Tracking of - IKAROS -

Similar documents
Near Earth Asteroid (NEA) Scout CubeSat Mission

RADIOMETRIC TRACKING. Space Navigation

Tracking of Moving Targets with MIMO Radar

National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology

Chapter 3 Solution to Problems

Satellite Sub-systems

Deep Space Communication The further you go, the harder it gets. D. Kanipe, Sept. 2013

RADIOMETRIC TRACKING. Space Navigation

Jet Propulsion Laboratory, California Institute of Technology

The results of Small Satellite technology transfer from JAXA

Satellite Testing. Prepared by. A.Kaviyarasu Assistant Professor Department of Aerospace Engineering Madras Institute Of Technology Chromepet, Chennai

Sensor & Actuator. Bus system and Mission system

Mission to Earth Moon Lagrange Point by a 6U CubeSat: EQUULEUS

RECOMMENDATION ITU-R SA (Question ITU-R 131/7) a) that telecommunications between the Earth and stations in deep space have unique requirements;

Abstract- Light Kite. things, finding resources and using them for our own use.

TELEMETRY, TRACKING, COMMAND AND MONITORING SYSTEM IN GEOSTATIONARY SATELLITE

Space Frequency Coordination Group

SECTION 2 BROADBAND RF CHARACTERISTICS. 2.1 Frequency bands

1. Detect and locate potentially illegal fishing ship using satellite image, AIS data, and external sources.

AES SATELLITE SOCRATES

A CubeSat Radio Beacon Experiment

Outernet: Development of a 1U Platform to Enable Low Cost Global Data Provision

GMES Sentinel-1 Transponder Development

ALOS and PALSAR. Masanobu Shimada

A Feasibility Study of Techniques for Interplanetary Microspacecraft Communications

RECOMMENDATION ITU-R SA Protection criteria for deep-space research

Interplanetary CubeSats mission for space weather evaluations and technology demonstration

Project Bellerophon April 17, 2008

Picture of Team. Bryce Walker. Charles Swenson. Alex Christensen. Jackson Pontsler. Erik Stromberg. Cody Palmer. Benjamin Maxfield.

The Overview Report of S-band Ground Station Verification and Operation for Lean Satellite, HORYU-IV

Engineering Discovery

Current Status of Hayabusa2. Yuichi Tsuda, Project Manager, Hayabusa2 Project Japan Aerospace Exploration Agency

Exploiting Link Dynamics in LEO-to-Ground Communications

FIRST ACQUISITION OF THE SKYBRIDGE CONSTELLATION SATELLITES

BENEFITS FOR DEPLOYABLE QUADRIFILAR HELICAL ANTENNA MODULES FOR SMALL SATELLITES

Rome, Changing of the Requirements and Astrofein s Business Models for Cubesat Deployer

Japanese concept of microwave-type SSPS

Chapter 6 Part 3. Attitude Sensors. AERO 423 Fall 2004

A Test Lab Techno Corp. Report Number:1410FR27

Analysis of Tumbling Motions by Combining Telemetry Data and Radio Signal

Satellite Navigation Principle and performance of GPS receivers

RECOMMENDATION ITU-R SA (Question ITU-R 210/7)

Exercise 1-4. The Radar Equation EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION OF FUNDAMENTALS

debris manoeuvre by photon pressure

Your final semester project papers are due in ONE WEEK, Thu April 28th (last day of class). Please return your marked-up First draft.

RF and Microwave Test and Design Roadshow 5 Locations across Australia and New Zealand

Study of Factors which affect the Calculation of Co- Channel Interference in a Radio Link

7. Transmitter Radiated Spurious Emissions and Conducted Spurious Emission

CHAPTER 6 ENVIRONMENTAL CONDITIONS

Wireless Power Transmission of Solar Energy from Space to Earth Using Microwaves

TIME TRANSFER EXPERIMENT BY TCE ON THE ETS-VIII SATELLITE

ERS-2 SAR CYCLIC REPORT

B ==================================== C

STK Missile Defense. Introduction: Scenario Storyline:

Discussion on regional radar network and radar exchange (Weather Radar Maintenance)

3.1. Historical Overview. Citizens` Band Radio Cordless Telephones Improved Mobile Telephone Service (IMTS)

Link Budgets International Committee on GNSS Working Group A Torino, Italy 19 October 2010

