Osprey Platform Assembly Guide. Menunkatuck Audubon Society. Rev 1.0

Similar documents
V nyl Gazebo truct c it Assembly Instr ons

8x8 Spa Breeze Pergola Assembly Manual Outdoor Living Today

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

12X20 Breeze Pergola Assembly Manual Outdoor Living Today

8X10 Breeze Pergola Assembly Manual Outdoor Living Today

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

10ft X 16ft Breeze Pergola Assembly Manual. Outdoor Living Today. Revision 6 March 20th,2012

Dura-Lock Roof System

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

Double Beam Freestanding Pergola Installation Guide

Assembly Instructions

Oxford Stalls Installation Instructions

Rear Mount Installation Instructions

MONKEY BARS OVERHEAD RACK INSTALLATION

Katerack Wagon Shelving System

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

10 Octagon Cedar Gazebo Assembly Instructions

Ledger Board Lean-to Instruction Manual

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

3/4 Rear DuraRac Installation Instructions

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

The following instructions will guide you through the installation of your new vinyl railing.

Roof Only Lean-to Instruction Manual

Assembly Instructions. Table of Contents

Model #SH & CH SH Pine CH Naturaline

Heavy-Duty Bypass Track System

DOCK WEDGE - STANDARD

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Ledger Board Lean-to Instruction Manual

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

Flex Fence Instruction Manual

CONTINUED. TABLE TOPS: 1. Sort one 2x6x8 piece from your lumber. 2. Measure and mark two 48 pieces from each, then cut.

6X3 Patio Garden Shed Assembly Manual

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

User Instructions Multiline Otter Scoreboard Caddy Assembly

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

176 S. New Holland Road Gordonville, PA Tel: Fax: Castle Loft

RUN-IN SHED INSTRUCTIONS

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

176 S. New Holland Road Gordonville, PA Tel: Fax: Playhouse Loft

GIRTS ON BACK OF BUILDING

Assembly Instructions

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Installation Manual For ToddPod Outdoor Shower Enclosures

Clearview Railing System Installation Instructions

Ripple Hanger ASSEMBLY INSTRUCTIONS

PROVEN WORLDWIDE SNORKEL FOR CHEVY COLORADO NEW PRODUCT

Renaissance Pavilion. Assembly Manual

Wood Duck Nest Box Design & Assembly Directions

SwingSafe Swing-Away Mailbox Support Diagram

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Art Thatch TM Umbrella Kit Installation Guide

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION INSTRUCTIONS

The following instructions will guide you through the installation of your new vinyl railing stair kit.

Spiral Slide

12x12 Pavilion. Assembly Manual

Track Rack. * Track Racks are not lockable

INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

The Queen Quilter Professional Quilters Kit Frame

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,

Installation Manual Flat Track Series

Installation Instructions

Qwik-Fence Installation Instructions

Installation Instructions for. Before You Begin TOOLS REQUIRED

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Pivot-Door Downdraft Cabinet Plans

A Huffy Sports Company In-Ground Basketball System Owners Manual. Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

176 S. New Holland Road Gordonville, PA Tel: Fax: Summit Tower

Rear Katerack Installation Instructions

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

(Toll Free); 8am-5pm Pacific Time, Monday-Friday. Assembly instructions for: CHAIR SWING SETS

BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS

Quick Hoops Seedling and Micro Green Bench Instruction Manual

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS GL75. BASE SIZE: 2.190m x 1.520m

INSTRUCTION BOOKLET #C20

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Assembly Instructions for: JEAN S ULTIMATE SWING SETS

Assembly Instructions Eggstreme Chicken Coops

Supplement. Assembly and Maintenance Guide Titan Series Commercial Step System. Manufactured in the USA

Assembly Instructions 10 X 10 Aluminum Roof Support

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

ASSEMBLY INSTRUCTIONS GG77. BASE SIZE: 2.190m x 2.020m

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

PRE-ENGINEERED HORSE STALL SYSTEMS 4884 HSD STANDARD SLIDING DOOR. & Assembly. Installation Instructions

6X3 Oscar Shed Assembly Manual

Transcription:

