2 W 48th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or ) or full replacement (rank 2, or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 202 95,25 $,9,8 SITE $45,9 Campus Total 95,25 $2,89,4 Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $2,05 Exterior Doors - Exterior Steel Door EA 5 $,4 Exterior Doors - Exterior Steel Door EA $5,28 Exterior Doors - Side lite 5 EA $,5 Exterior Doors - Store Front 8 EA $9,829 Exterior Doors - Transom Lite 4 EA $4,8 Power Door Operator and Controls 4 EA Foundation Lighting Roof System Foundation - Concrete,0 LF Superstructure - Steel 95,25 SF Exterior Lighting - Wall Mounted 2 EA $,50 Chimney - Metal Flue 25 LF $9,8 Coping - Metal,85 LF $59,4 Coping - Stone 0 LF $94 Downspouts - Exterior Downspouts 5 LF $498 Downspouts - Interior Downspouts 480 LF 5 $0, SHIELDS MIDDLE Page of Assessment Date: /25/205
Category: Building Exterior Roof System 2 W 48th St Chicago, IL 02 Downspouts - Interior Downspouts 80 LF $25,9 Parapet - " - 0" Height,29 LF $45,08 Parapet - Parapet < " Height 25 LF $5,4 Parapet - Parapet > 0" 50 LF $2,0 Roof - Modified Bitumen 50 SF 5 $4,284 Roof - Modified Bitumen 4,55 SF $90,89 Roof Structure - Steel / Metal Deck/ Concrete Topping 4,85 SF Walls Windows Exterior Walls - Brick,5 SF $250, Exterior Walls - Concrete Block 50 SF $,428 Exterior Walls - Prefabricated Metal Panel Wall 8,84 SF $5,52 Clerestory - Glass Double-Pane 50 SF $,28 Curtain wall - Glazed Double Pane,590 SF $,882 Guard - Guards perforated,50 SF $2,00 Lintels - Steel 800 LF $2, Windows - Casement Aluminum Double-pane 5,90 SF $, Building Exterior Subtotal: $,89,0 Building: Main Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs,000 SF Emergency A/C Power - Gym 2,000 SF Emergency A/C Power - Lunchrooms,500 SF Emergency A/C Power - Students Toilets,5 SF Emergency Generator- Outdoor- atural Gas - 5-200 KW EA Security System - CCTV 95,25 SF $28,08 Security System - Intrusion Detection 95,25 SF $,52 Main Service Independent Electrical Service for emergency power EA Main Electrical Service - 200 to 000 A 2/480/PH EA PA System 95,25 SF SHIELDS MIDDLE Page 2 of Assessment Date: /25/205
Category: Electrical System Power Distribution 2 W 48th St Chicago, IL 02 Lighting and Power Panels - 00 A 5 EA Lighting and Power Panels - Above 00 A EA Main Distribution Panels - 0-00 amp 2 EA Main Distribution Panels - Greater than 00 amp 2 EA Main Distribution Panels - Less than 0 amp 2 EA Transformers - 2/480-20/208 5 EA Electrical System Subtotal: $5,29 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA Fire Alarm Strobe Lights 95,25 SF Fire Alarm_System 95, SF Fire Pump Controller EA Pump Room Assembly Sprinkler System Fire Pump - 5-5hp EA Jockey Pump EA Sprinkler Heads 95,25 SF Sprinkler Piping 95,25 SF Wet Sprinkler System 95,25 SF Safty System Subtotal: Building: Main Category: Mechanical System Air Conditioning Chemical Pot Feeder EA Chiller-Air Cooled-Scroll Type-Roof Mounted - 5-200 tons 2 EA Condensing Unit- Roof Mounted - Less than 5 tons EA Glycol Feed EA SHIELDS MIDDLE Page of Assessment Date: /25/205
