Alexandra Secondary College Refurbishment Project No: 1507 SECTION MANUFACTURED CASEWORK - SHOP BUILT 12300/1

Similar documents
SECTION PRE-MANUFACTURED CABINETS

SECTION ARCHITECTURAL WOOD CASEWORK

SECTION MANUFACTURED CASEWORK

Music Area Casework General 1.01 Summary Related Sections Definitions Qualifications and Quality Assurance

CaseworkUSA. specifications. 1.1 General 1.2 Summary. 1.3 Related Sections. 1.4 Definitions. 1.5 Qualifications and Quality Assurance

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements.

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

SECTION ARCHITECTURAL WOODWORK. B. Related Sections: 1. Section Paints and Coatings: Field applied painted finishes.

Tender No Section St. James - Assiniboia Centennial Pool Fitness Facility Addition Page 1

SECTION INTERIOR ARCHITECTURAL WOODWORK. A. Section includes interior woodwork items indicated not specified elsewhere and as specified.

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

1. Division 6 Section "Rough Carpentry" for furring, blocking, and other carpentry work that is not exposed to view.

ADDENDUM TO THE CONTRACT. for the GLACIER FIRE STATION KITCHEN AND CLASSROOM RENOVATION. Contract No. E16-181

ROWAN COUNTY AIRPORT APRIL 2017 TERMINAL EXPANSION

Copyright 2017 AIA MasterSpec Premium 05/17 PRODUCT MASTERSPEC LICENSED BY ARCOM TO WEREVER PRODUCTS, INC.

B. Shop Drawings: For residential casework. Include plans. elevations, details, and attachments to other work.

SPEEDFRAME T h e s p e e d y w a y t o b e i n d i v i d u a l

SECTION INTERIOR FINISH CARPENTRY

SECTION WOOD ARCHITECTURAL CABINETS AND QUARTZ COUNTERTOPS

Addendum. McKee and Associates Architecture and Interior Design. No. ONE Date: Project:

SECTION WOOD ARCHITECTURAL CABINETS AND LAMINATE COUNTERTOPS

A. Provide all finish carpentry needed for a complete and proper installation.

Accessories and workbenches

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

Design and Construction Standards SECTION ATHLETIC LOCKERS

SECTION CUSTOM CABINETS

WHITE W/OAK TRIM NATURAL MEDIUM NORTHPORT OAK

Table and Furniture Base Fittings Plinth Adjusting Fittings

HARDWARE and PRODUCT SPECIFICATIONS ANTIMICROBIAL CASEWORK


A. Product Data: For each type of product indicated cabinet hardware and accessories, and finishing materials and processes.

SECTION ARCHITECTURAL WOODWORK

Organisational Kitchen Fittings Kitchen Cabinet Accessories

Chapter 22 - Cabinets & Vanities

Student Services & Classroom Addition

SECTION INTERIOR ARCHITECTURAL WOODWORK

Ask your DIY store or carpenter to cut the required boards to size. Instructions. 1. Cut out the opening for the bottles

SECTION CUSTOM MILLWORK

DIVISON 6 WOODS AND PLASTICS SECTION PLASTIC LAMINATE FACED ARCHITECTUAL CABINETS

B. Section Rough Carpentry: Support framing, grounds, and concealed blocking.

Locks and Catches Catches and Furniture Bolts

Bathroom Installation Manual

SECTION INTERIOR ARCHITECTURAL WOODWORK

SECTION WOOD DOORS


Coordinate installation of rough carpentry members specified in other sections.

77 cm. 5243/3-GA (3 pcs.) 5243/3-BO (3 pcs.)

S.NO Description Quantity Rate Amount

SECTION PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS AND COUNTERTOPS

Ash Brook Golf Course Scotch Plains, New Jersey

Opus Cabinets with "H Storage Unit, continued

SECTION INTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SLIDING DOOR SYSTEM_ S42 PRODUCT LIST. System description Accessories

C. Installation shall be by experienced carpenters. Coordinate with plumbing and electrical contractors.

SECTION ARCHITECTURAL WOOD CASEWORK


SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION INTERIOR ARCHITECTURAL WOODWORK

Interior Equipment/Shop Fittings

ADDENDUM TO BID DOCUMENTS ADDENDUM #03 SCCD RFP: # Project: Solano Community College District Vacaville Classroom Building (Annex) Renovation

SPEEDFRAME. The speedy way to be individual. The all purpose construction

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

SPECIFICATION OF THE STANDARD SHOWCAGE

DIVISION 6 WOOD, PLASTICS AND COMPOSITES

Lift-off hinge. Rising hinge. Standard hinge. Heavy duty hinge. Parliament hinge. Spring hinge. Double action spring hinge. Concealed mortise hinge

