Norman A Bridge Elementary School

Similar documents
Marcus Moziah Garvey Elementary School

Jackie Robinson Elementary School

Everett McKinley Dirksen Elementary School

Charles N Holden Elementary School

John Milton Gregory Elementary School

Philip Rogers Elementary School

Jonathan Burr Elementary School

Amos Alonzo Stagg Elementary School

EPIC Academy High School

Alexander Graham Bell Elementary School

Richard J Oglesby Elementary School

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Morton School of Excellence

Daniel S Wentworth Elementary School

John Harvard Elementary School of Excellence

John Spry Elementary Community School

Wendell Smith Elementary School

Robert Fulton Elementary School

Architecture, Construction, and Engineering Technical Charter

Andrew Carnegie Elementary School

Arthur E Canty Elementary School

University of Chicago Charter - Carter G Woodson

Cyrus H McCormick Elementary School

Rufus M Hitch Elementary School

William Penn Elementary School

George W Tilton Elementary School

Disney II Magnet School

Joseph E Gary Elementary School

Disney II Magnet High School

Brian Piccolo Elementary Specialty School

Urban Prep Academy for Young Men - West

George Washington Elementary School

Academy for Global Citizenship Elementary School

Langston Hughes Elementary School

George Washington High School

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

Amandla Charter High School

Henry H Nash Elementary School

Arthur A Libby Elementary School

University of Chicago Charter - NKO

Legacy Charter Elementary School

Theodore Roosevelt High School

John Hancock College Preparatory High School

Phoenix Military Academy High School

Walt Disney Magnet Elementary School

John F Kennedy High School

North Lawndale College Prep Charter - Collins

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Betty Shabazz Intl Charter - DuSable Leadership

John L Marsh Elementary School

Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

William Howard Taft High School

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Richard T Crane Medical Preparatory HS

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Multicultural Academy of Scholarship

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

James Otis Elementary School 525 N Armour St Chicago, IL 60642

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

James Shields Middle School 2611 W 48th St Chicago, IL 60632

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

OCPS Submittal Register for Product Data and Shop Drawing Reviews

U of I Facilities Standards Updates for 2017

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

RECAPP Facility Evaluation Report

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

BUILDING DEPARTMENT CURRENT

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy CHIMNEY Brick Chimney - Concrete/ Mortar Liner 4 GRE 6 277 4 GRE 6 41 90 277 SF $7,843 $7,843 131 LF $118,333 $118,333 Assessment Date: 2/13/2013 Page 1 of 18

CORNICE Cornice - Cast Stone Cornice - Terra Cotta 4,032 GRE 7 204 1,032 LF $55,518 204 LF $55,518 DOORS Exterior FRP Door Exterior Steel Door Store Front Door Transom Lite 4 GRE 7 23 GRE 7 1 GRE 6 5 2 GRE 7 4 23 EA 7 EA $2,595 4 EA $2,595 ENTRANCE Concrete Exterior Stairs Entrance Controls - Audio Entrance Controls - Audio and Video Stair Handrails Stone Stairs 4 GRE 6 363 GRE 7 1 GRE 7 1 4 GRE 6 50 363 LF $38,932 14 LF 50 LF $8,938 $47,869 FIRE ESCAPE Fire Escapes FOUNDATION 4 89 90 LF $9,390 $9,390 Concrete Foundation 4 GRE 6 30 1,939 1,969 LF $13,393 $13,393 Assessment Date: 2/13/2013 Page 2 of 18

LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted LINTELS 4 24 GRE 6 6 25 EA $13,442 6 EA $1,287 $14,729 Lintels - Steel Lintels - Stone Lintels - Terra Cotta 4 8 688 GRE 6 653 37 706 LF $680 653 LF 137 LF $680 PARAPET Coping - Stone Coping - Terra Cotta Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height 4,262 40 GRE 6 786 GRE 6 26 140 0 530,382 1,302 LF 786 LF 166 LF $4,049 540 LF $2,595 1,382 LF $286,953 $293,597 ROOF SYSTEM Asphalt Gravel Ballast Roof Exterior Downspouts Interior Downspouts Modified Bitumen Roof Roof Structure: Concrete 4 GRE 6 32,924 65 0 492 5,622 GRE 7 48,546 32,924 SF $209,983 165 LF $3,067 502 LF $1,073 15,622 SF $110,580 48,546 SF $324,703 Assessment Date: 2/13/2013 Page 3 of 18

