Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Similar documents
Aluminum Clad Wood Window Field Mulling and Stacking Instructions

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

Non-Reinforced Joining Guide (Horizontal/Vertical)

Non-Reinforced Joining Guide (2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Pocket Door Installation Instructions

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Sliding Glass Door Assembly and Installation Guide

Non-Reinforced Joining Guide (1-Way Vertical or Horizontal) for Andersen 200 Series Tilt-Wash Double-Hung Windows and Complementary Products

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Frameless Inline Door With Return QCI5263

Integrity Polygon and Round Top Installation and Finishing Instructions

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

for Andersen 400 Series Woodwright Transom over 400 Series Woodwright Double-Hung or 400 Series Woodwright Picture Window

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Sun Windows General Information New Construction Hinged Door Installation Instructions

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

Steel Reinforced Joining Guide (Horizontal / Vertical)

Frameless Inline Door QCI5254

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Tools required by installer: Materials required by installer:

Curtain Wall Installation Guide

Transom Joining. for Andersen Elliptical Windows over Perma-Shield Gliding Patio Door

STACKING MULTI-SLIDE DOOR SYSTEM

How To Install Windows: Nail-Fin Application

Eagle clad double-hung window installation instructions

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

HR175 Sash Replacement Kit Installation Instructions

Vinyl Windows and Doors Manufactured by Pella Corporation

Frameless Inline Door QCI5248

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

All Window Installation Instruction

Installer Please leave this booklet for the homeowner after the install is completed. IMPORTANT: Please read before you begin.

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Installation of Fiberglass Windows

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

UNIT 5: EXTERIOR DOORS AND WINDOWS

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

for Andersen Frenchwood Hinged and Outswing Patio Doors, Sidelights, and Transoms

Curium 19.4H Installation Instructions & Parts List

IMPORTANT: Please read completely before you begin.

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

FIG. #1 - ASD-90 & USD-90 Shower Door Assembly

Endura All-Aluminum Z-Articulating Cap Sill Retrofit Kit for French Doors

Installation Instructions For Vinyl Sliding Patio Door & French Sliding Patio Door 1-Wide, 2-Wide and 4-Wide

4-lite Patio Door. Installation Instructions

Frameless Inline Door QCI5250

INOVO 2-LITE SLIDING PATIO DOOR

4500 Series. Fabrication and Installation Instructions

Heavy Wall Applied Stop Tube Frame and Door Installation

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

Flashing Materials. Rough Opening Preparation

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

A-935 RODA WALL MOUNT HINGES

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Mulling & Stacking Guidelines for Ringer Windows Performa 3300 Series & Elite 5400 Series

IMPORTANT: Please read before you begin installation.

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

Window with Nail fin (New construction)

Panel Assembly and Installation

Storefront Installation Guide

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

Installation Guide for Andersen 400 Series Tilt-Wash Transom Windows with Stormwatch Protection (PG Upgrade) Manufactured After 2006

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

UNIT No FRAMELESS PIVOT SHOWER DOOR

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

POCKETING MULTI-SLIDE DOOR SYSTEM

Vinyl Sliding Glass Door Assembly Instructions

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Vinyl Hinged Door Installation Instructions Structure With Weather Resistant Barrier Applied Before Door Installation

QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Series Sloped glazed Curtain wall. Installation Instructions

Curium 19H Installation Instructions & Parts List

14000 Series. Fabrication and Installation Instructions

Dubnium 11 Installation Instructions & Parts List

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

YES 600 Thermal Clip Storefront System Installation Manual

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

InSTallaTIon InSTruCTIonS For 4-lITe PaTIo Door unassembled

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Transcription:

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement 1

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement The following instructions are a supplement for adding a 1/2 reinforcement when field mulling and or stacking. Contact your customer service representative for complete instructions for field mulling and stacking units. These installation instructions include details for specific window types. Adding reinforcements for other types of windows will be similar. IMPORTANT: Thoroughly read and follow these instructions. Failure to install as recommended will void any warranty, expressed or implied. Check building codes for the area in which the windows are being installed before installation to ensure proper compliance. The instructions that follow are based on typical frame construction. Specific applications may differ. The window manufacturer recommends that you consult a qualified installation professional. The window manufacturer is not responsible for installation. IMPORTANT: When placing units to be mulled or stacked, make sure the sills or water weeps on each unit will face towards the sill (bottom) of the rough opening when the combined unit is installed. IMPORTANT: High-quality, exterior, neutral-cure, clear, silicone sealant (compatible with wood, vinyl and aluminum) is to be used for all procedures in the following instructions which call for caulking or sealant. Place units to be mulled and/or stacked on a clean flat surface (interior side up) in the position that they will be assembled (FIGURE 1) 2

Assemble And Fasten Units Interior Side Up Units will come with the reinforcement attached to one side of the mull or stack. If shipped loose follow the same caulking instructions and fasten the reinforcement to one side using either (2) #8 x 1 flat head screws for the aluminum or steel reinforcement or staples 1 to 2 from ends and 8 to 10 on center for LVL. FIGURE 1 See field mulling instructions for trimming nail fins and opening accessory grooves if needed. 1. Run continuous beads of silicone at locations shown below. All units will need a generous amount of silicone across ends and across any mull joints. (FIGURE 2) FIGURE 2 3/8 bead of silicone at removed nail fin Generous amount of silicone over mull joint 3/8 bead of silicone at joint between wood and aluminum/vinyl 3/8 bead of silicone at inside end of reinforcement Generous amount of silicone across each end 3

