ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF NOVEMBER 25, 2013 DECEMBER 01, 2013)

Similar documents
ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF APRIL 29, 2013 MAY 05, 2013)

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JANUARY 27, 2014 FEBRUARY 2, 2014)

ARTHUR KILL 3. US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF JUNE 30, 2014 JULY 06, 2014)

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg.

Children's Center Noise Monitoring Monday, January 14, 2013

Children's Center Noise Monitoring Monday, June 17, 2013

Children's Center Noise Monitoring Monday, December 31, 2012

Attended Noise Monitoring - Quarter Ending September 2013

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority

Black. LWECS Site Permit. Stearns County. Permit Section:

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1


Orora Compliance Monitoring

The following is the summary of Keane Acoustics acoustical study for the City of St. Petersburg.

NOISE IMPACT ASSESSMENT 2016

Children's Center Noise Monitoring Monday, October 08, 2012

PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT RODEO STATION

Pre-Construction Sound Study. Velco Jay Substation DRAFT. January 2011 D A T A AN AL Y S IS S OL U T I ON S

DOWNWIND LEG NOISE MONITORING SUMMARY REPORT

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations

Technical Report NOISE MONITORING PROGRAM

AMERICAN UNIVERSITY EAST CAMPUS DEVELOPMENT WASHINGTON, D.C. Environmental Noise Study. Project Number

Raging River Quarry. Environmental Noise Monitoring Protocol Provisional Operations 11/30/2016

Noise Study for Proposed Mavis Tire

Noise Mitigation Study Pilot Program Summary Report Contract No

Background Ambient Noise Study Rosemont Copper

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

REPORT PERIOD: JANUARY 01 MARCH

Fundamentals of Environmental Noise Monitoring CENAC

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

91 Street Earth Berm Removal in Edmonton, Alberta

Southwest Anthony Henday Drive At Wedgewood Heights Residential Neighborhood in Edmonton, AB

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex

Orora Compliance Monitoring

Short Term Aircraft Noise Monitoring Pacifica

Public Hearing on Revisions to Lincoln County Zoning Ordinance

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX K Parallel Barriers

Black Butte Copper Project Mine Operating Permit Application (Revision 3)

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number

BASELINE NOISE MONITORING SURVEY

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2.

Protocol for Ambient Level Noise Monitoring

Liddell Coal Operations

January 15, File: A. Urban Systems Ltd Homer Street Vancouver, BC V6B 2W9. Attention: Tim Stevens. Dear Tim:

Advice No Rule 8 Metering and Schedule 300 Charges as Defined by Rules and Regulations

Compliance Noise Survey & Assessment

Subject: Pappy s Grill and Sports Bar DJ System Acoustical Isolation Study

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate

Roche Ireland Limited

APPENDIX G-4 NOISE MONITORING REPORT

Assured Monitoring Group

2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR)

CALGA SAND QUARRY ATTENDED COMPLIANCE NOISE MONITORING 12 APRIL 2017 REPORT NO E VERSION A APRIL 2017 PREPARED FOR

Bancroft & Piedmont Cellular Facility

Appendix 8. Draft Post Construction Noise Monitoring Protocol

Roche Ireland Limited

Project Survey Report Plotting of Noise Isopleth Maps of Robinson Lake Natural Gas Plant

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013

Offaly County Council

CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014

UC Berkeley Northside Relocation Cellular Facility

Some Relationships Between Fall Hawk Migration and Weather Features at High Park, Toronto

Environmental Noise Assessment Pa ia Relief Route Project Pa ia, Maui County, Hawaii

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017

November 12, Mr. Bryan Tripp Canadian Hydro Developers, Inc. 34 Harvard Road Guelph, ON N1G 4V8

Attended Noise Monitoring Program

06/25/13 CUP prepared for: June 20, prepared by: Earl Mullins, PE. architectural environmental and industrial noise control

Department of Conservation Chatham Islands Staff Development and Volunteer Opportunities Threatened species monitoring and management /19

Liddell Coal Operations

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) )

Sound Reflection from a Motorway Barrier

Low frequency noise near wind farms and in other environments

PRACTICAL METHODOLOGY FOR FAST ENVIRONMENTAL FIELD MEASUREMENTS

Attended Noise Monitoring Program

R e p o r t th A u g u s t

Virginia Avenue Tunnel (VAT) Reconstruction Noise Analysis Approach

TABLE OF CONTENTS. Executive Summary 1 Acknowledgements 3 Introduction 3 Storm Recovery and Beach Project Effectiveness 3

