Fabrication Documentation

Similar documents
Fasteners. Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Dwg. No Revision D March 24, 2015

MIL-STD-1580B REQUIREMENT 11 DETAILED REQUIREMENTS FOR CONNECTORS

Termination Procedure

Date: May 17 th, 16. Titre / Title HIGH RELIABILITY RF COAXIAL CONNECTORS SMP TYPE, 50 OHMS

Machine Shop Processes

AS9102 Training. First Article Inspection Guide. Rev A

MIL-STD B (SH) UPDATE

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

*Before starting, please read entire manual *Changes can be made in order for this manual to work for you. 3 x 6 I-Beam

8 x 10 Sandwich Panel

Assembly Instructions for Power Drawer Series 35 amp and 75 amp

Wiring Repair WIRING REPAIR

Requirements and Acceptance for Cable and Wire Harness Assemblies

Reasons for reissue are in Section 6, REVISION SUMMARY.

a. Does a written detailed procedure exist and is it utilized for the soldering process? Identify procedure number and revision.

EXTERNAL FEATURE: Feature on the part being delivered to a Lisk customer which is visible without disassembly.

Application Specification Slim WtoB Poke-in Connector

Engineering Drawing System

P0910 REV A (PTP) END-TO-END CHARGE CONTROL TEST

Qualification Test Report SlimSeal SSL Connector

Date: December 10 th, Titre / Title HIGH RELIABILITY RF COAXIAL CONNECTORS SMA 2.9 TYPE, 50 OHMS (FEMALE CONTACT)

FTM2 Series HCMOS/TTL OSCILLATORS FOR SPACE APPLICATIONS 0.5MHz to 160 MHz. ( 5 x 3.2 mm, SMD, 2.5 V )

RF COAXIAL PHASE SHIFTER SMA DC to 18 GHz DETAIL SPECIFICATION

Technical Manual Index July 1, 2018

TRAPPED FLUX MEASUREMENT PROCEDURE

(PTP) UV GYRO CHARGE CONTROL CHECK-OUT PROCEDURE

JUN FEATURE 2014 PRODUCT OF THE

Application Specification Ultraminiature Bare Poke-in Contact 26FEB2019 REV:A2

Crimping Instructions

Date: April 27 th, 07. Titre / Title HIGH RELIABILITY RF COAXIAL CONNECTORS SMA TYPE, 50 OHMS (FEMALE CONTACT)

STANDARD INSTALLATION PROCEDURES FOR RAYATEN COATED MOULDED PARTS STRAIGHT, 90 AND 45

TOYOTA TACOMA LED BED LIGHTS Preparation

RF, COAXIAL. HYBRID COUPLERS POWER DIVIDERS and DIRECTIONAL COUPLERS GENERIC SPECIFICATION

Termination for M29504/4, /5, /6 & /7, Style 2 (Tight)

Toyota Tundra Interior Light Upgrade

SUPERSEDED REVISION. Reasons for reissue of this instruction sheet are provided in Section 7, REVISION SUMMARY.

FTTC05 Series LVDS TCXO/VCTCXO FOR SPACE APPLICATIONS 10M Hz to 1400MHz. ( 5 x 7 mm, SMD, 2.5 V )

TOYOTA TUNDRA 2015 BLACK TEXTURED FENDER FLARE

Handling Precaution for Terminal and Connector

DEPARTMENT OF DEFENSE STANDARD PRACTICE FIBER OPTIC CABLE TOPOLOGY INSTALLATION STANDARD METHODS FOR NAVAL SHIPS (CONNECTORS AND INTERCONNECTIONS)

Crimping Instructions

G.W. Lisk Co., Inc. Workmanship Manual DOC Rev 3

SERVICE BULLETIN. Description: VOX\ICS Tie Line Subassembly Document #: AMS44\603-0 Service Bulletin #: 002

Terminal Replacement Procedures

SUPERSEDED. NOT the LATEST REVISION

PRO- CRIMPER* III Hand Crimping

Date: November 8 th, Titre / Title HIGH RELIABILITY. RF COAXIAL CONNECTORS for SMP Lock connectors GENERIC SPECIFICATION

(AMMA) American Maritime Modernization Association

GUIDE FOR WIRING HARNESS AND CONNECTOR REPAIR. This bulletin supersedes TSB 15-BE-004 to update the wiring connector ordering information.

