ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Similar documents
Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Platinum Swing Panel Installation Instructions

Installation Instructions

Installation Instructions

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Vanity Installation Instructions

B A T H R O O M G L A S S

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE

Vanity Installation Instructions

IMPORTANT READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Curium 19H Installation Instructions & Parts List

Curium 19.4H Installation Instructions & Parts List

PREMIUM GLASS BATH SCREEN

1 p

VALENCIA CORNER DOOR WITH RETURN

Dubnium 11 Installation Instructions & Parts List

Gallium 03 Installation Instructions & Parts List

Frameless Inline Door With Return QCI5263

Deauville Installation Guide

Portofino Case2 Installation Guide

Radon 07 Installation Instructions & Parts List

Monaco Installation Guide - Surface Profiles

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

INFINITE RANGE - CENTRE FOLDING DOOR

VALENCIA RONDO DOOR WITH RETURN

Deauville Installation Guide

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

Xenon 05 Installation Instructions & Parts List

mistley PELE Installation Guide vapr16 Mistley Bathroom Glass Limited No 4 One Mistley Quayside, High Street, Mistley, Essex CO11 1AL England

340 & 350 SERIES BATH ENCLOSURES

INFINITE RANGE - HINGE DOOR

Portofino Installation Guide

Frameless Inline Door QCI5254

INFINITE RANGE - CENTRE FOLDING DOOR

340 & 350 SERIES DELUXE FRAMELESS BYPASS

738 SERIES PIVOT SHOWER DOOR

UNIT No FRAMELESS PIVOT SHOWER DOOR

Thank you for your order

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Argon 02 Installation Instructions & Parts List

Step-by-Step Installation Instructions for

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

Frameless Inline Door QCI5248

Shower Screen and Door Kit Instructions

Frameless Inline Door QCI5250

A-935 RODA WALL MOUNT HINGES

Double Frameless Swing Door QCI5247

Frameless Door QCI5284

Frameless Hinged Door Enclosure. These instructions must be left with the user. Installation Guide W2-B

694 SERIES NEO-ANGLE PIVOT SHOWER ENCLOSURE

Frameless Heavy Glass Door with Wall Mount Hinges

VITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Frameless Inline Door With Return QCI5128

950 RODA WALL MOUNT HINGES PRECERIA INSTALLATION INSTRUCTIONS. NEED INSTALLATION HELP? Call BASCO ( ) FRAMELESS DOOR

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

Figure #1 - VSNEO Shower Door Assembly

Frameless Fixed Panel Slider

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

640S & 650S SERIES FRAMED BYPASS BATH ENCLOSURES

INSTALLATION INSTRUCTIONS

UNIT No. 15 & 16 SHOWER DOOR INSTALLATION INSTRUCTIONS

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

Monaco Installation Guide - Surface Profiles - vjun16

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

Hinge Door + Side Panel

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

UNIDOOR-X TUB DOOR TUB DOOR INSTALLATION NSTRUCTIONS. MODEL #s D58580-##

UNIDOOR X (STYLE L1)

340D & 350D SERIES FRAMELESS BYPASS BATH ENCLOSURES

ESSENCE. Shower / Tub Door Installaion Instructions

ProLine PL80 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

391 SERIES STIKSTALL TM SHOWER ENCLOSURE

3/16 FRAMED SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Hinge Door + One Inline Panel

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

Series----SP3600A SHOWER DOOR

Hinge Door + Inline Panel + Return Panel

FIXED PANEL SLIDER QCI5241

INSTALLATION INSTRUCTIONS

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A

WETROOM WALK-IN TWIN ENTRANCE AWT1500 AWT1200 AWT900

Step-by-Step Installation Instructions for

INSTALLATION INSTRUCTIONS

FIG. #1 - ASD-90 & USD-90 Shower Door Assembly

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Frameless Fixed Panel Slider QCI5279

BASIC TOOLS AND MATERIALS NEEDED. Introduction HOW TO CARE FOR YOUR DOOR

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

CORNER ENTRY ENCLOSURE

Installation Instructions

INSTALLATION INSTRUCTIONS

FITTING INSTRUCTIONS FOR FOLDING SLIDING DOOR SYSTEM SF75H

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Transcription:

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS Before Installation Please check that your Allora Swing Panel is undamaged

