Note Pad Holder. Tools:

Similar documents
Hose Hanger Cold Metal Work

Fence Wire Bender. Description: Tools: Materials: Procedure: Notes: Name: Date:

Sheet Metal Toolbox. Tools:

Saw Guide and Rafter Square

Battery Terminal Puller

Oxy-Fuel Cutting Skill Assignment

Boot Scraper. Description: Materials: Tools: Procedure: Name: Date:

Birdhouse. Materials: Tools: Procedure: Name: Date: Description:

Tool Tote Project. Tools:

Woodworking Clay Pot Hanger

Meat Hook. Tools: Materials: Directions: Name: 1/4 round cold rolled steel 20 long 1 wooden dowel 5 long Epoxy Wood Stain Sand Paper Emery Cloth

Woodworking Boot Jack

Exploration of a Student Project in a Materials Processing Course

Make a Mini Shield and Letter Opener

Build a Drill Press Vise

Wood Planter Box. Description: Materials: Procedure: Name: Date:

Secondary school metal shop or equivalently equipped technology education shop

Tools: Sharpie, Square, Vise, Hack saw, Ruler, Punch, Hammer, File. 2. Cut the stock Place stock in vise and cut with hack saw

Wood Sawhorse. Description: Materials: Tools: Drawing/Photo: Name: Date:

Step Stool. Description: Materials: Tools: Directions: Name:

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT

Receiver Hitch and Pin

Fabricate a Coat Hook

Precision Steel Car s 100 T Steel Coil Car

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology

Fabricate a Tool Caddy

Sheet Metal Brake Plans for a 6' Sheet Metal Brake

Machine Your Fishing Reel

PAT installation of a Sun Dome over a in-ground

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Paper Towel Holder Project

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

Ball-Joint Scrapers Steel Blade Carbide Blade 05K K21.04

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

Locker Pedestal Installation Instructions

Performance Standards Benchwork

Sheet Metal Tools. by:prem Mahendranathan

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions: Bencher Skylark

Desert Gold! OK Enterprises P.O. Box 2908 Lake Havasu City, AZ

STEEL RULE. Stock TRY SQUARE

MINI-LATHE QUICK CHANGE TOOL POST

Prof. Steven S. Saliterman Introductory Medical Device Prototyping

MUTINEER AND BUCCANEER TOP-MOUNTED CENTERBOARD HANGERS. Note, drawing not to scale Bob DeRoeck May 31, 05

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

Rafter. Cut a rafter using appropriate construction tools and learn to use a framing square to layout a common rafter angle and length.

Make a Portable Hibachi

Cross Peen Hammer. Introduction. Lesson Objectives. Assumptions

METAL FABRICATION MECHANICAL

woodworkersjournal.com MATERIAL LIST

TrendWall Floor-To-Ceiling Panels Installation Instruction

INSTALLING YOUR NEW SPRING LIFT ARM KIT

SAW-PIERCING. 79. Fig. 29. Placing new blade in saw-frame.

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

AMETAL SHAPER is indispensable for certain METAL SHAPER FOR YOUR SHOP. By S. S. Miner

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Shay Tender Frame Fabrication

Figure 2. Detail of exhaust stack mounting bracket made from sheet metal. The side shown here faces the kiln body and is attached by nine small bolts.

Electrical Wiring Projects

10x10 Trellis Pergola

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

st ANNUAL SKILLS MANITOBA COMPETITION CONTEST DESCRIPTION

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

Two Panel Frameless Bypass Door

Installation of Balustrade Systems

INSTALLATION INSTRUCTIONS 6 OVAL BENT END SIDEBARS DODGE RAM 1500, CREW CAB PART#: /241533B

Tri- State Consulting Co. Engineering 101 Project # 2 Catapult Design Group #

INSTALLATION GUIDE. TRANZFORM Sound TRANZFORM Space

10 x 10 Arch Top Pergola

Master Your Terrain (307) Extreme Duty ROCK RAILZ Jeep Cherokee. Installation Instructions

Flooring Nails 6-D Flooring Nails $3.40 / 1# 6-D Flooring Nails $14.50 / 5# 8-D Flooring Nails $3.40 / 1# 8-D Flooring Nails $14.

Make a BBQ Flipper. Description. Lesson Objectives. Assumptions

Dura-Lock Roof System

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Flat file. Round file. Hand file. Half -round. Mill file. Square file

Storage Cabinets 9000 Series Assembly Instructions

Question 1. Flat file. Half -round. Round file. Three square ( triangle ) Needle files. Page 1 of 46

Practical Scrap Metal Small Arms Vol.10 By Professor Parabellum

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

CARIBBEAN EXAMINATIONS SECONDARY EDUCATION CERTIFICATE EXAMINATION MECHANICAL ENGINEERING TECHNOLOGY. Paper 02 - Technical Proficiency.