Rev2-18.Feb Safety Reliability Integrity Training Asset Support Design Support Troubleshooting

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017

Xtratherm Limited Kells Road, Navan, Co Meath

Underwater Noise Levels

OFFICIAL NOISE MONITORING MONTHLY MONITORING REPORT SUMMARY CARNWATH ROAD RIVERSIDE (CARRR)

NOISE IMPACT STUDY FOR THE SOUTH PIER IMPROVEMENT PROJECT BROOKLYN, NEW YORK. April 2008

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Bickerdike Allen Partners

Roof top of Ash Lagoon decantrate pump house Existing Ching Lam noise monitoring station

Acquisition of Aerial Photographs and/or Satellite Imagery

Viterra's Pacific Terminal Dust Control & Ship Loader Upgrades Community Noise Asessment Report

Cymbaluk Noise Complaints

Noise monitoring report

Pfizer Ireland Pharmaceuticals

Transcription:

ARTHUR KILL 3 US Army Corps of Engineers NEW YORK DISTRICT NOISE MONITORING REPORT EASTERN SHORE (WEEK OF NOVEMBER 25, 2013 DECEMBER 01, 2013) SITE NAK-1 DUARTE MARTI SCHOOL, FIRST STREET, ELIZABETH, NEW JERSEY SITE # NAK-2 21 ARLINGTON AVENUE, STATEN ISLAND, NEW YORK SITE # NAK-3 238 FRONT STREET, ELIZABETH, NEW JERSEY SITE # NAK-4 3290 RICHMOND TERRACE, STATEN ISLAND, NEW YORK LEQ COMPARISON TO NYC CODE CRITERIA (ABSOLUTE LEVELS CRITERIA) BACKGROUND AND DREDGE SOUND LEVEL MONITORING PROGRAM SAK-2, SAK-3 JUNE 18, 2007 DECEMBER 01, 2013 (CONTRACT W912DS-09-D-0009 (IDC 3002) TASK ORDER 0016)

TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 MONITOR SITE LOCATIONS, DESCRIPTIONS & EXISTING CONDITIONS... 1 3.0 LONG TERM NOISE MEASUREMENT METHODS & PROCEDURES... 1 4.0 NOISE MONITORING DATA ANALYSIS... 1 5.0 LONG TERM FIELD MONITORING SUMMARY... 7 6.0 WEEK PERIOD SUMMARY... 7 i

1.0 INTRODUCTION The purpose of the report is to provide an update to the on-going long-term measurements at noisesensitive locations in the project area. This update incorporates long term baseline data collection and compares it to the NYC Code Criteria for absolute sound levels. This report includes noise monitoring data, dredging operations and a discussion of measured noise level exceedances above the impact criteria levels, if any, as defined by a substantial increase above baseline conditions. 2.0 MONITOR SITE LOCATIONS, DESCRIPTIONS & EXISTING CONDITIONS Noise monitoring locations were selected based on a survey of the project area and where landowner permission was granted. These locations are representative of noise-sensitive sites with the potential to be affected by dredge operation noise. Dredges ceased to operate in the KVK area during August 2011. Dredging commenced in the sak-2 area in September 2011. Site NAK-4 was relocated to 3290 Richmond Terrace, Staten, Island, New York on May 12, 2011 and NAK-3 previously located on the Nicholas Street was relocated to 238 Front Street, Elizabeth, New Jersey on May 30, 2011. Site NAK-2 was relocated to 21 Arlington Avenue, Staten Island, New York on October 5, 2011and Site NAK-1 was relocated to 182 West 8 th Street, Bayonne, New Jersey on October 8, 2011. Site NAK-1 was relocated to the roof top of Duarte Marti School on April 8, 2013. The locations of the monitoring sites are shown on the following regional aerial. The descriptions, existing conditions, and other monitor site photos are presented in the following sections. Please note that the aerial Photographs (2006) are copied from US Geological Survey web site (http://seamless.usgs.gov/index.asp). Street views and bird s eye views are taken from previous USACE reports and were reported to have been copied from Google Earth or from Virtual Earth sources. The solid red dots represent the noise monitor locations. The solid yellow dot represent the co-location of the Noise monitor and a Sound recorder location. Various symbols as defined in the legend are used to represent the various dredge locations as provided by the Contractor, if any, during the period. 3.0 LONG TERM NOISE MEASUREMENT METHODS & PROCEDURES During these measurements, the noise monitors are programmed to calculate sound levels for one-hour intervals and provide the results in terms of the Leq, Lmax, L1, L10, L33, L90, and L99 metrics. All long-term noise measurements were performed with instruments that are in compliance with criteria for a Type 1 (Precision) Sound Level Meter as defined in the current version of ANSI Standard S1.4. 4.0 NOISE MONITORING DATA ANALYSIS Currently, long term hourly background data collections have been tabulated into median background levels. Since the new guidance was released by NYCDEP, the absolute level criteria has been replaced by the increase over existing sound level criteria. These potential criteria impacts occur when levels exceed 10 dba or more during the daytime baseline conditions (7 AM-10 PM) and 7 dba or more during the nighttime baseline conditions (10 PM-7 AM) at a residence as adopted from Local Laws of the City of New York No. 113, an amendment of the administrative code. Though not directly applicable to the dredging, the increase over existing criteria is suggested to be the best available one to assess changes in the regional sound level environment. The reason that the absolute criteria is not as good a barometer to assess potential noise impacts is because the existing sound levels are usually above the Code at several sites, especially during the nighttime hours. Therefore, a typical person will tend to notice and react to an increase above their baseline environment more than if a dredge generated noise were to reach an absolute decibel level such as 60 or 65 dba. Below is a brief description of the Monitoring sites used in this investigation. 1

