NetShelter VX. Four-Post Open Frame. User s Manual

Similar documents
NetShelter VS Enclosure. User s Manual

NetShelter Recessed Rail Kit AR8010BLK

Mounting Kit for HP N-class Servers AR8014A

Broadband Step-Up Transformer. User Manual

Smart-UPS RT. Isolation Transformer Models: SURT001 and SURT002 Isolation and Step-Down Transformer Models: SURT003 and SURT004.

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Mighty Mo GX Series Cabinet Installation Guide. OR Rev /11

Tilting Flat Panel Wall Mount Installation Guide

Media Storage Systems Fixed Media Cabinets

Copyright Black Box Corporation. All rights reserved.

Tilting & Swiveling Plasma/LCD Flat Panel Wall Mount Installation Guide Model: A380SM

Powerware Series. Eaton Rail Kit 9- and 12-Slot Cabinets Installation Guide

EF-Series EuroFrame Gen 2 Cabinet System User Manual

These 15U, 22U, 37U, 42U, and 51U racks provide exceptional stability.

Instruction Sheet SNE SERIES. Cable Chase

Desk/Wall-Mount Rack

INSTALLATION INSTRUCTIONS

Models 2230 and 2240

Please Do Not Return This Product To The Store!

Tilting, Swiveling & Rotating Flat Panel Wall Mount

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #

N-Series TeraFrame Gen 3 Cabinet System User s Manual

Loading Dock Safety Gate

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

Your Performance Partner

Performance 2.0 Series

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set

Models 2130 and 2140

GF-Series GlobalFrame

Spa & Hot Tub Necessities. Cover Removal System Installation & Use Manual

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

V00029KX READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

COMPETITOR CB-610 STANDARD BENCH

Owner s Manual & Safety Instructions

SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

INSTALLATION INSTRUCTIONS

Models 2030 and 2040

User Manual. Smart-UPS On-Line. Uninterruptible Power Supply. Isolation Transformer Models: SURT001 and SURT002

INSTALLATION INSTRUCTIONS

Models 2130 and 2140

INSTALLATION INSTRUCTIONS

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Signature Choral Riser Side Rail

REC Series Rack Installation Guide

Owner s Manual Mobile Flat-Panel Floor Stand

THANK YOU FOR PURCHASING OUR STUDIO RTA CREATION STATION

MODEL T28000 HEAVY-DUTY MOBILE BASE INSTRUCTIONS

Install Instructions. NewAge Steel Welded Tall Locker

Full Motion Gas Spring TV Wall Mount - 24" to 55" Installation Instructions

Z4- Series SeismicFrame

INSTALLATION INSTRUCTIONS

Page 1 of 18. SunRail System Installation Instructions

OWNER'S MANUAL. Please Do Not Return This Product To The Store!

M ACS Instructions

INSTALLATION INSTRUCTIONS

Hardware Box 1 1/4 Diameter x 3/4 Long Bolts 24 1/4 Nylon Lock Nut 24 1/4 Diameter x 3 Long Lag Bolt 8 1/4 Washers 56

Please Do Not Return This Product To The Store!

Tilting & Swiveling Flat Panel Wall Mount Installation Guide Model: AXS2040

Paramount Enclosure. Installation Guide

Instruction Sheet D-CPU. Secure CPU Holder

Installation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays

PRC-LA Installation Guide

FIXED-POSITION WALL MOUNT FOR TVs in.

One Shelf, Wall Mounted A/V Component Stand Installation Guide Model: EX101SS

Installation Instructions Cage Kit JK Unlimited (4-Dr) Part # 76902

Manual Carton Closing Staplers

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

Installation Instructions Hinged Roof Rack

MARCY CLASSIC MCB-252 COMBO BENCH W/120 lbs Weight Set

Worktop INDEX eight Capacity Unpacking

AM500-U Installation Guide

STOP. Performance Plus 2.0 Series. hazard! ATTENTION: Is your cabinet damaged?

