Installation Guide: NC 25 System

Similar documents
How To Install Windows: Nail-Fin Application

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

COMPOSITE SIDING INSTALLATION GUIDE

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS

Norwood Windows Permaglass Fiberglass Products Installation Instruction

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

400 SERIES VERTICAL INSTALLATION

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Flashing Materials. Rough Opening Preparation

Installation of Fiberglass Windows

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM

KS SERIES - VERTICAL INSTALLATION

Vinyl Windows and Doors

PRIMED STRAND REVERSIBLE SHAKE

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Shapes Siding. Perfection Shingles. Chalk Line

Technical Note No. 028

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

Tools required by installer: Materials required by installer:

Technical Note No. 026

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Sun Windows General Information New Construction Hinged Door Installation Instructions

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Vinyl Windows and Doors Manufactured by VPI Quality Windows

GENERAL INSTALLATION GUIDELINES

Providing 3 Layers of Protection

TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

900 SERIES WALL PANELS

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

Vinyl Windows Manufactured by VPI Quality Windows

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

KuraStone TM Installation Guide

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

GENERAL INSTALLATION GUIDELINES

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

SPRINGLOK SPRINGLOK FLASHING SYSTEM PRODUCT BROCHURE ENGINEERED PRODUCT SYSTEMS

Installation Recommendations for Finless Frame Doors

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

SECTION SHEET METAL FLASHING AND TRIM

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

INSTALLATION MANUAL STORAGE

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

CONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies

INSTALLATION INSTRUCTIONS

4. Metal roof jacks at penetrations and attachments

Installation Instructions for Panel Siding and Soffit

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

SENTINEL SERIES 110 SINGLE HUNG WINDOWS

DW HORIZONTAL INSTALLATION

Installation Guidelines

Integrity Polygon and Round Top Installation and Finishing Instructions

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

ASC Building Products. Table of Contents

Installation Manual SOLID CORE SIDING

Engineered Hardwood Flooring Installation Instructions

INSTALLATION INSTRUCTIONS

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

SECTION ROUGH CARPENTRY

Installation Guidelines

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

STACKING MULTI-SLIDE DOOR SYSTEM

All Window Installation Instruction

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

Mount to the Wall INSTALLATION MANUAL

METALWORKS TARTAN PANELS General Installation Instructions

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

POCKETING MULTI-SLIDE DOOR SYSTEM

INSTALLATION INSTRUCTIONS

TARGA 7300 CASEMENT INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

TARGA 7100 SINGLE HUNG INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

Window Frame Installation Instructions For Nail-on and Block Frames

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

B. Sequencing: Schedule installation to keep sheathing exposure to UV within the manufacturer s recommended limits.

DW VERTICAL INSTALLATION

window installation Guide wood FRaMinG New Construction

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

Installation Manual for Thermo Panel

Installation Instructions for Vinyl Windows with Integral Nailing Fin (JII001)

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

ASSEMBLY AND INSTALLATION INSTRUCTIONS for Premium Aluminum and Premium Atlantic Aluminum Sliding Patio Doors (JII020)

Steel Sound Enclosure

Transcription:

Installation Guide: NC 25 System

Table of Contents INSTALLATION GUIDE: NC 25 SYSTEM 1 PROPER STORAGE AND HANDLING 3 SUITABLE SUBSTRATES 3 FLASHING 3 MOISTURE BARRIER 4 METAL CHANNELS/COMPONENTS 4 STAINLESS STEEL FASTENERS 4 HOW TO INSTALL ACRY- CHANNELS & COMPONENTS 5 INSTALLATION OF ACRYTEC PANELS 5 PATCHING FASTENERS 6 SEALANTS 6

Proper Storage and Handling Ø Ensure panels are stacked on flat surface Ø Keep panels protected from elements at all times Ø Carry panels in an upright position Ø Do not carry panels flat from either ends Ø Do not drop or hit edges of panels Ø Do not allow panels to sag when lifting. Ø Exercise caution when handling channels and panels by using proper protective equipment. NOTE: Use only Acrytec materials and components for installation of Rainscreen Systems. Installers must be certified and trained by Acrytec Panel Industries Suitable Substrates Ø Poured concrete Ø Structural concrete block Ø Wood studs with sheathing Ø Structural metal studs with sheathing Ø Existing substrates ( approved by engineer) Substrates are to be inspected for sound structural integrity and be approved by certified project engineer. Substrate surface preparation must meet acceptable building standards and be free of any obstructions, straight and uniform. The substrate must also be capable of handling load requirements for Acrytec Rainscreen systems. Flashing All flashing details must be pre- installed as indicated by architectural drawings. For information purposes

