SCHEMATIC MANOEUVRE ILLUSTRATIONS SCHEDULE P-13

Similar documents
SCHEMATIC MANOEUVRE ILLUSTRATIONS SCHEDULE P-13

GBR/CAA SCORE SHEET CLUBMAN SCHEDULE Judge

Cover the wing trailing edge and the aileron leading edge with strapping tape as shown.

Profi Tx Example Elevator Flap Compensation

PITTS S2S CONSTRUCTION

FÉDÉRATION AÉRONAUTIQUE INTERNATIONALE

Ÿ Battery Strap Ÿ Paper Knife Ÿ Elevon Throw Gauge Ÿ Instructional Manual. Building Tools:

Practicing Basic Machine Operation Sample #1

ARKBIRD-Tiny Product Features:

Overview: These flying oddities aren t your typical paper airplane. They may be strange to look at, but they re simple to make and fun to fly.

Fixed Wing Models 55

F-16 Falcon 70mm EDF

Chapter 1. Beam and Sill Plates

Paper Pinwheel. Supplies

Bed must be leveled and printer adjusted to produce good single layer prints. Measurement and calibration of your filament is highly recommended.

Copyright 2004 Society of Manufacturing Engineers. FUNDAMENTAL MANUFACTURING PROCESSES Extrusion Processes NARRATION (VO): NARRATION (VO):

Sky Eagle. User Guide. Cautionary and Warning Statements

F3A -70E ASSEMBLY MANUAL

Raceline / Shockline/Endloop Installation Manual

96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED

Trebuchet Construction Instructions

A3 Pro INSTRUCTION MANUAL. Oct 25, 2017 Revision IMPORTANT NOTES

1999 Combat Wing Trick R/C Products LLC 938 Victoria Ave. Venice, California 90291

The flying manual. Quique s Signature series 72 YAK 54

ZupAir ZULU OWNER S MANUAL

You need to be really accurate at this before trying the next task. Keep practicing until you can draw a perfect regular hexagon.

Ryan STA Sport Scale Model Aircraft Assembly and Instruction Manual

BOOMERANG TORUS. Aerobatic Sport Jet for 20 to 34 lbs (P80 to P160) thrust turbines.

CS-25 AMENDMENT 22 CHANGE INFORMATION

Build the Spitfire: Step-By-step. Pack 7 Stages 61-71

MAIN PARTS

Elastic-powered Bus : Assembly Instructions

Unit 2 Lesson 3 Machines. Copyright Houghton Mifflin Harcourt Publishing Company

4 Position the Suntile to the x tile s position and mark the felt around the square box flange. Then remove the Suntile

VT-ALLROUNDER V4 1500MM CORO 3/4 Channel Trainer Airplane

SIDE BORDERS -- Instructions for making a continuous line side borders to fit within your safe area (from top to bottom)

Flight-dynamics Simulation Tools

AT channel 6 servos

Circular Drawer Storage Unit

Happy December! On the wrong side of Fabric A, mark 1/4" from each edge on all four corners.

SuperTrack Parts List

Autonomous Robot Control Circuit

REX SCOUT D6. R/C Scale Model Instructions

Three Leaf Clover Rib Socks - Detailed (ladies small/medium)

Corvus Racer Colour schemes. AeroPlus RC Copyright 2013 All Rights Reserved

A Trio of Pretty Baby Hats. By FlossiePotts

THE APOGEE A 100-INCH AMA DURATION SAILPLANE FROM DYNAFLITE

HLG01. Hand Launch Glider #1. Span 18 in. / Length 19-3/8 in. / Area 46.5 sq. in. / Typical Flying Weight 25g

Two-Tone Vest. Abbreviations. Details & Instructions MEASUREMENTS

Tradewinds Amplify Display System Instructions

PokéBot GO! Rules 1. Participants will have 5 minutes to gain experience points. All team members may have hands on time in controlling the bots.

KSF selected problems Student

ULS Cherokee. Ultra Low Speed aircraft for indoor RC flying. Zippkits. Specifications: Required to complete:

CLASSIC 18'' BACKGAMMON SET

February,

WILDING WALLBEDS BUNK BED INSTALLATION INSTRUCTIONS

CJ-7 YJ FRONT KITS: Preparation. BEDRUG, INC. n 635 Old Hickory Blvd, Old Hickory, TN n n bedrug.com

Stage I Round 1. 8 x 18

Move System Swivel Caster Installation ( )

Building a WorId Record Fuselage Model

POP PLUS / SPIDER SET-UP INSTRUCTIONS

SPEKTRUM DX18. Programming Guide for a Six-Servo Sailplane. By: Sherman Knight July Version 2.0 AirWare Version 1.0

105" TIGER MOTH ARF INSTRUCTION MANUAL VERSION 1.0

ENTRY DOOR TEST REPORT. Rendered to: The Vistawall Group

ASSEMBLY INSTRUCTIONS

E-AERO EPP PITTS KIT From BP HOBBIES. Parts Included in kit

HIGH-END TECHNOLOGY. Electric ducted fan Starfighter

FUSELAGE CONSTRUCTION

Georgia Institute of Technology George W. Woodruff School of Mechanical Engineering ME Creative Decisions and Design Summer 2013 STUDIO II

COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles

INSTRUCTION MANUAL BOOK.