Primary POC: Prof. Hyochoong Bang Organization: Korea Advanced Institute of Science and Technology KAIST POC

Technician Licensing Class

Don M Boroson MIT Lincoln Laboratory. 28 August MIT Lincoln Laboratory

SATELLITE SUBSYSTEMS. Networks and Communication Department. Dr. Marwah Ahmed

2009 CubeSat Developer s Workshop San Luis Obispo, CA

RECOMMENDATION ITU-R SM Method for measurements of radio noise

Lecture Outlines Chapter 25. Physics, 3 rd Edition James S. Walker

A Scalable Deployable High Gain Reflectarray Antenna - DaHGR

SATELLITE LINK DESIGN

European Radiocommunications Committee (ERC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

OVERVIEW OF THE ALOS SATELLITE SYSTEM

CubeSat Integration into the Space Situational Awareness Architecture

Long-Haul DWDM RF Fiber Optic Link System

TELECOMMUNICATION SATELLITE TELEMETRY TRACKING AND COMMAND SUB-SYSTEM

ECE 6390: Satellite Communications and Navigation Systems TEST 3 (Fall 2004)

Enhancing space situational awareness using passive radar from space based emitters of opportunity

Revision of Lecture One

ECE 6390: Satellite Communications and Navigation Systems TEST 1 (Fall 2004)

t =1 Transmitter #2 Figure 1-1 One Way Ranging Schematic

Relative Cost and Performance Comparison of GEO Space Situational Awareness Architectures

Earth Emitted Longwave Energy. 240 W/m 2. Top of the Atmosphere (TOA)

2013 RockSat-C Preliminary Design Review

Antennas and Propagation

Overview of the Tracking and Control Center at the Tsukuba Space Center

CubeSat Proximity Operations Demonstration (CPOD) Vehicle Avionics and Design

Lecturer Series ASTRONOMY. FH Astros. Telecommunication with Space Craft. Kurt Niel (University of Applied Sciences Upper Austria)

W-Band Satellite Transmission in the WAVE Mission

INTRODUCTION The validity of dissertation Object of investigation Subject of investigation The purpose: of the tasks The novelty:

4GHz / 6GHz Radiation Measurement System

Tracking, Telemetry and Command

Project = An Adventure : Wireless Networks. Lecture 4: More Physical Layer. What is an Antenna? Outline. Page 1

UNIT- 7. Frequencies above 30Mhz tend to travel in straight lines they are limited in their propagation by the curvature of the earth.

Sea surface temperature observation through clouds by the Advanced Microwave Scanning Radiometer 2

TEST RESULTS OF A DIGITAL BEAMFORMING GPS RECEIVER FOR MOBILE APPLICATIONS

Appendix A: Inner Heliospheric Sentinels Analyses and Key Tradeoff Studies

ARTEMIS: Low-Cost Ground Station Antenna Arrays for Microspacecraft Mission Support. G. James Wells Mark A. Sdao Robert E. Zee

HEMERA Constellation of passive SAR-based micro-satellites for a Master/Slave configuration

2009 Small Satellite Conference Logan, Utah

Antennas and Propagation. Chapter 5

AirWave Bundle. Hole-Home Gesture Recognition and Non-Contact Haptic Feedback. Talk held by Damian Scherrer on April 30 th 2014

MarCO: Ready for Launch Andrew Klesh, Joel Krajewski

AircraftScatterSharp New Features

CubeSat Communications Review and Concepts. Workshop, July 2, 2009

Transcription:

Tracking of - IKAROS - First Solar Power Sail Demonstration F5PL measurements F5PL / F1EHN report Last update : 18/06/2010

About IKAROS Interplanetary Kite-craft Accelerated by Radiation Of the Sun Mission => Launch date 21/05/2010 More info : http://directory.eoportal.org/presentations/330/10002509.html IKAROS Blog : http://www.isas.jaxa.jp/home/ikaros-blog/

Measurement From F5PL station Radiometry Transmitter : Freq : 8.4 GHz, RF power : 7W

Measurement Ikaros using LGA1

Measurements and analyses. LGA1 antenna (supposed location) r Spin direction D 0 θ Goes to Venus Rotation F5PL Main body Sail

Measurement : 28/05/2010 Doppler shift : +/- 24 Hz Rotation speed : 15 rpm Doppler shift coming from Ikaros rotation F5PL / Ikaros relative mean motion

