set of safety brace steel cable draw-up gate kpl

Similar documents
AX1001. Smith/Functional training Combo-free weight ASSEMBLY INSTRUCTIONS

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Hardware and Components:

CHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)

aluminium profile system

Assembly Instructions

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

Removing the Z-Axis lead screw

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Piazzola Pergola Awning Manufacturing and installation guide

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

SPARE PARTS LIST MODEL NO. LB1200F PAGE 1 ITEM PART NO. DESCRIPTION QTY NOTE

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

BY ALIEN TECHNOLOGIES CORP

Repair manual. Fifth-wheel coupling JSK 38/50

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

TERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

INSTRUCTION MANUAL LEG PRESS OPTION OF ELITE GYM

25-200H. 12 Planer / Jointer. with Helical Cutterhead. Parts List.

MAG-CONV Basic, 48, 48R & Midline Front Mount

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.

HOME GYM Owner s Manual

Copper Tubing Hangers Clevis Hangers. Copper Tubing Hangers

Fifth-wheel coupling JSK 38/50

BUMP GATE FITTING INSTRUCTIONS.

Dublin Stalls Installation Instructions

Section A December 2009

CAM SYSTEM. Eccentric self-locking clamping devices. Set. CAM SYSTEM t. CAM SYSTEM t. Set. CAM SYSTEM s pag CAM SYSTEM s pag.

Hardware and Components:

TABLE OF CONTENTS. Impregnated... 1 NORDIC FENCE Fynbo FSC Certified... 1

PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS

Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions

Titan Series Awning Assembly and Installation Instructions

WPS crew Doors Installation instructions

installation guide

SpareParts Book Rev. 2.0

multi frame Exploded views / Part lists

It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating loose.

ASSEMBLY GUIDE. Mia Narrow Bookcase

08+ KAWASAKI KLR PD NERF

Sport-Thieme. Full-Size Goal. Assembly instructions. 7,32x2,44 m, Portable

Stainless Steel Bench Stand

STANDARD GRAVITY BOX TARP INSTALLATION

Assembly Instructions 10 X 10 Aluminum Frame Building

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

HD installation guide

INSTALLATION INSTRUCTIONS FOR SL-LB MANUAL LIFT BARRIER GATE ARMS

OWNERS MANUAL MODEL F660 HIP SLED

Oxford Stalls Installation Instructions

Installation Instructions Kit, Base Rail Bracket Part # 31413

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

EXPLODED PARTS LIST VSS 60

BARLOW TYRIE quality since Ref: x 3m - 12 x 10 Pavilion with Cabrio Folding Roof Step by Step Assembly Instructions

IIHS Side Impact Outrigger

Warnings. Description. Prior to Installation Tools Needed

NEWS Part. N /0 MINITEC NEWS

Manufacturing and installation instruction. Solidare Verso. Pergola awning (bottom mounted)

TROLLA LEAVY 97 CM Lawn sweeper

RPS. XR Front Drive Updates CORPORATION

Star Trac Turbo Trainer Assembly & Setup

Product overview. Fasteners. new article extended article. Fasteners. Fasteners adjustable. with spring clip K0043. heavy-duty version K0052.

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

The Bowflex Revolution XP Home Gym Assembly Instructions. P/N: Rev ( /0 )

Factory Assistance: Phone: Fax: Page 1

Assembly Instructions

Assembly Instructions 10 X 10 Aluminum Roof Support

Model PLM5113N PETROL LAWN MOWER

Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions

REVIEW ENTIRE INSTALLATION GUIDE. This step gives you the opportunity to contact your dealer to answer any questions before you begin.

HEARNE STEEL CO., INC.

Polaris General 1000 EPS 2016

FORPARK AUSTRALIA

F i t t i n g t h e N e w L a n d i n g G e a r t o Y o u r S k y J i b V 1

Parts Catalog Collector 34 Model Battery

Clamping devices 521

SS1062, SS10621 & SS10621E Free Standing PWC & Fishing Boat Hoist SS1062 SS10621 SS10621E

Odyssey Elementary Stem Installation

Simotec. 13.i

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.