SUPERSTRUCTURE Concrete 4 GRE 6 200 48 111,986 112,234 SF $4,679 $4,679 WALLS Brick Stone - Cast Stone - Cut Terra Cotta 4 GRE 6 37,102 18,232 GRE 6 2,042 GRE 7 202 GRE 6 3,072 55,334 SF $245,118 2,042 SF $29,201 202 SF 3,072 SF $87,859 $362,178 WINDOWS Curtain wall - Insulated panel Window - Guards perforated Windows - Casement Aluminum Double-pane Windows - Casement Lexan/ Glass Double-pane Windows - Decorative Windows - Sash Aluminum Double-pane EXTERIOR 4 GRE 6 78 GRE 7 3,783 GRE 7 608 YEL 4 96 YEL 4 34 GRE 7 11,682 78 SF $736 3,783 SF 608 SF 96 SF $11,054 34 SF $10,269 11,682 SF $22,058 $1,277,565 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms 4 GRE 6 3,887 GRE 7 21,784 GRE 7 3,819 $1,430 3,887 SF $5,280 21,784 SF 3,819 SF Assessment Date: 2/13/2013 Page 4 of 18

Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection MAIN SERVICE GRE 7 1,192 GRE 7 11 GRE 6 2 GRE 7 7 GRE 6 7 GRE 6 42 12 GRE 6 7 GRE 7 1 12,234 GRE 6 74,754 12,234 1,192 SF 1 2 EA $215 7 EA 7 EA $1,632 54 EA $9,790 7 EA $1,632 112,234 SF $67,408 74,754 SF $106,898 112,234 SF $104,322 $298,605 Main Electrical service - Live Front - 1500 A 120/208/3PH Main Electrical service 800 A and below 120/240/3PH POWER DISTRIBUTION 4 $9,295 $3,575 $12,870 Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 120/240-120/208 ELECTRICAL 4 GRE 6 8 4 BLU 5 1 2 GRE 6 2 12 EA $5,720 3 EA $15,015 2 EA $4,290 $1,216 $1,144 $27,385 $338,860 Assessment Date: 2/13/2013 Page 5 of 18

FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION 4 GRE 7 37,480 GRE 6 37,480 74,754 37,480 SF 112,234 SF $45,557 $45,557 $45,557 MECHANICAL AIR CONDITIONING Window A/C AIR HANDLING SYSTEMS Air Intake - Built Up Air Handling Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 25,001 to 35,000 cfm Reheat Boxes With Steam Coils Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft Roof Top - Multi Zone - Gas-Heating less than 10 tons Single Zone Built Up Air Handling - Steam 4,000 to 8,000 cfm Single Zone Built Up Air Handling Auxiliaries - Steam 4,000 to 8,000 cfm BOILER SYSTEMS Boiler Assembly - Non-Condensing Flex Tube Hot Water Boilers 500MBH-1,000MBH Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler greater than 200 HP Boiler Auxiliary - Steam Boiler greater than 200 HP 4 1 4 GRE 6 2 4 BLU 5 2 BLU 5 2 BLU 5 23 14 YEL 4 100 GRE 6 2 GRE 6 2 4 GRE 6 4 YEL 4 2 GRE 6 2 1 $2,360 $2,360 6 EA $37,752 2 EA $71,500 2 EA $34,320 37 EA $254,712 100 LF $264,550 $2,288 2 EA $10,010 2 EA $4,290 $679,422 4 EA $143,000 2 EA $597,740 2 EA $6,578 Assessment Date: 2/13/2013 Page 6 of 18