Category: Mechanical System Air Conditioning Air Handling Systems Boiler Systems Heating Devices Mechanical Plumbing 2 W 48th St Chicago, IL 02 Pipes - Chilled Water Pipe- Copper 500 LF Pressure Fill System EA Air Handling Unit- Package Multi Zone- Indoor- Hot Water and Chilled Water Coils - 000-2 EA 5000 cfm Air Handling Unit- Package Multi Zone- Indoor- Hot Water and Chilled Water Coils - 2000-2 EA 0000 cfm Air Handling Unit- Package Multi Zone- Indoor- Hot Water and Chilled Water Coils - 000- EA 0000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - 800- EA 2000 cfm Air Intake 5 EA Auxiliaries - 000-5000 cfm 2 EA Auxiliaries - 2000-0000 cfm 2 EA Auxiliaries - 000-0000 cfm EA Auxiliaries - 800-2000 cfm EA Energy Recovery Unit EA Fan Power Box - Fan Power Box with Hot Water Coil 8 EA $,902 Indoor Return Fans- Centrifugal Inline - 000-20000 CFM 2 EA Indoor Return Fans- Centrifugal Inline - Greater than 20000 CFM EA VAV Box 5 EA Zone Dampers 5 EA Boiler Auxiliary- Condensing Hot Water - 200-000 HP 2 EA Chemical Pot Feeder EA Combustion Dampers 2 EA Condensing- Hot Water Boiler - 200-000 MBH EA Glycol Feed System EA Water Fill System EA Unit Heater - Hot Water EA Chilled Water Pump - 0-20 HP 2 EA Hot Water Pump - 0-20 HP 2 EA Hot Water Pump - Greater than 50 HP 0 EA Hydronic Supply and Return - Copper 50 LF SHIELDS MIDDLE Page 4 of Assessment Date: /25/205
Category: Mechanical System Ventilation 2 W 48th St Chicago, IL 02 Exhaust Fans- Roof Mounted - 50-8000 CFM EA Exhaust Fans- Roof Mounted - 500-500 CFM EA Exhaust Fans- Roof Mounted - Greater than 8000 CFM 2 EA Exhaust Fans- Roof Mounted - Less than 500 CFM 9 EA Mechanical System Subtotal: $,902 Building: Main Category: Plumbing System Hot Water Gas Heater - 50000-00000 BTU/HR EA Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 95,25 SF Domestic Piping-Cold Water Horizontal Lines 95,25 SF Domestic Piping-Cold Water Risers 95,25 SF Domestic Piping-Hot Water from Risers to Fixtures 95,25 SF Domestic Piping-Hot Water Horizontal Lines 95,25 SF Domestic Piping-Hot Water Return Lines 95,25 SF Domestic Piping-Hot Water Return Risers 95,25 SF $,2 Sanitary Piping 95,25 SF Storm Piping 95,25 SF Vent Piping 95,25 SF Pumps - Domestic Booster Pump-Duplex EA Pumps - Sump-Duplex EA Plumbing System Subtotal: $,2 Building: Main Category: Classrooms Art Room ( room) Casework 0 LF Ceiling - Lay-in,0 SF SHIELDS MIDDLE Page 5 of Assessment Date: /25/205
Category: Classrooms Art Room ( room) 2 W 48th St Chicago, IL 02 Doors - Side-lite SF Doors - Wood Doors inclu hw 2 EA Floor - Tile,0 SF Kiln EA Lighting - Lay-in EA Lighting - Pendent/Surface 8 EA Marker Board LF Storage/ Closet 0 SF Walls - Concrete Block,0 SF Work Sink 2 EA Computer Lab (2 rooms) Health ( room) Casework LF $55 Ceiling - Lay-in, SF $,42 Ceiling - Lay-in,92 SF Doors - Side-lite SF $00 Doors - Side-lite 8 SF Doors - Wood Doors inclu hw EA $0 Doors - Wood Doors inclu hw EA Floor - Tile,92 SF Floor - Tile/Sheet, SF $,4 Lighting - Lay-in 2 EA Lighting - Pendent/Surface 20 EA Marker Board 0 LF Storage/ Closet 0 SF $28 Walls - Concrete Block 55 SF $,5 Walls - Concrete Block,5 SF Walls - Plaster/Drywall 98 SF $2,202 Walls - Plaster/Drywall 595 SF Wireless System EA $2 Wireless System EA Work Sink 2 EA $58 Casework 48 LF Ceiling - Lay-in SF Doors - Side-lite 8 SF Doors - Wood Doors inclu hw EA SHIELDS MIDDLE Page of Assessment Date: /25/205