Assemble And Fasten Units Interior Side Up (cont.) 2. Slide units together. Make sure units are straight, even with each other, and flat across the interior surface (FIGURES 3 & 4) 3. Clamp units to pull interior edges together (FIGURES 3 & 4) 4. Fasten jambs together with 1 wide x 3/8 deep corrugated staples (FIGURE 5). Place the staples 1 to 2 from each end, then every 4 to 6 on center. Staples will need to be staggered to engage both jambs and wood filler. 5. Attach a 2 high x 12 long 24 gauge steel mull plate to the exterior sides of the jambs where the two units meet. Attach mull plate with ten 7/16 x 1/2 long staples or six #8 x 1/2 Phillips pan head sheet metal screws. Place fasteners on each side of the mull/stack joint (FIGURES 6 & 7). 4

Interior Mull Cover Application NOTE: If mulling and stacking, install the vertical mull cover first. Then install the horizontal covers. NOTE: To prevent handling damage, interior mull covers can be applied after window is installed in the structure. NOTE: Length of interior mull cover pieces is dependent on reveal between casing moulding and jambs. 1. To determine the length of the vertical mull cover, measure the unit assembly height, jamb to jamb (FIGURE 1) and subtract reveal x2. Cut the mull cover to length with a saw. IMPORTANT: To prevent splitting or cracking, drill pilot holes in cover before nailing. 2. Install vertical cover by centering cover on jambs; center side-to-side and end-to-end. Drill pilot holes and nail to jambs with 1-1/2" long 4D finishing nails (FIGURE 3). Set nails below wood surface with a nail set. 3. Measure for both horizontal covers along jambs, going from edge of vertical cover to edge of jamb, and subtract reveal X1 (FIGURE 2). Cut pieces to length with a saw. 4. Butt horizontal covers to vertical piece, center top to bottom on adjacent units, drill pilot holes, and nail in place with 1-1/2" long 4D finishing nails. Set nails below wood surface with a nail set. 5. Remove clamps. 5

End Cap Application (if required) Turn unit over so the exterior side is facing up on a flat, clean surface. End Caps will be used at the ends of horizontal mulls where the reinforcement does not go past the removed nail fin. If you do not need to apply end caps proceed to the Exterior Mull Application section. End cap used End cap not used SEAL JOINT WITH HEAVY BEAD OF CAULK WHERE VINYL MEETS THE REINFORCEMENT ON BOTH SIDES PRIOR TO INSERTING MULL END CAP INSERT MULL END CAP AFTER CAULKING, END CAP MUST BE FLUSH WITH KERF AND CLADDING FOR LVL OR ALUMINUM REINFORCEMENTS FASTEN MULL END CAP WITH A SCREW. FOR STEEL REINFORCEMENTS APPLY MULL CAP WITH A GENER- OUS AMOUNT OF SILICONE APPLY EXTERIOR MULL COVER AFTER MULL END CAPS 6

Exterior Mull Cover Application 1. Apply a bead of sealant the full length of each horizontal or vertical joint (FIGURE 1 & 2). Tool sealant into joint so it does not build up under the mull cover. 2. When exterior mull cover is properly aligned, tap along the cover s full length with a dead-blow hammer to fully seat mull cover into window exterior accessory grooves (FIGURE 3). A padded block can be used between the hammer and mull cover (FIGURE 3). FIGURE 1 FIGURE 2 FIGURE 3 7

Seal Joints and Apply Gaskets FIGURE 1 1. Apply 3/8 bead of silicone, 1 each side of mull joint where nail fin meets aluminum cladding (FIGURE 1). 2. Apply 3M flashing tape around nail fins. If mull end cap was not used, also apply the 3M flashing tape to cover the 1/2 gap between units. 3. Each sill mull joint requires a sill fin gasket. Remove backing from gasket and place adhesive side against face of sill jamb and over nailing fin at joint (FIGURE 2). Apply pressure to seal gasket against window frame and nailing fin. Excess gasket should be wrapped around backside of fin. FIGURE 2 8

Install Drip Cap 1. Measure width of assembled units, jamb to jamb (FIGURE 1). Mark drip cap at this length and cut with a hacksaw. 2. Apply a continuous 1/8" diameter bead of sealant to head. Start 1/2" from side jamb. Caulk vertical face of nailing fin and continue along top of head to other end of unit and up the opposite nailing fin vertical face. Also apply sealant to the mulled joints laying a 1/8" diameter bead 1/2" from both sides of the joint. Add a third bead directly on top of the joint (FIGURE 2). 3. Center drip cap, from side to side, over head of combined unit and press firmly down into sealant (FIGURE 3). 4. Secure drip cap to head with #8 x 1/2" stainless steel TEK tip screws or #8 x 1/2" Phillips pan head stainless steel self tapping screws. Place screws 1" to 2" from each end of unit and every 24" to 30" along length of drip cap (FIGURE 4). 5. Examine entire exterior and remove excess sealant using a clean soft shop towel dampened with denatured alcohol. 6. Allow sealant to dry before installing unit. 9

Notes 10