SEQUENCE OF INSTALLATION These instructions are also available from the Athena website: www.athena.co.nz. Installation of the Wall Receiver. Installation of the Bottom Sill. Installation of the Take-up glass 4. Installation of the Glass Brace 5. Installation of the Door 6. Installation of the Door Dripseal 7. Installation of the Wall Receiver Covers and Glazing gaskets 8. Sealing the enclosure 9. Installation of the Wall liner finishing cap TOOLS REQUIRED. Cordless Drill. No. Square Drive screwdriver or screwdriver bit. Spirit Level- (minimum 00mm long) 4. Carpenters Square 5. Soft Pencil 6. 5mm masking tape 7. Ø.mm twist drill 8. Tape measure 9. Caulking gun 0.Sharp knife.hacksaw with fine tooth blade (8 TPI).White spirits.damp cloth INSTALLATION PACK INCLUDES Allora Swing Panel Door glass 47x65 mm Allora Swing Panel Take up glass 497x440mm Two Chrome 80 degree hinges with 4mm Allen key Glass brace Chrome Glass Bracing bracket Chrome Glass Brace Wall brackets Chrome end cap 80 set (LH & RH) Chrome end cap straight set ( LH & RH) Door sill Wall Receiver Wall Receiver cover Wall liner finishing cap Door Hinge Seal length Drip seal 65mm -.6 m glazing wedge - 8 gauge x 50mm stainless steel pan head square drive screws - 8 gauge x mm stainless steel pan head square drive screws - 8 gauge x 0 stainless steel countersunk square drive screws NG Translucent silicone mm Allen key x 7mm Spacer blocks (timber) Alignment Gauge

ASSEMBLY GLASS BRACE GLASS BRACE WALL BRACKET x GLASS BRACING BRACKET x GLAZING WEDGE x GLASS DOOR WALL RECEIVER COVER WALL RECEIVER WALL LINER CAP GLASS TAKEUP PVC DOOR HINGE SEAL HINGE x TAKE-UP SILL CHROME SILL END PLUG LH or RH DRIP SEAL DOOR SILL CHROME ENDCAP LH or RH 80 Right hand Hinge Set up shown

IMPORTANT: SITE PREPARATION To achieve optimum results when installing the Allora Swing Panel it is important that the Bath and walls of are level and plumb respectively. The maximum deviation the wall may be from plumb is ±5 mm over the 500mm height. For every millimetre the bath is out of level, adjustment of the Swing Panel will be reduced by mm. TILED WALL INSTALLATION The Bath must be installed level When being installed with tiled walls it is recommended that the Wall Receiver is fixed and sealed directly to the water proofing membrane and Bath before tiling INSTALLATION OF THE WALL RECEIVER The Allora Swing Panel can be installed right or left hand hinged. The following instructions shows a right hand hinged screen being installed Important The Take up glass must always be installed with the TOP label at the top. The glass door must always be installed with the Athena Logo facing outwards) Failure to follow these two points will result in insufficient clearances Wall Receivers and Brackets must be fixed into solid studs/nogs.. Apply silicone sealant where the Bath and lining meet, continuing 5mm in from the edge of the lining. Ensure the end of the liner is sealed to the bath.. Place the Wall Receiver mm in from the front of the bath edge with the slotted holes facing to the inside of the bath. Vertically plumb the Wall Receiver using a spirit level. &. Drill pilot holes into the wall. If an acrylic wall liner is installed check the Wall Liner Finishing Caps can be installed correctly. (pg 9) If required it is easier to trim the liner edges at this point. 4. Apply a continuous full length bead of silicone sealant down the rear of the Wall Receiver. 5. Fix the Wall Receiver in place using the No.8 x 50mm Pan-head screws. Re-check that the Wall Receiver is plumb. 4 & 5 4

INSTALLATION OF THE TAKE-UP NOTE: The Take up is labelled indicating the top of the shower.,. Place the Take up panel into the Wall Receiver.. Align the Take up so the aluminium edge cap s Vee groove is accessible through all three slots in the Wall receiver. Mark the end of the Take up on the bath then remove. 4. Peel the adhesive tape cover from the bottom face of the Take up sill. 5. Place the Take up sill to the end mark and into the Wall Receiver ensuring it is parallel to the front edge of the bath. Once in position apply downward pressure to the Take up sill to adhere it to the bath. 4,5 4,5 6 & 7 8 6. Wipe the bottom edge of the Take-up glass with a damp cloth to make it easier to slide into the Take-up sill. Position the glass into the Takeup sill with the Aluminium capped edge inserted into the Wall Receiver. The take up glass should finish flush with the exposed end of the Take up sill. 7. Drill through the slotted holes in the Wall Receiver, using the Vee groove in the aluminium profile attached to the edge of the Take-up glass as a guide ( Ø.mm drill). Do not drill in any other position as this could damage the glass. 8. Plumb the panel using a spirit level and fix with the No.8 x mm Pan head screws. INSTALLATION OF THE GLASS BRACE,,4,5. Position the Glass brace bracket to the top of the Take-up panel approximately 0mm in from the glass edge, with the grub screws facing inside the shower. Ensure the gasket is in place, then tighten the inside grub screw.. Attach the Glass Brace Wall Brackets to the Glass bracket approx 0 mm in from each end. Temporarily fit the Glass Brace into the Glass Brace bracket and mark the positions of the Wall Brackets on the wall 4. Remove the Glass brace and attach the Wall brackets to the wall using the No.8 x 0 countersunk screws. Ensure they are screwed into a solid stud or nog or alternatively use a suitable wall anchor system. (not provided) 5. Once the Wall brackets are in position slide the Glass brace into the brackets. Ensure the gaskets are in place, then tighten all grub screws.. 5

