GE 100 Trebuchet Field Activity Instruction Sheet

Similar documents
Trebuchet Parts List and Overview

It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating loose.

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

Electric Skein Winder

SAFETY INSTRUCTIONS. Wear protective clothing, including safety glasses and steel toe boots.

Warnings. Description. Prior to Installation Tools Needed

Desktop Trebuchet Kit Assembly Instructions

PORTABLE ADJUSTABLE BASKETBALL SYSTEM

The Useless Machine. Parts Only - Build Guide v0001

LIGHT BEAM ANTENNA MaxRange Antenna Series Assembly Instructions MaxRange Plus Digital / High Definition Television Antennas

Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual

RTI TECHNOLOGIES, INC.

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Giraud Tool Company, Inc.

TRAILMATE METEOR ASSEMBLY MANUAL

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

For additional assistance call

Using the RhAT II Universal

Item # Thanks for shopping with Improvements!

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Deck Mount Installation with Bench

WPS crew Doors Installation instructions

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

Catapult Engineering

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

Gared Pro-S Portable Backstop

STEP 1 : DESTROYER FRONT BUMPER INSTALL GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... *shorty bumper to show hardware* Tools Required:

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

INSTALLATION OF WELLS SUPER QUICK CHUCK LEFT HAND ON RED WING LATHE

Wind Pump Construction

Replacing the build plate clamps

American Morse Equipment

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.

Playground Assembly Instructions

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Installation instructions for FC14S Forward Controls for Shadow ACE and Aero 1100

DATE: January, 01, 2011 AUTHOR: Craig Macomber TOPIC: Making and operating a model onager

EPPA2-KIT DUAL MONITOR ARM CONVERSION

ABM International, Inc. Navigator Assembly Manual

model tsa-sa48 Sliding Crosscut Table installation guide

SwingSafe Swing-Away Mailbox Support Diagram

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Topo Freestanding Applications - Private Office

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

User Instructions Multiline Otter Scoreboard Caddy Assembly

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions

LCD MONITOR/TV WALL MOUNT

LANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage.

7878 K940. Checkpoint Antenna. Kit Instructions. Issue B

INSTALLATION INSTRUCTIONS

Model #SH & CH SH Pine CH Naturaline

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

ROMAN AND. Roller Lift System Continuous Cord Loop GETTING STARTED BRACKET INFORMATION INSIDE MOUNT. A few simple tools are required:

INSTALLATION INSTRUCTIONS

100mm (3in) Slide Stop Cut to 6mm (1/4in) Sections. Quantity: mm (10in) Skewers Quanity: 10. Material to Lift. Material for Blades.

Replacing the build plate clamps

Sliding Crosscut Table installation guide

METAL BENDER OPERATING & MAINTENANCE INSTRUCTIONS Model Nos: CCB1 & CCB2 Part Nos: & CCB2 CCB1

Installation Instruction

Universal Projector Ceiling Mount Model: DPM-45

BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches

For Barrel Tapers. Installation and Operating Instructions For use with small combination belt & disk sanders. Assembled Taper Tool

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting

ULTRAFEED INDUSTRIAL TABLE PACKAGES Set-up Guide for #120931, # & #121091

a.k.a. casegoods instructions

Work Space Set-up. Slats will level the pipe during bending and help minimize twisting of the bow.

Woodline USA Woodline Spacer Fence System

Castle Frame Assembly Table AT-8. Diagnostics Manual. Castle, Inc. Petaluma, CA

Wagon Vise Retrofit Installation Instructions. American Craft Woodworks. Wagon Vise

6' Wide Premium Greenhouse Benches

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

INSTALLATION INSTRUCTIONS

Gared Pro Portable Backstop

The Archer Bow Press OPERATING INSTRUCTIONS Partridge Woods Elk Rapids, MI

6' Wide Premium Greenhouse Benches

mila-wall (Series100) General Operating Instructions page 1 of 15

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

TRAMPOLINE A SSEMBLY I N S T RUC T I ONS

Continuum Frame Assembly Instructions

ASHFORD TABLE LOOM - FOUR SHAFT 410/610/800mm 16/24/32in

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

SPINKS BIN SCALES INSTRUCTIONS/OPERATIONS MANUAL FOR SCALE MODELS: ,000 lb ,000 lb ,268 kg ,500 kg.