Technical product descriptions WORKTOPS STANDARD SLIM LINE. 1. Material thickness 38 mm. 2. Core/substrate material Chipboard

SECTION Display Case Door Series 1301-CM

aluminium profile system

Kitchen Fittings Hanging Cabinets and Accessories

SECTION PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS

AIR MASTER SYSTEMS INSTALLATION GUIDE TABLE OF CONTENTS

Product Guide Specification

Cascade Ph: Casework Fax: Corp

SECTION LAMINATE CLAD CASEWORK - COMMERCIAL

SECTION MISCELLANEOUS ROUGH CARPENTRY

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM CASEWORK

SECTION INTERIOR FINISH CARPENTRY. A. Lumber grading agencies, and the abbreviations used to reference them, include the following:

Specialist Furniture Range

ASS 70 FD folding / sliding door. Installation Guide

Leveling Feet, Base Plates and Casters

SLIDING DOOR SYSTEM_ S34 PRODUCT LIST. System description Accessories

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

SECTION CUSTOM CASEWORK

TANDEM plus BLUMOTION

SECTION PLASTIC LAMINATED CASEWORK

ADDENDUM NO. 1 THOROUGHBRED ROOM RENOVATION PHASE II DINING AREA MURRAY STATE UNIVERSITY, MURRAY, KY PROJECT #

A. Boards or Strips: Lumber of less than 2 inches nominal size in least dimension.

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

60/30 CLASSIC STEEL SHELVING EUR PRICE LIST

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

BENCH MASTER THE STRENGTH IS IN THE FRAME EXTRA STRONG ALL STEEL FULLY WELDED READY TO USE FREE. Heavy Duty Workbenches. Mobile Workbenches

FITTINGS, SCREWS, BOLTS, ETC.

A great addition to Sub-Zero's complete line of

Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

Product Guide Specification

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

Transcription:

SECTION 12300 MANUFACTURED CASEWORK - SHOP BUILT 12300/1 PART I GENERAL 101 Scope The work of this Section covers the supply and installation of manufactured casework items. It includes but is not limited to: Wet Area Joinery Benchtops Under bench cabinets Overhead cabinets Adjustable shelving wall stripping Sewing Machine units Mobile units Full height cupboards sliding and hinged doors Storage units 102 Related Work Co-ordinate and co-operate with the following trades: Carpentry Wall Finishes Floor Finishes Ceiling Finishes Plumbing Electrical Installation 103 Quality Assurance Manufacturers and installers are required to be widely experienced in the relevant aspects and class of work required for this section. 104 References Comply with applicable portions of the Australian Standards: AS 1859 Re-constituted wood-based panels Includes particleboard & medium density fibreboard 1859.1 Particleboard 1859.2 MDF AS 2131 Adhesives - for bonding decorative thermoset laminates (contact adhesives) AS 2924 Decorative thermosetting laminated sheet 105 Submissions Submit the following prior to fabrication: Product literature on all proposed hardware items including components. 106 Delivery, Handling and Storage Do not deliver work to the site until after completion of other trade activities which could soil, damage or cause deterioration of manufactured joinery items. Prevent soiling, damage or deterioration during delivery, storage and handling. Keep site storage to a minimum. Install directly in place, but refer to Clause 302. If circumstances make storage necessary in areas other than the final location, store only in those that meet the requirements specified for installation areas. 1

SECTION 12300 MANUFACTURED CASEWORK - SHOP BUILT 12300/2 PART II MATERIALS 201 Materials A. Benchtops: Thickness: Edge Profile: Edge: Other: Water resistant Medium Density Fibreboard/Medium Density Fibreboard 32mm Square edge 2mm Heavy Duty PVC edge strip to match selected laminate finish All visible support rear & side rails to be paint finish to match wall B. Under bench Carcass units: Water resistant/medium Density Fibreboard Thickness: 18mm Internal White melamine External Note: where unit is open (i.e. does not have doors), all visible surfaces are to be laminate finish. C. Overhead Carcass units: Medium Density Fibreboard Thickness: 18mm Internal White melamine External Note: where unit is open (i.e. does not have doors), all visible surfaces are to be laminate finish. D. 2100 High Cupboard and open shelving carcass units Water Resitant/Medium Density Fibreboard Thickness: 18/25mmmm Internal White melamine External Note: where unit is open (i.e. does not have doors), all visible surfaces are to be laminate finish. E. Shelves within under/over bench/full height cupboard carcass: Medium Density Fibreboard Thickness: 18mm adjustable shelving <900mm span 25mm adjustable shelving >900mm span White melamine F. Doors of under/over bench and 2100 high cupboard units: Water resistant/medium Density Fibreboard Thickness: 18/25mm Edge: 2mm Heavy Duty PVC edge strip to match selected laminate finish G. Open Shelving Units/Support Fins to workbenches Water resistant/medium Density Fibreboard Thickness: 18/25mm Edge: 2mm Heavy Duty PVC edge strip to match selected laminate finish H. Splashbacks Material Thickness: Water Resistant Medium Density Fibreboard 12mm 2