INSTALLATION OF THE HINGES TO THE TAKE UP. Disassemble the hinge and position the non pivoting side of the hinge into the Take up panel with the screw ports facing to the inside.. Ensure that a rubber gasket is placed on each side of the glass to avoid metal to glass contact. (Tip: When fitting the inside gaskets it is easier to loosely fix the inside hinge plate first then slide the gaskets in behind) Please Note: Only the.0mm thick gaskets are required for this installation, discard the.0mm gaskets. Moderately tighten the socket heads screws 4. Repeat for the other hinge INSTALLATION OF THE DOOR TO THE HINGES. Tape the 7m spacer blocks to the top edge of the bath where the glass door will reside. Ensure the outside rubber gaskets are fitted to the pivoting side of the hinges.. Lift the Door glass and rest onto the spacer blocks. Align with the hinges. N:B Athena Logo should be on the outside 4. Fit the inside rubber gaskets between the glass and the hinge back plates (Use the same Tip as mentioned earlier) 5. Lightly tighten the socket head screws 6. Repeat for the other hinge 4 7. Using the Alignment set the gap between the Take up and Door glass at the point of the hinges to 6mm 8. Fully tighten the hinge back plates 5 9. Fully tighten the screws on the Take up side of the hinge 0.Remove the 7mm Spacer blocks 7 6

INSTALLATION OF THE DOOR SILL. Take the Right hand 80º Chrome End cap and apply a smear of silicone to the front and bottom faces of the spigot. Fit into the end of the Door Sill as shown.. To the other end fit the corresponding Flat end cap in the same way. Apply a continuous bead of silicone along the bottom of the Door sill and in the Chrome End cap recess as shown. 4. Position the Door sill to the end of the Take up panel and Parallel to the bath edge. Tape the sill securely into place. Remove any excess silicone. 4 7

INSTALLATION OF THE DOOR DRIPSEAL AND VERTICAL SEAL. The vertical seal is supplied in one length and cutting into three different lengths is required.. Open the door 90 degrees and fit the vertical seals to the Take up Panel as indicated in photo. (Note the direction that the curved flexible blade in the photo). Fit the Drip seal as indicated in the diagram. The drip seal will start flush with the Glass edge on the hinge side and the angled blade of the drip seal will always face towards the inside of the bath.. INSTALLATION OF THE WALL RECEIVER COVERS AND GLAZING GASKETS. Fit the Wall Receiver Covers inside the shower by sliding into the Wall Receivers. They may need to be lightly tapped home using the wooden block.. Insert the outside glazing gaskets between the glass and Wall Receivers starting at the bottom and trimming the excess at the top. Note the correct orientation of the gasket.. Repeat with the inside glazing gaskets. Note: To remove the Wall Receiver cover peel out the glazing gasket, slide the cover upwards approximately 50mm then carefully pull or lever out using a flat bladed screwdriver. It may be necessary to remove the Glass Brace first. 8

SEALING THE ENCLOSURE Under no circumstance should Silicone sealant be applied to the inside of the shower. Follow the manufacturers instructions when applying silicone sealant. When applying the silicone in long runs, mask either side of the area with masking tape to ensure a tidy finish. Remove the masking as soon as the silicone has been tooled smooth. Clean up and remove any uncured silicone with white spirits. Allow 4 hours for the Silicone to properly set. Longer setting times may be required if ambient temperatures are low.. Degrease and clean the Acrylic surface with white spirits to improve adhesion when using NG Translucent silicone.. Run a continuous bead of the NG Translucent silicone (supplied) along the joint where the Bath Swing meets the bath.. Seal the vertical joint between the Wall Receiver and bottom sill up to the glass Glazing gasket. 4. Seal between the Wall Receiver and wall extending up at least 00mm vertically from the tray. WALL LINER FINISHING CAP - NOT REQUIRED FOR TILED INSTALLATIONS. Run a generous bead of silicone up the full length of the joint where the Wall Receiver touches the wall liner.. Position the finishing cap so it fits firmly against the Wall Receiver. Note the correct orientation. Tape into place if necessary until silicone cures. 9

CONSTRUCTION & WARRANTY Athena Bathrooms (the Company ) warrants that the products or product components manufactured and distributed by the Company ( Products ): meet or exceed the standard requirements of the New Zealand Building Code and will be free from inherent defects in materials and workmanship for the extended warranty period applicable to the Product. The Company will provide a replacement product or replacement part (or the nearest equivalent) free of charge where a Product is covered by this warranty. Any remedial works will not be covered by Athena Bathrooms. This warranty is transferable provided proof of purchase details are passed on to the new owner. This warranty will not apply where the Products have been improperly installed, have been misused, proof of purchase cannot be provided or where the warranty claim has not been notified to the Company within three months of the problem first appearing. Warranty claims should be sent to: Athena Bathrooms Private Bag 4090 Glenfield Auckland CONTACT DETAILS Free Phone: 0800 4 ATHENA, Free Fax: 0800 88 46 Email: information@athena.co.nz, Web Site: www.athena.co.nz Issued Sept 00 0