Calculation F5PL D 0 D D Antenna θ Antenna a r r Hor. View Main body Ver. View F5PL D 0 Distance D = D0 + r*sin(θ)*cos(a) Speed rotation V = derivative (D) = D (a) Doppler shift = - V / lambda with lambda = c / freq The mean motion is not computed

Dopplet shift (Hz) Calculation antenna speed rotation (radius = 0.8 m - 15 rpm - Dir = 40 ) 25 20 15 10 5 0 Assuming : antenna is on peripheral of the main body (radius = 0.8m) Spin direction is 40 Rotation is 15 rpm -5-10 -15-20 => Calculation gives values closed to the measurement done on 28/5/2010. -25 0 0.5 1 1.5 2 2.5 3 3.5 4 time (seconds)

Measurement on 31/5/2010 Doppler shift : +/- 40 Hz Rotation speed : 25 rpm

Dopplet shift (Hz) Calculation antenna speed rotation (radius = 0.8 m - 25 rpm - Dir = 40 ) 40 30 20 10 0 Assuming : antenna is at the peripheral of the main body Spin direction is 40 Rotation is 25 rpm -10-20 -30 => Calculation gives values closed to the measurement done on 31/5/2010. -40 0 0.5 1 1.5 2 2.5 time (seconds)

From the IKAROS blog (6/2) : Solar Distance: 1.04AU Earth Distance: 4834395km, ascension =- 158.2, declination =- 22.9 Venus Distance: 1.28AU Attitude: spin rate = 24.5rpm, sun angle 16.8deg Measurement on 02/6/2010 Doppler shift : +/- 40 Hz Rotation speed : 25 rpm Ikaros flight is very stable at this time

Measurement on 03/6/2010 Doppler shift : +/- 25 Hz Rotation speed : 16 rpm The rotation speed is decreasing

Dopplet shift (Hz) Calculation antenna speed rotation (radius = 0.8 m - 16 rpm - Dir = 40 ) 25 20 15 10 5 0 Assuming : antenna is on peripheral of the main body Spin direction is 40 Rotation is 16 rpm -5-10 -15-20 => Calculation gives values closed to the measurement done on 3/6/2010. -25 0 0.5 1 1.5 2 2.5 3 3.5 4 time (seconds)

Conclusion on 3/6/2010 The measured speed rotation are very closed to the attended speed extracted from the flight information (from JAXA). The deployment sequence is defined as follows: 1) Separation from rocket with slow spin (5rpm) 2) Spin down using Reaction Control System (RCS) (5rpm -> 2rpm) 3) Release of launch lock 4) Spin up using RCS (2rpm -> 20rpm) 5) First stage of the deployment (20rpm -> 5rpm) 6) Second stage of the deployment (5rpm -> 2rpm) It seems IKAROS is between phase 4 and 5. May be phase 5 is starting. All the calculations are done with estimated value because we had any return from JAXA about the report of Bertrand F5PL. CONTINUE => Bertand F5PL / J-Jacques F1EHN ( http://www.f1ehn.org ). More measurements done by Bertrand on the dedicated DSN Yahoo group.

From the IKAROS Blog (6/4) Solar Distance: 1.04AU Earth Distance: 5588044km, ascension =- 158.0, declination =- 23.0 Venus Distance: 1.26AU Attitude: spin rate = 7.4rpm, sun angle 16.8deg Measurement on 4/6/2010 Doppler shift : +/- 12 Hz Rotation speed : 7.5 rpm The rotation speed is decreasing

Dopplet shift (Hz) Calculation antenna speed rotation (radius = 0.8 m - 7.5 rpm - Dir = 40 ) 15 10 5 0 Assuming : antenna is on peripheral of the main body Spin direction is 40 Rotation is 7.5 rpm -5-10 => Calculation gives values closed to the measurement done on 4/6/2010. -15 0 1 2 3 4 5 6 7 8 time (seconds)

IKAROS Deployement Last measurement indicates IKAROS is now at the end at this phase (Phase 5 First deployment)

Last info from IKAROS blog 4th of June Primary development proceeded today. Deployment length 5.3m. IKAROS size is now at 10m from end to end is over. Solar Distance: 1.04AU Earth Distance: 5588044km, Ascension =- 158.0, Declination =- 23.0 Venus Distance: 1.26AU Attitude: spin rate = 7.4rpm, sun angle 16.8deg