Category: Classrooms Health ( room) 2 W 48th St Chicago, IL 02 Floor - Tile SF Lighting - Lay-in 8 EA Lighting - Pendent/Surface 0 EA Marker Board LF Walls - Concrete Block,255 SF Walls - Plaster/Drywall 290 SF Music Room ( room) Casework LF Ceiling - Splined 2,25 SF Doors - Side-lite SF Doors - Wood Doors inclu hw 2 EA Floor - Tile,90 SF Lighting - Pendent/Surface EA Marker Board LF Sound Panels 2 EA Sound System EA Storage/ Closet 2 SF Walls - Concrete Block 2,9 SF Work Sink EA (25 rooms) Casework 9 LF $,288 Casework 92 LF Ceiling - Lay-in 5,2 SF $,85 Ceiling - Lay-in,20 SF Doors - Side-lite 42 SF 2 Doors - Side-lite 52 SF Doors - Wood Doors inclu hw EA $2,0 Doors - Wood Doors inclu hw 9 EA Floor - Tile,20 SF Floor - Tile/Sheet 5,2 SF $5,8 Lighting - Lay-in 259 EA Lighting - Pendent/Surface 90 EA Marker Board 54 LF Storage/ Closet 0 SF $45 Walls - Concrete Block,854 SF $,298 Walls - Concrete Block,855 SF SHIELDS MIDDLE Page of Assessment Date: /25/205
Category: Classrooms (25 rooms) 2 W 48th St Chicago, IL 02 Walls - Plaster/Drywall,02 SF $8,5 Walls - Plaster/Drywall 8,0 SF Work Sink EA $2,5 Science (2 rooms) Casework 44 LF $, Ceiling - Lay-in 2,280 SF $,84 Doors - Side-lite 8 SF $0 Doors - Wood Doors inclu hw EA $90 Floor - Tile/Sheet 2,280 SF $2,282 Lighting - Lay-in 42 EA Marker Board LF Science Lab Shower 2 EA $58 Storage/ Closet 0 SF $45 Walls - Concrete Block,0 SF $, Walls - Plaster/Drywall,59 SF $4,5 Work Sink 2 EA $58 Science Lab Level ( room) Special Education ( room) Casework 2 LF Ceiling - Lay-in,92 SF Doors - Side-lite 8 SF Doors - Wood Doors inclu hw EA Eye Wash Station EA Floor - Tile,92 SF Gas Line EA Lighting - Lay-in 2 EA Lighting - Pendent/Surface 20 EA Marker Board LF Science Lab Elements,92 SF Science Lab Shower EA Storage/ Closet 2 SF Walls - Concrete Block,5 SF Walls - Plaster/Drywall 595 SF Work Sink EA Casework 48 LF Ceiling - Lay-in SF SHIELDS MIDDLE Page 8 of Assessment Date: /25/205
Category: Classrooms Special Education ( room) 2 W 48th St Chicago, IL 02 Doors - Side-lite 8 SF Doors - Wood Doors inclu hw EA Floor - Tile SF Lighting - Lay-in 8 EA Lighting - Pendent/Surface 0 EA Marker Board LF Walls - Concrete Block,255 SF Walls - Plaster/Drywall 290 SF Classrooms Subtotal: $8,45 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Exposed 285 SF Ceiling - Lay-in,4 SF $0,9 Ceiling - Lay-in 9 SF Doors - Side-lite 9 SF $,05 Doors - Side-lite 28 SF Doors - Steel Doors incl hw 2 EA $02 Doors - Steel Doors incl hw 2 EA Doors - Wood Doors inclu hw EA $,9 Doors - Wood Doors inclu hw 2 EA Floor - Carpet,94 SF $4,4 Floor - Carpet 5 SF Floor - Concrete 00 SF Floor - Tile 89 SF Floor - Tile Ceramic/ Porcelain 80 SF $8 Floor - Tile/Sheet,5 SF $, Lighting - Lay-in 80 EA Lighting - Pendent/Surface EA Power Distribution 98 EA $208,28 Power Distribution 50 EA Storage/ Closet 0 SF $94 Storage/ Closet 0 SF Walls - Concrete Block 9,5 SF $2,9 SHIELDS MIDDLE Page 9 of Assessment Date: /25/205