Worktop. Weight Capacity. 100 lbs. 21 Corner Worktop. 48 Worktop. Fits over 2 Cabinets. 72 Worktop. Fits over 3 Cabinets. 200 lbs. 150 lbs.

CAUTION: WEIGHT ON THIS PRODUCT SHOULD NOT EXCEED 136KG / 300LBS.

Agilent N2902A 9000 Series Oscilloscope Rack Mount Kit

ECM Installation Guide Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d Installation, Installatie gids

COMPETITOR WM-203 COMBO BENCH

UNIVERSAL STAND. Owner s Manual. Visit us on the web at QUESTION Model No. UT1002

INSTALLATION INSTRUCTIONS

4Post Server Rack-111 Assembly For Floor Anchored Models

INSTALLATION INSTRUCTIONS

Eaton Data Center Racks

P4263TP. Installation Guide. Low-Profile Tilting Portrait Mount for Flat-Panels

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS

Installation Instructions Factory Style Bow Kit

Model 6360/6361. Ambulance Cot Fastener INSTALLATION/OPERATION INSTRUCTIONS. IMPORTANT Keep manual on file at all times.

Instruction Sheet REB SERIES. Rotating Sliding Base REB18

F-150 Structural Holding System

Owner s Manual & Safety Instructions

Please Do Not Return This Product To The Store!

Powered by. For further installation assistance: prxperformance.com/pages/murphy-rack

INSTALLATION INSTRUCTIONS CJ-5 M38A PART # With Doors

Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

for Magna-Matic Stands & Accessories Covering: MAG & MAG / / / /

FOR WALL MOUNT WORKSTATION

GB-AVSTOR5 Ceiling Equipment Storage Box with Pipe Coupler

AST-2446 INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

10-PIECE. Garage Storage Set OWNER'S MANUAL. Patent pending

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Transcription:

NetShelter VX Four-Post Open Frame User s Manual

Contents Product Overview......................... 1 NetShelter VX Four-Post Open Frame models 1 Product Inventory......................... 2 Features of the Four-Post Open Frame 3 Hardware, grommets, and covers 4 Before Installation......................... 5 Location of mounting hardware 5 Tools required 5 Packaging of the frame 6 Unpacking the frame 7 Disclaimer 7 Taking inventory 8 Configuration 8 Installing the Four-Post Open Frame........... 9 Leveling feet 9 How to level the frame 9 Removing the casters and leveling feet (optional) 10 Stabilizing kits (optional) 10 Installing Equipment...................... 12 Identifying one U-space on the mounting rail 12 Installing and removing caged nuts 13 Grounding studs 14 Cable Management....................... 15 Location of cable access openings 15 Removing the skirts 16 Cable management options 16 Vertical Mounting Rails.................... 17 Location of screws for adjusting the mounting rail 17 Adjusting the mounting rails on the frame posts 18 Repositioning the rails using the horizontal braces 18 NetShelter VX Four-Post Open Frame User s Manual

Contents Horizontal Braces........................ 19 How to move a brace 19 Removing the Roof....................... 20 Warranty and Service..................... 21 Limited warranty 21 Warranty limitations 21 Obtaining service 21 Specifications........................... 23 ii NetShelter VX Four-Post Open Frame User s Manual

Product Overview This American Power Conversion (APC ) NetShelter VX Four-Post Open Frame is a high-quality frame for storage of industry-standard (EIA-310) 19-inch rack-mount hardware, which includes servers, voice, data, networking, internetworking, and APC power protection equipment. NetShelter VX Four-Post Open Frame models Model Height Width Depth AR2102 AR2102BLK 42U 19" EIA 1070mm AR2802 AR2802BLK 42U 19" EIA 900mm One U = 1.75 in. (4.44 cm) NetShelter VX Four-Post Open Frame User s Manual 1

