I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

Similar documents
D r a f t I m p l e m e n t a t i o n P l a n : D a l l a s a n d K a u f m a n C o u n t i e s

FM 691 CORRIDOR STUDY

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

Updated: April 7, 2016

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

The Shoppes at Forney Crossings

San Antonio Wrong Way Driver Initiative

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

TEXAS SENATE MILES DESCRIPTION: WIDEN NB AND SB MAINLANES TO 3 LANES EACH DIRECTION TO: 0.25 MILES N. OF LOOP 20/FM 3464 IN

Exit 61 I-90 Interchange Modification Justification Study

Abilene District Traffic Signal Timing and Capacity Analysis

Single Point Urban Interchange (SPUI) with Signals

Maintenance of Traffic sequence of operations including any phasing and detour maps;

GENERAL MEETING OF THE BOARD OF DIRECTORS OF THE NORTH EAST TEXAS REGIONAL MOBILITY AUTHORITY RESOLUTION NO

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Appendix B: Transportation B-10 Toll Plaza Analysis

Increasing Pace of Utility Accommodations

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

ACEC OC February 22, 2017

User s Guide: Traffic Noise Model

King Mill Lambert DRI# 2035 Henry County, Georgia

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

2018 District 1 Highway Construction Program

Charlton/Oxford Route 20 Reconstruction Project

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

Ohio Department of Transportation Office of Traffic Engineering July 17, 2009

Planarization & Routing Guide

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

Texas Transportation Institute The Texas A&M University System College Station, Texas

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

Anti-Trust Statement

Interchange Feasibility Study

DESIGN PUBLIC HEARING

TABLE OF CONTENTS 1200 PLAN PREPARATION

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

Metro - Let me know about major weekend traffic impacts

Attachment #2 PPW133-07

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

ZOO INTERCHANGE PROJECT

%&g( %&g( ) Bridge Projects DRAFT

MARQUETTE GREENWAY TRAIL

2017 San Juan College Luminarias 6:00pm - 11:30pm

Complete Streets & PPM to FDM Update

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Task 27: Prepare the Experiment. Center for Infrastructure and Transportation Studies Technical Report No: October 25, 2008

Update: July 20, 2012

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

CLINTON CLOSURE DETOURS

Stimulus April Letting

MAINTENANCE OF TRAFFIC &

Deep Creek Canyon US Highway 12

PINELLAS COUNTY MPO FY 2013/ /18 TRANSPORTATION ALTERNATIVES (TA) PROGRAM PRIORITY LIST STATUS REPORT

INTELLIGENT COMPACTION

2015 GDOT PowerPoint. Title Page

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES

Noise Mitigation Study Pilot Program Summary Report Contract No

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2

Arkansas State Highway and Transportation Department

Precast Concrete Pavement

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee April 28, 2011

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

MoDOT ACEC St. Louis Partnering Meeting. September 14, 2017

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

Real-Time Identification and Tracking of Traffic Queues Based on Average Link Speed

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

DIGITAL MOBILE RADIO THE VERY BASICS

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District

ASSESSING THE POTENTIAL FOR THE AUTOMATIC DETECTION OF INCIDENTS ON THE BASIS OF INFORMATION OBTAINED FROM ELECTRONIC TOLL TAGS

Managing traffic through Signal Performance Measures in Pima County

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS

FORT WORTH DISTRICT. SH 360 Corridor Noise Workshop Andy Kissig, P.E.

WHERE TO GO FROM HERE?

FM SETTLERS VILLAGE

Case Study: Roofing Shingle Scrap in Hot Mix Asphalt, TxDOT Dallas District. Project Overview

DISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/10/19 to 03/16/19 Contact: Rick Estrada (209)

March 1, Buildings for Our Future: 2016 Update

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

WAUKEE MARKETPLACE A H U R D D E V E L O P M E N T RICHIE HURD RICHARD HURD DANIEL HURD

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

112" 72" 40" BIKE LANE MARKING SHARED LANE MARKING PAVEMENT MARKING DETAILS N.T.S. GENERAL NOTES

DEVELOPMENT PLAN CHECKLIST

WAUKEE MARKETPLACE A H U R D D E V E L O P M E N T RICHIE HURD RICHARD HURD DANIEL HURD

Directions to Office

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

Halton (Milton) LRO #20

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

Aesthetic Steering Committee Meeting No. 8

FOR SALE ALTAMONT PARK DEVELOPMENT SITE SE Bristol Park Drive, Clackamas, OR

Transcription:

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median Dallas $2,582,661 6.0 Under Development. Expected Letting March 2016. Add continuous frontage roads Dallas $27,730,000 4.0 Under Development - CSJ 009513038 AF-2 FM 740 to FM 741 New frontage roads Dallas $18,850,000 3.9 Candidate for PA a 900 CSJ AF-3 SH 557 to FM 138 (Wilson Rd) Add continuous frontage roads Kaufman $46,540,000 3.7 Under Development - CSJ 049501071 AF-13 Dallas County Line to SH 557 Add continuous frontage roads Kaufman $131,860,000 8.6 Under Development - CSJ 009514027 AB-1 Ramp Improvement SH 34 Kaufman $770,000 N/A TJ-10 Bridge Modifications SH 34 Replace SH 34 SB bridge Kaufman $4,720,000 N/A TJ-8 Bridge Modifications SH 34 RECOMMENDED M-TERM PROGRAM (2021-2030) I-20 westbound vertical Kaufman $504,000 N/A clearance improvement Recommended Near-Term Program Sub-Total $233,556,661 TC-3 Added Capacity Dallas County Line to FM 741 Add one-lane in each direction Kaufman $19,610,000 4.0 TC-4 Added Capacity FM 741 to SH 557 Add one-lane in each direction Kaufman $26,580,000 8.6 AC-1 Added Capacity SH 557 to Wilson Road Add one-lane in each direction Kaufman $23,280,000 4.3 TC-5 Added Capacity Wilson Road to FM 310 Add one-lane in each direction Kaufman $31,500,000 3.7 TC-6 Added Capacity FM 310 to Van Zandt County Line Add one-lane in each direction Kaufman $23,170,000 6.4 AD-3 Ramp Improvement Wilson Road AD-4 Ramp Improvement FM 429 TD-1 Ramp Improvement CR 310 Combine AD-3, AD-4, TD-1, and TB-2 into Kaufman $358,000 0.2 single project broken down by interchange Kaufman $1,290,000 0.7 See AD-3 status Kaufman $1,610,000 0.8 See AD-3 status Recommended Mid-Term Program Sub-Total $128,698,000 AD-1 Bridge Modifications FM 429 Vertical clearance improvement Kaufman $640,000 N/A Based on the TxDOT Tracker Recommended Long-Term Program Sub-Total $640,000 Recommended Level Implementation Program Sub-Total $362,894,661 Full Depth Pavement Reconstruction Preliminary Estimate $350,000,000 Recommended Implementation Program Total $712,894,661 1 May 10, 2016

I-20 East Texas Corridor Implementation Plan TYLER DISTRICT Updated March 2016 AF-7 Toll SL 49 to FM 14 New One-way and Conversion of Two-way to Smith $52,940,000 8.9 TJ-11 Bridge Modifications FM 47 Replace FM 47 bridge Van Zandt $2,400,000 N/A TJ-9 Bridge Modifications FM 859 TJ-12 Replace Bridge and Approaches Van Zandt $2,250,000 N/A FM 17 Replace FM 17 bridge Van Zandt $2,520,000 N/A Postponed until further notice TJ-13 Bridge Modifications FM 1255 Replace FM 1255 bridge Van Zandt $2,650,000 N/A TJ-14 Bridge Modifications FM 773 Replace FM 773 bridge Van Zandt $2,240,000 N/A TB-1 Ramp Improvement FM 314 Realign WB exit ramp Van Zandt $2,000,000 N/A Finalizing for Construction (CSJ: 049503061) TJ-6 Bridge Modifications FM 849 TD-7 Ramp Improvement CR 431 TA-2 Ramp Improvement US 69 Realign & lengthen WB exit and EB entrance ramps Smith $4,000,000 N/A Under Development (CSJ: 049504068) Smith $1,230,000 N/A TJ-1 Bridge Modifications Fritz Swanson Road Vertical clearance improvement Gregg $3,230,000 N/A TJ-3 Bridge Modifications FM 2087 Vertical clearance improvement Gregg $2,690,000 N/A Smith $4,700,000 N/A Finalizing for Construction (CSJ: 049504065) TJ-15 Bridge Modifications Estes Parkway Gregg $5,500,000 N/A TI-15 Bridge Modifications Estes Parkway Ramp Improvements Gregg $150,000 N/A TJ-2 Bridge Modifications MLK Blvd Gregg $4,000,000 N/A Under Development (CSJ: 049507073) TC-(6-8) PS&E Van Zandt County Van Zandt $5,447,500 16.2 PS&E cost @5% of Construction Cost TC (16- PS&E Smith County 20) Smith $13,597,000 26.7 PS&E cost @5% of Construction Cost TC (21-24) AD-2(i) PS&E Schematic / Environmental Gregg County SH 31 Interchange Schematic/Environmental Effort for the SH 31 Interchange Gregg $7,504,500 16.7 PS&E cost @5% of Construction Cost $2,065,000 Recommended Near-Term Program Sub-Total $121,114,000 RECOMMENDED M-TERM PROGRAM (2021-2030) TC-6 Added Capacity FM 310 to Van Zandt County Line Add one-lane in each direction Van Zandt $23,170,000 6.4 2 May 10, 2016 Anticipate developing schematic environmental soon (Cost @3.5% of construction cost)

