WRS Artificial Lift System

Similar documents
Wellhead Control Products, Inc. Hangers

Multi-Bowl Applications

Cameron MBO Multi-Bowl Wellhead System

General Four-Way Operation, Maintenance & Service Manual

Assembly Instructions

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool

Plumbing Part II - Hand Pump

PORTABLE PULL TESTER

M-5 PRO CORE BORE PARTS LIST DRILLING MACHINE. (March 2017) Part #

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

Operating Instructions

Fiber Splice Box (FSB-D) Installation Instructions

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring

Shetland Stalls Installation Instructions

MODEL D DIESEL PILE HAMMER

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

Dublin Stalls Installation Instructions

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27B

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5

Installation Instructions for Vista Air Vertically Folding Walls

Diesel Pile Hammer D30-32 Part # 66508

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" SLIDING COMPOUND MITER SAW

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

Tools Required For Servicing: Needle Nose Pliers

DIAMOND CONCRETE SAW PARTS LIST MODEL CC1113-XL P R O D U C T S. June Part #

Signal Mirror Installation Instructions

Heidrun Inverted Gas Lift System

Sole Fitness E95 Elliptical Trainer TurnKey Delivery and Setup Training

Serial Number Location

SUPER PRO GUN & SUPER PRO GUN II

The GAK using Ziv s GAK in the box

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2

Parts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG)

Diesel Hammer Model D19-42 Part #

Manufacturing Sun Cartridge Cavities

BL-ER-P Ethernet Radio Unit for Pedestal Installation Guide

LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD

HANDWHEEL ASSEMBLY UPGRADE

PAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder

Main Components. Pipe and Bolt Threading Machine 300/300A. Early Style. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

Assembly Instructions Nevins Phone Booth

CATALOG OF REPLACEMENT PARTS

Wellhead equipment CATALOG

Click Here to Go Back

ATTACH WALL PLATE TO WALL

Optical Cable Entry Facility (OCEF) Installation Instructions

Hardened Structures Hardened Shelters, LLC. Explosion Resistant Pre-hung Sealed Blast Door

B-Too Drilling and Tapping Machine Instruction and Maintenance Manual

PRINT MAY BE REDUCED - DO NOT SCALE. No Compression Load on Ceiling Possible Lateral Load of 8kg 2 Fixed Pins in Shear with Ceiling

NEWLONG. r PORTABLE FILLED BAG CLOSING MACHINE NEWLONG MACHINE WORKS, LTD.

00278 R1 AXLE, FOR 1-1/8" FREE WHEEL HUBS

Mechanical Frappe Press

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

COYOTE Terminal Closure (Single Chamber) Hermetically Sealed With Hardened Adapters

Bi-Color Signal Mirror Installation Instructions

OXYGEN INSTALLATION. Revision date

Assembly Instructions

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S)

Signal Mirror Installation Instructions Honda Odyssey

CONCRETE SAW PARTS LIST

INSTALLATION INSTRUCTIONS

Ruby 0-4-0T Kit Assembly Instructions

BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

Installation/Care/Use Manual Soft Sides Freeze Resistant Fountain

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

PFT CABLE GYM INSTRUCTION MANUAL

MIL-STD B (SH) UPDATE

ROLL-A-GLIDE INSULATED ROLLER DOOR

SECTION 9.0 MAINTENANCE

OPERATOR S MANUAL MAINTENANCE MANUAL PARTS LIST TURFCO. 60 Inch Seeder. Product Number Starting Serial Number H00801 PATENT PENDING

Model No: TC10. Parts Information: Tyre Changer - Automatic

QB78 CO 2 Pellet Rifle

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V5.0

Tooling Approving Report

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF

CLASSIC 300D Kubota PARTS LIST FOR RETURN TO MAIN INDEX

Clearview Railing System Installation Instructions

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105

OWNERS MANUAL. Model No LB. POLY PRO SPIKER/SPREADER. CAUTION: Read Rules for Safe Operation and Instructions Carefully

