John L Marsh Elementary School

Similar documents
Jackie Robinson Elementary School

Marcus Moziah Garvey Elementary School

Amos Alonzo Stagg Elementary School

Langston Hughes Elementary School

Everett McKinley Dirksen Elementary School

Wendell Smith Elementary School

Disney II Magnet School

John Spry Elementary Community School

Robert Fulton Elementary School

Architecture, Construction, and Engineering Technical Charter

Morton School of Excellence

University of Chicago Charter - NKO

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

William Penn Elementary School

Rufus M Hitch Elementary School

Daniel S Wentworth Elementary School

Jonathan Burr Elementary School

Charles N Holden Elementary School

Philip Rogers Elementary School

Andrew Carnegie Elementary School

Richard J Oglesby Elementary School

EPIC Academy High School

Alexander Graham Bell Elementary School

Arthur A Libby Elementary School

George Washington Elementary School

John Milton Gregory Elementary School

John Harvard Elementary School of Excellence

Cyrus H McCormick Elementary School

Brian Piccolo Elementary Specialty School

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

North Lawndale College Prep Charter - Collins

Phoenix Military Academy High School

Arthur E Canty Elementary School

University of Chicago Charter - Carter G Woodson

John Hancock College Preparatory High School

George W Tilton Elementary School

Academy for Global Citizenship Elementary School

Walt Disney Magnet Elementary School

George Washington High School

Multicultural Academy of Scholarship

Urban Prep Academy for Young Men - West

Joseph E Gary Elementary School

Amandla Charter High School

Richard T Crane Medical Preparatory HS

Norman A Bridge Elementary School

Disney II Magnet High School

Henry H Nash Elementary School

Legacy Charter Elementary School

Betty Shabazz Intl Charter - DuSable Leadership

Theodore Roosevelt High School

William Howard Taft High School

John F Kennedy High School

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

James Shields Middle School 2611 W 48th St Chicago, IL 60632

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

James Otis Elementary School 525 N Armour St Chicago, IL 60642

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

OCPS Submittal Register for Product Data and Shop Drawing Reviews

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

U of I Facilities Standards Updates for 2017

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

BUILDING PLAN REVIEW REQUIREMENTS

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Metal Canopy GRE 7 290 290 SF CHIMNEY Brick Chimney - Concrete/ Mortar Liner Metal Flue GRE 7 26 0 26 LF 10 LF Assessment Date: 2/18/2013 Page 1 of 19

CORNICE Cornice - Metal Projecting GRE 7 312 312 LF DOORS Exterior FRP Door Exterior Steel Door Store Front Door Transom Lite 6 1 4 GRE 6 9 16 EA 1 14 EA 9 EA $2,548 $2,548 ENTRANCE Concrete Exterior Stairs Entrance Controls - Audio and Video Power Door Operator and Controls GRE 6 6 30 GRE 7 3 GRE 7 2 36 LF $5,148 3 EA $5,148 FOUNDATION Concrete Foundation Masonry Foundation GRE 7 945 GRE 7 700 945 LF 700 SF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted GRE 6 2 5 51 GRE 6 8 15 58 EA $14,586 23 EA $1,716 $16,302 Assessment Date: 2/18/2013 Page 2 of 19

LINTELS Lintels - Brick Lintels - Steel GRE 6 26,785 26 LF 1,785 LF PARAPET Coping - Metal Coping - Stone Parapet > 30" Height Parapet 16" to 30" Height GRE 7 50 GRE 7 2,090 GRE 6 500 1,100 GRE 6 150 240 50 50 LF 2,090 LF 1,600 LF $129,773 440 LF $97,966 $227,739 ROOF SYSTEM Asphalt Shingle Roof Exterior Downspouts Interior Downspouts Modified Bitumen Roof Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping 80 GRE 6 28 24 GRE 6 480 740 GRE 6 17,600 31,945 7,600 GRE 7 31,655 180 SF 52 LF $521 1,220 LF 49,545 SF $124,582 17,600 SF 31,655 SF $125,102 SUPERSTRUCTURE Metal Deck/Concrete Topping Steel with Clay Tile Arch GRE 7 83,300 GRE 7 57,470 83,300 SF 57,470 SF Assessment Date: 2/18/2013 Page 3 of 19