Osprey Platform Assembly Guide Menunkatuck Audubon Society Rev 1.0 1

Menunkatuck Audubon Society is a local chapter of National Audubon Society. We serve the shoreline towns of West Haven, New Haven, East Haven, Branford, Guilford, and Madison, Connecticut. We have a 32-year record of conservation, education, and advocacy. Menunkatuck s conservation efforts allow us the opportunity to give back to nature and restore the delicate balance of the ecosystems in our area. Our aim is to minimize and mitigate the damage from human impact. This installation guide is designed to help other Audubon chapters and individuals that would like to install new, or repair existing, osprey platforms. Learn more at: menunkatuck.org Menunkatuck Audubon Society PO Box 214 Guilford, CT 06437 Menunkatuck Audubon Society is a 501c3 organization. All donations are tax deductible as allowed by law and fund our conservation work and programing. 2

Major Components Platform Main Post Diagonal Brace Ground Level Ground Post 3

Platform Assembly Platform Overview The platform is assembled prior to installation and then added to the main post onsite. Pilot holes should be used for all screws to prevent splitting. Materials All wood that could make contact with the ospreys is cedar. We do not recommend pressure treated wood. 4

Platform Assembly Cut Material to Length 1. Cut 1x6 cedar to the following lengths. Long Sides Long Side: 43 Short Side: 40 Middles: 17.25 Qty:2 Qty:4 Qty:4 Short Sides Materials 1 x6 x 14 Cedar#3 -rough on one side Qty: 2 Middle Boards 5

Platform Assembly Corner Posts 1. Cut four posts 12 long 2. Notch top two corners of post at 45 degrees. Post: 12 Qty:4 Corner Posts Materials 2 x4 x8 Cedar Qty: 1 6

Platform Assembly Assemble Ladder Structure Pilot holes should be used to prevent splitting. 1. Position the middle boards 13 inches (on center) from the ends of a short side board. 2. Secure each middle board with two lag screws with washers. 3. Attach the second short side board with lag screws. 4. Make a second ladder structure. Materials ¼ x3 Galvanized lags screws Qty: 16 ¼ galvanized washers Qty: 16 7

Platform Assembly Add Long Sides Pilot holes should be used for all screws to prevent splitting. 1. Use scrap pieces of 2x4 to help position the two ladder structures so they are the same width as the main post. 2. Center the long sides across the ladder structures and secure with two lag screws through each center board. (red dots) 3. Repeat on other long side. Materials ¼ x3 Galvanized lag screws Qty: 8 ¼ Galvanized washers Qty: 8 8

Platform Assembly Add Corner Supports Pilot holes should be used for all screws to prevent splitting. 1. Position a corner post to fit squarely in each corner of the platform. 2. Secure posts with two lag screws and washers on each side. Materials ¼ x3 Galvanized lag screws Qty: 16 ¼ Galvanized washers Qty: 16 9

Platform Assembly Support Bracket Top Hole 1. Drill a ⅜ hole in the center of each side of the platform to attach the metal support bracket. 2. Insert a hex bolt with washers through hole. The nut should be on the inside of the platform and there are two washers on each end. The support bracket will be attached on-site. The hole for the bottom of the support bracket is drilled once the platform is attached to the main post to ensure it aligns properly. Materials ⅜ x2 Galvanized hex bolt Qty: 4 ½ Galvanized washer Qty: 8 ⅜ Galvanized washer Qty: 8 ⅜ Galvanized nuts Qty: 4 10

Platform Assembly Support Brackets 1. Drill a ⅜ hole in each end of the metal bar. 2. Bend 45 degree angles on each end of the metal bar. The bent end should be about 2 long. (Note that each bend goes in the opposite direction). 3. Paint the bracket to prevent rusting. There is 1 metal bracket per side. Materials 3/16 (or ¼ ) x1 x30 Steel flat bar Qty: 4 11

Platform Assembly Add Flashing 1. Add a piece of scrap metal flashing to protect the end grain of the main post. 2. Use 2 sheet metals screws with washers to secure the flashing. Make sure both screws are on the same board. Materials 26 Gauge (or 22 Gauge) Sheet metal 10 x10 (this can be scrap from baffle) 1 #8 Sheet metal screws with hex heads Qty: 2 #8 Fender washers Qty: 2 12

Platform Assembly Add Mesh 1. Position hardware cloth over platform. 2. Cut notches in corners to go around corner posts. 3. Secure hardware cloth with sheet metal screws and washers around perimeter. (3 per side) 4. Trim any hardware cloth that extends over edge of platform. Materials ½ Hardware cloth (42 x42 ) 1 #8 Sheet metal screws with hex heads Qty: 12 #8 Fender washers Qty: 12 13