Product Inventory Features of the Enclosure 42U (73.5 in) of storage height for 19-inch rack-mount equipment Frame posts Frame Adjustable horizontal braces and vertical mounting rails Front and rear skirts Ground studs on roof and base Ground studs on rear cabling channel (AR2102BLK only) Roof Cable access Feet Ventilated roof Access on sides (AR2102BLK only), and base Removable, heavy-duty casters and removable, adjustable leveling feet 2 NetShelter VX Four-Post Open Frame User s Manual

Product Inventory Features of the Four-Post Open Frame NetShelter VX Four-Post Open Frame User s Manual 3

Product Inventory Hardware, grommets, and covers Baying hardware Item AR2102BLK AR2802BLK Baying brackets 4 Vertical baying trim 1 M6 counter-sunk screws 4 M6 12 socket-head screws 8 M6 caged nuts 8 Mounting hardware M6 16mm Phillips/slotted screws 60 60 Caged nut installation tool 1 1 M6 caged nuts 60 60 Plastic cup washers 60 60 Open-ended wrench (13mm/14mm) 1 1 M5 Allen wrench 1 1 Covers 4 4" cover 4 3 4 4" grommet 4 4 8" grommet 6 4 NetShelter VX Four-Post Open Frame User s Manual

Before Installation Warning Before you begin to unpack the frame, read and follow these warnings to prevent injury and damage: Use at least two persons to unpack the frame. Stabilize the frame before installing the components failure to do so could allow the frame to tip over. Do not extend more than one component from the frame at one time to prevent the frame from becoming dangerously unstable. Load the heaviest components first and place them toward the bottom of the enclosure to prevent the frame from becoming top-heavy. Location of mounting hardware The bag containing the mounting hardware is fastened to the floor of the frame. Tools required The following tools (not included) will be necessary to unpack and adjust the frame: Phillips screwdriver Shears/utility knife Level NetShelter VX Four-Post Open Frame User s Manual 5

Before Installation Packaging of the frame Cardboard top cover Cardboard corner protectors Stretch wrap Pallet brackets 13mm bolts Shipping pallet Pouch containing the open-ended wrench, this user s manual, warranty card, and literature 6 NetShelter VX Four-Post Open Frame User s Manual

Before Installation Unpacking the frame 1. Move the shipping pallet to a firm, level surface in an open area. Inspect the frame for visible signs of shipping damage. If you detect shipping damage, contact APC Customer Support at the number listed on the yellow sticker on the front of the frame. 2. Remove the open-ended wrench from the pouch on the front of the packaging. 3. Refer to the label on the packaging to determine where to cut the wrapping. Using heavy-duty shears or a utility knife, carefully remove the plastic stretch-wrap surrounding the frame. 4. Remove the cardboard cover and the four tall, cardboard corner protectors. 5. Remove the four brackets that are anchoring the frame to the shipping pallet. Use the 13-millimeter end of the open-ended wrench (stored inside the pouch on the front of the frame packaging) to remove the 13-millimeter bolts that secure the brackets to the pallet. 6. With one person on each side of the frame, carefully roll it toward the rear of the pallet until the rear casters clear the back edge of the pallet. Continue to slide the frame rearward until the rear casters make contact with the floor. 7. While one person carefully tips the frame slightly away from the pallet, have the other person pull the pallet away from the frame. Note Save the pallet if you plan to reship the frame. Please recycle The shipping materials are recyclable. Please save them for later use, or dispose of them appropriately. Disclaimer APC is not responsible for damage sustained during reshipment of this product. NetShelter VX Four-Post Open Frame User s Manual 7

