A. Section includes administrative and procedural requirements for project record documents, including the following:

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION SUBMITTAL PROCEDURES

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Section Project Closeout

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SECTION ADMINISTRATIVE REQUIREMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

East Central College

SECTION OPERATION AND MAINTENANCE DATA

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

Answer: Qualification statement should be provided with the bid.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION PROJECT MANAGEMENT AND COORDINATION

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

SECTION SUBMITTAL PROCEDURES

Vanderbilt University Standard Specification Revised 2/6/08

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

1. Land survey Work. 2. Civil and Structural engineering services.

01100 SUMMARY OF WORK

UDS OVERVIEW Uniform Drawing System

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

This specification describes the general requirements for Engineering Services provided to Vale.

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

Section Meetings Section Material and Equipment. None Required

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

SECTION PROJECT COORDINATION VIA BIM

SUBMITTAL PROCEDURES

ADDENDUM #2 September 12, 2018

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

CHAPTER A-10 DRAWINGS

C. This Section is based on completion and acceptance of the entire project during a single time period.

Engineering Drawing System

Engineering Drawing System

RIT CAD Specifications

Construction Phase Project Management and Documentation

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

Copyright 2017 AIA MasterSpec Premium 05/17 PRODUCT MASTERSPEC LICENSED BY ARCOM TO WEREVER PRODUCTS, INC.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Working Drawing Manual

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CMW DELIVERABLES SPECIFICATION Version 1.0

Merrick Pet Care New Distribution Center Hereford, Texas

Bidders for the Oak Brook Park District Family Locker Room Renovation

January, 2014 Page 1 of 5

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Solid Surface Countertops

What Are Submittals?

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Facility Services Subgroup Preface for Divisions 21` through 28

Jacksonville District Master

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

National BIM Standard - United States Version 3

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Issue Date: August 2018 Revision: 03

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

Solid Surface Fabrications

Cloud Based Plan Review Process (Applicant)

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

SECTION PANELBOARDS

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

It is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects.

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

10930 W. Sam Houston Parkway N., Suite 900

Transcription:

SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for project record documents, including the following: 1. Record Drawings. 2. Record Specifications. 3. Record Product Data. 4. Miscellaneous record submittals. 5. Record Documents Submission Format B. Related Requirements: 1. Section 011200 "Multiple Contract Summary" for coordinating project record documents covering the Work of multiple contracts. 2. Section 017300 "Execution" for final property survey. 3. Section 017700 "Closeout Procedures" for general closeout procedures. 4. Section 017823 "Operation and Maintenance Data" for operation and maintenance manual requirements. 1.3 CLOSEOUT SUBMITTALS A. Record Drawings: Comply with the following: 1. Number of Copies: Submit copies of record Drawings as follows: a. Initial Submittal: 1) Submit record digital data files and one set(s) of plots. 2) Architect will indicate whether general scope of changes, additional information recorded, and quality of drafting are acceptable. b. Final Submittal: 1) Submit one paper-copy set(s) of marked-up record prints. 2) Submit record digital data files and one set(s) of record digital data file plots. 3) Plot each drawing file, whether or not changes and additional information were recorded. PROJECT RECORD DOCUMENTS 01 7839-1

B. Record Specifications: Submit annotated PDF electronic files of Project's Specifications, including addenda and contract modifications. C. Record Product Data: Submit annotated PDF electronic files and directories of each submittal. 1. Where record Product Data are required as part of operation and maintenance manuals, submit duplicate marked-up Product Data as a component of manual. D. Miscellaneous Record Submittals: See other Specification Sections for miscellaneous recordkeeping requirements and submittals in connection with various construction activities. Submit annotated PDF electronic files and directories of each submittal. E. Reports: Submit written report indicating items incorporated into project record documents concurrent with progress of the Work, including revisions, concealed conditions, field changes, product selections, and other notations incorporated. PRODUCTS 2.1 RECORD DRAWINGS A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop Drawings, incorporating new and revised drawings as modifications are issued. 1. Preparation: Mark record prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to provide information for preparation of corresponding marked-up record prints. a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later. b. Accurately record information in an acceptable drawing technique. c. Record data as soon as possible after obtaining it. d. Record and check the markup before enclosing concealed installations. e. Cross-reference record prints to corresponding archive photographic documentation. 2. Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Depths of foundations below first floor. d. Locations and depths of underground utilities. e. Revisions to routing of piping and conduits. f. Revisions to electrical circuitry. g. Actual equipment locations. h. Duct size and routing. i. Locations of concealed internal utilities. j. Changes made by Change Order or Construction Change Directive. k. Changes made following Architect's written orders. l. Details not on the original Contract Drawings. m. Field records for variable and concealed conditions. n. Record information on the Work that is shown only schematically. PROJECT RECORD DOCUMENTS 01 7839-2

