IBM xseries 345 Third Party Slide Rail Kit

Similar documents
4 Post Adapter Kit for Dell PowerEdge 2U & 3U

4Post and 2Post Universal Shelf System for 19 Racks

2Post Flush Racking System

4Post and 2Post Sliding Rails for Lenovo/IBM M5

4Post and 2Post Rails for Dell PowerEdge R810

4Post and 2Post Universal Shelf System

4Post Server Rack-111 Assembly For Floor Anchored Models

Desk/Wall-Mount Rack

Y1160A EIA Rack Sliding Shelf Installation Note

ASSEMBLY MANUAL WALL MOUNT RACK SR-WM-10U SR-WM-12U SR-WM-16U

ASSEMBLY MANUAL WALL MOUNT RACK SWING KIT SR-WM-SWING-10U-3IN SR-WM-SWING-12U-3IN SR-WM-SWING-16U-3IN

Y1160A EIA Rack Sliding Shelf Installation Note

ADJUSTABLE MOUNTING POST

S6 User s Manual USER S MANUAL ver. 1.0

3M Cross-Connect Cabinets 4220SVB, 4220SVC and 4220SVE Cabinet Mounting with Stakes, Installation Guide

Powerware Series. Eaton Rail Kit 9- and 12-Slot Cabinets Installation Guide

Sea Doo Spark Engine Access Kit

F-150 Structural Holding System

OnSite 19 /15U Wall Rack Model WR-15U

Visit us at or

FP-4855 Flat Panel Television Stand ASSEMBLY INSTRUCTIONS

Video Wall Installation Instructions 2W X 3H, 3W X 3H

OnSite 19 /15U Wall Rack Model WR-15U

LAN Locker Adjustable Shelves

MODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Door Operator Owner's Manual

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

Medium HoneyBadger Chase Rack Installation Instructions

Fletcher F-3000 / F-3100 Accessory Laser Kit

Agilent N2902A 9000 Series Oscilloscope Rack Mount Kit

RMD5000 Rackmount Kit Instructions

Powerware 4-Post Rail Kit User s Guide

Installation Procedures 2015 Corvette C-7 Z06 With Carbon Fiber Kit SNS 50a


SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

THANK YOU FOR PURCHASING OUR STUDIO RTA PROJECT STATION

25-A Shawnee Way Bozeman, MT Fed ID PH FAX

Installation Instructions

Signature Choral Riser Side Rail

TOYOTA TUNDRA CARGO DIVIDER Preparation. Part Number: PT

Installation Instructions Lower Cargo Rack Bracket

THANK YOU FOR PURCHASING OUR STUDIO RTA CREATION STATION

10-PIECE. Garage Storage Set OWNER'S MANUAL. Patent pending

6 Foot/ 1800mm Aisle Width Net-Contain Aisle Containment for N-Type and S-Type Cabinets

SANnet II Family Rack Installation Guide for 2U Arrays

Installation Instructions Factory Style Bow Kit

Installation Instructions Hinged Roof Rack

D3976 RECESSED EXIT INSTALLATION INSTRUCTIONS

FOLDING TONNEAU RACK. 1. Rack Rail Assembly

ASSEMBLY & INSTALLATION GUIDE

User Instructions Multiline Otter Scoreboard Caddy Assembly

PM4S3 Monitor Kiosk. features and benefits: dimensions: additional information:

SmartView Mounting Frame 3 Wide x 3 Deep Video Wall Display Installation Guide

Assembly Instructions

FRONT BUMPER KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6

ASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK

08+ KAWASAKI KLR PD NERF

Slide Rail Kit DVA-ASRK-28A DVA-ASRK-36A. Installation Manual

25U 36 in. Knock-Down Server Rack Cabinet with Casters

RITE-HITE RAINGUARD TM

INSTALLATION INSTRUCTIONS Lateral Shift Accessory Model: PAC-800

CTTR Tire Rack Required tools

Expandable Bar Cabinet CF4001

Single Arm Pole Mount. Installation Manual Edition v1.01. For models: UNI-SA/14 UNI-SA/21.5 UNI-SA/26 UNI-SA01-MAN

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

RMD3000 DPO3000 Series Rackmount Kit

ALUMINUM HEADKNOCKER RACK P/N HKRS4-1 / HKRS5-1

SM-RAZOR-ART2-L / SM-RAZOR-ART2-XL

Note: This assembly instruction will cover all configurations of Alloy adjustable height double bases.