TC-7 Added Capacity Van Zandt County Line to FM 47 Add one-lane in each direction Van Zandt $30,540,000 3.4 TC-8 Added Capacity FM 47 to US 64 Add one-lane in each direction Van Zandt $55,240,000 6.4 TC-20 Added Capacity US 271 to Gregg County Line Add one-lane in each direction Smith $74,650,000 8.7 TC-21 Added Capacity Smith County Line to SH 135 Add one-lane in each direction Gregg $31,300,000 3.5 TC-22 Added Capacity SH 135 to SH 42 Add one-lane in each direction Gregg $31,480,000 3.7 TC-23 Added Capacity SH 42 to FM 2087 Add one-lane in each direction Gregg $29,790,000 4.3 TC-24 Added Capacity FM 2087 to Harrison County Line Add one-lane in each direction Gregg $57,520,000 5.2 AF-14 FM 14 to US 271 New frontage roads Smith $54,620,000 18.0 TG-10 FM 2087 to Loop 281W New frontage roads Gregg $24,420,000 4.2 TG-11 TB-3 Ramp Improvement FM 47 TB-4 Ramp Improvement CR 3412 TB-5 Ramp Improvement US 64 TA-1 Ramp Improvement SH 19 TD-3 Ramp Improvement FM 17 Loop 281W to Harrison County Line TB-8 Ramp Improvement CR 35 (Lavender Rd) TD-12 Ramp Improvement FM 14 TB-9 Ramp Improvement FM 2015 TD-8 Ramp Improvement SH 155 TD-9 Ramp Improvement FM 757 TD-10 Ramp Improvement CR 3101 TD-11 Ramp Improvement CR 3111 TI-11 Ramp Improvement US 271 TI-15 Ramp Improvement Loop 281 W / US 259 TD-14 Ramp Improvement SH 135 TI-13 Ramp Improvement SH 42 New frontage roads Gregg $4,100,000 2.0 Van Zandt $2,190,000 N/A Van Zandt $1,280,000 N/A Van Zandt $1,790,000 N/A Van Zandt $810,000 N/A Interest in developing TG-11/TG-12 from an economic development standpoint Van Zandt $840,000 N/A Will be handled by the District office Smith $600,000 N/A Smith $690,000 N/A Smith $780,000 N/A Smith $730,000 N/A Smith $490,000 N/A Smith $500,000 N/A Smith $620,000 N/A Smith $360,000 Finalizing for Construction Smith $150,000 Gregg $320,000 N/A Gregg $300,000 N/A 3 May 10, 2016

