Busbar and Modular Wiring Systems

2.14 Main Cable Type HO7RN-F4G10-15 Metres each Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type

SECTION ELECTRICAL IDENTIFICATION

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

Distribution transformers Part 2 Ground mounted transformers not closecoupled

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

MANUFACTURING GUIDELINES FOR PLC (LEVEL-1 AUTOMATION)

50-SDMS-01 SPECIFICATIONS FOR

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

Construction Measurement III SBQ3314. Electrical Installations : Single & Three Phase. Dr. Sarajul Fikri Mohamed

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

SECTION PANELBOARDS

Plant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2

Wanco Electric & Machinery Pte Ltd. Cable Management Systems. Cable Trunking

5/2 Introduction. Unequipped Distribution Boards 5/4 Modular distribution boards 5/5 Add-on parts

INTRODUCTION NUHAS OMAN QUALITY & RELIABILITY.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

Risk Assessment & Safe Working Practice

ZUCCHINI MS - LOW TO MEDIUM POWER BUSBAR

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

SAUDI COMMITTEE FOR PALESTINIAN RELEIF

Testing Manual for Electrical Equipment

ELECTRICAL RISER & DISTRIBUTION. Co-X/FMD/SOP06

Section five. Connection systems. Isobar 4 Evo MCB pan assemblies Mulitclip busbar and Polybloc 126. Comb busbars 127

36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Low Voltage Products. Enclosed Third Harmonic Filter THF and THF star Enclosed units. Brochure THFS1GB 03_04 1SCC330003C0201

B. Manufacturers: Square-D, G.E. or Westinghosue.

11-SDMS-03 REV. 02 SPECIFICATIONS FOR

General Requirements. Technical Specification LVAC Systems

TECHNICAL SPECIFICATION OF ELECTRICAL MATERIALS CT & PT GROUP C

SECTION CABLE TRAYS

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

MESP TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER TRANSFORMER

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Reference Number PPS 05 - (RIC Standard: EP SP)

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes

MISTRAL SYSTEM IMPACT 2

Wisconsin Contractors Institute Continuing Education

CONTINUING EDUC ATION

Technical Specification. for 1.1 KV Copper Control Cable

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation

METRIC LIGHTNING PROTECTION PRODUCTS

CABLE TRAYS & STRUTS CATALOUGE

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

Collection of standards in electronic format (PDF) 1. Copyright

Page Electric Utility Service Specifications

4/2 Introduction. Marshaling Boxes 4/8 8GK1 surface-mounting distribution boards

KENYA ELECTRICITY GENERATING COMPANY LTD

AL AQTAAR AL ARBAAH EST. COMPANY PROFILE. Panel Boards, Substation, Instrumentation, Automation.

ELECTRICAL WORKS PART 1 - GENERAL 1.01 SCOPE OF WORK

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL

, Power Industries and Communications Industry Training Board

CDV 22, 62. Voltage Controlled Overcurrent Relay GRID PROTECTION

POTENTIAL TRANSFORMER

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

Isolating Spark Gaps. Isolating spark gaps at an additional earth ring conductor. Isolating spark gaps for Ex zones

Types CDG 11 and CDG 16 Inverse Time Overcurrent and Earth Fault Relay

those activities and considerations associated with the design, installation and

MinorWorks/Single Circuit Electrical Certificate

IBAR (EMEA) LIMITED Castle Mills Aynam Road Kendal Cumbria LA9 7DE UK YEARS+ Established. t. +44 (0) e.

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

SECTION LIGHTING PART 1- GENERAL

DPX TM MCCBs LP* Description Cat. nos. ` / Pack Unit

T-Line, current transformers

TT W Wireless receiver Inline Switch

SECTION EQUIPMENT WIRING

SPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Grounding and Bonding of Service Equipment

Residential Construction Checklist Single and Two Family Construction

ECP GROUND-MOUNTED SWITCHGEAR WITH PROTECTION RELAYS COMMISSIONING PROCEDURE

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

JULY Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

Siemens AG Safe and Flexible Power Distribution in the Automotive Industry SIVACON. Answers for industry.

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

FAQ ON EARTHING STANDARDS 16/08/2018

Electrak Lightrak KNX Proprietary lighting control

Licensed Electricians Practical Assessment (LEP)

ER 87 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes. (1 mark) ESR 27(2) (2 marks) ESR 74A(1AA)

SECTION DISTRIBUTION SWITCHBOARDS

50 YEARS+ A brand of the. IBAR (EMEA) LIMITED Castle Mills Aynam Road Kendal Cumbria LA9 7DE UK

INSTALLATION WARNING: BEFORE COMMENCING INSTALLATION ISOLATE YOUR MAINS ELECTRIC SUPPLY

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Notes 3 Explanatory Information 4-10

VOLUME - 4 (GENERAL TECHNICAL SPECIFICATIONS)

Smart Power Relay E I...

