 03. Water (standing /moving) 04. Icy 05. Snowy 06. Muddy 07. Slushy 08. Debris 09. Sand, Dirt, Oil 10. Other (specify) 9 01. Daylight 02. Dark lighted roadway 03. Dark roadway not lighted 04. Dawn 05. Dust 06. Other (specify) 6 of 9

Company Safety Program 40. Were safety issues discussed with the victim prior to starting the day s work? 41. Were safety issues discussed during the planning and design phases of the project? 40a. NOTES Personal Protective Equipment 42. What types of PPE does the company require employees to use while performing the task: (Circle all that apply) 43. What types of PPE was victim using? (Circle all that apply) 01. None 02. Hard Hat 03. Retro-reflective vest 04. Safety glasses/goggles 05. Gloves 06. Hearing protection 07. Foot protection 08. Respirator 09. Other (specify) 9 01. None (Go to Q47) 02. Hard Hat 03. Retro-reflective vest 04. Safety glasses/goggles 05. Gloves 06. Hearing protection 07. Foot protection 08. Respirator 09. Other (specify) 44. Was PPE used in accordance with its design and function? 45. Was the type of PPE used sufficient to protect him/her? 46. Did the PPE malfunction? (Go to Q47) (Go to Q47) 47. If yes, briefly describe PPE malfunction: 48. Did employer maintain and inspect PPE on a regular basis? (END) (END) 49. Date of last PPE inspection 01. / / Hard Hat 02. / / Retro-reflective vest 03. / / Safety glasses/goggles 04. / / Gloves 05. / / Hearing protection 06. / / Foot protection 07. / / Respirator 08. / / Other (specify) 7 of 9

8 of 9 N O TES/ SKETCHES/ PICTU RES

9 of 9 N O TES/ SKETCHES/ PICTU RES