Before Installation Taking inventory After unpacking the frame, verify that all required components and hardware have been shipped with the frame. See the earlier section on product inventory. Note If any items are missing, contact APC Customer Support using a number or Web address listed on the back cover of this manual. Configuration Before installing your frame, plan the location of the equipment to be installed. Consider the space needed by equipment, ergonomics of keyboards and video monitors. The NetShelter Configurator, available on the APC Web site, helps you plan your configuration to maximize the available U-space of your frame(s). Warning To maintain proper airflow, cover any empty vertical enclosure space with optional blanking panels (AR8101 and AR8101BLK for 19-inch wide enclosures, not included). Improper airflow could damage installed components. To avoid damage or injury, level and stabilize the enclosure in its permanent location before loading equipment. 8 NetShelter VX Four-Post Open Frame User s Manual

Installing the Four-Post Open Frame To install the frame, you will first level it. You can also provide additonal stability using any of several methods described in this section. Leveling feet Leveling feet are attached under the frame at each corner. The leveling feet can help provide a stable base if the selected floor space is uneven, but they are not intended to compensate for a badly sloped surface. You can remove the casters and leveling feet to allow the base of the frame to rest directly on the floor. How to level the frame 1. Move the frame to a relatively level location. 2. Fit the 14-millimeter end of the open-ended wrench (included) to the hex head just above the round pad on the bottom of the leveling foot. Turn the wrench clockwise to extend the leveling foot until it makes firm contact with the floor. 3. Repeat step 2 for each of the remaining leveling feet. 4. Use a level to determine which feet need further adjustment to level the frame. Adjust as necessary. NetShelter VX Four-Post Open Frame User s Manual 9

Installing the Four-Post Open Frame Removing the casters and leveling feet (optional) 1. Lay the frame on its side. Warning To avoid personal injury or damage to the frame, two people should support the frame. 2. Remove the four hex nuts from each of the casters and remove the casters. 3. Fit the 14-millimeter end of the open-ended wrench (included) to the hex head just above the round pad on the bottom of the leveling foot. Turn the wrench clockwise to extend the leveling foot until it comes off. 4. Repeat step 3 for each of the remaining leveling feet. Stabilizing kits (optional) American Power Conversion offers additional products (not included) for stabilizing frame: Stabilizer Plate Kit (AR8115 or AR8115BLK) one plate and mounting hardware for attaching to the frame. Use up to 3 plate kits to provide stability to the front and sides. You can also bolt stabilizer plates to the floor for additional stability. Note To use the Stabilizer Plate Kit, you must first remove the front skirt of the frame. See Removing the skirts on page 16. 10 NetShelter VX Four-Post Open Frame User s Manual

Installing the Four-Post Open Frame Bolt-Down Bracket Kit (AR8112BLK) four brackets and mounting hardware for attaching to the inside or outside of the base of the frame. These brackets must be bolted to the floor to stabilize the frame. Baying kits You can expand your installation by joining frames together with optional baying kits (AR8376BLK or AR8377BLK). NetShelter VX Four-Post Open Frame User s Manual 11

Installing Equipment This section gives general information on installing rackmount equipment in the frame. See also the instructions provided with the equipment to be installed. Identifying one U-space on the mounting rail When installing equipment, you will need to locate the top and bottom of a U-space on the mounting rails. Every third square hole on the mounting rails of a NetShelter frame is notched and numbered to indicate the middle of a U-space. A U-space consists of one of these notched holes and one hole immediately above and below it, as shown. 31 One U 30 29 he 12 NetShelter VX Four-Post Open Frame User s Manual

Installing Equipment Installing and removing caged nuts During installation of equipment in your frame, you may need to install or remove caged nuts. To install: Warning Install caged nuts horizontally, with the ears engaging the sides of the square hole. Do NOT install caged nuts vertically with the ears engaging the top and bottom of the square hole. 1. Insert the caged nut into the square hole by hooking one ear of the caged nut assembly through the far side of the hole. Note Install the caged nuts on the interior of the mounting rails. 2. Place the caged nut tool (included) on the other ear of the caged nut and pull to snap it into position. To remove: Remove any attached screw and reverse the action in step 2. Grasp the caged nut before releasing the tool. NetShelter VX Four-Post Open Frame User s Manual 13