Pressure Vessel Assembly Instructions

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

WESTERN PISTOL.22 CALIBER SINGLE SHOT. Entire pamphlet Copyrighted by JACO Designs 1972

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions

Technicians of Terror. This is the air valve we make to use with our air

PRO Series Brakes Operating Instructions

Shed Assembly Instructions

Design and Fabrication of Rolling, Bending and Riveting Tool

INSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.

Miter Saw Super Stand

Electrical Construction Name:

General Machining, Fitting and Assembly Applications A/508/5164

4/29/2016 Big Block Main Bearing Stud Girdle Kit HUG7380K For B & RB Blocks

Titan - Double Skin Steel Partitioning. Installation Pack

Transcription:

Note Pad Holder Name: Date: Description: The note pad holder is a cold metal project that involves layout skills and sheet metal fabrication skills Materials: 3 1/8 x ¼ Aluminum Pop Rivet 18 ga. Galvanized Sheet Metal 1 1/8 x1 Flat Hot Rolled Mild Steel 1 1/8 x1 x1 HR Angle Iron 2 1 x ¼ -20 (NC) Pan Head Screw 2 ¼ Split Lock Washer 2 ¼ -20 (NC) Wing Nut Tools: Steel Tape Measure Combination Square Scratch Awl/Sharpie Sheet Metal Shear Mill Files (Bastard & Smooth) Abrasive Cut-off Saw Center Punch Ball Peen Hammer Pop Rivet Tool Drill Press #30 Drill Bit ¼ Twist Drill Locking Pliers Procedure: 1. Layout the 5½ x7 main base on 26ga galvanized sheet metal. Cut using a sheet metal shear. 2. Measure a 5½ long piece of 1/8 x1 flat steel for the top plate strip. Measure a 5½ long piece of 1/8 x1 x1 angle iron for the bottom support. Cut both pieces using an abrasive cut off saw. 2. File rough or uneven edges smooth or even with mill file. 3. Layout two locations for drilling outside screw-holes on the top plate strip front using a center punch. Line-up and securely clamp together all three pieces of material with locking pliers. 4. Drill two outside holes using a ¼ drill and drill press. Remove any burs with a file. 5. Layout three locations for drilling inside pop rivet-holes on the main base plate front using a center punch. Line-up and securely fasten together the main base and support for drilling. 6. Drill three inside holes using a #30 drill bit and drill press. Remove any burs with a file. 7. Attach the main base plate and supporting angle iron using three 1/8 x ¼ pop rivets and a pop rivet tool. Drive down the metal tight against rivet head with a ball peen hammer, if necessary. 8. Assemble note pad holder inserting a 1 x ¼ -20NC pan head screw through each outside hole along with a ¼ split lock washer. Thread on a ¼ -20NC wing nut to each. Revised: 6/27/2011 1

Cutting List: Description Quantity Size Material Main Base Plate 1 5½ x7 18 ga. Galvanized Sheet Metal Top Plate Strip 1 5½ 1/8 x1 Flat Cold Rolled Mild Steel Bottom Support 1 5½ 1/8 x1 x1 Angle Iron Notes: Revised: 6/27/2011 2

Photo/Drawing: Revised: 6/27/2011 3

Revised: 6/27/2011 4

Note Pad Worksheet Name: Date: 1. The main base plate of the notepad holder is by. (1 pt) 2. Calculate the distance of each of the two outside 5/16 drilled holes from the project edges, and note on given plan. The center of each hole is measured at ½ from the top of the note pad holder, and from the side, both right and left, project edges. (1 pt) 3. Name the three larger machine tools used to complete this project. (3 pts) 4. The tool used to smooth rough edges of metal is called a. (1 pt) 5. List the following steps in order of the recommended method used to layout and drill a hole with a drill press. (2 points) At a 90 -angle to material surface, drill hole completely through applying light, constant pressure on hand feed lever Place and firmly secure materials for drilling to the drill platform According to plan, measure and mark locations of holes to drill with a center punch Select desired drill bit to put in drill press chuck and a piece of wood for protective backing 5. The difference in the diameter of the 1/8 pop rivets ( ) and the #30 drill bit ( ) is. This difference helps to eliminate a(n). (2 pts) Grading Rubric: CRITERIA POSSIBLE SCORE Worksheet Questions 10 Assembly (properly assembled, ordered lay of pieces) 5 Measurement height & width 5 Rivets (placement, cleanliness, tight) 5 Screws (placement, cleanliness) 5 Workmanship (straight cuts, not sharp edges, flat/level) 5 TOTAL POINTS : 35 Revised: 6/27/2011 5