Main Post Cut Main Post 1. Mark a line 4 feet from the bottom of the post. (this is how deep the pole will go in the ground). 2. Measure 9-8 from bottom of pole and drill a 1/2 hole through post. 3. Rotate post 90 degrees. 4. Measure 9-10 from bottom of pole and drill a 1/2 hole through post. 5. Cut 45 degree bevels on bottom of post. 9-10 9-8 Main Post Notes: These two holes are perpendicular to each other. They will be used to secure the diagonal braces. Make sure the top hole is not covered when you attach the wrap baffle. Materials 4 x4 x16 Pressure Treated Qty: 1 4 - depth in ground Beveled Bottom 14

Main Post Pole Wrap Baffle 1. Position the bottom edge of the sheet metal 9-10 from the bottom of the main post (don t cover hole). Align the long edge with the post edge. 2. Secure with 5 nails. 3. Use a wooden mallet to bend the metal around face of post. 4. Rotate post 90 degrees. 5. Secure with nails. 6. Continue to wrap and nail post until flashing overlaps. Materials 16 x48-26 gauge galvanized metal (painted) Qty: 1 1½ Roofing nails Qty: 20 15

Main Post Main Post Holes 1. Center the main post in the platform so that it just touches the sheet metal end grain cap. 2. Drill a ½ hole though the center of both 1x6 cedar boards and the main post. 3. Mark the orientation of the platform and pole so that during assembly you can line up the hole. Materials Completed platform Main post 16

Ground Posts Cut Ground Posts 1. Cut 4x4 posts to 5 foot lengths. 2. Cut 45 bevel cuts on bottom of each post to make it easier to drive them in the ground. Ground Posts Materials 4 x4 x10 Pressure Treated Qty: 2 Beveled Bottom 17

Braces Diagonal Braces 1. Cut 45 degree notches on all four corners of the 2x4. Braces Materials 2 x4 x10 Pressure Treated Qty:4 Notched Corners 18

Hardware Hardware Summary ½ x8 Galvanized hex bolt with two ½ washers and nut ½ x7 Galvanized hex bolt with two ½ washers and nut ½ x6 Galvanized hex bolt with two ½ washers and nut ⅜ x2 Galvanized hex bolt with four washers (two ½ & two ⅜ ) and nut ⅜ x2½ Galvanized lag screw with ⅜ washer ¼ x3 Galvanized lag screw with ¼ washer ¼ x2 Galvanized lag screw with ¼ washer ¼ x½ Zinc bolt with washer and nut 1 #8 Sheet metal screw, hex head with fender washer 1½ Roofing or joist nails 19

Hardware Material List Description Quantity Used for ½ x8 Galvanized hex bolt 2 Secure diagonal braces to main post ½ x7 Galvanized hex bolt 1 Secure platform to main post ½ x6 Galvanized hex bolt 4 Secure diagonal braces to ground posts ⅜ x2 Galvanized hex bolt 4 Secure metal support straps to platform ⅜ x2½ Galvanized lag screw 4 Secure metal support straps to main post ¼ x3 Galvanized lag screw 40 Assembly of platform ¼ x2 Galvanized lag screw 4 Secure round baffle to main post 1 #8 Sheet metal screws, hex head 14 Secure hardware cloth and metal end cap to platform 1½ Roofing or joist nails 20 Secure metal wrap baffle to main post ¼ Galvanized washer 44 ½ Galvanized washer 22 ⅜ Galvanized washer 8 ⅜ Galvanized nut 4 ½ Galvanized nut 7 #8 Fender washers 14 Baffle 30 1 (see separate instructions for making baffle) 22 or 26 Gauge sheet metal 16 x48 1 Pole wrap baffle 22 or 26 Gauge sheet metal 10 x10 1 Main pole end grain cap 3/16 (or ¼ ) x1 x30 Steel flat bar 4 Support brackets 2x4 8 Foot Cedar 1 Platform corner posts (do not use pressure treated - osprey contact surface) 1x6 14 Foot Cedar #3 one-side rough 2 Platform 4x4 16 Foot Pressure treated 1 Main post 4x4 10 Foot Pressure treated 2 Ground posts 2x4 10 Foot Pressure treated 4 Diagonal braces Sticks 24-30 (qty: 30) and wood chips Material for a starter nest (2 buckets) Cedar perch pole 10-12 1 Used for adults to perch (look for old dead cedar tree) 20