Installing Equipment Grounding studs There are five grounding studs on the Four-Post Open Frame. # of studs Location 4 Base 1 Rear cabling channel (AR2102BLK only) 1 Roof American Power Conversion offers an optional grounding kit (AR8390) for grounding the frame. 14 NetShelter VX Four-Post Open Frame User s Manual

Cable Management Location of cable access openings There are cable access openings in the roof, base, and sides (AR2102BLK only) of the enclosure. The rear cabling channel on the back of the AR210BLK model provides clearance for routing cables. Before routing wires through the side access holes on the Base enclosure, ensure the protective grommets (included) are installed into the cable access openings. AR2102BLK AR2802BLK NetShelter VX Four-Post Open Frame User s Manual 15

Cable Management Removing the skirts For additional cable access or to install the Stabilizer Plate, you can remove the skirts at the front and rear of the frame by removing the two countersunk screws in each skirt. Cable management options APC offers the following products for managing cables in your frame: Product SKU Description Figure Cable Management Hoops Cable Containment Kit (AR2102BLK only) AR8113 AR8116BLK Fasten cables to posts, mounting rails, or braces. Fasten cables to rear cabling channel. Side Cable Management Tray AR8114BLK Fasten cables to posts, mounting rails and braces. Rear Cable Management Tray (AR2102BLK only) AR8118BLK Fasten cables to rear cabling channel 16 NetShelter VX Four-Post Open Frame User s Manual

Vertical Mounting Rails The vertical mounting rails are factory-installed in the proper position for use with rack-mountable equipment that has a depth of 29.13 inches (739mm). You can adjust the rails to the front or rear a total of 2.35 inches (60mm) to accommodate different rails or equipment with various depths. You can also move the rails by attaching them to the horizontal braces. The following sections describe the procedures for adjusting the position of the mounting rails and for moving them within the frame. Location of screws for adjusting the mounting rail The location of the screws that govern the position of the mounting rails is shown below (AR2102BLK shown). 2.35 (60 mm) NetShelter VX Four-Post Open Frame User s Manual 17

Vertical Mounting Rails Adjusting the mounting rails on the frame posts Warning To avoid personal injury or damage to the frame, perform this procedure with no equipment installed on the vertical mounting rails. 1. Use the 5-millimeter Allen wrench (included) to loosen but not remove the socket-head screws in the slot of the vertical mounting rail. 2. Slide the vertical mounting rail forward or rearward as desired. Use a level to make sure the mounting rail is vertical. Tighten each screw. Repositioning the rails using the horizontal braces 1. Use the 5-millimeter Allen wrench (included) to remove the socket-head screws in the slots of the vertical mounting rail. 2. Locate the new position for the vertical mounting rail. 3. Secure the vertical mounting rail to each horizontal brace. Note You may have to adjust the position of the horizontal brace up or down to align it with the mounting channel in the rear mounting rail. See How to move a brace on page 19. a. Insert a caged nut into the appropriate holes at the new position on the upper and lower horizontal brace. b. Place the mounting rail at the new position and insert a socket-head screw through the rail, brace, and caged nut. c. Tighten the screw to secure the vertical mounting rail to the brace. d. Repeat steps a-c for the other side. 5. Repeat steps 1-3 for the opposite side of the enclosure. 18 NetShelter VX Four-Post Open Frame User s Manual

Horizontal Braces Each side of the frame has two horizontal braces between the vertical frame posts. These adjustable braces support the vertical mounting rails and are available for managing cables. How to move a brace 1. Use the 5-millimeter Allen wrench (included) to remove the four socket-head screws that are holding the brace to the frame posts (AR2102BLK shown). 2. Remove the caged nuts from the frame post. See Installing and removing caged nuts on page 13. 3. Locate the new position for the brace and secure the brace to the frame posts: a. Insert a caged nut into the appropriate holes at the new position on the frame posts. b. Place the brace at the new position and insert a socket-head screw through the brace, frame post, and caged nut. Tighten. NetShelter VX Four-Post Open Frame User s Manual 19