Heritage Solar Lamp Post

MFJ-1835K34 40,30 METER ADD ON KIT FOR THE MFJ-1835 COBWEB ANTENNA INSTRUCTION MANUAL. CAUTION: Read All Instructions Before Operating Equipment

CM340B STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING SERVER CABINET FROM SKID

RMD2000 DPO2000 and MSO2000 Series Rackmount Kit Instructions

OPERATORS MANUAL WEEKENDER STEEL LADDER RACK

ASSEMBLY INSTRUCTIONS FOR SERVICE BODY A MOUNT RACKS

ASSEMBLY INSTRUCTIONS Last Updated

INSTALLATION INSTRUCTIONS

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Instruction Sheet D-CPU. Secure CPU Holder

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

TLA72X, TLA7XM, & TLA7016 Benchtop Mainframe Rackmount Installation

MPA-9000 Universal Ceiling Projector Mount Kit

Security Products & Services...That Never Sleep. Sur-Lock. I/O 2000L Family of Exit Control Alarm Locks. Installation Instructions

22U 36in Depth Enclosed Server Cabinet with Casters

3DOF Leg Kit Assembly Guide VERSION 1.0

Sloped Top Shop Desk and Cabinet Conversion Kit Assembly Instructions

Installation Instructions Tailgate Rack Bracket

INSTALLATION INSTRUCTIONS

Hardware and Components:

ASSEMBLY INSTRUCTIONS

NetShelter VS Enclosure. User s Manual

Mounting Instructions Item No.: xxx

V00029KX READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

INSTRUCTION BOOK FOR. Parallax 0.8 Screen

2-Door EXO-Top Roof Rack System

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

ASSEMBLY INSTRUCTIONS

CNC Router Parts PRO Machine Kit Cable Track Installation Instructions

RM4000 DPO4000 Series Rackmount Kit

ASSEMBLY INSTRUCTIONS

TMA812 Tilt Mount Adapter for NEAR A8 and A12 Loudspeakers Installation Instruction Manual

Transcription:

RackSolutions.com Patent(s) Pending IBM xseries 345 Third Party Slide Rail Kit Installation Instructions Kit P/N: 2URAIL-IBM-345 info@racksolutions.com Technical Support & Sales 903.453.0801

Kit Contents Partially Assembled Rail Pair Brackets: (1) Rack Arm Bracket (1) Chassis Arm Bracket (1) Short Rear Bracket Bracket Hardware Kit: (4) 8-32 x 5/16 Screw (gold) (2) 8-32 x 1/4 Screw (silver) (4) 8-32 Nut Rack Hardware Kit: (8) 12-24 x 5/8 Screws (8) 10-32 x 5/8 Screws (8) 12-24 Square Nuts (8) 10-32 Cage Nuts Required IBM Hardware: (1) xseries 345 Server (1) Cable Management Arm (3) Cable Management Ring Pins Installation Instructions Step 1. Mounting Depth: Measure the Mounting-Depth for your rack from the front of the Front-Mounting-Surface to the back of the Back-Mounting-Surface (see the figure below). 4Post Cabinet Double 2Post FRONT REAR FRONT REAR MOUNTING DEPTH MOUNTING DEPTH Step 2. Depth Range: Locate your Mounting-Depth in the table below. Go to the page listed in the first column to adjust the rear rail bracket location Min Mounting Depth Max Mounting Depth Range A Step 2a 22.5 (572mm) 25.0 (635mm) Range B Step 2b 25.0 (635mm) 27.5 (699mm) Range C Step 2c 27.5 (699mm) 31.0 (787mm) Page 2

