KO LO SH E LT E R. High Capacity and Flexibility

Similar documents
KOLO SHELTER Installation Instructions Parts List

CYCL E STAT IO N. High Capacity

Safe and secure Dero

Next Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.

DERO BIKE LOCKER 33. Maximum Security

STRATUS SHELTER. Take bike parking to new heights

Secure Bike Parking. Patent Pending Dero

TO O L K IT. Public Bike Repair

ULT R A SPAC E SAV E R

Pocket Shelter. Covered bike parking earns your site LEED credits.

ULT R A S PACE SAV E R SQ UA R E D

S W E RV E RAC K. Simple Security. Simple Stability.

Bike Locker Model DBL1 & DBL2

H O O P RAC K. Simple Security

AIR KIT 3. Heavy-Duty Public Bike Pump

Today s Service Station

H O O P RAC K. Simple Security

Today s Service Station

Downtown Rack. Custom logo option available

Swerve Rack CUSTOM RACKS AVAILABLE

ULTRA SPACE SAVER Installation Instructions

ULTRA SPACE SAVER SQUARED Installation Instructions

Track Rack. * Track Racks are not lockable

SADDLE BUDDY EASY ASSEMBLY. The Saddle Buddy is easy to install Galvanized Surface In-Ground. Rail.

Ultra Space Saver American Bicycle Security Company

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

BIKE FILE (301)

HOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero

96 (Standard Length)

Allow 60 from door face

Independent Containment System (ICS)

AUXILIARY FRAMING AND ACCESSORIES

Connect Transit Shelter

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

Leveling Feet, Base Plates and Casters

BIKE DEPOT Parts List B UPRIGHT BACK WELDMENT B (12) 1/4 SELF-DRILL SCREWS (4) 1/2 BOLTS TRUSS WELDMENT C

CSS Central Mount System

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER

Double Beam Freestanding Pergola Installation Guide

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:

May 14, Installation Manual

PRODUCT INFORMATION Dero Space Saver Bike Racks

New Product Release: October 2014 Boone Racks

RELINER INSIDE DROP SYSTEM SPECIFICATIONS

INDEX PAGE RELEASE SECTION NUMBER DATE

TYPE J (20 FT - 40 FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" NOTE: sheet 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.

ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER

Dura-Lock Roof System

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

(50 FT FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" 8-0" 6-0" Truss Depth. 3" sheets 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.

INSTALLATION INSTRUCTIONS 10' WIDE FRAME FRAME SIZE: 10 X 18 X 7 (2 SQUARE TUBING) STORAGE SHELTER / CARPORT

Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

DOCK WEDGE - STANDARD

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER #

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

GENERAL ISOMETRIC LAYOUT

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

Tools Needed. 8 per column: stainless steel or hot-dipped galvanized bolts. Mallet

INSTALLATION INSTRUCTIONS FOR SL-LB MANUAL LIFT BARRIER GATE ARMS

INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

LAS VEGAS PATIO COVER INSTALLATION INTSRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

ALL SEASON PATIO COVER

UP139 CRUISE-A-LONG (STANDARD) NATURAL COATED DECK COATED RAMP DESCRIPTION SQUIRREL PANEL BACK WALL CLEAR BUBBLE CRUISE RAIL SQUARE SPIRAL WHEEL 90 AN

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

TREX PERGOLA INSTALLATION INSTRUCTIONS

ROUND STEEL POLE STRAIGHT

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

RIDGE MAST MOUNT (RMM)

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,

10 x 10 Flat Top Two Tone Pergola

UP133 CRAWL & TODDLE (STANDARD) NATURAL COATED DECK COATED RAMP FRONT WALL BACK WALL DESCRIPTION COATED STEPS 90 ANGLE BRACKET LEFT WALL RIGHT WALL CL

INSTALLATION INSTRUCTIONS 12' x 18' x 7' FRAME (12 x 20 x 7 ROOF COVERAGE) 2 SQUARE CARPORT

BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS

Titan Series Awning Assembly and Installation Instructions

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

12x12 Pavilion. Assembly Manual

installation guide 1 GUIDE#: pwb-assault-004

WHITE - Accessories. Series 500 Greenhouse Kit w/blackout System, Ventilation & Evaporative Cooling

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT

Large Diameter Tapcon

TABLE OF CONTENTS REQUIRED TOOLS

1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.