WALLS Brick Concrete Block Prefabricated Metal Panel Wall Stone - Cast Stone - Cut GRE 6 4,200 46,800 GRE 7 4,274 GRE 6 900 GRE 7 280 GRE 7 4,825 51,000 SF $27,748 4,274 SF 900 SF $7,645 280 SF 4,825 SF $35,393 WINDOWS Skylite - Glass Single-Pane Storefront Windows Window - Guards perforated Windows - Sash Aluminum Double-pane EXTERIOR GRE 6 32,400 GRE 6 270 2,265 3,675 32 SF $302 1,400 SF 2,535 SF $6,811 13,675 SF $7,113 $419,345 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency generator 150 KW -200 KW diesel - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power GRE 7 5 GRE 7 4,205 GRE 7 25,142 GRE 7 7,374,790 0 GRE 7 45 GRE 7 5 GRE 7 2 5 EA 4,205 SF 25,142 SF 7,374 SF 1,790 SF 10 EA 45 EA 5 EA Assessment Date: 2/18/2013 Page 4 of 19

Public Announcement System Security System - CCTV Security System - Intrusion detection MAIN SERVICE 40,770 GRE 6 83,300 40,770 140,770 SF 83,300 SF $119,119 140,770 SF $119,119 Main Electrical service 2000 A 120/208/3PH Main Electrical service 2000 A 277/480/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Transformers 277/480-120/208 ELECTRICAL GRE 7 39 GRE 7 3 GRE 7 2 GRE 7 5 39 EA 3 EA 5 EA $119,119 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller 40,770 GRE 7 83,300 140,770 SF 83,300 SF PUMP ROOM ASSEMBLY Fire Pump 25-50hp Jockey Pump Assessment Date: 2/18/2013 Page 5 of 19

SPRINKLER SYSTEM Wet Sprinkler System FIRE PROTECTION GRE 7 83,300 83,300 SF MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Roof Mounted greater than 300 tons Condensing - Roof Mounted 5 to 10 tons AIR HANDLING SYSTEMS GRE 6 1 GRE 6 1 $100,100 $2,288 $102,388 Air Handling Package - Multi Zone - Hot Water 6,001 to 10,000 cfm Air Handling Package - Multi Zone - Hot Water 10,001 to 15,000 cfm Air Handling Package - Multi Zone - Hot Water above 30,000 cfm Air Intake - Built Up Air Handling Air intake for all Air Handling s except built up AHU Fan Coil - Electric Fan Coil - Hot Water and Chilled Water Fan Power Box With Electric Coil Fan Power Box With Hot Water Coil Multi Zone Double Delivery Built Up Air Handling - Hot Water or Dual Temperature Water 30,001 to 45,000 cfm Multi Zone Double Delivery Built Up Air Handling Auxiliaries - Hot Water or Dual Temperature Water 30,001 to 45,000 cfm Return Duct Work - Indoor - Vertical Shaft and Ducts Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor 5,000 to 10,000 CFM GRE 6 3 GRE 6 1 GRE 7 23 GRE 6 5 GRE 6 44 GRE 7 760 GRE 6 1 1 3 EA $4,290 $1,430 23 EA 5 EA $1,430 44 EA $16,988 760 LF $1,716 Assessment Date: 2/18/2013 Page 6 of 19