SECTION 12300 MANUFACTURED CASEWORK - SHOP BUILT 12300/3 202 Hardware A. Hinges: Type: Metallamat A Hinges Centre panel mounting No. per door: 2 for door height < 900mm 3 min for door height > 900mm B. Door handles: Type: Zinc Alloy Handle Chrome plated matt 106x35 Code: 116.09.015 C. Adjustable shelf supports: Type: 282.01.701 282.50.704 D. Bench Support Brackets: Type: Hebgo bracket 480 287.44.489 E. Wall Stripping & brackets for wall mounted adjustable shelfing Single and double Slotted wall stripping uprights Straight heavy duty shelf brackets to suit shelf depth Manufacturer: Kingfisher system or similar approved. F. Locks to joinery units Locations: J01 all underbench cupboards J11 sliding full height cupboard doors All underbench cupboards J13 All underbench cupboards & drawers JT01, JT02 Sliding & hinged cupboard doors JT04, JT05 roller shutter doors JT06 sliding full height cupboard doors JT07, JT08, JT09 all underbench cupboards Symo 3000 locking system to suit situation, or similar approved All locks within each facility to be keyed alike. G. Castors Locations: JT01, JT02 Heavy duty 100mm diameter wheel swivel castors with brake 100kg capacity Hafele 670.03.212 or Richmond Zinc Durolite plate castors or similar approved. I. Whiteboard cupboard sliding door face and track Locations: J11 JT01, JT02, JT06 Manufacturer: Educational Writing Boards of Australia Ph. 9561 6000 Item: EWB282 Horizontal Sliding Whiteboard Units Kaydra Lightweight sliding panels and two way track system Panel surface: Vitreous enamel Whiteboard Track: C65 top wheel assembly and bottom track with nylon guide. 3

SECTION 12300 MANUFACTURED CASEWORK - SHOP BUILT 12300/4 J. Sewing Machine Hutch roller Shutter & system Locations: JT04 and JT05 Hafele Plastic Roller Shutter door system including Shutter Slats 442.40.935 (silver) Roller shutter Door handle 442.38.925 (silver) End/Lock profile & Fascia profile 442.35.900 (silver) Guide track 442.32.304 & 90 degree bend (black) Including all caps & stops and Counter balancing mechanism K. Underbench Steel ladder framing Locations: JT04 and JT05 25x25 SHS ladder framing and legs. Powdercoat finish: Black 204 Fabrication Construct by screwing and gluing or other approved method. A dry stapled assembly will not be approved. Fabricate bench tops as indicated in a manner recommended by the material's manufacturer. Fabricate units without joints unless counter length exceeds maximum available length of materials. Seal joints between counter and splash back with matching colour silicone. Wherever possible, pre-cut openings to receive hardware, appliances, plumbing fixtures, electrical work and similar items. Locate openings accurately using templates or roughing-in diagrams for proper size and shape. Smooth edges of cutouts and, where located in bench tops and similar exposures, seal edges of cut-outs with a water resistant coating. Back prime all concealed solid timber surfaces prior to installation. Install fasteners, hinges, etc. in accordance with manufacturer s instructions. When in doubt about suitability, consult with manufacturer of the items specified or selected. 205 Inspection Before Delivery Advise Superintendent when the first of any group of items is ready for inspection not less than four days before delivery is due at the site. Where work is found not to comply with documentation, the Superintendent will order rectification. The Superintendent will be the sole decision-maker regarding compliance or non-compliance. PART III EXECUTION 301 Examination Visit the site and inspect conditions. Check dimensions and compare all aspects with the drawings and specification. Resolve differences before ordering materials or starting work. Start of work means total acceptance of all conditions. 302 Preparation for Installation Prior to installing, condition joinery to the average humidity conditions prevailing in the installation areas. Delivery anchoring devices and similar inserts required to be built into substrates well in advance of the fixing of fittings and provide full details when they are to be fixed by others. Prior to installation, examine shop-fabricated work for completeness and remedy and deficiencies. Include back priming. Remove packing where not required. Thoroughly clean all floors and walls that will be permanently concealed by joinery. 303 Installation Use concealed shims as required to install the work plumb, level, straight and distortion free within the following tolerances: - 1mm in 800mm for plumb and level (including bench tops), - 0.5mm maximum offsets in flush adjoining surfaces, - 2mm maximum offsets in revealed adjoining surfaces. Scribe and cut to fit adjoining work; refinish cut surfaces or repair damaged finishes at cuts. Secure joinery with anchors of blocking built-in or directly attached to substrates. Secure to grounds, stripping and blocking with countersunk, concealed fasteners and blind nailing as required to complete the installation. Except where pre-finished matching fastener heads are required, use fine finishing nails, countersunk and filled flush. Use a matching filler where a transparent finish is required. 4