OPERATOR'S MANUAL RULES FOR SAFE OPERATION

High performance 90mm fiberglass jet

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

CV1B Sliding Table Installation and Setup Guide

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

Tin Lizzie 18 Assembly Instructions

Installation Instructions Kit, Base Rail Bracket Part # 31413

Transcription:

GE 100 Trebuchet Field Activity Instruction Sheet Safety Instructions: 1) Make sure that at the time of trebuchet launch, no person is leaning over/or is in close proximity of the rotating arm. 2) Only use the provided soft clay projectiles. 3) Trebuchets must be inspected by a TA/ELA before launching, ensuring that: a. Knots, pin joints, bolts, and other connections are secure. b. The finger is adjusted so that the projectile is not launched backwards. Also, the finger bolt must be secure enough to prevent rotation of the finger. c. Trebuchets must be re-inspected after each modification. 4) There will be approximately one staff member for every 3-4 project groups. a. Staff members (ELAs/TAs) will be wearing yellow vests so that they are easy to identify. b. Staff members will be available to help answer questions in addition to inspecting trebuchets. c. Design decisions (fulcrum location, finger angle, wheels/no wheels, sling length) are up to the student group; staff members will allow students to make these decisions on their own, but supervise to ensure safety. 5) Do not launch if any person is in front of, behind, or leaning over the trebuchet. Ensure that no body part of any person is in the path of trebuchet + sling movement. 6) The sidewalks on the Bardeen Quad will be blocked at four locations, and caution tape will be used to block off the landing zone. Staff members will be standing watch at each sidewalk barricade to ensure pedestrians do not enter the landing zone. Students are not to enter the landing zone without permission. 7) Two staff members at the east end of the launch zone will each have a green flag. When they see that the landing zone is clear of people, they will raise their flag. Do not launch unless both green flags are raised.

Launch Area: Assembled Trebuchet:

Assembly Instructions: 1) Side Pieces. Bolt each side assembly to the base with three ¼ bolts. You can use the nutdrivers to tighten the bolts. Side Assembly Base a. Please ensure that the side pieces are attached such that the vertical oak boards are closest to the center of the trebuchet. b. Bolts should be installed with the bolt heads down and with one washer on each side of the bolt. Upside-down bolts will protrude unsafely from the bottom of the base. 2) Wheels. If your group decides to use wheels, attach them now to the base at each of the four corners using the machine screws. Washer Lock Washer a. Important: Install the machine screws with the screw heads up. Otherwise, the screw ends will protrude unsafely up through the top surface of the base, and may snag the sling during launch. b. Important: Machine screw threads can be stripped easily, even with just a screwdriver. Tighten the machine screws by holding the nut with your fingers and tightening the head with the screwdriver snugly.

c. Use a lock washer with each machine screw to prevent the machine screws from vibrating loose. Also, to prevent screws from vibrating loose, do not wheel the trebuchets long distances. d. Tip: two wheels can be installed simultaneously by two group members to save time. 3) Fulcrum Guides. If the fulcrum guides (guide pipes) are not already installed, please complete this step with the help of an ELA or TA 1. Otherwise, SKIP THIS STEP. a. While holding the two guide pipes (3 long) between the two sidepiece holes with the threads pointed outward, slide the 3/8 shaft through the guides. Install the hitch pins on either side of the shaft to secure it. Installing the shaft helps maintain alignment of the guide pipes as they are threaded into the side pieces 2. b. By hand, thread each guide into its hole just 1-2 threads. If they are difficult to turn at this point, the guides may be misaligned. Ensure both guides are going in straight before fully installing either guide. c. Screw the guides in as far as possible by hand, and then tighten with pliers (obtain from a TA/ELA) until the base of the threads is flush with the wood surface. Tightening beyond this may cause the wood to split. 4) Assemble Throwing Arm: a. Install the center fulcrum guide pipe (2 long) into the throwing arm slot and install the two large nuts with washers. Tighten these nuts with the adjustable wrenches. Loosen these nuts to adjust fulcrum position, but be sure to retighten the nuts. b. Install the counterweights by sandwiching the large end of the throwing arm between the two weights. Slide the 1 diameter dowel through the weights and throwing arm. Once the large dowel is in position with the 3/8 holes visible on each side, tap the 3/8 dowels into the holes far enough to center them. 1 Please get help from an ELA/TA as the side pieces can be damaged easily during this 2 Correct alignment is important for getting the trebuchet to throw correctly.