Return Fans - Indoor greater than 20,000 CFM Return Fans - Outdoor l0,001 to 20,000 CFM Roof Top - Single Zone - Electric 11 to 20 tons Single Zone Built Up Air Handling - Hot Water or Dual Temperature Water 4,000 to 8,000 cfm Single Zone Built Up Air Handling Auxiliaries - Hot Water or Dual Temperature Water 4,000 to 8,000 cfm Variable Air Volume (VAV) Box With Hot Water Coil BOILER SYSTEMS GRE 6 2 GRE 6 1 GRE 6 11 $6,578 $4,290 1 $3,618 $40,340 Boiler Assembly - Non-Condensing Flexible Tube Hot Water Boiler greater than 4,000 MBH Boiler Auxiliary Non-Condensing Hot Water Boiler greater than 4,000MBH Chemical Pot Feeder - Hot Water Combustion Dampers Gas Boosters Glycol Feed System GRE 7 2 GRE 7 2 GRE 6 1 1 GRE 6 2 GRE 7 2 GRE 7 2 $300 $572 $872 HEATING DEVICES Cabinet Heaters With Hot Water Coils Fin Tube Hot Water Heater - Electric Heater - Hot Water 2 GRE 7 56 GRE 6 1 8 GRE 7 5 1 56 LF 9 EA $1,430 5 EA $1,430 MECHANICAL PLUMBING Piping - Hydronic Supply and Return - Steel or Galvanized Pumps - Chilled Water 21-50 HP Pumps - Hot Water 11 to 20 HP GRE 7 2,008 GRE 6 2 GRE 6 2 2,008 LF $11,440 $5,148 Assessment Date: 2/18/2013 Page 7 of 19

Pumps - Hot Water less than 5 HP TEMPERATURE CONTROL GRE 6 3 3 EA $4,290 $20,878 Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) Zone Dampers 40,770 GRE 7 86 GRE 7 27 140,770 SF 86 EA 27 EA VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts Type II Exhaust Hood - Warming Kitchen MECHANICAL GRE 6 1 3 GRE 7 6 GRE 7 4 GRE 7 3 GRE 7 2 4 EA $1,859 6 EA 4 EA 3 EA $1,859 $167,768 PLUMBING HOT WATER Hot Water Heater - Gas 150,000-300,000 BTU/HR PIPING GRE 6 3 3 EA $12,441 $12,441 Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures 40,770 GRE 6 57,470 83,300 40,770 140,770 SF 140,770 SF $36,982 140,770 SF Assessment Date: 2/18/2013 Page 8 of 19

Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping PUMPS GRE 6 57,470 83,300 GRE 6 57,470 83,300 40,770 40,770 40,770 GRE 6 57,470 83,300 GRE 6 57,470 83,300 GRE 6 57,470 83,300 140,770 SF $26,298 140,770 SF $31,229 140,770 SF 140,770 SF 140,770 SF 140,770 SF $35,338 140,770 SF $27,120 140,770 SF $20,546 $177,513 Domestic Booster Pump duplex PLUMBING $189,954 INTERIOR ADMINISTRATIVE SUITES Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Terrazzo Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile GRE 7 3,538 GRE 6 1,077 730 GRE 7 2,478 GRE 6 1,075 58 45 GRE 6 407 325 1,015 GRE 6 23 38 GRE 6 6 16 GRE 7 2,939 GRE 6 3,929 2,519 GRE 7 608 3,538 SF 1,807 SF $3,049 2,478 SF 1,133 SF $5,073 145 SF 1,747 SF $2,770 61 SF $16 22 SF $4 2,939 SF 6,448 SF $9,270 608 SF $20,183 Assessment Date: 2/18/2013 Page 9 of 19

AUDITORIUM - DEDICATED Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System GRE 6 95 GRE 6 295 GRE 7 4 95 EA $3,497 295 EA $10,858 4 EA $14,355 DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Transom Window GRE 6 62 29 GRE 6 27 36 40 48 98 GRE 6 690 9 $17,555 15 $114,955 198 SF 690 SF $12,827 $145,337 DRINKING FOUNTAINS Single Water Cooler GRE 7 6 6 EA GYMNASIUM / AUDITORIUM Ceiling - Plaster/Drywall Flooring - Wood Lighting - Metal Halide/Sodium Vapor Scoreboards Walls - Plaster/Drywall GRE 7 3,145 GRE 6 3,145 GRE 6 12 GRE 7 3,648 3,145 SF 3,145 SF $23,746 1 $2,145 3,648 SF $25,891 Assessment Date: 2/18/2013 Page 10 of 19

