Installation Guidelines

Similar documents
Installation Guidelines

Installation Guidelines

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Installation Manual 0318

3.1 Continuous top and bottom lock 3.2 Engineered nailing hem 3.3 Temperature markings

Shapes Siding. Perfection Shingles. Chalk Line

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

Installation Guide 2016

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

Installation Manual SOLID CORE SIDING

Siding Components. Installation Guide

Chapter 17 - Porch Trim

Aluminum Siding System

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

COMPOSITE SIDING INSTALLATION GUIDE

Before Assembling the Storage Wall

INSTALLATION INSTRUCTIONS for EVERROCK SKIRTING

Siding Systems NOVIKSTONETM FS FIELDSTONE INSTALLATION GUIDE

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

Roofing Training - Basics. Sandy Wesch

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

Installation Guide - Evolution Series Wood Siding

INSTALLATION PROCEDURE

10 Octagon Cedar Gazebo Assembly Instructions

ROOFING APPLICATION STANDARD (RAS) No. 130

Turada Hardwood Shingles and Shakes Installation instructions

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

Slate Shingle Specifications

Five Star Panel Installation Instructions

Video Wall Installation Instructions 2W X 3H, 3W X 3H

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

SIDING-MASTER VINYL SIDING ATTACHMENT & ALIGNMENT SYSTEM & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS

Install Windsor Corners

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

AIA Specification. Section Slate Shingles PART 1 GENERAL

Vertical Offset Base and Safety Rail System Installation Instructions

Ekoroof LiteTile Dimensions

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

A P P L I C A T I O N I N S T R U C T I O N S

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

PVC Composite Railing & Stair Kit

Engineered Hardwood Flooring Installation Instructions

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

DIRECTIONS FOR APPLICATION

Assembly Instructions

Renaissance Pavilion. Assembly Manual

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

Vinyl Gazebo Instructions

V nyl Gazebo truct c it Assembly Instr ons

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

BARDOLINE INSTALLATION INSTRUCTIONS

Installation Manual for Thermo Panel

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

INSTALLATION INSTRUCTIONS

Shed Assembly Instructions

R Form No MILLENNIUM GONDOLA / WALLCASE ASSEMBLY

Chapter 9. Windows and Exterior Doors

DIRECTIONS FOR APPLICATION

Cape Cod Manual. Little Cottage Co. PO Box 455 Berlin, OH Little Cottage Co.

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Sun Windows General Information New Construction Hinged Door Installation Instructions

6X3 Patio Garden Shed Assembly Manual

eco-shake INSTALLATION INSTRUCTION

PRIMED STRAND REVERSIBLE SHAKE

Flashing Materials. Rough Opening Preparation

western window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B

DIRECTIONS FOR APPLICATION

AMISHGAZEBOSHOP.COM VINYL GAZEBO KIT CONTENTS

REGAL. Installation Manual

Sunhouse. Assembly Manual

Tools required by installer: Materials required by installer:

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

Installing Novi Siding Trim

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Grand Garden Chalet 6X3 Assembly Manual - Costco

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

Curtain Wall Installation Guide

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

SECTION 4 Preparation for Horizontal Siding

woodworkersjournal.com MATERIAL LIST

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

SENTINEL SERIES 110 SINGLE HUNG WINDOWS

A-935 RODA WALL MOUNT HINGES

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

TECHNICAL BULLETIN. 7/2017 CertainTeed Corporation

Transcription:

Installation Guidelines Exteria Building Products provides these instructions as general guidelines only. Exteria Building Products neither installs siding nor has any control over any installation. The contractor and/or installer shall be responsible for ensuring that all applicable local building codes are followed, which may require modification of these general guidelines. Exteria Building Products assumes no liability for personal injury or property damage resulting from improper or careless application of the described techniques. For more information on Exteria Building Products and its wide variety of state of the art products, please call us at 877 EXTERIA (877 398 3742) or write: 1111 NW 165 Street, Miami, FL 33169 5819. Installation Guidelines can be downloaded from our website: www.exteriapb.com. WI QPC 1015 REV Page 1 of 7 CAPE COD PERFECTION