Engineering Drawing System

FTTC15 Series CMOS/Clipped sinewave Output TCXO/VCTCXO. FOR SPACE APPLICATIONS 2M Hz to 100 MHz. ( 7x5 mm, 3.3 V )

BHARAT HEAVY ELECTRICALS LIMITED

(R) Aerospace First Article Inspection Requirement FOREWORD

SECTION SUBMITTAL PROCEDURES

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

STATEMENTS MADE AND DATA SHOWN, ARE TO THE BEST OF OUR KNOWLEDGE AND BELIEF, CORRECT AND WITHIN THE USUAL LIMITS OF COMMERCIAL TESTING PRACTICES.

CONNECTORS, ELECTRICAL, CIRCULAR, TRIPLE-START SELF-LOCKING COUPLING, SCOOP-PROOF, REMOVABLE CRIMP CONTACTS BASED ON MIL-C SERIES III

LIQUID CRYSTAL DISPLAY MODULE

Date: April 27 th, 04. Titre / Title HIGH RELIABILITY RF COAXIAL ADAPTORS AND CONNECTING PIECES SMA TYPE, 50 OHMS

UNSIGNED HARDCOPY NOT CONTROLLED

Piping & Equipment Identification

Hand Crimp Tool Operating Instruction and Specifications Sheet Part No Eng. No. RHT 5770 (Replaces and )

AUG 15 Rev M

Toyota Tacoma Interior Light Upgrade

( 7 x 9 mm, J-Leads, SMD, 3.3V )

PRODUCT SPECIFICATION

CIRRUS SR22 SB 2X R3. Service Bulletin. Issued: Revised: October 13, 2009 May 18, 2010

sealed mini usb connectors

SCOPE Perma-Seal Terminals and Splices AWG (Rings, Spades, Hooks, 3 and 4-Ways, and Splices). RHT-5770 Hand Crimp Tool

POLYIMIDE INSULATED WIRES AND CABLES, LOW FREQUENCY, 600V, -200 TO +200 C BASED ON TYPE SPL. ESCC Detail Specification No.

PRODUCT SPECIFICATION

Product Parts Information. Lever Chain Hoists. KL Series. Save These Instructions. Form Edition 2 December Ingersoll-Rand

Refer to Figure 2 and select the appropriate wire, die assembly, and terminal or splice. Strip the wire to the length indicated in the table.

RF COAXIAL CONNECTORS, BASED ON TYPE SMP. ESCC Detail Specification No. 3402/0xx

Hand Crimping Tools , , and AUG 12 Rev D

Handling and Electrical Contacting of Piezoceramic Components

LAND AND CONDUCTOR REPAIR (DVD-97ABC)

C99-20LL System Cable P/N 40935G-06 INSTALLATION SHEET

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

TOGGLE SWITCHES IP67 A 9 SERIES 1B AGENCY APPROVALS SPECIFICATIONS

Mercury 1200 and 1500P

Screw-Thread Standards for Federal Services, Inspection Methods for Acceptability of UN, UNR, UNJ, M and MJ Screw Threads

MIL- B Rev NAVSEA 0900-LP

Downloaded from MSFC-STD-3425 National Aeronautics and. BASELINE Space Administration December 12, 2006 EI42

XSIS XE7S L0 HC/ACMOS OSCILLATORS FOR SPACE APPLICATIONS 500 KHz to 125 MHz. ( 5 x 7 mm, SMD, 3.3 V )

1. Actuate the upper die release button located in the C head or closed head. 2. Slide the nest into place in C head or closed head. See Figure 2.

Installation & Weatherproofing Guide for ENCOM Broadband Radios

Qualification Test Report Summary for the Smiths Connectors Solderless EMI Filtered Connector. STR #569 Revision N/C 2/09/09

Hand Crimp Tool Operating Instruction And Specifications Sheet Order No Eng. No. RHT 7050 (Replaces )

CONTINUED ON NEXT PAGE..

Our Top 10 Commonly Asked Soldering Questions This Year

Application Specification Releasable Poke-in Connector 08JUL 2015 REV:A

Flat Style Fender Flares Front Pair. Jeep. Included in Hardware Kit:

ASSEMBLY INSTRUCTIONS

CEELOK FAS-T* High-Speed Circular Connector System

TOYOTA PRIUS BODY SIDE MOLDING Preparation

1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting

SURFACE VEHICLE RECOMMENDED PRACTICE

Report Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center

Service Bulletin Terminal Replacement Instructions (Replaces , dated May 2, 1995) December 18, 2000 ALL

Transcription:

Rev. ECO Description Author Approved Date A Initial Release B. Klatt W. Mayer 04/24/91 B General Review 02/17/06 C General Editorial Update B. Klatt M. Bautz 07/16/14 Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Fabrication Documentation Dwg. No. 99-03001 Revision C May 9, 2014 99-03001 Page 1 of 23 Revision C

Table of Contents PREFACE 3 1.0 SCOPE 4 2.0 APPLICABLE DOCUMENTS 4 3.0 REQUIREMENTS 4 4.0 CONTENTS 4 4.1 ASSEMBLY WORK ORDER DOCUMENTATION PACKAGE 5 5.0 INSTRUCTIONS FOR COMPLETING THE ASSEMBLY WORK ORDER 7 ASSEMBLY WORK ORDER 8 REVISION SHEET ASSEMBLY WORK ORDER 9 6.0 INSTRUCTIONS FOR COMPLETING THE MECHANICAL WORK ORDER 10 MECHANICAL WORK ORDER 11 7.0 INSTRUCTIONS FOR COMPLETING THE ASSEMBLY FAULT LOG 12 ASSEMBLY FAULT LOG 13 8.0 INSTRUCTIONS FOR COMPLETING THE KIT TAG 14 MATERIAL PROCESSING MIXING RECORD 15 MKI POTTING LOG 16 CONNECTOR MATE/DEMATE LOG 17 CONFIGURATION TRACEABILITY LIST 18 CONFORMAL COAT WORK SHEET 19 CRIMP CONNECTOR ASSEMBLY WORK ORDER 20 SOLDER CONNECTOR ASSEMBLY WORK ORDER 21 ASSEMBLY WORK ORDER FINAL CHECK LIST 22 MKI REJECT TAG 23 99-03001 Page 2 of 23 Revision C

Preface Revision A was the Initial Release of 99-03001 written by Brian Klatt 12/18/90 and checked by W. F. Mayer on 04/24/91. Revision B issued a General Revision on 02/17/06. Revision C issued a new format and general editorial update on 07/16/14. 99-03001 Page 3 of 23 Revision C

1.0 Scope This procedure is a collection of the fabrication forms and documentations which are used on Sponsored Research Projects at the Massachusetts Institute of Technology (MIT) in the Kavli Institute for Astrophysics and Space Research (MKI). 2.0 Applicable Documents None. 3.0 Requirements The forms and documentation included herein are imposed as a requirement by this specification. The forms contained herein, document parts, materials, processes, procedures, assembly steps, and configuration of hardware fabricated for the MKI project. 4.0 Contents Forms and documentation included in this specification are as follows: v Work Order Documentation Package including: Instructions for Work Order (AWO) Work Order (AWO) Work Order (AWO) Continuation Sheet Work Order (AWO) Revision Sheet Instructions for Mechanical Work Order Mechanical Work Order Instructions or Fault Log Fault Log Instructions for Kit Tag Conformal Coat Work Order Materials Process Mixing Record Solder Connector Work Order Crimp Connector Work Order Kit Tag Potting Log Configuration Traceability List Material Status Tag Work Order (AWO) Final 99-03001 Page 4 of 23 Revision C

4.1 Work Order Documentation Package The Work Order Documentation Package includes the following: Work Order. This incudes: o steps Inspection Checkpoints. These include: o Fabrication Inspections o Quality Assurance Inspections o Government Source Inspections (GSI) o Other Mandatory Inspection Points (MIPs) AWO Continuation Sheet. Self Explanatory AWO Revision Sheet. This includes: o Unanticipated assembly steps o Unanticipated inspection steps o ECO number o Revision letter o Inspections o Tests Mechanical Work Order. This includes: o Shop traveller o Machining operations o Insert installation o Inspections AWO Final Checklist Provides a checklist to be used during final review of electronic assemblies. The object of this document is to ensure that consistent tests and inspections are applied to all assemblies prior to moving the hardware to the next assembly level. Included are: o Visual inspections o Parts location and orientation o Revision check o drawing note check o I/O connector Quality check o I/O connector ring- in o Electrical tests at present level o Photographic record Fault Log. This includes: o Physical discrepancies o Electrical discrepancies o Rework sign- offs o Re- inspection sign- offs Potting Log. This includes: o Potting compounds o Conformal Coatings o Spot bonding materials o Epoxies o Material Manufacturer o Material Manufacturer s Part Number o Lot Or Date Code o Date Of Manufacture o Date Of Expiration o Weight Ratios (if not pre- packaged) 99-03001 Page 5 of 23 Revision C