KITCHEN Ceiling - Lay-In Flooring - Concrete Lighting - Lay-In Wall - Concrete Block,200,200 8,216 1,200 SF 1,200 SF 18 SF 1,216 SF LIBRARY Flooring Carpet Lighting - Lay-In GRE 7 2,998 GRE 7 36 2,998 SF 36 SF LOCKER/SHOWER ROOM Benches Lockers Showers 24 GRE 7 34 124 LF 34 EA LUNCHROOM Ceiling - Exposed Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Serving Line Wall - Concrete Block Wall - Plaster/Drywall GRE 7 4,131 GRE 7 2,149 GRE 7 5,749 GRE 7 33 GRE 7 60 GRE 7 9,753 GRE 6 340 4,131 SF 2,149 SF 5,749 SF 33 SF 60 LF 9,753 SF 340 SF $802 $802 Assessment Date: 2/18/2013 Page 11 of 19

MDF/IDF Finishes Ventilation and Cooling GRE 7 235 235 SF MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room,125 GRE 6 7 4 GRE 6 57 11,663 GRE 7 4,384 1,125 SF 11 SF $33 11,720 SF $269 4,384 SF $302 STAFF RESTROOM Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile GRE 6 1,329 4,163 GRE 6 70 742 GRE 6 1,868 2,925 GRE 6 16 15 GRE 7 40 GRE 7 5,487 GRE 6 34 2,400 GRE 7 26 GRE 7 61 GRE 7 74 GRE 6 1 32 GRE 7 54 GRE 7 34 GRE 6 845 1,110 GRE 6 3,340 1,352 GRE 6 365 3,805 5,492 SF $10,263 812 SF $150 4,793 SF $5,289 3 $4,805 40 SF 5,487 SF 2,434 SF $49 26 EA 6 74 SF 33 SF $1 54 EA 34 EA 1,955 SF $2,417 4,692 SF $7,881 4,170 SF $2,610 Assessment Date: 2/18/2013 Page 12 of 19

Wall - Tile Ceramic/ Porcelain Water Closet THEATER,275 GRE 7 71 1,275 SF 7 $33,463 Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Wood Lighting - Chandelier, Incandescent Lighting - Pendant/ Surface Lighting - Wall Mounted Stage Wall - Plaster/Drywall GRE 6 4,205 GRE 6 1,660 GRE 7 2,105 GRE 6 9 GRE 6 4 6 0 GRE 7 440 GRE 6 4,327 4,205 SF $35,959 1,660 SF $2,374 2,105 SF 9 EA $2,896 10 SF $30 10 EA 440 SF 4,327 SF $37,126 $78,384 VOCATIONAL SHOP Work Sink INTERIOR GRE 6 2 11 13 EA $772 $772 $319,489 ROOM ADMIN_CEILING Administrative Office Ceiling ADMIN_WALL GRE 6 158 158 SF $447 $447 Administrative Office Walls GRE 7 2,075 2,075 SF Assessment Date: 2/18/2013 Page 13 of 19

CASEWORK Casework GRE 6 66 591 657 LF $2,360 $2,360 CEILING Lay-In/Drop Plaster/Drywall GRE 6 1,430 23,024 GRE 6 3,737 9,424 24,454 SF $3,067 13,161 SF $10,581 $13,648 CHALK BOARD Chalk Board YEL 4 685 685 LF $83,262 $83,262 CORRIDORS Asphalt Concrete Block Concrete Epoxy/Painted Drop/Lay-In Floors Lay-In Pendant/Surface Plaster/Drywall Single Water Cooler Stair Handrails Structural Glazed Tile Student Lockers Terrazzo Tile Ceramic/Porcelain GRE 6 214 GRE 7 7,723 GRE 6 3,697 4,760 GRE 6 100 892 8,765 2,083 GRE 6 29,262 GRE 6 1 22 GRE 6 80 872 8,786 GRE 7 284 8,767 GRE 7 550 214 SF $306 7,723 SF 3,697 SF $17,446 14,760 SF 992 SF $755 18,765 EA 12,083 EA 29,262 SF $69,044 23 EA $615 952 LF 18,786 SF 284 EA 18,767 SF 550 SF Assessment Date: 2/18/2013 Page 14 of 19