Boiler Auxiliary -Non- Condensing Flexible Tube Hot Water Boiler 500MBH-1,000 MBH Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Gas Boosters HEATING DEVICES GRE 6 4 GRE 7 1 GRE 6 2 GRE 6 6 GRE 7 2 4 EA $17,160 2 EA $601 6 EA $1,716 $8,437 2 EA $775,232 Cabinet Heaters With Electric Coils Fin Tube Electric Fin Tube Hot Water Radiators - Hot Water Radiators - Steam Heater - Gas Wall Heater - Electric MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Hot Water less than 5 HP TEMPERATURE CONTROL Pneumatic System Thermostats - Pneumatic Zone Dampers 4 BLU 5 2 BLU 5 64 BLU 5 122 135 GRE 6 48 GRE 6 38 GRE 6 22 4 BLU 5 1,000 BLU 5 1,000,000 BLU 5 2 1 4 GRE 6 74,754 37 GRE 6 37 2 EA $3,718 64 LF $4,576 257 LF $23,252 48 EA $6,040 38 EA $5,325 $2,145 22 EA $2,265 $47,322 $715 1,000 LF $32,533 1,000 LF $49,478 1,000 LF $8,866 3 EA $22,880 $114,472 74,754 SF $26,725 38 EA $5,949 37 EA $5,291 Assessment Date: 2/13/2013 Page 7 of 18

$37,964 VENTILATION Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm MECHANICAL PLUMBING HOT WATER 4 YEL 4 2 2 EA $8,580 $229 $8,809 $1,665,579 Hot Water Heater - Gas 150,000-300,000 BTU/HR Hot Water Heater - Gas less than 150,000 BTU/HR Storage Tank less than 500 gallons 4 1 YEL 4 2 2 EA $4,147 $3,575 2 EA $29,744 $37,466 PIPING 4 Domestic Piping - Cold Water from Risers to Fixtures YEL 4 74,754 37,480 112,234 SF $31,018 Domestic Piping - Cold Water Risers YEL 4 74,754 37,480 112,234 SF $60,431 Domestic Piping - Hot Water from Riser to fixtures YEL 4 74,754 37,480 112,234 SF $58,912 Domestic Piping - Hot Water Return Risers YEL 4 149,508 37,480 186,988 SF $76,454 Domestic Piping - Hot Water Risers BLU 5 37,480 37,480 SF $9,647 Domestic Piping Cold Water Horizontal lines YEL 4 74,754 37,480 112,234 SF $211,750 Domestic Piping Hot Water Horizontal lines YEL 4 74,754 37,480 112,234 SF $167,350 Domestic Piping Hot Water Return Lines YEL 4 74,754 37,480 112,234 SF $105,885 Sanitary Piping BLU 5 112,234 112,234 SF $69,013 Storm Piping BLU 5 112,234 112,234 SF $52,963 Vent Piping BLU 5 112,234 112,234 SF $40,124 $883,548 Assessment Date: 2/13/2013 Page 8 of 18

PUMPS Ejector Pump Sump Pump PLUMBING INTERIOR ADMINISTRATIVE SUITES 4 $3,003 $1,359 $4,362 $925,375 Ceiling - Plaster/Drywall Ceiling - Splined Flooring - Carpet Flooring - Concrete Flooring - Terrazzo Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile 4 GRE 6 75 4,408 GRE 6 744 GRE 6 75 738 BLU 5 695 GRE 6 593 GRE 6 475 568,104 GRE 6 603 378 GRE 6 73 1 GRE 6 2,186 GRE 6 2,763 6,463 BLU 5 502 4,483 SF $12,906 744 SF $1,596 813 SF $1,834 695 SF $3,280 593 SF $3,358 1,043 SF $8,918 1,104 SF $1,579 981 SF $4,553 74 SF $52 2,186 SF $6,252 9,226 SF $28,288 502 SF $23,689 $96,304 AUDITORIUM - DEDICATED Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System 4 GRE 6 80 GRE 6 288 GRE 6 2 80 EA $2,945 288 EA $10,601 $35,750 2 EA $22,651 $114,400 Assessment Date: 2/13/2013 Page 9 of 18

$186,347 CORRIDOR Stair Handrails Stairs - Tile DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Transom Window DRINKING FOUNTAINS Double Fountain GYMNASIUM / AUDITORIUM Ceiling - Plaster/Drywall Flooring - Wood Lighting - Metal Halide/Sodium Vapor Scoreboards Sound System Walls - Plaster/Drywall Walls - Structural Glazed Tile 4 GRE 6 212 00 4 BLU 5 5 BLU 5 12 90 125 GRE 6 781 4 GRE 6 6 4 BLU 5 2,766 GRE 6 2,766 GRE 6 8 BLU 5 4,259 BLU 5 1,420 212 LF 100 LF $755 $755 5 EA $2,360 227 EA $116,371 781 SF $14,519 $133,249 6 EA $3,947 $3,947 2,766 SF $27,688 2,766 SF $20,884 8 EA $1,430 $2,076 $5,005 4,259 SF $60,904 1,420 SF $67,010 $184,997 Assessment Date: 2/13/2013 Page 10 of 18