Configuration Traceability List. This includes: o Individual Part Identification o Part Number o Part Description o Part Purchase Order Number o Part Serial Number o Part Lot- Date Code Kit Tag. The kit tag becomes the temporary nameplate for the subassembly during fabrication. It includes: o Drawing Number o Serial Number o Individual Preparing The Kit o Individual Inspecting The o Individual Fabricating The o Individual Accepting The Performance Material Status Tag. This includes: o Material or Part Name o Material Manufacturer o Material Distributor o Manufacturer s Part Number o Lot Number o Purchase Order Number Reject Tag. This includes: o Part Name o Part Number o Reason for Rejection o Hardware Disposition 99-03001 Page 6 of 23 Revision C

5.0 Instructions for Completing the Work Order Project Name Page of DWG No. Build to Rev. Serial No. Special Instructions Authorizing Engineer Build Data Package Approval Document Control R&QA Build History/Changes Incorporated Step No. Type Description Performed by Final Acceptance R&QA The abbreviated form of the project name, i.e., XTE, AXAF, SAS- C, MJS, TESS, etc. Name of the assembly. Page number and total number of pages in the AWO. The drawing used for the particular assembly work. The drawing revision used for the particular assembly work, at the time of AWO issue. The identifying number of the particular assembly. Particular instruction required to perform the assembly task but which may not be shown on the drawing (i.e. safety, or handling instructions). The particular engineer, as designated by the Project Manager, responsible for the particular assembly job. As determined by the project production supervisor. The project Production Supervisor. Review and sign off of the assembly work order by the cognizant Q.A. representative. Changes incorporated after the initial work order is completed. A procedural step number. Electrical, mechanical, MKI QA, Customer QA, Fabrication/, Inspection, or Test. Brief description of the step to be performed. The signature of the person performing the particular step. Project Manager or his designee, signature. The Reliability and Quality Assurance Representative s signature. 99-03001 Page 7 of 23 Revision C

Work Order Project: Page: of: Name: Special Instructions: Drawing Build To Rev. Serial Authorizing Engineer: Build Data Package Approval: Build History/Changes Incorporated: Document Control Date: R&QA: Step No. Type Description Performed By: Date Final Acceptance: Engineering: Date R&QA: Date: 99-03001 Page 8 of 23 Revision C

Revision Sheet Work Order Project: Page: of Name: Drawing Build To Rev. Serial Drawing No: ECO NO.: Revision Letter: Performed by: Parts Location and Orientation Check: Visual Inspection MIT Q.A.: NASA Q.A.: Photographic Record, if needed: ECO Description: Drawing No: ECO NO.: Revision Letter: Performed by: Parts Location and Orientation Check: Visual Inspection MIT Q.A.: NASA Q.A.: Photographic Record, if needed: ECO Description: Drawing No: ECO NO.: Revision Letter: Performed by: Parts Location and Orientation Check: Visual Inspection MIT Q.A.: NASA Q.A.: Photographic Record, if needed: ECO Description: 99-03001 Page 9 of 23 Revision C

6.0 Instructions for Completing the Mechanical Work Order Project Originator Approval CPY No. Part No and rev. Part Description QTY/Pld. Req d By Engineer Description of Work Operations Location Signature Remarks Routing Close out Comments Abbreviated form of the project name, i.e., XTE, AXAF, ASTRO- D, HEAO- B, TESS, etc. The cognizant Mechanical Engineer requesting the work. Program Manager or Production Supervisor. 3 copies are needed: one for the originator, one for the production file, and one copy accompanies the work. The drawing and revision number to which part or assembly will be made. Part name Quantity per payload (gives and indication of spares). Date parts are required. The cognizant Mechanical Engineer. (quantity) brief description of the work order including the quantity Machine, plate, inspection, polish, etc. Location where the job will be performed. Signature of the person performing the actual work. Special instructions Pertains to outside machine shops. Topics are self- explanatory. Date work order Is completed. On the job performance. 99-03001 Page 10 of 23 Revision C

Mechanical Work Order Work Order MIT Originator & Date Approval & Dates Copy No. Part No: Rev. Part Description: Qty/Pld: Req'd by: Engineer Description of Work (including Quantity): Operations Location Signature Date Remarks: Routing Outside Close Out Quotes Requested (Date) W.O. Closed Quotes Received (Date) Comments: Successful Bidder (Date) P.O. Let (Date) Work Received (Date) (Date) 99-03001 Page 11 of 23 Revision C

