MANAGEMENT DIRECTIVE CONTRACTOR ALERT REPORTING DATABASE (CARD)

Similar documents
Signature: Signed by GNT Date Signed: 12/16/2013

Truckee Fire Protection District Board of Directors

JANUARY. DATE ACTIVITY ORC Reference NOTES 1st day of January after election

1 SERVICE DESCRIPTION

Intellectual Property

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Further information concerning Exel Composites Corporate Governance matters is available on the Group s website at

Brad Luke. Director Peddle Thorp Auckland

DATE OF REVISION March 15, ADMINISTRATIVE OFFICE Office of Research

CENTER FOR DEVICES AND RADIOLOGICAL HEALTH. Notice to Industry Letters

New York University University Policies

General Manager Assurance and Risk Management in Oakton;

TERMS AND CONDITIONS. for the use of the IMDS Advanced Interface by IMDS-AI using companies

Technology transactions and outsourcing deals: a practitioner s perspective. Michel Jaccard

Public Art Mural Packet

COLORADO RULES OF CIVIL PROCEDURE

Licensing Procedure for Wireless Broadband Services (WBS) in the Frequency Band MHz

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

INTERNAL AUDIT DIVISION

NATS Swanwick. Interface Agreement. Owners: General Manager Swanwick. General Manager XXX

RULES GOVERNING THE COPYING OF WORKS OF ART

Pickens Savings and Loan Association, F.A. Online Banking Agreement

SECTION SUBMITTAL PROCEDURES

East Central College

A Step by Step guide to making and maintaining a Universal Credit claim online

Chapter 1 General Design Information

MORGAN STATE UNIVERSITY PROCEDURES ON PATENTS AND TECHNOLOGY TRANSFER APPROVED BY THE PRESIDENT NOVEMBER 2, 2015

Answer: Qualification statement should be provided with the bid.

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

STATE OF NORTH CAROLINA OFFICE OF THE STATE AUDITOR BETH A. WOOD, CPA ALBEMARLE COMMISSION HERTFORD, NORTH CAROLINA

Scripps Funding Corporation Meets State s Statutory and Contractual Requirements

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

California State University, Northridge Policy Statement on Inventions and Patents

Policy 7.6 Intellectual Property Policy

CHAPTER 10 - PUBLIC SAFETY RADIO SYSTEM COVERAGE INTENT AND PURPOSE DEFINITIONS USE AND OCCUPANCY EXEMPTIONS.

PROCEDURE FOR PROCESSING WORKING DRAWINGS

GAO. NASA PROCUREMENT Contract and Management Improvements at the Jet Propulsion Laboratory. Report to Congressional Requesters

FACULTY OF ENGINEERING & INFORMATION TECHNOLOGIES RESEARCH DATA MANAGEMENT PROVISIONS 2015

Product Guide Verizon Delaware LLC. Section 31 Delaware LLC Original Sheet 1. Connection With Certain Facilities of Others

Ellis Pond Homeowners Association Architectural Review Application

CHESTER COUNTY AREA AIRPORT AUTHORITY MINUTES. May 1, 2012

F98-3 Intellectual/Creative Property

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

GSFC CONFIGURATION MANAGEMENT MANUAL

Town of Skowhegan Application For Development Review

DNVGL-CP-0338 Edition October 2015

Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

Revisions and Clarifications to the Franchise Review Process. February 21, Franchise Updates

Overview. How is technology transferred? What is technology transfer? What is Missouri S&T technology transfer?

EL PASO COMMUNITY COLLEGE PROCEDURE

Protection of Privacy Policy

VINTAGE ORIGINAL ART MURAL REGISTRATION PROCESS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

Working Drawing Manual

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology

State of New York Office of the State Comptroller Division of Management Audit and State Financial Services

Using the Tax Research Center

SHARED TENANT SERVICE (STS) ARRANGEMENTS

Data Security Guidelines for Student Information Systems. John Escalera

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

LIFE SAFETY DIVISION GUIDELINE. Subject: BDA Radio Amplification Checklist Date initiated: Date revised:

TECHNICAL MEMORANDUM

SECTION SUBMITTAL PROCEDURES

Section Meetings Section Material and Equipment. None Required

Request or Schedule an Appointment Health Link

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch

Model Pro Bono Policy for Large Firms

Author Instructions FPIN Editorial Manager

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at

Appendix 6.1 Data Source Described in Detail Vital Records

SAN DIEGO CITY SCHOOLS

The 2020 Census A New Design for the 21 st Century

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

City of Keizer Floodplain/Greenway Development Application

The 2020 Census: A New Design for the 21 st Century Deirdre Dalpiaz Bishop Chief Decennial Census Management Division U.S.

pill Los Angeles World Airports

MINISTRY OF HEALTH STAGE PROBITY REPORT. 26 July 2016

A. Notice to Inventors

New Mexico Lottery Authority MY REWARDS PROGRAM DRAWING PROCEDURES v1.0

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit)