KITCHEN Ceiling - Splined Flooring - Tile/Sheet Lighting - Pendant/Surface Wall - Plaster/Drywall Wall - Tile Ceramic/ Porcelain LIBRARY Casework Ceiling - Splined Flooring Carpet Flooring Tile/ Sheet Lighting - Pendant/ Surface LUNCHROOM Ceiling - Splined Flooring - Tile/Sheet Lighting - Pendant/Surface Serving Line Wall - Plaster/Drywall MDF/IDF Finishes Ventilation and Cooling 4 BLU 5 235 93 BLU 5 235 93 GRE 6 6 BLU 5 856 324 08 4 50,482,143,482 GRE 6 56 4 GRE 6 2,855 BLU 5 2,855 GRE 6 36 GRE 6 30,490 1,873 4 GRE 6 81 227 BLU 5 1 1 328 SF $1,933 328 SF $1,464 6 SF $4 1,180 SF $4,804 108 SF $275 $8,480 150 LF $4,601 1,482 SF $3,179 1,143 SF $1,634 1,482 SF $2,119 56 SF $40 $11,574 2,855 SF $6,124 2,855 SF $16,167 36 SF $26 30 LF $1,287 3,363 SF $11,451 $35,055 308 SF $1,681 2 EA $15,415 $17,096 Assessment Date: 2/13/2013 Page 11 of 18

MECHANICAL/SERVICE ROOMS Air Tunnels Boiler Room Crawl Space - Unfinished Janitor's Closet Mechanical/Service Rooms Storage Room STAFF RESTROOM 4 BLU 5 5,529 BLU 5 3,426 6,759 GRE 6 5 BLU 5 9,095 16 3,341 5,529 SF $125,238 3,426 SF $38,802 16,759 SF $31,634 5 SF $24 9,095 SF $103,006 3,457 SF $17,080 $315,784 Accessories Ceiling - Plaster/Drywall Ceiling - Splined Floor Drain Flooring - Concrete Flooring - Terrazzo Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Lavatory Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet 4 GRE 6 41 4,267 GRE 6 401 3,794 GRE 6 29 2 4 211 74 447 GRE 6 3,363 BLU 5 27 72 GRE 6 5 33 GRE 6 52 GRE 6 57 GRE 6 26 GRE 7 698 GRE 6 421 8,319 GRE 6 625 1,747 GRE 6 2,543 GRE 6 2 60 4,308 SF $33,995 4,195 SF $13,013 29 SF $62 12 EA $3,604 225 SF $1,062 621 SF $985 3,363 SF $8,560 99 SF $485 38 EA $21,564 52 SF $37 57 EA $10,221 26 EA $9,667 698 SF 8,740 SF $21,615 2,372 SF $41,985 2,543 SF $6,473 62 EA $26,026 $199,355 Assessment Date: 2/13/2013 Page 12 of 18

THEATER Ceiling - Plaster/Drywall Flooring - Concrete Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/ Surface Stage Wall - Plaster/Drywall VOCATIONAL SHOP Work Sink INTERIOR ROOM CASEWORK Casework CEILING 4 BLU 5 3,887 GRE 6 952 BLU 5 2,435 GRE 6 500 GRE 6 32 GRE 6 500 BLU 5 6,103 4 4 GRE 6 267 332 3,887 SF $38,909 952 SF $4,492 2,435 SF $13,789 500 SF $3,775 32 SF $53 500 SF $2,124 6,103 SF $87,273 $150,415 $386 $386 $1,343,742 599 LF $59,595 $59,595 Lay-In/Drop Plaster/Drywall Splined Ceiling 4 GRE 6 2,780 GRE 6 31,614 1,442 GRE 6 2,840 2,780 SF $5,963 33,056 SF $89,512 2,840 SF $6,092 $101,567 Assessment Date: 2/13/2013 Page 13 of 18