BASIC GUIDELINES 1. Always work from left to right installing one row at a time, and completing one wall before beginning another. Always start at the lowest point of the structure. 2. As with any composite plastic exterior building materials, Exteria Building Products panels will expand and contract with a change in temperature. Therefore, during installation it is necessary to position the panels properly to compensate for temperature effects. Note that the average spacing between shingle seams within a panel is approximately 3/16. If the temperature is about 30 degrees F, position the panels on the 30 degree spacing guide mark to allow for expansion in warmer weather. If the temperature is nearer to 60 degrees F, position panel on 60 degree spacing guide mark thereby allowing for both expansion and contraction as the temperature changes. If the temperature is closer to 90 degrees F, position the panel on the 90 degree spacing guide mark to allow for contraction in colder temperatures. Use caution not to force panels down onto the flange of the lower row, as this will override the expansion joints and may cause buckling. Storing panels in heated areas make them more pliable, allowing for easier installation in colder temperatures. 3. Store panels on edge, do not stack flat. 4. After positioning the panel at the proper spacing for the installation temperature, install a nail or fastener in the center hole of the panel. By attaching a fastener through the center hole, the panel will move evenly in both directions from the center out (Figure 2). WI QPC 1015 REV Page 2 of 7 CAPE COD PERFECTION

5. If the panel is a partial panel used at either end, a new center hole should be created, by drilling at 1/8 hole in the top flange, near the center of the panel at the same height as the other installation holes (Figure 3). 6. Exteria panels are intended for use in a vertical placement only, and are not designed or warranted for roofing or flooring applications. Mansard roofs with a 45/12 slope or greater are acceptable applications. 7. It is essential that you work over a smooth, flat, nailable wall surface, (i.e., Minimum 7/16 OSB board or plywood is recommended). Refer to the respective furring strip installation guidelines if furring strips are utilized. 8. Non corrosive fasteners are required to secure the panels and they must penetrate the solid substrate by at least 7/16. 9. If face nailing is employed, pre drill a hole in an inconspicuous area, such as a shingle seam. The hole must be larger than the shank of the nail or screw, but smaller than the head, to allow for possible expansion. The head can be covered with matching paint. 10. Fastening the panels should not restrict panel movement. Fasteners should be driven straight into the center of any elongated hole making light contact with the panel, allowing the panel to be hung. It is best to work with the panels at waist level, allowing the installer to inspect the back of the panels, verifying that all fingers are properly engaged. 11. Do not install all corners at one time, or you will lose the ability to adjust and properly align them to the panels. It is recommended to not install more than two corners at a time. 12. Siding has always been designed as an exterior cladding, not a weather resistant barrier. Exteria siding is designed to allow the material underneath it to breathe; therefore, it is not a watertight covering. To achieve designed performance, Exteria siding must be installed over a weather resistant house barrier system such as house wrap. WI QPC 1015 REV Page 3 of 7 CAPE COD PERFECTION

INSTALLATION STEPS STEP ONE Install the starter strip at the lowest point of the structure. The structure s solid substrate must be no less than 7/16 thick. The strip should be positioned 3 from the wall corner allowing for the width of the corner piece. Nail the starter strips every 12 ensuring that the starter strip remains level (Figure 4). A chalk line is recommended. STEP TWO It is recommended to determine the number of panels needed for the wall by measuring the total length of the wall in inches, subtracting the width of the corner pieces used an dividing by 38 (the width of one panel exposed to the weather). As you will need to cut the end panel, ensure that it remains at least 12 wide by reducing the size of the starting panel. For best results, cut the panel on the A cut line, with the second cut on C, and the third on B to avoid vertical seam overlap and to eliminate repeating patterns (Figure 5). Following the specified A, B, C cutting line order on succeeding rows will provide an authentic and random shingle appearance. However, if you choose an alternate cutting location you must be careful not to create any vertical seam overlap. Do not cut more than one end piece at a time since adjustments may be required for succeeding rows. STEP THREE: Work from left to right. If a matching 28 Cape Cod Perfection EZ corner is used, it must be properly aligned with the first panel to start the row. This is accomplished by first loosely installing the corner so that it will align horizontally with the first cut panel (Figure 6). WI QPC 1015 REV Page 4 of 7 CAPE COD PERFECTION