Tech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer

D300K 3+3 SE KUBOTA PARTS LIST FOR RETURN TO MAIN INDEX

Assembly Instructions Nevins Phone Booth

INSTALLATION INSTRUCTIONS

MUELLER GAS. DH-5/EH-5 Drilling. Reliable Connections. DH-5 Drilling Machine General Information 2. EH-5 Drilling Machine General Information 3

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE

JANUARY 2002 ARMADILLO

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

HDL(M)6 Nut/Screw Assembly

Transcription:

WRS Artificial Lift System Patent Pending Designed to adapt to any type of Artificial Lift Suspension!

Artificial Lift and Down hole gauge monitoring Is fast Becoming the go to in the oil production market. The WRS Artificial Lift suspension system will allow you to utilize the same Feed thru Wellhead and hanger system for all types of Artificial Lift Types. It also work equally as well with gauge wires, Fiber optic, etc., without the need for any penetrators or spliced connections.

Interchangeable inserts WRS Artificial lift hanger system ***Patent Pending*** This system was designed to aid in the installation of Multiple types of artificial lift systems without the need to change hangers or adapters. The system can handle ESP suspension without the need for wire splicing. Converts to Gas lift with the same equipment just change out inserts for different line pass thru styles. Convert to rod completion with same changes. Convert to Hydraulic with same changes. Convert to straight production with same changes. Will allow for the passage of gauge wires without the need to do any splicing or without any type of penetration device to get you thru the hanger. Utilizes seals and inserts to accommodate these changes. No need to re plumb after completion switch over. Concentric completion! Temporary Hang off capabilities! Permanent completion utilizing the same equipment! Easy handling and operation! Safe and tested to hold 5k working pressure. String weight is handled with the bottom plate allowing for maximum load capacity. Various seal combinations

Dual Wire ports ESP completion Any combination of ESP wire X capillary and gauge wire can be achieved with the system. Wire size and combinations can be addressed easily by changing out seals and inserts to fit the combination.

Dual wire ports Gas lift completion Dual capillary and gauge wires can easily be achieved with this system.

ESP Completion When installing the ESP, the last thing you need is to worry about unnecessary splices of the wires controlling your production number cost. Not only will this system allow for concentric completion avoiding costly eccentric setup, It will totally eliminate the need to cut and splice lines and wires during installation. The Patent Pending Hanger system is designed to be used during the running,with night time seal off capabilities, but it is also designed to be used at final completion. ESP installation

Step 1 When shutting down for the day or getting ready to complete the well, install the Hanger collar into the tubing box as shown using a 18 nipple threaded into the bottom of the hanger collar.

Step 2 Pull the hinge screw and open the Patent pending Split hanger and ready it to be installed around the grooved area of the collar.

Step 3 Install the Patent pending split wrap around in the slot in the collar to ensure positive up and down motion when raising and lowering the hanger into the well bore.

Step 4 Wrap around the collar. Pin to lock hanger in place. This places the hanger in that positive locked position to ensure up and down motion inside the BOP stack during installation and removal.

Step 5 Pull the pin to allow E line door to open. Strip back outer sheath from the E line to expose wires. (Caution should be taken not to damage the Lead Shield!!) Give yourself enough room to be able to separate the wires and insert them one at a time into the rubber of the hanger.

Step 6 a) Position the wires close to the hanger to begin inserting them into the rubber element. b) Starting from the back to the front. c) Lube the wires and slip them into position one at a time. d) Once there all in place ensure that the element has closed around each wire and is sitting firmly in place in its original form. (This also applies to gauge wires fiber optic, electric, capillary, etc. )

Step 7 Ensuring not to pinch the wires, close the door and pin with threaded shoulder bolt to encase the wires in the sealing pocket created inside the doors and seal element.

Step 8 Control line sealing. Pull the shoulder bolt to open the door. Lube the line and insert it into the seal element. Once in its position, inspect the element to ensure its back into position to allow for the door to be closed and pinned.