CHALK BOARD 4 Chalk Board YEL 4 518 518 LF $62,963 $62,963 CORRIDORS Concrete Block Concrete Epoxy/Painted Double Water Cooler Exposed Pendant/Surface Plaster/Drywall Single Water Cooler Splined Stair Handrails Structural Glazed Tile Student Lockers Terrazzo Tile Ceramic/Porcelain Tile/Sheet Flooring Walls 4 BLU 5 778 2,924 BLU 5 462 74 GRE 6 2 ORA 2 462 GRE 6 462 21,069 BLU 5 22,437 16,015 GRE 7 4 GRE 6 599 1,537 GRE 6 554 BLU 5 2,317 650 GRE 6 289 460,707 4,365 482,748 GRE 6 2,583 9,506 GRE 6 4,249 3,702 SF $41,739 536 SF $2,529 2 EA $1,687 462 SF $2,180 21,53 $16,551 38,452 SF $143,668 4 EA 2,136 SF $6,689 554 LF 2,967 SF $113,987 749 EA $117,439 6,554 SF $56,622 1,748 SF $4,449 12,089 SF $28,221 4,249 SF $10,026 $545,786 CORRIDORS CEILING Plaster/Drywall FLOOR Tile/Sheet 4 9,186 4 BLU 5 6,492 4,498 19,186 SF $54,323 $54,323 10,990 SF $43,195 Assessment Date: 2/13/2013 Page 14 of 18

Wood LIBRARY_CEILING GRE 6 25,235 2,451 27,686 SF $190,534 $233,729 Plaster/Drywall LIBRARY_WALL 4,143 1,143 SF $3,236 $3,236 Concrete Block 4,166 1,166 SF $3,335 Plaster/Drywall GRE 6 2,986 2,986 $7,045 LIGHTING $10,380 Lay-In Pendant/Surface 4 GRE 6 48 GRE 6 496 88 48 EA $3,432 584 EA $35,464 $38,896 MARKER BOARD Marker Board 4 GRE 6 351 209 560 LF $10,039 $10,039 RESTROOM_CEILING Restroom Ceiling STAIRS 4 GRE 6 84 84 SF $238 $238 Terrazzo 4 34 122 256 SF $1,518 Assessment Date: 2/13/2013 Page 15 of 18

$1,518 WALL Concrete Block Metal/Folding Panel Plaster/Drywall ROOM SITE ATHLETIC 4 GRE 6 9,788 GRE 6 3,792 1,381 37,482 9,788 SF $27,994 3,792 SF $8,947 48,863 SF $142,146 $179,087 $1,301,357 4 Basketball - Asphalt YEL 4 3,892 3,892 SF $29,386 $29,386 CIVIL/DRAINAGE Catch Basin Site Drain Site Manhole 4 5 GRE 7 2 GRE 7 10 6 EA $543 2 EA 10 EA $543 FENCING Chain Link Ornamental Iron 4 GRE 6 350 GRE 7 232 350 LF $5,020 232 LF $5,020 LANDSCAPE Asphalt Play Area/Hardscape 4 YEL 4 49,587 14,276 63,863 SF $437,705 Assessment Date: 2/13/2013 Page 16 of 18

Benches Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas Retaining Wall - Concrete Trash Receptacles MODULAR GRE 7 3 GRE 6 6,100 GRE 6 667 8,934 GRE 7 50,726 GRE 6 864 GRE 7 1 3 EA 6,100 SF $2,442 9,601 SF $21,022 50 EA 1,726 SF 864 SF $20,386 $481,556 4-Classroom Modular Building PARKING LOT 4 Asphalt Trash Enclosure Vehicular Screening 4 YEL 4 23,246 GRE 6 744 GRE 7 231 23,246 SF $199,451 744 SF $7,979 231 LF $207,430 PLAYGROUND Playground - Swingset Playground Equipment - Combo 3-12 Playground Surfacing - Square Rubber Mats Playground Surfacing - Wood Chips 4 GRE 6 2 GRE 7 1 YEL 4 2,100 YEL 4 1,577 2 EA 2,100 SF $46,547 1,577 SF $10,148 $56,694 SIDEWALKS Internal Walks Perimeter Sidewalks 4 GRE 6 40 393 9,492 433 LF $4,955 19,492 SF $36,793 Assessment Date: 2/13/2013 Page 17 of 18

$41,748 SIGNAGE Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 4 GRE 7 1 GRE 7 1 $822,378 $7,720,413 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 2/13/2013 Page 18 of 18