REPLACEMENT TARP for SRT-2 SPOOL ROLL TARP

Hatch Whiteboard: Portable Stand Installation Instructions

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

M4 Hex Nut [ ] M4 T-Nut 20 [20-044] Appx. 1. 3mm. 20 Series profiles (1 per hole) (1 per hole) Ordering Information

Arducopter 3DR-B Hardware

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

MODEL 200/220 ASSEMBLY INSTRUCTIONS

Operating Instructions and Parts Manual. 10 x 16 Horizontal Band Saw Models J-7020, J-7040

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

Hydraulic Clamp Carrier. Installation & Operation Manual

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Index Pipe Hangers and Straps

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

CFT STRENGTH TRAINING SYSTEM OWNER'S MANUAL

Castle Frame Assembly Table AT-8. Diagnostics Manual. Castle, Inc. Petaluma, CA

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Serial Number Location

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

Transcription:

0324101 7108020 8208100 Order-nr. Description Number 0324101 safety brace steel cable draw-up gate 2 7108020 hexagon-head tap bolt M8x20 galv. 2 8208100 hexagon nut M8 galv. 2 set of safety brace steel cable draw-up gate kpl Number: 0324100-O Date: 7-12-2015

detail A (1 : 7) 0324101 7108020 8208500 A 0324330 Order-nr. Description Number 0321030 0321030 tube 48, length 3m 2 0324010 support post 76x280cm 2 0324020 locking bar 2 0324050 assembly parts for draw gate 1 0324090 bottom tube for draw gate 1 0324101 safety brace steel cable draw-up gate 2 0324050 0324090 0324020 0324220 0324010 0324220 adjusting frame small for draw gate 2 0324330 contra-weight 100cm 2 0412021 plate for T-clamp 48x48 4 7108020 hexagon-head tap bolt M8x20 galv. 2 7310070 coach bolt m10x70 galv. 2 8208500 self locking nylon nut M8 galv. 2 8210400 self locking capped nut M10 galv. 2 7310070 8210400 0412021 draw-up gate 200-330cm Number: 0324200-O Date: 25-10-2017

detail A (1 : 5) 1 Mount the steel wires to the contra weights and impel the contra weights in the (still horizontal) support posts. 2 Mount the pulley structure (with frame for pulley detail A) make sure the end of the steel wire does not drop into the support post. 3 Mount the two support postst level with the welded-on mounting plates to the outside. 4 Mount the sliding frames between the posts. Allow on both sides 5 space between the frame and the post (section B-B). 5 Fit the locking bars to the right lengths L1 and L2. Possibly rounding the ends (detail C). 6 Mount the locking bars (section D-D). Do not overlook to mount the parts of detail E! Adjust the set screw in a way that, in locking position, the spring has still a little tension. 7 Lock the gate by putting the locking bars into the holes of the supports posts. 8 Arrange the steel wire over the pulley pull up the contra weight and mount the end of the gate. 9 It is advised tot grease the locking bars at the passing in the gate. detail E (1 : 5) B B D D section B-B (1 : 5) section D-D (1 : 5) 5 detail C (1:20) assembly draw-up gate 200-330cm L1 L2 Number: 0324200-A Date: 12-12-2016

0321030 0412021 0324020 7310070 8210400 Item-nr. Description Number 0321030 tube 48, length 3m 1 0324020 locking bar 2 0412021 plate for T-clamp 48x48 4 7310070 coach bolt m10x70 galv. 2 8210400 self locking capped nut M10 galv. 2 repair kit draw-up gate 200-330 Number: 0324290-O Date: 18-10-2017