Step 2a. Range A: Remove and reverse the two rear brackets. Adjust the Rear Brackets on both rails to match your rack s Mounting Depth. Keep the two screws and nuts (pre-installed) as far apart as possible. Tighten all screws. Rear Bracket Rear Attachment for Range A: Attach the back of the rails as shown below. The rail should be centered vertically with the 2U space required by the server. Attach (1) Rack Arm Bracket using (2) 8-32 x 5/16 screws (gold) and (2) 8-32 nuts. Tighten all screws. Rack Attachment Hardware is provided for square hole racks (12-24 Screw + Cage Nut), threaded hole racks (10-32 or 12-24 screws), or unthreaded hole racks (12-24 screws and nuts). Tighten all screws. Proceed to Step 3 (page 7). Rack Arm Bracket (This Side Only) Page 3

Step 2b. Range B: Adjust the Rear Brackets on both rails to match your rack s Mounting Depth. Keep the two screws and nuts (pre-installed) as far apart as possible. Tighten all screws. Rear Bracket Rear Attachment for Range B: Attach the back of the rails as shown below. The rail should be centered vertically with the 2U space required by the server. Attach (1) Short Rear Bracket and the rear of the rail using the same screws. Attach (1) Rack Arm Bracket using (2) 8-32 x 5/16 screws (gold) and (2) 8-32 nuts. Tighten all screws. Rack Attachment Hardware is provided for square hole racks (12-24 Screw + Cage Nut), threaded hole racks (10-32 or 12-24 screws), or unthreaded hole racks (12-24 screws and nuts). Tighten all screws. Proceed to Step 3 (page 7). Short Rear Bracket (This Side Only) Rack Arm Bracket (This Side Only) Page 4

Step 2c. Range C: Adjust the Rear Brackets on both rails to match your rack s Mounting Depth. Keep the two screws and nuts (pre-installed) as far apart as possible. Tighten all screws. Rear Bracket Rear Attachment for Range C: Attach the back of the rails as shown below. The rail should be centered vertically with the 2U space required by the server. Attach (1) Rack Arm Bracket and the rear of the rail using the Rack Attachment Hardware (see below). Tighten all screws. Rack Attachment Hardware is provided for square hole racks (12-24 Screw + Cage Nut), threaded hole racks (10-32 or 12-24 screws), or unthreaded hole racks (12-24 screws and nuts). Tighten all screws. Proceed to Step 3 (page 7). Rack Attachment Hardware goes thru Both Brackets (this side only) Rack Arm Bracket (this side only) Page 5

Step 3. Front Rail Attachment: Attach the front of the rails as shown below. The rail should be centered vertically with the 2U space required by the server. Rack Attachment Hardware is provided for square hole racks (12-24 Screw + Cage Nut), threaded hole racks (10-32 or 12-24 screws), or unthreaded hole racks (12-24 screws and nuts). Tighten all screws. Latch Alignment Latch Page 6

Step 4. Install Server: Install the server onto the rails per the IBM Installation Instructions. Be sure to follow all safety guidelines. Before proceeding, ensure both locks are engaged on the sides of the chassis. Step 5. Chassis Arm Bracket: The server must be installed before completing this step. Attach (1) Chassis Arm Bracket using (2) 8-32 x 1/4 screws (silver). Tighten all screws. Note: If you install the server in the top of the rack or directly under another server or device, install the cable-management arm on the chassis arm bracket before attaching the chassis arm bracket to the slide rail. See the Rack Installation Instructions that come with your system for instructions. Installed Server Not Shown This Tab goes on THE OUTSIDE of the server. Chassis Arm Bracket Page 7

RackSolutions.com Installation Instructions Step 6. Cable Management Arm: Attach the IBM supplied Cable Management Arm using the IBM supplied ring pins. Note: This solution will not support the cable management arm in some shorter depth racks. Attach Arm with Pins here Installed Server Not Shown Warranty Statement Innovation First, Inc. warrants our products against defects in material and workmanship for a period of one (1) year from the date of purchase. Innovation First, Inc. liability shall be limited to repairing or replacing, at our option, any defective product. 44 231 info@racksolutions.com Technical Support & Sales 903.453.0801