Site NAK-1: Duarte Marti School, First Street, Elizabeth, New Jersey The Noise monitor is located on the roof of Duarte Marti School. There are single and multi-family homes along with commercial interests in the area. Traffic from Front Street is the major noise contributor in addition to the channel traffic, School and neighborhood activities. 2

Site NAK-2: 21 Arlington Avenue, Staten Island There are single and multi-family homes along with commercial interests across Richmond Terrace. Traffic from Arlington Avenue and Richmond Terrace are the major noise contributor in addition to the channel traffic and neighborhood activities. The microphone has a direct line of sight to the water, partially obstructed because of trees and other structures. 3

Site NAK-3: 238 Front Street, Elizabeth, New Jersey 07206 There are single and multi-family homes along with commercial interests in the area. Traffic from Front Street is the major noise contributor in addition to the channel traffic and neighborhood activities. 4

Site NAK-4: 3290 Richmond Terrace, (KVK 9 - Staten Island, NY) This area includes single family residences. This site was retained in case of dredge activities in the AK2 area of the project grid. The location is within the first block of residences, slightly set back from Richmond Terrace. The microphone is located in the backyard of the house located in the southeast corner of Northfield and Richmond Terrace. 5

6

5.0 LONG TERM FIELD MONITORING SUMMARY The regional sound levels are typical of a densely developed urban area with a mix of heavy industry, warehouses, commercial, marine, water transit, and single and multi-family residential land use types with a mix of parks, and commercial buildings. Typical regional noise generators include water traffic (plus on-site area noise from the Staten Island Ferry), aircraft, local construction, local vehicular traffic (Richmond Terrace is dominant), pedestrian and neighborhood activities, and home maintenance. A summary of the weather conditions, events, dredge operations and other factors is presented in Section 6.0. When the dredges are in operation, sound levels that increase greater than the applicable daytime and nighttime impact criteria levels as defined by the substantial increase criteria are examined. 6.0 WEEK PERIOD SUMMARY Weather: Average High Wind Speed (mph) Day Date Average Wind Speed (mph) Gust Speed (mph) General Wind Direction Meteorological Event/Amount Monday 11/25/13 9 17 23 WSW None Tuesday 11/26/13 6 16 22 ESE 0.57 Inches, Rain Wednesday 11/27/13 15 26 36 WNW Trace Snow, 1.91 Inches Rain Thursday 11/28/13 14 32 43 WNW None Friday 11/29/13 8 17 22 NW None Saturday 11/30/13 7 13 15 NE None Sunday 12/01/13 5 8 10 NNW None Note: 1 inch of precipitation is equal to approximately 10 inches 14of snow. Source: Newark Airport Weather Data [Weather Underground] Dredge Operations: The dredge operations are as listed below. FJ Day Date Dredge 54 Apache Belesimo Monday 11/25/13 Active Active Active Tuesday Wednesday Thursday Friday Saturday Sunday 11/26/13 Active Active Active 11/27/13 Active Active Active 11/28/13 Active Active Active 11/29/13 Active Active Active 11/30/13 Active Active Active 12/01/13 Inactive Inactive Active JP Boisseau Delaware Drill Boat Kraken Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Inactive Information Source For Dredge Activity US Army Corps of Engineers US Army Corps of Engineers US Army Corps of Engineers US Army Corps of Engineers US Army Corps of Engineers US Army Corps of Engineers US Army Corps of Engineers 7