detail A 0324101 7108020 8208500 A Item-nr. Description Number 0321030 tube 48, length 3m 2 0324330 0324010 support post 76x280cm 2 0324020 locking bar 2 0324050 assembly parts for draw gate 76 1 0324090 bottom tube for draw gate 1 0324101 safety brace steel cable draw-up gate 2 0324050 0324220 0324010 0324320 adjusting frame large for draw gate 2 0324330 contra-weight 100cm 2 0324392 spacing tube adjusting frame large 2 0324090 0324020 7310080 8210500 0412026 0324392 0412021 0412021 plate for T-clamp 48x48 4 0412026 plate for four-way clamp 48x48x48 4 7108020 hexagon-head tap bolt M8x20 galv. 2 7310080 coach bolt M10x80 galv. 6 8208500 self locking nylon nut M8 galv. 2 8210500 self locking nylon nut M10 galv. 6 7310080 8210500 draw-up gate 330-440cm Number: 0324300-O Date: 31-3-2016

detail A (1 : 5) 1 Mount the steel wires to the contra weights and impel the contra weights in the (still horizontal) support posts. 2 Mount the pulley structure (with frame for pulley detail A) make sure the end of the steel wire does not drop into the support post. 3 Mount the two support postst level with the welded-on mounting plates to the outside. 4 Mount the sliding frames between the posts. Allow on both sides 5 space between the frame and the post (section B-B). 5 Fit the locking bars to the right lengths L1 and L2. Possibly rounding the ends (detail C). 6 Mount the locking bars (section D-D). Do not overlook to mount the parts of detail E! Adjust the set screw in a way that, in locking position, the spring has still a little tension. 7 Lock the gate by putting the locking bars into the holes of the supports posts. 8 Arrange the steel wire over the pulley pull up the contra weight and mount the end of the gate. 9 It is advised tot grease the locking bars at the passing in the gate. B B D D detail E (1 : 5) doorsnede B-B (1 : 5) doorsnede D-D (1 : 5) 5 detail C (1:20) assembly draw-up gate 330-440cm L1 L2 Number: 0324300-A Date: 12-12-2016

0321030 0412026 0324392 0324020 0412021 7310070 8210400 Item-nr. Description Number 0321030 tube 48, length 3m 1 0324020 locking bar 2 0324392 spacing tube adjusting frame large 2 0412021 plate for T-clamp 48x48 4 0412026 plate for four-way clamp 48x48x48 4 7310070 coach bolt m10x70 galv. 6 8210400 self locking capped nut M10 galv. 6 repair kit draw-up gate 330-440 Number: 0324390-O Date: 18-10-2017

7108050 8308100 1107100 0456086 8210100 1106400 1106200 0324410 Item-nr. Description Number 0324410 mounting bracket 89 draw gate left-s. 2 0324411 mounting bracket 89 draw gate right-s. 2 0456086 threaded strap M10/60x90 galv. 4 1106200 stopper 60 2 1106400 stopper 40 square 8 0324411 7110140 8210500 1107100 rubber buffer 4 7108050 hexagon-head bolt M8x50 galv. 4 7110140 hexagon-head bolt M10x140 galv 4 7310080 coach bolt M10x80 galv. 2 8210100 hexagon nut M10 galv. 8 8210500 self locking nylon nut M10 galv. 6 8308100 washer M8 (8x17x1,6) 4 assembly parts for 89 draw gate 7310080 8210500 Number: 0324401-O Date: 23-3-2018 Drawing remains our property and may not be reproduced, shown or entrust to third party or used otherwise. No rights can be derived from this drawing.

0421021 7110030 8210500 0321040 0324401 0324615 0324610 Item-nr. Description Number 0321040 tube 60, length 2m 2 0324401 assembly parts for 89 draw gate 1 0324610 post 89 draw gate 300cm (Ø70 x 98cm) 2 0324615 extendable barrier 89 draw g. 270-330 1 0421021 clamp for tube clamp coupling 60 1 7110030 hexagon-head tap bolt M10x30 galv. 3 8210500 self locking nylon nut M10 galv. 3 draw gate Heavy Duty, 270-330 cm Number: 0324600-O Date: 13-11-2017 Drawing remains our property and may not be reproduced, shown or entrust to third party or used otherwise. No rights can be derived from this drawing.