7.0 Instructions for Completing the Fault log Project DWG No. Ser. No. Page of NO. Description Originator MRB NO. ECO. Rework and Re- Inspection The abbreviated form of the project name, i.e., XTE, AXAF, SAS- C, MJS, HEO- B, TESS, etc. The drawing used for the particular work order The identifying number of the particular assembly. Number of pages required for the Fault Log. The item number (discrepancy). A brief description of the problem. The person first noting the discrepancy. Where appropriate, the Material Review Board action number. Engineer Change Order No. associated with the problem if appropriate. The person responsible for re- work and the person responsible for re- inspection. 99-03001 Page 12 of 23 Revision C

Fault Log Project: Dwg. No. Page of Ser. No. No. Date Description Originator MRB No. ECO No. Disposition Rework & Re-inspection Remarks 99-03001 Page 13 of 23 Revision C

8.0 Instructions for Completing the Kit Tag Project Drawing No. Ser. No. Accepted by and Date Inspected by and Date Fabricated by and Date The abbreviated form of the project name, i.e., XTE, AXAF, SAS- C, MJS, HEO- B, TESS, etc. Self Explanatory A unique number which identifies hat particular subassembly or assembly from all other subassemblies or assembly of the same type. The signature of the Project Engineer or his designee: month, day, and year. The inspector s signature or mark; month day and year. The person who fabricates the assembly or subassembly. Kit Tag Kavli Institute For Astrophysics and Space Research Massachusetts Institute of Technology Project: Dwg. No. Ser. No. Kit Prepared By: Fabricated By: Inspected By: Tested By: Performance Accepted By: Date: Date: Date: Date: Date: 99-03001 Page 14 of 23 Revision C

Material Processing Mixing Record ASSEMBLY NAME. DRAWING #. SERIAL #. PROCESS TECH DATE SURFACE PREP LOT NUMBER EXP DATE MIX RATIO OUT GAS CONTR SAMPL INSPECT WITN SAMPL CURE HUM. TEMP TIME 99-03001 Page 15 of 23 Revision C

MKI Potting Log No. Serial No. Date AWO No. Manufacturer Manufacturers Part Number Lot Number Date of Manufacture Expiration Date Weight 99-03001 Page 16 of 23 Revision C

Connector Mate/Demate Log Project: Page of Name: Drawing Build To Rev. Serial CONN # M D DATE M D M D M D M D M D M D M D M D M 99-03001 Page 17 of 23 Revision C

Configuration Traceability List PROJECT DATE ASSEMBLY NO NAME S/N PAGE OF Special Instructions Name Dwg. No. Part Dwg. No. Rev. No. Req Rev. Serial Number Description S/N Lot # Date Code Kitted By: Remarks 99-03001 Page 18 of 23 Revision C

Conformal Coat Work Sheet Work Order Project: Page: 1 of: Name: Drawing Build To Rev. Serial No.: SPECIAL INSTRUCTIONS: -HANDLE PER MKI STATIC HANDLING PROCEDURE 99-01003 and ANSI ANSI/ESD S20.20, -REFERENCE DOCUMENTS IPC-J-STD-001ES Step Type Description Perf No. By: 1 I VERIFY CONFORMAL COAT LOT WITH TEST SAMPLE 2 P VERIFY ELECTRICAL TEST ACCEPTANCE 3 P VERIFY FINAL CHECKLIST SIGNED OFF 4 A CLEAN P.C. BOARD 4 -CLEAN AND SOAK USING REAGENT GRADE XYLENE BLOW DRY WITH DRY NITROGEN 4 -SOAK AND RINSE USING REAGENT GRADE ISOPROPYL ALCOHOL BLOW DRY WITH DRY NITROGEN 4 -USE PINK ANTI-STATIC GLOVES FOR HANDLING BOARD AFTER CLEANING 5 I MKI. Q.A. INSPECT FOR CLEANLINESS Date 6 A DRY P.C. BOARD BY EVACUATING @ 30 IN/MERCURY FOR 1/2 HOUR START: DATE TIME FINISH : DATE TIME 7 A REMOVE FROM VACUUM SYSTEM AND BAG IN NEW ANTI-STATIC BAG PURGE WITH DRY NITROGEN AND HEAT SEAL BAG. 8 A MOVE TO CLEAN BENCH -MASK LOCATIONS TO BE FREE OF CONFORMAL COATING USING FLIGHT TAPE. LOCATIONS SPECIFIED BY ASSEMBLY DRAWING -SPOT BOND COMPONENTS PER NASA-STS-8739.1 USING URALANE 5753A/B. -CURE OVER NIGHT IN CLEAN BENCH. PLACE IN ANTI-STATIC BAG, PURGE WITH NITROGEN AND SEAL. 99-03001 Page 19 of 23 Revision C