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 2 W 48th St Chicago, IL 02 Walls - Concrete Block,2 SF Walls - Plaster/Drywall,00 SF $,588 Work SInk 2 EA Gymnasia Kitchen Library Bleacher Seating 90 EA $2,05 Ceiling - Exposed 4,0 SF $,8 Ceiling - Plaster/Drywall,450 SF $8,004 Doors - Steel Doors incl hw 4 EA $,204 Floor - Wood 4,0 SF $29,28 Lighting - Metal Halide/Sodium Vapor 20 EA Scoreboards EA $2,4 Sound System EA $4,54 Stage,450 SF $8, Stage Curtain EA Stage Lift EA $,50 Stage Lighting System EA $2,9 Stage-Stairs - Asphalt 2 LF $ Storage/ Closet 2 SF $, Walls - Concrete Block 8,290 SF $,02 Ceiling - Lay-in,5 SF $4,29 Doors - Steel Doors incl hw EA $90 Floor - Tile,5 SF $,008 Lighting - Lay-in 5 EA Storage/ Closet 80 SF $580 Walls - Concrete Block 2,900 SF $8,50 Casework 84 LF Ceiling - Lay-in, SF Doors - Side-lite SF Doors - Steel Doors incl hw 2 EA Floor - Carpet, SF Lighting - Pendent/Surface 4 EA Walls - Concrete Block 9 SF Walls - Structural Glazed Tile,08 SF SHIELDS MIDDLE Page 0 of Assessment Date: /25/205
Category: Rooms (Other Than Classrooms) Lunch & Multipurpose Room 2 W 48th St Chicago, IL 02 Ceiling - Lay-in,80 SF $,5 Ceiling - Lay-in,520 SF Doors - Side-lite SF Doors - Steel Doors incl hw 4 EA $,204 Doors - Wood Doors inclu hw 2 EA Floor - Tile,520 SF Floor - Tile/Sheet,80 SF $,84 Lighting - Lay-in EA Lighting - Pendent/Surface 20 EA Market Board LF Serving Line 0 LF $,85 Storage/ Closet 0 SF Walls - Concrete Block,250 SF $,4 Walls - Concrete Block,55 SF Walls - Plaster/Drywall 280 SF Walls - Structural Glazed Tile 0 SF $,982 MDF_IDF AC Unit EA Doors - Steel Doors incl hw EA Finishes SF Ventilation and Cooling EA Mechanical/ Service Rooms Janitor's Closet 20 SF Mechanical/ Service Rooms,09 SF Storage Room 92 SF Restroom Accessories 2 SF $2, Accessories,4 SF Ceiling - Lay-in 2 SF $2 Ceiling - Lay-in 4 SF Ceiling - Plaster/Drywall,000 SF Doors - Steel Doors incl hw EA Doors - Wood Doors inclu hw EA $90 Floor - Terrazzo 00 SF Floor - Tile SF Floor - Tile Ceramic/ Porcelain 2 SF $508 SHIELDS MIDDLE Page of Assessment Date: /25/205
Category: Rooms (Other Than Classrooms) Restroom 2 W 48th St Chicago, IL 02 Floor - Tile Ceramic/ Porcelain,04 SF Floor Drain EA $, Floor Drain EA Hand Dryer EA Lavatory EA $959 Lavatory 4 EA Lighting - Lay-in 85 EA Partitions EA Urinals 2 EA Walls - Concrete Block 80 SF $2,5 Walls - Concrete Block 2,80 SF Walls - Structural Glazed Tile,008 SF Water Closet EA $,008 Water Closet 4 EA Rooms (Other Than Classrooms) Subtotal: $,50 Building: Main Category: Building Interior Corridor Ceiling - Lay-in 2,909 SF Ceiling - Plaster/Drywall,8 SF Doors - Side-lite 40 EA Doors - Steel Doors incl hw EA Doors - Store Front EA Doors - Transom Window EA Drinking Fountains - Triple Fountain EA Floor - Terrazzo 4,094 SF Lighting - Lay-in 4 EA Lighting - Pendent/Surface 2 EA Lighting - Wall Mounted EA Student Lockers - One Tier,280 EA Walls - Masonry,80 SF Walls - Plaster/Drywall 9,80 SF Walls - Structural Glazed Tile 0,9 SF SHIELDS MIDDLE Page 2 of Assessment Date: /25/205