i. If you have difficulty installing a dowel, the fit may be too tight. If this is the case, use the sheet of sandpaper to reduce the pin diameter slightly so that it can be installed with light tapping. ii. If you need to remove one of the 3/8 dowels, use the ¼ steel shaft (6 long) as a punch with the hammer. Do not use the screwdriver to remove the dowel; it will damage the wooden dowel pin. c. Install the finger assembly. Bolt it on to the small end of the throwing arm as shown in the figure. The bolt head goes on the finger side with one washer under the head. The plastic sling anchor goes on the other side of the throwing arm under the nut. When installing the anchor, make sure that the pin is perpendicular to the throwing arm as shown. Adjust to the desired finger angle, and tighten securely to prevent rotation. 5) Attach the throwing arm to the rest of the trebuchet. Remove the fulcrum shaft. Have one person hold the throwing arm with the weights pointed down. Move the throwing arm so that the center fulcrum guide is between the other two fulcrum guides. Slide the shaft through all three guide pipes. Secure the shaft with the hitch pins. a. You may need to squeeze the side pieces together and adjust the location of the shaft to expose both hitch pin holes. b. If the guide pipes are not aligned (i.e., the shaft will not go through the guide pipes), first try loosening the 6 side piece bolts and making small adjustments to the side piece positions to get the guide pipes aligned. c. If that doesn t work, you will need to remove the guide pipes from the side pieces and reinstall them as described in step 3. 6) Attach sling cord and adjust sling length. a. Start by identifying the desired sling length.

b. Create a loop 3.5 long beyond the chosen length. c. Feed this loop through the hole closest to the center of the clamp. d. Feed the loop once more into the second hole furthest from the center of the clamp. e. Place the loop around the looping pin. f. Tighten the sling around the clamp. g. To change sling length, loosen cord around anchor and adjust cord position. Readjust pouch to center of sling. Launch Day Protocol: We will hold two launch days: one after you have designed your trebuchet experiments, and another after you have adjusted your design using the computer simulation. When you arrive at the quad please locate your trebuchet and move to the staging area behind the appropriate launch pad number. As shown in the figure below, all groups whose number ends in 1 lines up behind launch pad number 1, all groups whose number ends in 2 lines up behind launch pad number 2, and so on. Three groups will rotate through using the same launch pad. Ten groups can be launching simultaneously, but only two students from each group are allowed at the launch pad. All other group members must wait in the staging area. Group members can take turns being the ones to launch the trebuchet. All people in the launch area must wear safety glasses. Each group will be issue two safety glasses. These can be shared within the group.

Stay behind yellow rope unless you are launching 1) Approach launch pad when directed (two students per group) 2) Launch projectiles with no adjustments 21 11 1 1 22 12 2 2 4) Return to the same line you went through before. Make adjustments before next launch. 23 24 13 14 3 4 3 4 25 15 5 5 26 16 6 6 27 17 7 7 28 18 8 8 29 19 9 9 30 20 10 10 3) Return to staging area when launches are complete. Between turns make your necessary adjustments in preparation for the next test. Have your trebuchet inspected before the next launch. When it is your turn to launch and you move your trebuchet to the launch pad, you will be given 1-2 projectiles. Be sure to record your design and distance for each launch. Do not make adjustments on the launch pad, only in the staging area. Once you are done launching, please exit the launch pad (with your trebuchet and toolbox) by walking south behind all of the other teams, and then return to the staging area. On the Launchpad: 1. Have your trebuchet inspect each time you move to the launch pad. 2. Ensure no one is in front of, behind, or above the trebuchet. 3. Verify that both green flags are raised. 4. Load the projectile and loop the sling around the finger.

5. Rotate the throwing arm back as far as possible. 6. While holding the arm in position, place the projectile on the base toward the front such that there is no slack in the sling. 7. Yell something so that people know you are launching. 8. Let go of the throwing arm, taking care to stay out of the path of the rotating arm and sling. 9. Watch your nano-pumpkin sail! 10. Observe and record distance. Trebuchet Competition: The group that achieves the longest range will be recognized in class after the second launch day, and at the Engineering Open House trebuchet demonstration. We are especially interested in the trebuchet design (the four variable values) that achieves this distance, so please record each design that you test.