Crimp Connector Work Order Project: Page: of: Name: Drawing Build To Rev. J#/P# Connector Contact Prepared By: R&QA Project Serial Step Type Description Perf No. By: 1 A PREPARE WIRES AND CRIMP CONTACTS PER NASA-SRD-8739.4 2 A PREPARE WIRES FOR CRIMPING -STRIP WIRES WITH MECHANICAL STRIPPER LABELLED PER WIRE GAUGE WIRE STRIPPER SET # -CLEAN WIRES USING WIPES AND ISOPROPANOL 3 A PREPARE CONTACTS FOR CRIMPING -BLOW OUT CONTACT BARREL USING COMPRESSED AIR -VISUALLY INSPECT CRIMP CONTACTS INSURING NO DEBRIS IN CONTACT BARREL 4 A CRIMP TOOL QUALIFICATION 5 A/I TEST -CRIMP TOOLS USED -TOOL: M22520/2-01 - TURRET: M22520/2- -GO/NO GO TEST WITH TOOL M22520/3-01 RECALIBRATION DATE -VERIFY PULL TEST PERFORMED PER TENSILE TEST DAILY LOG 6 A/I CRIMP PINS/SOCKETS FOR CONNECTOR J#/P# PER SCHEMATIC DRAWING -CONNECTOR TYPE PER PARTS LIST -CONTACT TYPE -USE TOOL SPECIFIED IN STEP 4 -CRIMP TOOL SETTING WIRE TYPE #1 -CRIMP TOOL SETTING WIRE TYPE #2 -CRIMP TOOL SETTING WIRE TYPE #3 -VISUAL INSPECTION M.I.T. Q.A. REV 7 A INSERT CONTACTS IN CONNECTOR PER ATTACHED WIRING LIST -LABEL CONTACT PIN #'S ON WIRES 8 A/I VERFIY PIN RETENTION M.I.T. Q.A. 9 A CLEAN, BAG, AND TAG HARNESS; INSTALL CONN COVERS 10 A STORE IN FLIGHT ASSEMBLY AREA FOR NEXT LEVEL OF ASSEMBLY Date 99-03001 Page 20 of 23 Revision C

Solder Connector Work Order Project: Page: of: Name: Drawing Build History/Changes Incorporated: Build To Rev. Serial Step No. Type Description Perf By: 1 SOLDER WIRES IN CONNECTOR # PER SCHEMATIC: Date -BLOW OUT SOLDER CUPS -INSPECT SOLDER CUPS INSURE FREE OF DEBRIS AND INSURE THAT GOLD PLATING IS FREE OF FLAWS -TIN CUPS AND REMOVE SOLDER (3X) -AVOID SPILLOVER -INSTALL WIRES PER SCHEMATIC -CUT AND STRIP WIRES -INSPECT STRIPS -TIN WIRES -INSPECT TINNING -SOLDER WIRES IN CUPS -CLEAN EACH SOLDER CONNECTION AFTER SOLDERING, USE ISOPROPANOL. -AFTER ALL CONNECTIONS MADE CLEAN CONNECTIONS USING XYLENE AND RINSE USING ISOPRPOANOL. -INSPECT M.I.T. QA ONR -SLEEVE CONNECTIONS USING SHRINK TUBING 99-03001 Page 21 of 23 Revision C

Work Order Final Check List Project: Page: Of: Name: Drawing Build To Rev. Serial A. Revision Check -Latest Revision Letter in ECO Book: -Latest Revision Letter performed per Revision Sheet: B. Parts location and orientation check per Drawing - Drawing No: -Performed by: Revision Letter C. Drawing Note Check: -Performed by: D. I/O Connector Quality Check: -Sockets - Retention Check - Performed by: -Pins - Push Test - Performed by: E. I/O Connector Ring-in -Performed by: F. Visual Inspection -MIT Q.A.: -NASA Q.A.: G. Electrical Test -Performed by: H. Photographic Record 99-03001 Page 22 of 23 Revision C

MKI Reject Tag MKI REJECT Tag KAVLI CENTER FOR SPACE RESEARCH Massachusetts Institute of Technology Project: Part Name: Date Part No. Reason for Rejection: Disposition Inspector: 99-03001 Page 23 of 23 Revision C