3. Mark the Contract Drawings and Shop Drawings completely and accurately. Use personnel proficient at recording graphic information in production of marked-up record prints. 4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location. 5. Mark important additional information that was either shown schematically or omitted from original Drawings. 6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable. B. Record Digital Data Files: Immediately before inspection for Certificate of Substantial Completion, review marked-up record prints with Architect[ and Construction Manager]. When authorized, prepare a full set of corrected digital data files of the Contract Drawings, as follows: 1. Format: Same digital data software program, version, and operating system as the original Contract Drawings. 2. Format: DWG, Version, [Microsoft Windows] [Apple Macintosh] operating system. 3. Incorporate changes and additional information previously marked on record prints. Delete, redraw, and add details and notations where applicable. 4. Refer instances of uncertainty to Architect[ through Construction Manager] for resolution. 5. Architect will furnish Contractor one set of digital data files of the Contract Drawings for use in recording information. a. See Section 013300 "Submittal Procedures" for requirements related to use of Architect's digital data files. b. Architect will provide data file layer information. Record markups in separate layers. C. Newly Prepared Record Drawings: Prepare new Drawings instead of preparing record Drawings where Architect determines that neither the original Contract Drawings nor Shop Drawings are suitable to show actual installation. 1. New Drawings may be required when a Change Order is issued as a result of accepting an alternate, substitution, or other modification. 2. Consult Architect[ and Construction Manager] for proper scale and scope of detailing and notations required to record the actual physical installation and its relation to other construction. Integrate newly prepared record Drawings into record Drawing sets; comply with procedures for formatting, organizing, copying, binding, and submitting. D. Format: Identify and date each record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. 1. Record Prints: Organize record prints and newly prepared record Drawings into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets. 2. Format: Annotated PDF electronic file[ with comment function enabled]. 3. Record Digital Data Files: Organize digital data information into separate electronic files that correspond to each sheet of the Contract Drawings. Name each file with the sheet identification. Include identification in each digital data file. 4. Identification: As follows: a. Project name. b. Date. c. Designation "PROJECT RECORD DRAWINGS." d. Name of Architect[ and Construction Manager]. PROJECT RECORD DOCUMENTS 01 7839-3

e. Name of Contractor. 2.2 RECORD SPECIFICATIONS A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications. 1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. 2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected. 3. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made. 4. For each principal product, indicate whether record Product Data has been submitted in operation and maintenance manuals instead of submitted as record Product Data. 5. Note related Change Orders, record Product Data, and record Drawings where applicable. B. Format: Submit record Specifications as annotated PDF electronic file. 2.3 RECORD PRODUCT DATA A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal. 1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. 2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation. 3. Note related Change Orders, record Specifications, and record Drawings where applicable. B. Format: Submit record Product Data as annotated PDF electronic file. 1. Include record Product Data directory organized by Specification Section number and title, electronically linked to each item of record Product Data. 2.4 MISCELLANEOUS RECORD SUBMITTALS A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference. B. Format: Submit miscellaneous record submittals as PDF electronic file. 1. Include miscellaneous record submittals directory organized by Specification Section number and title, electronically linked to each item of miscellaneous record submittals. PROJECT RECORD DOCUMENTS 01 7839-4

EXECUTION 3.1 PROJECT RECORD DOCUMENTS ORGANIZATION A. Provide Project Record Documents in an electronic file format and organization that corresponds to that indicated below. Provide all items which are assigned to the Prime Contractor in the Responsible Party column. For the XX (Material) (Subcontractor Name) folders, provide one folder per Division and / or Subcontractor, and rename the folder to match the CSI Division, Material and Subcontractor. Example: 08 Doors, Frames & Hardware (ANDERSON LOCK). PROJECT RECORD DOCUMENTS 01 7839-5

3.2 RECORDING AND MAINTENANCE A. Recording: Maintain one copy of each submittal during the construction period for project record document purposes. Post changes and revisions to project record documents as they occur; do not wait until end of Project. B. Maintenance of Record Documents and Samples: Store record documents and Samples in the field office apart from the Contract Documents used for construction. Do not use project record documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project record documents for Architect's[ and Construction Manager's] reference during normal working hours. END OF SECTION 01 7839 PROJECT RECORD DOCUMENTS 01 7839-6