Category: Building Interior Safety 2 W 48th St Chicago, IL 02 Camera Viewing Station EA $8 Security Cameras EA $2,5 Security Cameras EA Stairs Vertical Conveyance Ceiling - Lay-in,95 SF $5,8 Floor - Terrazzo,0 SF $0,4 Handrails 84 LF $,28 Lighting - Lay-in 2 EA Lighting - Wall Mounted EA Stairs - Terrazzo 92 LF $,82 Walls - Concrete Block,8 SF $,25 Walls - Masonry,8 SF $2,08 Elevator - Hydraulic Elevator EA $9,28 Building Interior Subtotal: $8, Total Building Cost $,9,8 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin 2 EA $,2 Civil/ Drainage - Site Drain 9 EA $2,92 Civil/ Drainage - Site Manhole 9 EA $,45 Fencing - ew Standard Ornamental,908 LF $0,8 Fencing - Wood Fencing w/ Steel Frame,580 LF $20,9 Benches EA $5,59 Landscape - Grass,50 SF $8,89 Landscape - Hardscape- Concrete 20,900 SF $0,892 Landscape - Hardscape- Pavers 9 SF $544 SHIELDS MIDDLE Page of Assessment Date: /25/205
2 W 48th St Chicago, IL 02 SITE Category: Site Landscape Parking Lot Playground Sidewalks Signage Lighting - Pole Mounted 9 EA $20,59 Parkway trees 2 EA $, Planting Beds/ Area,0 SF $,480 Play Area - Synthetic Turf Play Field 2,800 SF $55,82 Retaining Wall - Concrete SF $,805 Trash Receptacles EA $2,8 Walking Path 4,4 SF Concrete Curbs 4 LF $5,99 Interior Plantings 0 LF $425 Lighting - Lighting 4 EA $,8 Surface - Concrete 2,25 SF $0,42 Trash Compactor EA Trash Enclosure 2,850 SF Vehicular Screening LF $5,25 Equipment - School Age 5-2 EA $,54 Surface - Poured Surface,00 SF $2,58 Sidewalks - Perimeter Sidewalks,295 SF $2,5 Flag Pole - Flag Pole EA 5 $,0 Monument - Building Mounted Cut Letter Sign EA Site Subtotal: $45,9 Total Site Cost $45,9 Campus Total ² ³ $2,89,4 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. SHIELDS MIDDLE Page 4 of Assessment Date: /25/205
2 W 48th St Chicago, IL 02 ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. SHIELDS MIDDLE Page 5 of Assessment Date: /25/205
2 W 48th St Chicago, IL 02 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Computer Lab Health Music Room Science Science Science Lab Level Special Education Art Room Computer Lab Music Room Science Lab Level st Floor rd Floor rd Floor st Floor st Floor st Floor st Floor st Floor st Floor rd Floor rd Floor rd Floor rd Floor rd Floor rd Floor rd Floor rd Floor rd Floor st Floor st Floor rd Floor 4 200 8 20 2 25 2 2 28 29 0 2 08 0 2 4 5 8 4 5 20 20 2029 200 09 02 05 08 0 08 0 208 20 2020 205 202 204 20 20 20 202 0 05 05 04 0 0 08 02 0 052 2004 00,0,,92,90,, 0 0 0,052,,,92 0 4 0 20 2 20 20 20 20 8 4 5 4 8 4 4 4 4 4 52 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 SHIELDS MIDDLE Page of Assessment Date: /25/205