Step 9 Now that all the line have been inserted and secured in place. Finally inspection of the hanger should be done to insure that all the element splits are lined up with each opposing ends and that its ready to be lowered into the tubing head for the night.

Step 10 Lower it thru the stack and into the bowl. At this point the weight of the string will land on the bottom plate Lock down pins are now run in to contain the hanger in the bowl and seal off the well for the night by compressing down on the hanger and sealing off against the thru cables. ( E line, Control line, coupling, etc.)

Step 11 In a Temporary installation, When you return the next work day, its as easy as it was to un install as it was to install! Simply back off the lock down screws in the tubing head and lift the hanger out of the well. At this point, remove the pins holding the doors which are holding in the lines and remove the lines from the hanger. Re pin the doors. Pull the hanger pin and remove from the collar. Now, remove the collar nipple and collar from the string and save encase its needed again. At this point, you should be ready to take off where you left off the day before. If for some reason you would need to hang off the tubing again, simple repeat steps 1-10 and the system will perform the same way. At the end of the setting process, you will need to finish your well and this same system is designed to be utilized for that also. Its recommended to use a new element, unless it is inspected by competent parties and deemed usable.

Rod completion collar This will help to show the major difference of the to collar subs. The Rod completion sub has only a connection on each end with a straight thru bore ID. The Permanent has internal BPV threads with an external S seal groove at the top to complete inside the adapter and seal off. Both would be connected to an 18 pipe nipple for easy handling. The weight loading of the assembly is on the lower plate, allowing the upper plate to float and utilize the wellhead lockdown pins for sealing pressure. Permanent collar

Interchangeable inserts allow for different styles of completion Multiple completion style adaptability An assortment of elements allow for the different completion styles. With interchangeable inserts and elements to match, the system can be utilized for a multitude of artificial lift types with only a small amount of expense.

Completion The system can be tailored to several types of completion scenarios. a)free flow pressure completion. 10k working pressure. b) ESP completion with 5Kvoid test. c) Hydraulic lift with 10k void test. d)gas lift with 10k void test. e) Rod lift with 10k void test. The system allows for miscellaneous sensor, electric, capillary and other types of penetrations thru the wellhead without the need for splicing.

Step 11 Completion Once the hanger is landed and the BPV is set, The BOP stack will be removed and now you will be ready to finish the adapter stage of the well head completion.

Step 12 Threading the e line and control line thru the ports in the adapter as it is lowered down over the hanger/bowl assembly is easy thru the larger ports. Take caution not to skin the wire or crimp the line as you come down.

Adapter Scenario's Because the hanger system has numerous types of combinations, we designed the system adapters to be able to handle all the different types of possibilities with minor parts to be changed. The exit cap and plug are the only items on the adapter that would need to be changed when switching between completion styles.

Step 12A As the adapter is lowered, pull outward on the lines to ensure the slack doesn t kink on the bottom side!!

Step 12B With everything in place, continue to lower the adapter flange into place. The neck of the coupling with its S seal will seal off the upper portion of the cavity. The hanger seal seals off the annulus. The ring gasket seals off the outside at the top. The next step is to seal the penetrations at the wire and the control/injection line.

Step 13 Our Patent pending wire compression fitting will seal off the wire penetration in a very easily installed process as shown. 1) Insert split wedge around the wire. 2) Insert split washer. 3) Insert seal element. 4) Insert secondary washer. 5) Screw on compression cap. This locks the wire in place and seals it at the same time.

Step 14 Sealing off the injection line is a simple process which involves and industry standard fitting which seals off the tubing with a swedgloc fitting. Should you be running this for gas lift, chances are we would furnish adapters and hangers with wire ports on each side to help to accommodate gauges and sensor cables along with capillary lines.

Final stage Installing the flow line.

System components E Line compression fitting Tubing Head Adapter Permanent Coupling 18 Nipples Patent Pending ESP Side door hanger