AD-2 Ramp Improvement SH 31 Gregg $59,000,000 N/A Recommended Mid-Term Program Sub-Total $488,130,000 Cost for this improvement is outside of district budget - possibility of inclusion in statewide plan TC-16 Added Capacity Toll 49 to US 69 Add one-lane in each direction Smith $69,560,000 2.9 TC-17 Added Capacity US 69 to FM 14 Add one-lane in each direction Smith $57,700,000 6.2 TC-18 Added Capacity FM 14 to SH 155 Add one-lane in each direction Smith $38,850,000 5.6 TC-19 Added Capacity SH 155 to US 271 Add one-lane in each direction Smith $31,180,000 3.3 AF-6 FM 314 to SH 110 New frontage roads and conversion of two-way to Smith $35,250,000 7.3 TG-7 US 271 to Gregg County Line New frontage roads and conversion of two-way to Smith $25,000,000 8.6 TG-8 Smith County Line to SH 42 New frontage roads and conversion of two-way to Gregg $21,220,000 7.3 TG-9 SH 42 to FM 2087 New frontage roads and conversion of two-way to Gregg $12,500,000 4.3 TD-2 Ramp Improvement Hayden Rd/CR 3442 Van Zandt $840,000 N/A TB-6 Ramp Improvement FM 1255 Van Zandt $1,660,000 N/A TD-4 Ramp Improvement CR 1308 Van Zandt $1,050,000 N/A TB-7 Ramp Improvement CR 1311 Van Zandt $2,400,000 N/A TD-5 Ramp Improvement FM 773/FM 16 Van Zandt $170,000 N/A TD-6 Ramp Improvement CR 426 Smith $1,370,000 N/A TI-9 Ramp Improvement CR 110 Smith $510,000 N/A Recommended Long-Term Program Sub-Total $299,260,000 Recommended Level Implementation Program Sub-Total $908,504,000 Full Depth Pavement Reconstruction Preliminary Estimate $770,000,000 Recommended Implementation Program Total $1,678,504,000 Based on the TxDOT Tracker 4 May 10, 2016

I-20 East Texas Corridor Implementation Plan ATLANTA DISTRICT Updated March 2016 TJ-7 Bridge Modifications Lansing Switch Road Replace bridge Harrison $4,400,000 0.6 TJ-16 Bridge Modifications FM 450 Replace bridge and approaches Harrison $4,874,784 N/A Construction Scheduled TJ-17 Bridge Modifications US 59 Vertical clearance improvement Harrison $4,600,000 0.2 Recommended Near-Term Program Sub-Total $13,874,784 RECOMMENDED M-TERM PROGRAM (2021-2030) TG-14 / AF-9 Reconstruct Mainlanes Added Capacity Construct and Grade Separations Reconstruct 4 mainlanes with 10 ft outside shoulders Harrison $69,400,000 9.2 Harrison $62,400,000 9.2 Add Third Lane in each direction Harrison $12,400,000 9.2 TC-25 Added Capacity Gregg County Line to Loop 281 Add one-lane in each direction Harrison $34,120,000 2.3 TG-12 /AF-8 AF-10-1 AF-10-2 SH 43 to US 59 US 59 to FM 31 Gregg County Line to Loop 281 EB AF-11 FM 31 to FM 2199 AF-12 FM 2199 to US 80 US 80 to Louisiana State Border conversion of two-way to conversion of two-way to conversion of two-way to conversion of two-way to conversion of two-way to New frontage roads at east end Harrison $13,690,000 2.5 Harrison $24,500,000 3.0 Harrison $26,990,000 3.6 Harrison $8,300,000 3.2 Harrison $13,770,000 4.7 Harrison $7,730,000 2.0 TI-16 Ramp Improvement Loop 281 E Harrison $640,000 N/A 11 PA / Future Candidate Recommended Mid-Term Program Sub-Total $273,940,000 TC-33 Added Capacity US 80 to FM 134 Add one lane in each direction Harrison $38,080,000 4.5 TC-34 Added Capacity FM 134 to Louisiana State Line Add one lane in each direction Harrison $22,620,000 2.9 TJ-4 Bridge Modifications FM 450 Vertical clearance improvement Harrison $1,170,000 N/A Based on the TxDOT Tracker Recommended Long-Term Program Sub-Total $61,870,000 Recommended Level Implementation Program Sub-Total $349,684,784 Full Depth Pavement Reconstruction Preliminary Estimate $350,000,000 Recommended Implementation Program Total $699,684,784 5 May 10, 2016