Moisture Barrier Moisture and vapor barrier materials must be in accordance to local building code requirements and installed as specified. (Seal all window details/wall openings appropriately, prior to installation of Acrytec channel(s). Be sure to follow manufacturer s instructions. Metal Channels/Components All channels must be installed securely using Acrytec fasteners, and components, to the suitable substrate. Acry- Channels are Available in: G90 galvanized; GalvaLoom [aluminum oxide coating]; & Stainless Steel. Acry- Channels also include a pre installed 3M self sealing weather strip on flange. 18 gauge G90 galvanized Channels standard; I. Acry- channel 25 (Depth=25 mm, width=62.5mm, length=2440mm) 26 gauge galvanized Join/termination components include; I. Acry- band (62.5mm x 2440mm) II. Acry- 90* (L shaped 50mm x 100mm x 2440mm) III. 3M 540 adhesive (10mm diameter bead) IV. Tremco spectrum 3 low modulus sealant or illmod 600 Stainless Steel Fasteners Ø 1.5 # 10 Pan Socket Self- Drilling stainless steel Screw used for fastening Acry- channels through sheathing into metal studs. Ø 1.5 #10 Round Socket stainless steel wood screws- used for fastening Acry- channel through sheathing into wood studs. Ø 3/16 industrial stainless steel rivet Ø 1.25 # 6 Flat Socket Self- Drilling corrosion coated stainless steel screw- used for securing Acry NC Panels to Acry- channels

Note: Do not over tighten mechanical fasteners as it will cause screws to strip therefore not providing adequate support. All stripped fasteners must be removed immediately. How to Install Acry- Channels & Components Substrate surface preparation must meet acceptable building standards and be free of any obstructions, straight and uniform. The substrate must also be capable of handling load requirements for Acrytec Rainscreen systems. Ensure moisture barrier is installed as per building code and manufacturers specifications 1) Establish termination points (i.e. at grade, top of windows, doors, top of wall etc.) and install channels horizontally, tightly butted together with appropriate fasteners to every vertical stud. (If substrate is concrete or block, span fasteners no greater than 400mm apart). Ensure 25mm flange is always pointed up. 2) Begin with installation of vertical channels securely fastened to every vertical stud with appropriate mechanical fasteners. Add additional channels where necessary for added support where required. Span fasteners no greater than 400mm apart. Do not overlap any channels. Vertical structural studs shall not be spaced more than 400mm apart. 3) Add Acry- band at all horizontal joints and expansion joints, during panel installation. Note*at expansion joints the Acry- band must be fastened only on one side to allow for expansion and contraction. 4) During panel installation add the Acry- 90 at all outside and inside corners. Installation of Acrytec Panels Note: Keep finished face down when cutting panels. Install panel to the channels using appropriate size and type of mechanical fasteners (specified adhesive must be used in conjunction with mechanical fasteners on all NC Panels. 3M 540 sealant must be applied to all channels in a zig zag pattern using a 10mm bead).

If illmod 600 is being used, apply during installation of panels, as per manufacturers specifications. Pre drill all Acry NC panels before the installation of each corrosion coated stainless steel fastener (remove panel dust created from drilling). Counter sink all fasteners to a depth of 4mm (from surface) no more than 450mm apart and keeping a distance of 15mm from panel edges and 75mm from panel corners. Reminder: add Acrytec components as required during installation process. {Example: Acry 90 & Acry- Band} Patching Fasteners EXTREMELEY IMPORTANT: A. Prior to patching screw holes, ensure panel surface is flat and clean(remove loose debris). B. Mix material in container prior to use. C. Using supplied Acrytec color matched finish, fill the fastener cavity in with the amount needed to fill in screw hole, not exceeding the size of the screw hole diameter. D. Remove excess material to ensure a flat surface. E. Patch screw heads as soon as possible to avoid color variations. (Recommended time lapse of no more than 24 hrs). Sealants Caution- Do not apply patching material below 5 degree Celsius. Tremco Spectrem 3 low modulus sealant Compressed Polyurethane Foam Sealant (illmod 600)