TN, TT & IT Earthing Arrangements

Licensed Electricians Practical Assessment (LEP)

SECTION DISTRIBUTION SWITCHBOARDS

.1 Provide dry type cast-resin 11kV/0.420kV transformers in accordance with the Contract Documents.

Transcription:

PROJECT: SUPPLY & INSTALL ELECTRICAL SWITCHBOARD AT SENGKURONG EXCHANGE PHASE 1, JLN TUTONG, BSB. SCOPE OF WORK The scope of work under Electrical Services shall include but not limited to the supply, delivery to site, installation, testing, commissioning and maintenance (during Defects Liability Period) of the whole Work as described in this Specification and Bills of Quantity, and as depicted in the Drawings. The Work shall comprise: supply and install switchboard equipment including earthing to DES requirement electrical switchboards, sub-switchboards and distribution boards, All submains cable inclusive of excavation, cable ladder, cable tray, cable trunking, pipe sleeves, support and all accessories. All final sub circuits inclusive of all trunking, conduits, support and other accessories. All necessary cutting and hacking work including making good thereafter. Earthing for the whole electrical installation The contractor shall deliver to the owner a complete working system/s described above including all minor and incidental items necessary for the proper functioning of the whole system, even though not specifically detailed or mentioned in the quotation /contract document. Tender price shall include allowance for such items and any exchange, duty, tax, excise and levy on material and labour. L.V. MAIN SWITCHBOARD 1 General Requirements Factory built assembly to BS 5486. Protective standard IP 54 to BS 5420, including the base plate. Floor mounted type, with front access to all equipment including cable termination. All components shall be suitable for indoor use under tropical conditions. Drawings Refer to clause SHOP DRAWINGS Submit the following drawings to the Engineer for review. Details of the base support arrangement showing the necessary support steelwork as described above. This drawing shall be submitted for review in time for any work required to be cast into the switch room slab. Detailed drawing showing the type, arrangement, actual dimensions and assembly of the switchboard. To be submitted for review prior to fabrication. A neat "AS FITTED" drawing showing the schematic wiring diagram of the switchboard arrangement. The drawing is to be framed and displayed in the main switch room. EARTH FAULT & OVERCURRENT PROTECTION 1 Over-current Relay Triple pole type in a single casing. For IDMT induction disc type relays, graded tap range shall be 50-200% of 5A, with 7 plug tappings at 2.5, 3.0, 3.75, 5.0, 6.0, 7.5, and 10A. Time setting adjustable from 0-1.3 seconds at 10 times the current setting. Page 1 of 3

PROJECT: SUPPLY & INSTALL ELECTRICAL SWITCHBOARD AT SENGKURONG EXCHANGE PHASE 1, JLN TUTONG, BSB. 2 Earth Fault Relay Single pole type. Graded tap range 10-40% of 5A, with 7 plug tappings at 0.5, 0.6, 0.75, 1.0, 1.2, 1.5 and 2.0A. Time setting adjustable from 0-3 seconds at 10 times the current setting. 3 DPM Alarm notification by e-mail Real time viewing of data Diagnostic via predefined web pages Web server DISTRIBUTION BOARDS General Wall mounted, dead front, totally enclosed, vermin proof front connected type to BS 5486 or IEC 60439-3 and protection category IP30 for all live parts. Isolators shall comply with BS 5419. Enclosure manufactured from 16 SWG galvanised mild steel sheet, finished in stoved semi gloss to BS 2660. Thickness of the finish shall be minimum 20 microns. Conduit knock-outs shall be provided at both top and bottom cover plates with an incoming 50mm knock-out. The cover shall have openings for access to the MCCBs, MCBs, ELCBs or fuses. These openings shall have slots to accept blanking plates. Fit circuit identification labels on the cover, and a circuit identification diagram inside the cover. Bus-bars shall be tinned or nickel plated copper, rated at a minimum of 100A, with incoming cable termination capacity of up to 50mm sq. Main earth terminal clamp shall be fitted inside the enclosure and a multi-terminal bar shall be provided for circuit protective conductors of at least equal capacity to the line conductors. Clip-on mounting rails shall be provided for mounting the MCCB, MCB. Multi-pole distribution boards shall have busbar arrangement presenting 1 or 2 banks of MCBs of mix combinations of 1P, 2P or 3P types, as indicated on the line diagrams. Single phase consumer units shall accept combinations of 1P and 2P MCB's and have busbars in horizontal arrangement. Distribution boards shall have maximum depth of 200mm. MCCB (or MCB) shall comply with BS 3871 or IEC 60898, HRC fuses shall be to BS 88 or relevant parts of IEC 60269. Ensure that the distribution boards can fit in the spaces provided. Cable Termination Cable termination shall be carried out by experienced cable jointers using as far as possible original manufactured components of the cable suppliers. Page 2 of 3