detail A C C 4750 4 4 9 9 6c 6a view B 7 10 view B 10 1 Position the two uprights level with the attachment on the outside; 2 Install the mounting brackets for draw gate to both uprights using the hexagon bolts M10x140 and nuts M10, fastened enough so that they do not fall down but are still adjustable. The lips on the mounting device will fit the groove in the uprights, see detail A; 3 Place the 60 tube into the mounting brackets and secure with threaded straps 60 and nuts M10. At this time also fasten the bolts M10x140 from the previous step completely. We recoend mounting this interconnecting bar to the building structure - hence the extra length; 4 Fit the four rubber impact buffers with hexagonal bolt M8x50 and washers M8 on the inside brackets of the mounting device; 5 Fit the stoppers in the ends of the tube and the mounting brackets; 6 Remove the M10x100 hexagon bolts and nuts M10 above the counterweights, pull the counterweights up and place the bolt and nut (hand tight) under the counterweights. The eyelets of the steel cables are now approximately at the same level as the attachment on the uprights; 7 Remove the M10x100 hexagonal bolts and M10 nuts that originally were under the counterweights; 8 Mark the center on both upper and lower beam of the draw gate frame; 9 Loosen the 8 adjustment screws in the sliding frames; 10 Loosen the 2 adjustment screws of the handle, see view B; 11 Slide out the fence until the wheels hit the posts and position the gate on the stops located on the uprights (the forks will go around the uprights). The locking pins should now fall into the upright, see view C-C; 12 Slide the upper and lower beam to be centered between the sliding frames - use the previously made marks. ATTENTION: make sure the gate doesn t fall of the stops! Fasten the beams tot the sliding frames by using the 8 adjustment screws (see point 9); 13 Slide the handles outwards and fasten them with the adjustment screws (see point 10). Check the latching action by sliding the handles towards each other; they should move outwards again by spring force; 14 Slide the eyelets of the steel cables through the sliding frames and secure them with locking bolts M10x80 and nuts M10; 15 Pull the counterweights up one by one with the steel cables and remove the M10x100 hexagon bolts and M10 nuts from under the counterweights. Gently lower the counterweights; 16 Check functionality of the draw gate by opening and closing the gate. If necessary adjust the space between the uprights by changing the position of the 60 tube (see point 3). draw gate Heavy Duty, 270-330 cm section C-C Number: 0324600-A mounting bracket Date: 4-5-2017

0321040 0421021 7110030 8210500 0321050 0324401 0324715 0324710 Item-nr. Description Number 0321040 tube 60, length 2m 1 0321050 tube 60, length 3m 1 0324401 assembly parts for draw gate 89 1 0324710 post 89 draw gate 300cm (Ø70 x 123cm) 2 0324715 extendable barrier 89 draw g. 330-440 1 0421021 clamp for tube clamp coupling 60 1 7110030 hexagon-head tap bolt M10x30 galv. 3 8210500 self locking nylon nut M10 galv. 3 draw gate Heavy Duty, 330-440 cm Number: 0324700-O Date: 13-11-2017

C detail A C 4750 4 4 9 9 view B 10 view B 10 6c 6a 7 1 Position the two uprights level with the attachment on the outside; 2 Install the mounting brackets for draw gate to both uprights using the hexagon bolts M10x140 and nuts M10, fastened enough so that they do not fall down but are still adjustable. The lips on the mounting device will fit the groove in the uprights, see detail A; 3 Place the 60 tube into the mounting brackets and secure with threaded straps 60 and nuts M10. At this time also fasten the bolts M10x140 from the previous step completely. We recoend mounting this interconnecting bar to the building structure - hence the extra length; 4 Fit the four rubber impact buffers with hexagonal bolt M8x50 and washers M8 on the inside brackets of the mounting device; 5 Fit the stoppers in the ends of the tube and the mounting brackets; 6 Remove the M10x100 hexagon bolts and nuts M10 above the counterweights, pull the counterweights up and place the bolt and nut (hand tight) under the counterweights. The eyelets of the steel cables are now approximately at the same level as the attachment on the uprights; 7 Remove the M10x100 hexagonal bolts and M10 nuts that originally were under the counterweights; 8 Mark the center on both upper and lower beam of the draw gate frame; 9 Loosen the 8 adjustment screws in the sliding frames; 10 Loosen the 2 adjustment screws of the handle, see view B; 11 Slide out the fence until the wheels hit the posts and position the gate on the stops located on the uprights (the forks will go around the uprights). The locking pins should now fall into the upright, see view C-C; 12 Slide the upper and lower beam to be centered between the sliding frames - use the previously made marks. ATTENTION: make sure the gate doesn t fall of the stops! Fasten the beams tot the sliding frames by using the 8 adjustment screws (see point 9); 13 Slide the handles outwards and fasten them with the adjustment screws (see point 10). Check the latching action by sliding the handles towards each other; they should move outwards again by spring force; 14 Slide the eyelets of the steel cables through the sliding frames and secure them with locking bolts M10x80 and nuts M10; 15 Pull the counterweights up one by one with the steel cables and remove the M10x100 hexagon bolts and M10 nuts from under the counterweights. Gently lower the counterweights; 16 Check functionality of the draw gate by opening and closing the gate. If necessary adjust the space between the uprights by changing the position of the 60 tube (see point 3). draw gate Heavy Duty, 330-440 cm section C-C Number: 0324700-A mounting bracket Date: 4-5-2017