RF Budget RF Power : 7 W => 8.5 dbw LGA1 : 5 db (estimated) Distance : 5.6 10 9 m => Free space atten. : - 246 db @8.4Ghz F5PL antenna gain : 44 db Tsys : 80 K (estimated) B = 1Hz Noise floor (ktb): -209 dbw Signal level : -188 dbw (sum of power, gain and attenuation) S/B should be around 20 db FFT display gives about 10 db (1 Hz band) => continue

Dopplet shift (Hz) RF Budget The difference of 10 db is probably coming from the extremely narrow band of 1 HZ regarding the swing of the received signal. Then the signal is spread over a few FFT bins. antenna speed rotation (radius = 0.8 m - 7.5 rpm - Dir = 40 ) 0-1 -2-3 -4-5 -6-7 -8-9 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 5 time (seconds) In 1 sec (1Hz), the signal swing is about 8Hz. Then, probably losses are near 10 db With a measurement near the swing reversal, the peak value is better (near 15 db) and confirms this analyze.

Conclusion on 4/6/2010 Measurement confirms that IKAROS is at the end of the phase 5. 5) First stage of the deployment (20rpm -> 5rpm) 6) Second stage of the deployment (5rpm -> 2rpm) IKAROS could begin the Phase 6 in the coming hours. Measurements and observations match to the IKAROS flight. The spin rotation axis relative to the earth seems to be constant up to now because the ratio between Doppler shift and Rotation speed remains constant. The spin rotation angle relative to the Earth is estimated at 40. The RF budget is correct regarding the extremely narrow used for measurement. May be a band of 10 Hz should be better for a S/B measurement using an averaging over a few measurements (be careful with the Doppler shift coming from the mean motion of IKAROS). CONTINUE => Bertand F5PL / J-Jacques F1EHN ( http://www.f1ehn.org ). More measurements done by Bertrand on the dedicated DSN Yahoo group.

From IKAROS blog (8/6/2010) Small solar powered sail demonstration unit "IKAROS (Icarus)" implementation date for the expansion of secondary and primary sail deployment of the third day Measurement on 8/6/2010 Doppler shift : +/- 7 Hz Rotation speed : 5.3 rpm The rotation speed is still decreasing coming from the expansion of the sail

Dopplet shift (Hz) Calculation antenna speed rotation (radius = 0.8 m - 5.3 rpm - Dir = 40 ) 10 8 6 4 2 0 Assuming : antenna is on peripheral of the main body Spin direction is 40 Rotation is 5.3 rpm -2-4 -6-8 => Calculation gives values closed to the measurement done on 8/6/2010. -10 0 2 4 6 8 10 12 time (seconds)

From IKAROS blog (10/6/2010) The operation ended today as planned. Solar Distance: 1.05AU - Venus Distance: 1.23AU Earth Distance: 7480787km, Ascension =- 157.3, Declination =- 23.0 Attitude: spin rate = 2.5rpm, sun angle 13.3deg Measurement on 10/6/2010 Doppler shift : +/- 4.5 Hz Rotation speed : 2.5 rpm The rotation speed is still decreasing coming from the expansion of the sail. To measure the low Doppler shift and rotation speed, now we have to compensate the mean Doppler shift coming from the Earth rotation and Ikaros relative speed.

Dopplet shift (Hz) Calculation The calculation shows the angle of the spin rotation relative to the Earth is probably a little bit higher. With this value (45 ) the calculated Doppler shift is closed to the measured value. antenna speed rotation (radius = 0.8 m - 2.5 rpm - Dir = 45 ) 5 Assuming : 4 antenna is on peripheral of the main 3 body 2 Spin direction is 45 Rotation is 2.5 rpm 1 0-1 -2-3 -4-5 0 5 10 15 20 25 time (seconds)

IKAROS Deployement Last measurement indicates IKAROS is now at the end at this phase (Phase 6 Second deployment)

Conclusion on 11/6/2010 Last measurements show the dynamical change on the IKAROS flight. Now the sail seems to be completed deployed and IKAROS is at the end of the phase 6. 6) Second stage of the deployment (5rpm -> 2rpm) Measurements and observations match to the IKAROS flight reported by the IKAROS blog. The spin rotation axis relative to the earth seems to be stable but probably higher because the ratio between Doppler shift and Rotation speed increased by about 10%. The spin rotation angle relative to the Earth is estimated at 45. The RF budget is correct regarding the IKAROS s distance (about 7.5 million of km). Continue => Bertand F5PL / J-Jacques F1EHN ( http://www.f1ehn.org ). More measurements done by Bertrand on the dedicated DSN Yahoo group.