Using your right hand, temporarily position the first cut panel on the starter strip about 3 from the left edge of the wall. With the left hand, hold the corner so that it is properly aligned with the panel. Still holding the corner in place, remove the panel and install a fastener loosely into the center of the elongated hole located in the middle of the corner piece. Reposition the panel again, but this time slide the corner up or down along the elongated hole until it is properly aligned with the first cut panel, then permanently mount the corner with fasteners in the remaining holes. Now permanently install the first panel by properly spacing the panel. Install a fastener into the center hole and fasten per Step Six. STEP FOUR: For all succeeding panels of the present row, simply position the panel approximately 2 inches below the previous panel and slide upward (Figure 7) making sure to engage the two side locking tabs and bottom locking rail. Once engaged, gently tap the panel into place with the palm of your hand. Use the proper spacing guide marks (Figure 1) to ensure the correct seam spacing between panels. STEP FIVE By attaching a fastener into the center of any elongated hole on the top flange of the panels, you will have the flexibility to move the panels to adjust the shingle seam per Step Four in the basic guidelines above. This will also make it easier to install the end piece, either into a J channel or corner post. STEP SIX Exteria provides positive stop posts which are 1/8 below the top edge of installation fingers. Do not force the panels beyond the stop posts when installing succeeding rows of panels. The stops are designed to prevent buckling due to changing temperatures (Figure 8). The panel requires a minimum of seven fasteners per panel as shown (Figure 9). A closer spacing of fasteners is required for WI QPC 1015 REV Page 5 of 7 CAPE COD PERFECTION

high velocity wind areas; for details refer to report ESR 3070, which can be downloaded from our website www.exteriabp.com. The fasteners must be installed into a solid substrate of no less than 7/16 thick. When attaching the fasteners, be sure they only lightly touch the panel allowing it to move with varying temperatures. The fastener must be installed flush with the panel, so as not to interfere with the succeeding row of panels. Note: The installation holes on the side flange are recessed. When fastening in these recessed areas, be sure the head of the fastener is level with or below the top surface of the panel. Be careful not to secure the fastener too tightly giving the panel the ability to expand and contract in varying temperatures. STEP SEVEN Note that the average spacing between shingle seams within a panel is approximately 3/16. If the temperature is about 30 degrees F, position the panels on the 30 degree spacing guide mark to allow for expansion in warmer weather. If the temperature is about 60 degrees F, position the panels on the 60 degree spacing guide mark to allow for both expansion and contraction. If the temperature is about 90 degrees F, position the panels on the 90 degree spacing guide mark to allow for contraction in colder weather (See Figure 1). Note: Allow 1/8 spacing around all openings for installation around 30 degrees F. Once the panel has been properly spaced, insert a fastener into the center hole of the panel. STEP EIGHT When completing a wall and a partial panel is used, remember to drill a new center hole and if face nailing is required, refer to Basic Guideline # 9. Start each successive row by cutting the panels at either the A, B, or C cut lines located on the top flange of the panels (Figure 5). Cutting the panels at the cut lines will avoid vertical seam overlap. Randomly choosing between the three available cutting lines will provide a pleasing and natural appearance and avoid potential repeating patterns on a wall. Step Two suggests cutting order (A, C, B). Be sure the right end piece of the row is no less than 12 wide. STEP NINE Exteria J channels may be used for inside corner treatments (Figures 10 and 11). It is recommended to sleeve the corner with vinyl or aluminum coil prior to installation of panels. WI QPC 1015 REV Page 6 of 7 CAPE COD PERFECTION

STEP TEN When continuing a course that has been cut to go above a window or doorway, the upward installation method described in Step Four may not be possible. In this case, it may be necessary to notch the side flange of the panel to allow the adjacent panel to slide into it from right to left (Figure 12) rather than the normal upward motion. REMINDERS: Some adjustment may need to be made at the vertical overlap of two corners (as they are installed) in order to maintain the corner/panel horizontal alignment. There is approximately a ½ vertical adjustment available. ATTACHING OBJECTS TO PANELS Never attach fixtures directly to Exteria siding. When attaching fixtures, use a block and follow the fixture manufacturer s installation instructions. Fitting panels between windows or around openings requires a cut back spacing of approximately 1/8 to allow for product expansion. SITUATION 1. Panels wont lock together side to side 2. The bottom locking fingers won t lock into the previous row. SPECIAL SITUATIONS AND SUGGESTIONS ITEMS TO CHECK The wall may not be level and flat. Check previous panels to ensure that all panels and installation fingers are properly seated. (See Basic Guidelines) 3. Panels are buckling on the wall. 4. Panels are not laying down flat. Make sure the nails are not restricting panel movement. Make sure all fingers are engaged into corresponding rails. WI QPC 1015 REV Page 7 of 7 CAPE COD PERFECTION