AU PAIR NEW ZEALAND Au Pair - Family Contract

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SPECIFICATIONS PROPOSAL & BID DOCUMENT

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

CHECKLIST FOR DESIGNATING AUTHORITIES DESIGNATION OF NOTIFIED LABORATORY. 1. General Requirement Complies Comments

RULES AND REGULATIONS. Title 58 - RECREATION PENNSYLVANIA GAMING CONTROL BOARD [58 PA. CODE CH. 525] Table Game Internal Controls

POLICY

International Sculpture Garden Relationship Statement

STATE OF NEVADA STATE CONTRACTORS BOARD. MINUTES OF THE MEETING November 16, 2011

CITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR

Kryptonite Authorized Seller Program

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

Transcription:

MANAGEMENT DIRECTIVE CONTRACTOR ALERT REPORTING DATABASE (CARD) Management Directive # MD 12-02 Date Issued: 03/01/12 New Policy Release Revision of existing Management Directive dated Cancels: POLICY/BACKGROUND STATEMENT On April 27, 2010, the Board of Supervisors directed the Chief Executive Office, Auditor-Controller, County Counsel, and the Director of Internal Services to develop a mechanism to alert departments of poorly performing contractors. As a result, the County developed the Contractor Alert Reporting Database (CARD), which utilizes the County s existing enterprise-based ecaps Systems to track poorly performing contractors. The procedures set forth in this Management Directive (MD) provide impacted staff with guidelines for placing contractors in CARD. APPLICABLE TO This MD applies to DCFS employees involved with the management and monitoring of contracts (also known as Program Managers or contract monitors), and Contracts Administration Division staff. OPERATIONAL IMPACT DCFS must develop and follow internal approval procedures before placing a contractor in CARD, and must send written notification to a contractor before placing the contractor in CARD. At minimum, DCFS Administrative Deputy or designee should approve a CARD placement. Before placing a contractor in CARD, the Department must also ensure that contractors are provided with due process. Contractors must be provided with an opportunity and a reasonable amount of time to correct the issue(s). MD 12-02 (03/12) Page 1 of 7

The attached CARD Manual provides guidelines and instructions for using the database. The Department must: Provide contractors with due process prior to placing them in CARD; Notify contractors that they may be placed in CARD, and the reasons for the placement; Place poorly performing contractors in CARD and include adequate documentation to justify/support placement; Notify other County departments when a contractor has been placed in CARD; Work with the contractor to resolve the issue(s) that resulted in placing the contractor in CARD and provide training (any training provided should be considered reasonable and within the scope of the County program manager) to help prevent future non-compliance; Update contractor records in CARD; and, Use CARD during each applicable contract solicitation and ongoing monitoring of existing departmental contractors. PROCEDURES A. WHEN: A CONTRACTOR HAS BEEN IDENTIFIED AS, OR IS SUSPECTED OF, UNDERPERFORMING, BEING OUT OF COMPLIANCE WITH THE CONTRACT, OR OTHERWISE MEETING THE CRITERIA FOR CARD PLACEMENT Program Manager s Responsibilities: DCFS internal process requires Program Managers to monitor their contracts to ensure that contractors are performing at or above a level that is consistent with the terms and conditions of the contract and County contracting standards. If a Program Manager suspects that a contractor is underperforming, out of compliance with the contract, or otherwise meeting the criteria for CARD placement, they must contact the Contracts Administration Division s Administrative Services Manager I, commonly referred to as the Contract Analyst, assigned to the program (or the Contract Manager) to discuss the next steps. Contractors must meet one or more of the following criteria to be placed in CARD: MD 12-02 (03/12) Page 2 of 7

1. The Contractor owes the County for overpayments and/or questioned costs and has not entered into a repayment agreement or agreed to pay the County back, or has been referred to the Treasurer and Tax Collector for collection. 2. The contractor has not taken the appropriate steps to correct significant documented instances of contract noncompliance in a timely manner. 3. The contractor and/or their principal owners are currently debarred by other governmental entities. Principal owner is any person or entity, who or which owns a 10 percent or more interest in the contractor. Department must update CARD to indicate if/when the issue is resolved once the debarment period of the other government entity expires (if applicable). 4. The contractor has experienced financial, administrative, programmatic or legal issues that affect their ability to comply with the County contract requirements. Examples of these issues include, but are not limited to the following: Bankruptcy Loss of licenses Failure to pay property or payroll taxes Financial Viability concerns Lack of qualified staff Amount of disallowed or undocumented costs Lack of required insurance Poor program services Assessment of any fines and/or penalties by public entities 5. The County has imposed contractual remedies against the contractor for noncompliance with the County contract requirements. Examples of contract remedies include, but are not limited to, the following: Termination for default Assessing liquidated damages Adjusting the contractor s funding Not renewing the contract MD 12-02 (03/12) Page 3 of 7