installation guide 1 GUIDE#: pwb-assault-001

Straight Stringer Installation Instructions

INSTALLATION, ASSEMBLY & OPERATIONAL MANUAL

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Installation Instruction

2.0 INSTALLATION PROCEDURE. 2.1 Open the Speaker Post. 2.2 Install the Speaker and Microphone Grills. Figure 2. SPP2 rear view

OVERVIEW You are installing 2 Major components: SITE PREP Remove organics

Installation Instructions for Bike Fixtation Public Work Stand and Floor Pump Manual RevH

SolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List

Recommended Tools: Before You Begin:

Transcription:

KO LO SH E LT E R High Capacity and Flexibility The unique styling of our redesigned Dero Kolo Shelter will help beautify your facility and provide secure, covered bike parking for cyclists. The Kolo is designed to accommodate a variety of bike parking options, including vertical and two-tiered arrangements, to best suit your needs. Modular construction makes the Dero Kolo Shelter a flexible choice for your bike parking project.

Easy to expand on The modular design of the Kolo Shelter allows you to expand as necessary to meet your bike parking capacity needs Galvanized FINISH OPTIONS Powder Coat SOLAR POWERED LIGHTING AVAILABLE White Black Light Gray RAL 7042 Deep Red RAL 3003 Yellow RAL 1023 CNH Bright Yellow Orange RAL 2004 Blue RAL 5005 Sky Blue RAL 5015 Hunter Green RAL 6005 Light Green RAL 6018 Green RAL 6016 Sepia Brown RAL 8014 Bronze Silver 9007 Dark Purple Flat Black Wine Red RAL 3005 Beige RAL 1001 Iron Gray 7011

Submittal Sheet 185 CAPACITY Varies per configuration 135 MATERIALS Uprights: 6 x1/4 square tube Center member: 6 x1/4 square tube, C6 channel Feet: 1/2 plate Rafter: 3/16 plate Roof Panels: ½ UV resistant polycarbonate` FINISHES Galvanized An after fabrication hot dipped galvanized finish is our standard option. 250 TGIC powder coat colors, thermoplastic coating, PVC dip, and thermoplastic finishes are also available as alternate options. Campus Rack Capacity by shelter length Short: 5 Bikes Medium: 9 Bikes Long: 11 Bikes MOUNT OPTIONS Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sandblast 2. Epoxy primer electrostatically applied 3. Final thick TGIC polyester powder coat Surface It is the responsibility of the installer to ensure that all base materials into which the shelter will be installed can support the rack and will not be damaged by any required installation procedures. See structural drawings for details. Dero Deckers Capacity by shelter length Short: 14 Bikes Medium: 22 Bikes Long: 30 Bikes LOAD DATA LIGHTING Dead load = self weight of structure Live load = 40 psf Wind load = 90 mph exposure B Seismic load = Moderate Footing: see page 4 Anchor bolt = 3/4 dimater x 14.625 Simpson Torq-Cut wedge anchor Solar powered lights are available for an additional charge Ultra Space Saver Capacity by shelter length Short: 6-9 Bikes Medium: 12-18 Bikes Long: 16-24 Bikes Dero Shelters can be used in a modular fashion (shared uprights) however, when used in this manner, please consult a Dero Bike Rack sales associate for layout, as the rack spacing and bike capacity can change!

Installation Instructions Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14 Bolt.625 x 1.5 Self Drilling Screw.25 x 1

Installation Instructions Footing Details GENERAL STRUCTURAL NOTES: 1. FOOTING CONCRETE STRENGTH = 3000 PSI 2. REBAR STRENGTH = 60 KSI (ASTM A615, GRADE 60) 3. THREADED RODS = 36 KSI (ASTM F1554, GRADE 36) 4. ADHESIVE = SIMPSON SET 3G. NOTE THAT SPECIAL INSPECTION OF BOLT INSTALLATION IS REQUIRED PER IBC 2015. 5. FOOTING SHALL BE PLACE ON WELL COMPACTED AND FREE DRAINING SOIL. 6. DESIGN PER IBC 2015, RISK CATEGORY 1 SNOW: 60 PSF GROUND SNOW WIND: 105 MPH, EXP. B SEISMIC: DESIGN CATEGORY A-C KOLO (SHORT) KOLO (MEDIUM) KOLO (LONG).875 HOLES FOR (4).75 DIA. THREADED RODS (ASTM F1554, GRADE 36) WITH SIMPSON SET-3G ADHESIVE (12.00 EMBED) DRILL HOLES AT INSTALLATION 7-#5 X 5 3 @ BOTTOM OF FOOTING EACH WAY (3 CLR) 4-6 3000 PSI CONCRETE SLAB W/ #4 @18 OC EACH WAY CENTERED IN SLAB 16 THICK 3000 PSI CONCRETE INSIDE LINES 12 x 12 x 5/8 BASE PLATE W/ (4).75 DIA. THREADED RODS (ASTM F1554, GRADE 36) WITH SIMPSON SET-3G ADHESIVE (12.00 EMBED) AT EACH COLUMN TUBE STEEL COLUMN SEE SHELTER ASSEMBLY DRAWINGS STIFFENER PLATES PER SHELTER ASSEMBLY DRAWINGS 1.50 TYP. FOOTING = 16 MIN