Removing the Roof You can remove the roof from the frame by removing the four socket-head screws from the inside corners. Use the 5-millimeter Allen wrench (included). 20 NetShelter VX Four-Post Open Frame User s Manual

Warranty and Service Limited warranty APC warrants the Four-Post Open Frame to be free from defects in materials and workmanship for a period of five years from the date of purchase. Its obligation under this warranty is limited to repairing or replacing, at its own sole option, any such defective products. This warranty does not apply to equipment that has been damaged by accident, negligence, or misapplication or has been altered or modified in any way. This warranty applies only to the original purchaser. Warranty limitations Except as provided herein, APC makes no warranties, express or implied, including warranties of merchantability and fitness for a particular purpose. Some jurisdictions do not permit limitation or exclusion of implied warranties; therefore, the aforesaid limitation(s) or exclusion(s) may not apply to the purchaser. Except as provided above, in no event will APC be liable for direct, indirect, special, incidental, or consequential damages arising out of the use of this product, even if advised of the possibility of such damage. Specifically, APC is not liable for any costs, such as lost profits or revenue, loss of equipment, loss of use of equipment, loss of software, loss of data, costs of substitutes, claims by third parties, or otherwise. This warranty gives you specific legal rights and you may also have other rights, which vary according to jurisdiction. Obtaining service To obtain support for problems with your Four-Post Open Frame: 0 1. Note the serial number and date of purchase. (The serial number appears on the top of the frame at rear.) 2. Contact Customer Support at a phone number on the back cover of this document. A technician will try to help you solve the problem by phone. 3. If you must return the product, the technician will give you a return material authorization (RMA) number. If the warranty expired, you will be charged for repair or NetShelter VX Four-Post Open Frame User s Manual 21

Warranty and Service replacement. 4. Pack the unit carefully. The warranty does not cover damage sustained in transit. Enclose a letter with your name, address, RMA number and daytime phone number; a copy of the sales receipt; and a check as payment, if applicable. 5. Mark the RMA number clearly on the outside of the shipping carton. 6. Ship by insured, prepaid carrier to the address provided by the Customer Support technician. 22 NetShelter VX Four-Post Open Frame User s Manual

Specifications Item Measurement AR2102BLK AR2802BLK Height 81.5 in (207cm) 81.5 in (207cm) Width 23.0 in (58.5cm) 23.0 in (58.5cm) Depth 42.2 in (107.4cm) 35.5 in (90.1cm) Net weight 217 lb (98.4kg) 163 lb (73.9kg) NetShelter VX Four-Post Open Frame User s Manual 23

APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: Visit the APC Web site to find answers to frequently asked questions (FAQs), to access documents in the APC Knowledge Base, and to submit customer support requests. www.apc.com (Corporate Headquarters) Connect to localized APC Web sites for specific countries, each of which provides customer support information. www.apc.com/support/ Global support with FAQs, knowledge base, and e-support. Contact an APC Customer Support center by telephone or e-mail. Regional centers: APC headquarters U.S., Canada Latin America Europe, Middle East, Africa (1)(800) 800-4272 (toll free) (1)(401)789-5735 (USA) (353)(91) 702020 (Ireland) Japan (03)5434-2021 Guidance 3 Local, country-specific centers: go to www.apc.com/support/contact for contact information. Contact the APC representative or other distributor from whom you purchased your APC product for information on how to obtain local customer support. Entire contents copyright 2002 American Power Conversion. All rights reserved. Reproduction in whole or in part without permission is prohibited. APC, the APC logo, and NetShelter are trademarks of American Power Conversion Corporation and may be registered in some jurisdictions. All other trademarks, product names, and corporate names are the property of their respective owners and are used for informational purposes only. 990-0398 02/2002