Installation Installing the Platform It takes about 1.5 hours to install the platform. Carry all materials to site location. Keep mud and salt water away from power tools. Tools needed: Post pounder (or post hole digger and shovel) 4 Bubble level 8 Step ladder 10 Step ladder 8 C-clamp Hammer Power drill with spare battery Drill bits: ¼, ½ Ratchet wrench with sockets: 7/16, 9/16, ¾ Box wrenches: 7/16, 9/16, ¾ Battery sawsall or hand saw 21

Installation Main Post 1. Using a pounder, drive the main post into the ground until it reaches the four foot mark you made on the post. Try to keep the post as vertical as possible, but it does not have to be perfectly plumb at this stage. Alternately, use a post hole digger to dig a four foot deep hole. Try to keep the hole as narrow as possible. Insert the main post and then back fill the hole, trying to keep the pole vertical. 22

Installation Diagonal Braces 1. Attach two of the diagonal braces on opposite sides of the main post. Secure the braces loosely using a 8 bolt with washers on both ends through the pre-drilled holes. 2. Position one ground post at the end of each brace. The brace should extend about 2 inches beyond the ground post. 23

Installation Ground Posts 1. Using a pounder, drive the ground post into the ground until 12-15 inches remain exposed. Keep the post as vertical as possible. Alternately, use a post hole digger to dig a 3½-4 foot deep hole. Try to keep the hole as narrow as possible. Insert the ground post and then back fill the hole, trying to keep the pole vertical. 24

Installation Secure Diagonal Braces 1. Using a C-clamp, lightly clamp the diagonal brace to one of the ground posts. 2. Use a 4-foot level to plumb the main post. 3. Tighten the C-clamp. 4. Drill a ½ hole through the diagonal brace and ground post. 5. Insert a 6 bolt with washers on both ends, and tighten to secure. Make sure main post remains plumb. 6. Repeat this process for the opposite ground post. 25

Installation Ground Posts 1. Lightly, secure the second set of diagonal braces to the main post with a 8 bolt with washers on both ends. 2. Position one ground post at the end of each brace. The brace should extend about 2 inches beyond the ground post. 3. Using a pounder, drive the ground post into the ground until 12-15 inches remain. Keep the post as vertical as possible. 26

Installation Secure Diagonal Braces 1. Using a C-clamp, lightly clamp the diagonal brace to one of the ground posts. 2. Use a 4-foot level to plumb the main post. 3. Tighten the C-clamp. 4. Drill a ½ hole through the brace and ground post. 5. Insert a 6 bolt with washers on both ends, and tighten to secure. Make sure main post remains plumb. 6. Repeat this process for the opposite ground post. 27

Installation Baffle 1. Slide the baffle over the main post until it just touches the post wrap baffle. 2. Secure the baffle with four ¼ x2 galvanized lag screws with washers. Check to make sure the baffle is level as you install screws. 28

Installation Install Platform 1. Place the platform on top of the main post. Center the platform and align the marks you made when pre-drilling the hole (note the hole will only align in this orientation). 2. Align the pre-drilled holes in the platform with the predrilled hole in the main post. 3. Secure the platform with a 7 bolt with washers on both ends. 29

Installation Support Brackets 1. Remove the nut and washers from the 2 bolt in the center of each side of the platform. 2. Attach a metal support bracket on the inside of each bolt and secure loosely. 3. Position the bottom of the metal support bracket so that it is parallel to the main post. 4. Pre-drill a ¼ hole through the bracket where it meets the main post. 5. Secure the bottom of the metal support bracket with a 2½ lag screw and washer. 6. Tighten the top bolt on the platform. 7. Repeat for remaining three brackets. 30

Installation Nesting Material 1. Dump buckets of medium size branches and wood chips on top of platform to act as a starter nest. 31

Installation Perch Pole 1. Using post hole diggers, dig a three foot hole about 15-20 away from the main post. 2. Insert a 10-12 cedar tree post (do not use any pressure treated lumber as the adult birds often eat on this pole). 3. Backfill the hole. The adults use this perch instead of sitting on nest. 32

Installation Group Photo 1. Take a group photo of your outstanding work. 2. Submit your photo to the local newspaper. photo shows optional perch bar 33