B. WHEN: SUPPORTING DOCUMENTATION CONFIRMS A CONTRACTOR IS UNDER-PERFORMING, OUT OF COMPLIANCE WITH THE CONTRACT, OR OTHERWISE MEETING THE CRITERIA FOR CARD PLACEMENT Contracts Administration Division s Responsibilities: If the supporting documentation confirms that the contractor meets the criteria for CARD placement, Contracts Administration Division will: 1. Ensure the contractor receives, or has received, the required notice that the County maintains a database to track contractor performance. 2. Inform the contractor that a CARD placement, whether resolved or unresolved, becomes part of their permanent record with the County and may be considered in cases where a proposer s performance history is scored as part of the evaluation process. 3. Ensure the contractor has had the opportunity to take corrective action to avoid placement in CARD. 4. Contact County Counsel if the Department is not sure that the supporting documentation is sufficient to proceed with a CARD placement. 5. Submit the recommendation for a CARD placement to the Administrative Deputy, or designee, and the DCFS Director or designee for review and comment. 6. Complete a standardized CARD Placement Notification Letter, including an approval signature line from the Director or designee; and submit for Director s signature via the Director s signature clearance process. 7. Send the signed notification letter to the contractor 10 business days before CARD placement via certified U.S. mail and e-mail. C. WHEN: CONTRACTOR DOES NOT RESOLVE ISSUE(S) WITHIN 10 DAYS Contracts Administration Division s Responsibilities: If the issue(s) is unresolved (meaning, the response received from the contractor is not considered sufficient to correct or resolve the existing criteria for CARD placement) after 10 business days following the CARD placement notification, the contractor will be placed in CARD according to the following procedures: 1. Upload the supporting documentation justifying CARD placement (including the signed notification that was sent to the contractor) into the database. The Department may delay the CARD placement to allow the contractor additional MD 12-02 (03/12) Page 4 of 7

time to resolve any issues. Generally, any further delay in CARD placement will require clear and convincing documentation that previous opportunities given to the contractor for corrective action were insufficient due to no fault of the contractor. 2. Send an e-mail notification of the CARD placement to the DCFS Board Liaison and ask him/her to forward the notification to the Board of Supervisors Budget Deputies, and the designated Board Deputies for the Children and Families Well- Being Cluster. Send an e-mail notification of the CARD placement to the Countywide Contracting Network. To notify the Countywide Contracting Network, e-mail a request to ctovar@isd.lacounty.gov and attach the signed notification letter to the e-mail request so it can also be forwarded to the network. D. WHEN: FOLLOWING PLACEMENT IN CARD, CONTRACTOR EXPRESSES INTEREST IN RESOLVING ISSUE(S) Contracts Administration Division s and Program Manager s Responsibilities: Following a contractor s placement in CARD, if a contractor expresses interest in resolving any issues, Program Managers and Contracts Administration Division will indicate to the contractor the necessary steps to resolve the issue(s). 1. Once the contractor resolves one or more of their CARD issues, their CARD status will be updated to indicate a resolved status for each resolved issue. 2. The contractor will be notified that their CARD record is updated. Note: The contractor will remain in CARD even after the contractor s status is updated to resolved. 3. Documentation demonstrating that each issue was resolved will be uploaded into CARD. MD 12-02 (03/12) Page 5 of 7

E. WHEN: DEVELOPING NEW CONTRACTS AND NEW SOLICITATIONS Contracts Administration Division s Responsibilities: Contracts Administration Division must check the CARD system during solicitations to review a prospective proposer s performance history as part of the evaluation process. Contracts Administration Division must ensure CARD language is included in each solicitation informing the prospective proposers that the CARD system is part of the evaluation process under the proposer s performance history. If the proposer is using non-county references, the Contract Analyst must use the Non-County Services Evaluation Checklist as part of the performance history. Additional information and instructions can be found in the CARD Manual. NOTE: After a contractor has been identified as, or is suspected of, underperforming, being out of compliance with the contract, or otherwise meeting the criteria for CARD placement, Program Managers must maintain documentation to support placing the contractor in CARD, and demonstrate sufficient due process was provided to the contractor. Contracts Administration personnel must contact County Counsel and/or the Auditor-Controller s Countywide Contract Monitoring Division at (213) 253-0300 for assistance if they are not sure they have sufficient documentation to proceed with a CARD placement. APPROVAL LEVELS Section Level Approval A. B. Administrative Deputy or Designee CARD Notification Letter C E. MD 12-02 (03/12) Page 6 of 7

LINKS RELATED POLICIES FORM(S) REQUIRED/LOCATION HARD COPY: LA Kids: CWS/CMS: SDM: DCFS Number, Title DCFS Number, Title CARD Notification Letter (TBD/Pending for LA Kids) Non-County Services Evaluation Checklist (TBD/Pending for LA Kids) MD 12-02 (03/12) Page 7 of 7