Meteorological Information: The winds gusts were low to moderate. Trace amount of snow was recorded on Wednesday and rain event was recorded on Tuesday and Wednesday. Newspaper Reports: According to the Staten Island Advance, there were no reported activities that might have influenced the recordings. Field Reports: Noise monitoring in KVK-1 was discontinued during the first week of October, 2011. Four noise monitors were relocated to the sak-2 area. One sound recorder was also installed at the new location on October 8, 2011, to correlate noise to sounds in the area to better correlate the exceedance, if any. Bayonne Noise Monitoring station was shut down during the afternoon on March 15, 2013 and On April 5, 2013 NAK-1 station has been relocated to Duarte Marti School, First Street, Elizabeth, New Jersey. Other Information: At a March 2009 public workshop, the general public indicated to the Corps representatives that they were under the impression that the dredges had been working recently and, in some cases, continuously for years in this area as the people have claimed to hear the dredging. Since the clamshell dredges operated only from late September 2008 through the end of January 2009, (and previously, not since about the year 2000), it is apparent that there are other noise sources that are being misinterpreted by the public as the dredge operations. This mistaken identity will have to be observed as carefully as possible in the future when the dredging operations return so as to identify the proper noise generating sources and address them accordingly. General Overview During the Week: The recorded sound levels were generally below the baseline (and, of course, the criteria), indicating that a normal person should not have been able to perceive any dredging noise unless they were genuinely attempting to focus on the noise itself. Noise monitoring station NAK-1 located at Duarte Marti School, First Street, Elizabeth, New Jersey and Noise monitoring station NAK-2 located at 21 Arlington Avenue, Staten Island, New York recorded exceedances on Saturday and Sunday during the week. 8

Sites NAK1 through NAK4 Leq Measurements vs. NYC Code Absolute Criteria sak-3- Site NAK-1 Duarte Marti School, First Street, Elizabeth, New Jersey 11/25/2013-12/01/13 Sound Pressure Level (dba) 85 80 75 70 65 60 55 50 45 40 Sound levels exceeded the Impact Criteria Levels on Saturday and Sunday. Time 2 2 2 2 2 2 2 Monday Tuesday Wednesday Thursday Friday Saturday Sunday Leq Baseline Sound Levels Fall Impact Criteria Levels 9

Sound Pressure Level (dba) 85 80 75 70 65 60 55 50 45 40 sak-3- Site NAK-2 21 Arlington Avenue Staten Island, New York 11/25/2013-12/01/2013 Sound levels exceeded the Impact Criteria Levels on Saturday and Sunday. Time 2 2 2 2 2 2 2 Monday Tuesday Wednesday Thursday Friday Saturday Sunday Leq Baseline Sound Levels Fall Impact Criteria Levels 10

Sound Pressure Levels 90 85 80 75 70 65 60 55 50 45 Time sak-3- Site NAK-3 238 Front Street, Elizabeth, New Jersey 11/25/2013-12/01/2013 2 2 2 2 2 2 2 Monday Tuesday Wednesday Thursday Friday Saturday Sunday Leq Baseline Sound Levels Fall Impact Criteria Levels 11

sak-3- Site NAK-4 3290 Richmond Terrace, Staten Island, New York 11/25/2013-12/01/2013 85 Sound Pressure Levels 80 75 70 65 60 55 50 45 40 Time 5:00:00 1 19:00:00 9:00:00 1 23:00:00 13:00:00 20:00:00 3:00:00 17:00:00 0:00:34 7:00:00 21:00:00 4:00:00 11:00:00 1:00:00 8:00:00 15:00:00 2 Monday Tuesday Wednesday Thursday Friday Saturday Sunday Leq Baseline Sound Levels Fall Impact Criteria Levels 12