PROJECT: SUPPLY & INSTALL ELECTRICAL SWITCHBOARD AT SENGKURONG EXCHANGE PHASE 1, JLN TUTONG, BSB. Crossing Where the cables cross pipes and cables of other services, provide heavy duty G.I. or PVC sleeves at the crossing. Sleeves shall extend 1000mm beyond the services crossed. Cables shall be 300mm clear and above the crossed services. MAIN EARTHING SYSTEM 1 General The scope shall include supply, install and connect the main earthing system comprising, but not limited to the following: Distribution Board main earthing bar. Interconnecting conductors between main and sub-earthing bars. Interconnecting tapes or cables between main earthing bar and earthing electrodes. Earthing electrodes complete with approved earth chamber and heavy-duty cover. Interconnecting copper tapes between earth electrodes, to be connected in a ring circuit. Earthing conductors from electrical equipment, including cables lugs, sheath and support brackets, to the relevant earthing bars. Earthing shall comply strictly to latest IEE Regulations, the requirements of DES Brunei and this specification. Testing and Commissioning The contractor shall be responsible for the testing of the switchboard and certifying that it safe and that all the equipment complies with the requirements of this specification. Generally, such tests shall include: Demonstration that all equipment is installed and all wiring connected so that the board functions as required. Tests of accuracy of all measuring instruments. Continuity, phasing out and insulating resistance testing. Protective equipment testing. Testing & Commissioning for the all electrical switchboard approved by qualified engineer register by MOD. Any other tests required by the Department of Electrical Services. All the above tests shall be performed in the manufacturer's factory. Allow the cost of two Engineer's representatives to witness the tests. Provide all certification required by the Department of Electrical Services, to ensure connection of supply. Note: Please be informed that participants are required to conduct site survey at Sengkurong Exchange on 9 th March, 2018 at 9:00 am to 10:30 am. Conducting SITE SURVEY is mandatory and failure to do so will be excluded from participating this project. For further enquiries regarding the above requirements, kindly contact: (i) Abang Muhd Aisar bin Abang Hj Zainuddin (aisar.zainuddin@telbru.com.bn) or (ii) Nurezzah Istikhomah Zakeria (nurezzah.zakeria@telbru.com.bn) Page 3 of 3

" " " B ISSUE FOR QUOTATION Dec. 2017 A DESIGN APPROVAL - STAGE 1 Dec. 2017 NO. DESCRIPTION DATE DWN CHKD APPD REVISIONS (A: Prelim/Detailed Design; B: Tender/Costing; C: Construction) DESIGNED Dec. 2017 CLIENT VOTE No. XXX DRAWN CHECKED OM APPROVED CONTRACTOR. PROJ. NO.: XXX -------- CLIENT: PROJECT: CONTRACTOR: TelBru Berhad UPGRADING FOR ELECTRICAL SWITCHBOARD AT SENGKURONG EXCHANGE, PHASE 1 JLN TUTONG, BSB. DRAWING TITLE: SSB-SUB SWITCHBOARD(NEW) SENGKURONG EXCHANGE SCALE: REVISIONS: DRAWING No. AS SHOWN A E-001

" " " B ISSUE FOR QUOTATION Dec. 2017 A DESIGN APPROVAL - STAGE 1 Dec. 2017 NO. DESCRIPTION DATE DWN CHKD APPD REVISIONS (A: Prelim/Detailed Design; B: Tender/Costing; C: Construction) DESIGNED Dec. 2017 CLIENT VOTE No. XXX DRAWN CHECKED OM APPROVED CONTRACTOR. PROJ. NO.: XXX -------- CLIENT: PROJECT: CONTRACTOR: TelBru Berhad UPGRADING FOR ELECTRICAL SWITCHBOARD AT SENGKURONG EXCHANGE, PHASE 1 JLN TUTONG, BSB. DRAWING TITLE: SSB-SUB SWITCHBOARD(NEW) SENGKURONG EXCHANGE, SCALE: REVISIONS: DRAWING No. AS SHOWN A E-002