Installation Instructions TOOLS NEEDED Tape Measure Marker or chalk Level Sledge Hammer Rubber Mallet Large Hammer Drill Standard Drill 3/8 Socket with drill attachment 7/8 Diameter Masonry Bit 3/4 Wrench/Socket 15/16 Wrench/Socket (2) 1 1/8 Wrench/Socket 1 1/4 Wrench Spud Wrench 1 Place Uprights based on footing diagram and drill (4) 1/2 diameter pilot holes in concrete 13 deep for each Upright. Remove Upright and use pilot holes to drill 7/8 diameter holes 13 deep. Arrange special inspection of anchor holes and anchor/epoxy installation per IBC 2012. Consult Simpson Set 3G epoxy instructions for further detail. After inspection a sufficient epoxy cure time, the Uprights may be placed over the threaded rod and secured with washers and nuts finger-tight. 2 Lift the Center in place and fasten finger-tight with (8) 5/8x7.5 bolts, lock washers and nuts.

Installation Instructions 3 If building a Kolo shelter with Dero Decker racks, lift the Dero Decker Beam in place and fasten with (8) 5/8x7.5 bolts, lock washers and nuts. 4 If building a Kolo shelter with Dero Campus Racks, lift the Campus Rack in place and fasten with (8) 5/8x7.5 bolts, lock washers and nuts 5 6 If building a modular system of Kolo shelters, continue to place and fasten Uprights, Center Weldments, and Dero Decker Beams/Campus Racks. Fully tighten all above bolts and nuts. Then tighten Simpson Torq-Cut anchor nuts to 240 ft-lbs.

Installation Instructions 7 Center of Gravity Notch Apply foam rubber tape to the Rafter without covering.30 holes. Working from one end of the shelter to the other, lift a Rafter into place using a lifting strap. Secure the lifting strap at the rafter s center of gravity which is indicated by a notch at the apex of the Rafter cut-out. Once the Rafter is in place, fasten the rafter to the Upright with (2) 5/8x1.5 bolts, (4) lock washers, and (2) nuts using the two upper-most holes. Continue to fasten all remaining Rafters with the above method. 8 Fully secure the Rafters with (6) 5/8x7.5 bolts, (12) lock washers, and (6) nuts for each pair of Rafters

Installation Instructions 9 Polycarbonate Polycarbonate Drop Polycarbonate Edge Polycarbonate Flange Polycarbonate Rafter Apply foam rubber tape to the Polycarbonate Flange without covering.20 holes. Place (1) Polycarbonate Drop, (1) Polycarbonate, (1) Polycarbonate Edge in place. Make sure the Polycarbonate Drop is flush with the outside edge of the Rafter and that the Polycarbonate is centered between both Rafters. Use care to not scratch the Polycarbonate. Using the 16 holes in the Polycarbonate Flange and 16 holes in the Rafter, align the Polycarbonate Flange over the Rafter so that the Polycarbonate and Polycarbonate Drop are sandwiched between them. Starting at the holes furthest from the shelter center, secure the Polycarbonate Flange with (16) 1/4x1.5 self-drilling screws. It s recommended that the assembly be clamped together while fastening the first two screws. The self-drilling screws will pass through the Rafter, drill through the Polycarbonate, and tap through the Polycarbonate flange.

Installation Instructions 10 Continue installing the remaining Polycarbonates, Polycarbonate Drops, Polycarbonate Edges, and Polycarbonate Flanges. 11 Place the Roof Cap on top of the shelter and secure with (2) ¼ x6.5 bolts, (4) washers, and (2) lock nuts. Do not over-tighten to avoid bowing of the Roof Cap. 12 If installing Dero Decker bike racks, see Dero Decker instructions.