SECTION 12300 MANUFACTURED CASEWORK - SHOP BUILT 12300/5 Install casework without distortion so that doors will fit openings properly and be accurately aligned. 304 Hardware Install all door and joinery hardware as scheduled, listed and required in full compliance with the manufacturer's recommendations. Adjust as needed to centre doors in openings. 305 Adjustments, Cleaning, Finishing and Protection A. Finish the work specified in this Section and remedy anything not finished at the shop or any other stage prior to completion. B. Adjust joinery to achieve a uniform appearance. C. Lubricate and clean hardware making any final adjustments needed for proper operation. Remove all handling marks from visible joinery surfaces. D. Protection: Do everything needed to ensure that all work is without damage or deterioration at completion. 306 Completion Complete all contracted work in accordance with contract documents and written variation orders issued by the Superintendent. 5

SECTION 12300 MANUFACTURED CASEWORK - SHOP BUILT 12300/6 307 Schedules Colours & Finishes: LC1 Silver Ash 589 Laminex LC2 Midnight 464 Laminex LC3 Black 460 Laminex LC4 Jalapeno 031 Laminex LC5 Silver Grey 324 Laminex LC6 Chichi 010 Laminex AL Anodised Aluminium Natural PC2 Black Powdercoat PHASE ONE BASE SCHEME J01 Multi Materials Benchtop Laminate LC4 Underbench cupboard unit visible faces & cupboard Laminate LC1,LC2,LC5 doors Splashback Upstand Laminate LC4 J11 VCD Benchtop Laminate LC2 Underbench visible carcass faces and cupboard doors Laminate LC5 Splashback Laminate LC2 Full height cupboard carcass faces Laminate LC5 Sliding cupboard door leaf faces Whiteboard - PHASE TWO BASE SCHEME J13 First Aid Benchtop Laminate LC2 Underbench cupboard carcass, cupboards and drawers Laminate LC5 Splashback Laminate LC2 PHASE TWO - TENDER OPTION 3 JT 07 Teaching 1 Benchtop Laminate LC2 JT 08 Teaching 2 Underbench carcass faces & lockable cupboard doors Laminate LC1 JT 09 Teaching 3 PHASE ONE - TENDER OPTION 4 JT06 Drama Benchtop Laminate LC2 Full height cupboard carcass faces Laminate LC5 Sliding cupboard door leaf faces Whiteboard - 6

SECTION 12300 MANUFACTURED CASEWORK - SHOP BUILT 12300/7 PHASE ONE - TENDER OPTION 5 JT01, JT02 Multi Materials Mobile Cupboard Carcass external faces Laminate LC5 Sliding cupboard door faces Whiteboard - JT03 Multi Materials Adjustable shelving in built in carcass Laminate LC5 JT04 & JT05 Multi Materials Benchtop Laminate LC2 Over bench hutch carcass Laminate LC1 Roller Shutter Aluminium AL Steel frame Powder-coat PC2 PHASE ONE - TENDER OPTION 6 J02, J03 Store 1 Benchtop Laminate LC4 Underbench Shelving Laminate LC5 J04 Store 1 Adjustable shelving to wall stripping Laminate LC5 J05 Store 1 Adjustable shelving to wall stripping Laminate LC5 Benchtop Laminate LC4 Underbench vertical dividers Laminate LC5 J06 Store 2 Adjustable shelving to wall stripping Laminate LC5 Benchtop Laminate LC4 Underbench shelving Laminate LC5 J07 Store 2 Adjustable shelving to wall stripping Laminate LC5 Benchtop Laminate LC4 Underbench shelving Laminate LC5 J08 Store 2 Cupboard external visible carcass faces and doors Laminate LC5 J09 Store 3 Benchtop Laminate LC4 Underbench vertical dividers Laminate LC5 J10 Store 3 Adjustable shelving to wall stripping Laminate LC5 7