0421021 7110030 8210500 0321050 0324401 0324815 0324810 Item-nr. Description Number 0321050 tube 60, length 3m 2 0324401 assembly parts for draw gate 89 1 0324810 post 89 draw gate 300cm (Ø70 x 142cm) 2 0324815 extendable barrier 89 draw g. 440-550 1 0421021 clamp for tube clamp coupling 60 1 7110030 hexagon-head tap bolt M10x30 galv. 3 8210500 self locking nylon nut M10 galv. 3 draw gate Heavy Duty, 440-550 cm Number: 0324800-O Date: 13-11-2017

C detail A C 6000 4 4 9 9 view B 10 view B 10 6a 6c 7 1 Position the two uprights level with the attachment on the outside; 2 Install the mounting brackets for draw gate to both uprights using the hexagon bolts M10x140 and nuts M10, fastened enough so that they do not fall down but are still adjustable. The lips on the mounting device will fit the groove in the uprights, see detail A; 3 Place the 60 tube into the mounting brackets and secure with threaded straps 60 and nuts M10. At this time also fasten the bolts M10x140 from the previous step completely. We recoend mounting this interconnecting bar to the building structure - hence the extra length; 4 Fit the four rubber impact buffers with hexagonal bolt M8x50 and washers M8 on the inside brackets of the mounting device; 5 Fit the stoppers in the ends of the tube and the mounting brackets; 6 Remove the M10x100 hexagon bolts and nuts M10 above the counterweights, pull the counterweights up and place the bolt and nut (hand tight) under the counterweights. The eyelets of the steel cables are now approximately at the same level as the attachment on the uprights; 7 Remove the M10x100 hexagonal bolts and M10 nuts that originally were under the counterweights; 8 Mark the center on both upper and lower beam of the draw gate frame; 9 Loosen the 8 adjustment screws in the sliding frames; 10 Loosen the 2 adjustment screws of the handle, see view B; 11 Slide out the fence until the wheels hit the posts and position the gate on the stops located on the uprights (the forks will go around the uprights). The locking pins should now fall into the upright, see view C-C; 12 Slide the upper and lower beam to be centered between the sliding frames - use the previously made marks. ATTENTION: make sure the gate doesn t fall of the stops! Fasten the beams tot the sliding frames by using the 8 adjustment screws (see point 9); 13 Slide the handles outwards and fasten them with the adjustment screws (see point 10). Check the latching action by sliding the handles towards each other; they should move outwards again by spring force; 14 Slide the eyelets of the steel cables through the sliding frames and secure them with locking bolts M10x80 and nuts M10; 15 Pull the counterweights up one by one with the steel cables and remove the M10x100 hexagon bolts and M10 nuts from under the counterweights. Gently lower the counterweights; 16 Check functionality of the draw gate by opening and closing the gate. If necessary adjust the space between the uprights by changing the position of the 60 tube (see point 3). draw gate Heavy Duty, 440-550 cm section C-C Number: 0324800-A mounting bracket Date: 4-5-2017