From IKAROS blog (15/6/2010) Solar Distance: 1.06AU Earth Distance: 9778124km, Ascension =- 156.0, Declination =- 23.2 Venus Distance: 1.18AU Attitude: spin rate = 2.5rpm, sun angle 12.6deg Measurement on 15/6/2010 Doppler shift : +/- 4.5 Hz Rotation speed : 2.5 rpm The rotation speed is stable since 10th of june. To measure the low Doppler shift and rotation speed, now Bertrand is able to offset the mean Doppler shift coming from the Earth rotation and Ikaros relative speed.

From IKAROS blog (16/6/2010) Solar Distance: 1.06AU Earth Distance: 10163561km Ascension =- 155.9, Declination =- 23.2 Venus Distance: 1.18AU Attitude: spin rate = 1.7rpm, sun angle 12.8deg Measurement on 16/6/2010 Doppler shift : +/- 3 Hz Rotation speed : 1.7 rpm The rotation speed is again decreasing. The measurement is very closed to the report of IKAROS blog. 4 cycles / 140 sec => 1.7 rpm IKAROS is now over 10 Millions of km

Dopplet shift (Hz) With an angle of the spin rotation relative to the Earth of 45, the calculated Doppler shift is closed to the measured value (16/6/2010). Calculation antenna speed rotation (radius = 0.8 m - 1.7 rpm - Dir = 45 ) 3 Assuming : antenna is on 2 peripheral of the main body Spin direction is 45 1 Rotation is 1.7 rpm 0-1 -2-3 0 5 10 15 20 25 30 35 40 time (seconds)

From IKAROS blog (17/6/2010) Solar Distance: 1.06AU Earth Distance: 10546259km Ascension =- 155.7, declination =- 23.3 Venus Distance: 1.17AU Attitude: spin rate = 1.1rpm, sun angle 13.3deg Measurement on 17/6/2010 Doppler shift : +/- 2 Hz Rotation speed : 1.1 rpm The rotation speed is still decreasing up to 1.1 rpm. The measurement is very closed to the report of IKAROS blog. 5 cycles / 262 sec => 1.1 rpm

Dopplet shift (Hz) With an angle of the spin rotation relative to the Earth of 45, the calculated Doppler shift is closed to the measured value (17/6/2010). Calculation antenna speed rotation (radius = 0.8 m - 1.1 rpm - Dir = 45 ) 2 Assuming : 1.5 antenna is on peripheral of the main body 1 Spin direction is 45 0.5 Rotation is 1.1 rpm 0-0.5-1 -1.5-2 0 10 20 30 40 50 60 time (seconds)

IKAROS Deployement Last measurements indicates the IKAROS sail is now totally deployed (Phase 6 Second deployment seems to be over)

A video about IKAROS gives some technical information about IKAROS and its journey. http://www.youtube.com/watch?v=7_6hoqbkp2o This is also a good summary of our observations IKAROS LGA1 Antenna location This picture shows the LGA1 location. That confirms the antenna is at the peripheral of IKAROS.

Conclusion on 18/6/2010 Last measurements indicates the IKAROS sail is now totally deployed (Phase 6 Second deployment seems to be over). The rotation speed is now under 2 rpm. Measurements and observations still match to the IKAROS flight reported by the IKAROS blog. 17/6/2010 : 2.5rpm today dropped to from 1.7rpm. Finally, around 1rpm aim. IKAROS will adjust the angle between the Sun and Sail (steering) that controls the intensity of the light pressure you. 18/6/2010 : Even today, made a spin-down operations continued yesterday. The final spin rate 1.1rpm. Spin rates became the lowest since the launch! The spin rotation axis relative to the earth seems to be stable at the estimated value of 45. We didn t received any confirmation from JAXA (Bertrand sent each report to the Japan agency) but a video confirms the location ot the LGA1 antenne used during this path. The RF budget is still correct regarding the IKAROS s distance (about 10 million of km). To be continued Bertand F5PL / J-Jacques F1EHN ( http://www.f1ehn.org ). More measurements done by Bertrand on the dedicated DSN Yahoo group.