Revised: 6/27/2011 6

Agricultural Standards Met: Note Pad Holder -- Teachers Notes: B1.0 Students understand personal and group safety: B1.1 Practice the rules for personal and group safety while working in an agricultural mechanics environment. B1.2 Know the relationship between accepted shop management procedures and a safe working environment. B5.0 Students understand agricultural cold metal processes: B5.1 Know how to identify common metals, sizes, and shapes. B5.2 Know basic tool-fitting skills. B5.3 Know layout skills. B5.4 Know basic cold metal processes (e.g., shearing, cutting, drilling, threading, bending). B5.5 Complete a cold metal project, including interpreting a plan, developing a bill of materials, selecting materials, shaping, fastening, and finishing. Objectives: By properly completing this project, students will be able to: Read a plan and to layout dimensions. Safely and properly use a power machine tool, such as a drill press, sheet metal shear and abrasive cut off saw. Perform basic sheet metal fabrication. Alternative Tools/Methods/Materials: Make larger in size (for 8½ x11 paper) Use various tools for cutting: hydraulic shear, chop saw, hacksaw, iron worker, Beverly shear, tin snips, etc. Use lighter/heavier, thinner/thicker angle iron or flat steel Use different kinds or sizes of bolts, screws or nuts (bigger drill bits = less likely to be broken) Tap holes for screws Replace flat cold rolled mild steel top holding strip with sheet metal Replace angle iron and top flat strip with wood and/or use wood for base material Fold edges of sheet metal Add metal strip to bottom of front face (design) Replace angle iron with a hanger or hook Make entire project out of aluminum Drill more holes (makes project adjustable for various sizes of paper) Replace pop rivets with spot welding or with countersunk screws Revised: 6/27/2011 7

Safety Review: Abrasive cut off saw/cutting metal Sheet metal shear/shearing metal Drill press (floor)/drilling holes in metal Project Time: Demonstration: 40 minutes Build: 3 hours Demonstration Notes 1. Measure twice before you cut. 2. Remember to file or smooth rough and sharp edges. 3. Layout/measure material at machines and/or drilling to minimize back and forth traveling. Demo the use of the combination square for layout. 4. Emphasize correct drill speed for drilling metal. 5. Clamp material pieces together locking pliers facing upwards, minimizing interference in accurately securing and leveling project on drill press platform before drilling. By drilling the clamped pieces you insure the holes will align. 6. Remember: metal will be hot after cutting with an abrasive cut off saw and after drilling. 7. Using a #30 drill bit (.1285 diameter) to make holes for 1/8 pop rivets (.125 diameter) eliminates an interference fit. Since the hole is slightly larger (difference of.0035 ), inserting the pop rivet is more efficient, requires less time to try and push it in, and allows for more productivity. 8. Push pop rivet and tool firmly against material before squeezing to ensure rivets are flush against metal. 9. Unclamp pieces after drilling outside ¼ holes, and attach main base plate to supporting angle iron with screws for drilling inside pop rivet holes. 10. Pound down the rivet heads to make them as flush as possible against the metal. 11. Lock washer is placed near end of screw next to wing nut. 12. Workmanship should be emphasized. Revised: 6/27/2011 8

Bill of Materials: Projects: 24 Size Description Units Qty/Project Cost/Unit Order Amount 18 ga Galvanized Sheet Metal 3'x8' sheets 0.013 $48.00 1 $ 48.00 1/8"x1/4" Aluminum Pop rivet 100-pack 0.03 $5.50 1 $ 5.50 1/8"x1" Flat HR mild steel 20' bar 0.025 $10.00 1 $ 10.00 1/8"x1"x1" Angle iron 20' bar 0.025 $ 12.00 1 $ 12.00 1"x1/4" 20 NC steel pan head screw 100-pack 0.02 $ 5.50 1 $ 5.50 1/4" Split Lock washer 100-pack 0.02 $ 12.00 1 $ 12.00 1/4" 20 NC wing nut 50-pack 0.04 $ 7.00 1 $ 7.00 TOTAL $ 100.00 Project from: Mr. Patterson, Ripon High School Plan by: Lindsey Pahl Revised: 6/27/2011 9