Tile/Sheet Flooring Wall Mounted Walls CORRIDORS CEILING GRE 6 9,372 74 GRE 7 5,652 GRE 6 6,130 6,025 9,446 SF $13,402 5,65 12,155 SF $14,464 $116,031 Plaster/Drywall GRE 6 15,447 4,219 19,666 SF $43,737 $43,737 FLOOR Carpet Tile/Sheet Wood GRE 7 410 GRE 7 24,507 2,698 410 SF 24,507 SF 12,698 SF LIBRARY_CEILING Drop/Lay-In GRE 7 2,998 2,998 SF LIBRARY_LIGHTING Library Lighting GRE 7 23 23 EA LIBRARY_WALL Structural Glazed Tile GRE 7 2,609 2,609 SF Assessment Date: 2/18/2013 Page 15 of 19

LIGHTING Lay-In Lighting Pendant/Surface GRE 7 301 3 GRE 6 18 200 30 13 EA 218 EA $7,079 $7,079 LUNCH_FLOOR Lunchroom Floor GRE 7 306 306 SF LUNCH_LIGHT Lunchroom Lighting GRE 7 20 20 EA MARKER BOARD Marker Board GRE 6 18 570 588 LF $2,188 $2,188 RESTROOM_FLOOR Restroom Floor GRE 7 44 44 SF RESTROOM_LIGHT Restroom Lighting GRE 7 21 2 Assessment Date: 2/18/2013 Page 16 of 19

RESTROOM_WALL Restroom Walls GRE 6 3,121 838 3,959 SF $7,944 $7,944 STAIRS Asphalt Terrazzo Tile GRE 7 26 81 GRE 6 395 26 SF 181 SF 395 SF $2,982 $2,982 THEATER_WALL Auditorium Walls,970 1,970 SF WALL Concrete Block Plaster/Drywall Wall ROOM GRE 7 29,503 GRE 6 1,283 15,030 6,590 GRE 6 1,088 29,503 SF 22,903 SF $41,518 1,088 SF $2,567 $44,085 $323,763 SITE ATHLETIC Running Track Asphalt GRE 7 5,500 5,500 SF Assessment Date: 2/18/2013 Page 17 of 19

CIVIL/DRAINAGE Catch Basin Site Manhole 6 GRE 7 24 16 EA 24 EA FENCING Chain Link Ornamental Iron Wood Fencing w/ Steel Frame GRE 7 86 GRE 6 1,560 1 86 LF 1,560 LF $29,447 11 LF $29,447 LANDSCAPE Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas GRE 6 12,700 25,265 GRE 7 26,869 GRE 7 49 GRE 7 3,985 37,965 SF $16,527 26,869 SF 49 EA 3,985 SF $16,527 PARKING LOT Asphalt Concrete Curbs Parking lot interior plantings Trash Compactor Trash Enclosure Vehicular Screening GRE 6 30,835,335 GRE 7 4 GRE 7 520 GRE 7 485 30,835 SF $26,456 1,335 LF 4 LF 520 SF 485 LF $26,456 Assessment Date: 2/18/2013 Page 18 of 19

PLAYGROUND Playground Equipment - Combo 3-12 Playground Surfacing - Poured Surface GRE 6 1,470 1,470 SF SIDEWALKS Internal Walks Perimeter Sidewalks 15 3,820 115 LF 13,820 SF SIGNAGE Flag Pole Monument Sign - Lighted SITE Campus Need ² ³ $72,430 $1,611,867 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 2/18/2013 Page 19 of 19