Jelly Mould Blanket. Frankie s Knitted Stuff

Math Circle. Hexaexagons. Warm-up. How many sides does a piece of paper have? How many sides do you think all at objects have?

Velocity Slingjet. Specifications: Construction Span Length Take-off weight w/ gear. Balsa/foam/film 1055m m (41.54 ) 1040m m (40.

Isometric Drawing Chapter 26

Basic Sewing Portfolio. Name

JAMESTOWN175 SERIES Fixed, Projected and Casement Steel Windows

IF A PART IS MISSING OR DAMAGED...

THE PRIVATEER. A Class B job that performs well with both small and intermediate bore engines. By BEN SHERESHAW

Trimming your Aerobatic Model

Page 1. Step 3: Unfold your DreamHouse into 2 panels. Shown Above. Step 1: Remove your DreamHouse from the pack.

UNIVERSITY OF VICTORIA FACULTY OF ENGINEERING. SENG 466 Software for Embedded and Mechatronic Systems. Project 1 Report. May 25, 2006.

Hospital Grade Welded Ceiling System

Super Sky Surfer 2000 Assembly Instructions

How to Read the Stock Chart

The rubber band-powered helicopter is easy to construct, and with a little practice it can be flown 20+ feet into the air!

Required Tools. Installation of Hook Plates & Discs. Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products

Master Template Unusual Minibooks 1

INCLUDED IN THIS KIT: SPECIFICATION: NEEDED BUILDING TOOLS: REQUIRED EQUIPMENT:

Sbach 1,2m 3D/aerobatic EPP model Building instructions

Dancing Rain Dolls. Knot Doll. Created By. Amy Prentice

7 Materials for teaching

Assembly Manual / Airframe 65 Vyper SAFETY in Assembly SAFETY in Flying

Table of Contents. 13 Quilt Patterns 6 The Patterns 6 The Border Glossary 8 Coping or Fudge Strips 8 Determining the Number of Borders to Use

Deriving Consistency from LEGOs

Projectiles: Earth to Earth; The Dynamics of Catapults & Trebuchets

Simple Machines. Contact the National Museum of the U.S. Navy for Field Trip and School Visit opportunities!

IMLEM Meet #2 December, Intermediate Mathematics League of Eastern Massachusetts

Chapter 14. Wall Sheetrock

Engineering Graphics. Practical Book. Government Engineering College Bhuj (Kutch - Gujarat) Department of Mechanical Engineering

Transcription:

SCHEMATIC MANOEUVRE ILLUSTRATIONS SCHEDULE P-13

Take-off procedure ( not judged, not scored ) wind 120 0 Security line

P-13.01: Half Clover Leaf with horizontal roll full roll

P-13.01: Half Clover Leaf with horizontal roll

P-13.01: Half Clover Leaf with horizontal roll All radii are equal. Roll on middle of the line.

P-13.02: Stall Turn with ¼ roll up, ¼ roll down All radii are equal. ¼ roll ¼ roll

P-13.02: Stall Turn with ¼ roll up, ¼ roll down Two wing spans or more zero points! Pivot on CG ¼ roll on middle of the line. ¼ roll

P-13.02: Stall Turn with ¼ roll up, ¼ roll down ¼ roll on middle of the line. 1/4-roll

P-13.03: Roll Combination with consecutive three ¼ rolls, three ¼ rolls in opposite direction The ¼ rolls must have the same roll rate. Lines between part rolls must be short and of equal length. Between part rolls in opposite direction there must be no line.

P-13.04: Half square loop with consecutive two ½ rolls in opposite direction ½ roll ½ roll

P-13.04: Half square loop with consecutive two ½ rolls in opposite direction Half rolls on middle of the line. The half rolls must have the same roll rate. No line between the half rolls. All radii are equal.

P-13.05: Triangle with roll in each line roll roll roll

P-13.05: Triangle with roll in each line roll 90 roll Rolls on middle of the lines. Al radii are equal. roll

P-13.06: Split S with roll Roll Half loop immediately after the roll.

P-13.07: 45 Upline with 1 ½ snap roll 1 ½ snap roll 45

P-13.07: 45 Upline with 1 ½ snap roll If snap roll = barrel roll or aileron roll: Severe downgrade > 5 pts. Snap roll on middle of the line. 45 Al radii are equal.

P-13.08: Reverse Top Hat with ¼ roll down, ¾ roll up ¼ roll ¾ roll

P-13.08: Reverse Top Hat with ¼ roll down, ¾ roll up ¼ roll ¾ roll Rolls in middle of the lines. Horizontal cross box must be inverted. Al radii are equal.

P-11.10: Spin with 2 ½ turns in opposite direction

P-11.10: Spin with 2 ½ turns in opposite direction Snap entry - zero points! Forced entry: downgrade. Spin reversal must be immediate. Spiral dive - 0 points!

P-13.11: Pull-Push-Pull Humpty Bump with ¼ roll up, ¼ roll down (Option : Consecutive two ¼ rolls up) ¼ roll ¼ roll

P-13.11: Pull-Push-Pull Humpty Bump with ¼ roll up, ¼ roll down (Option : Consecutive two ¼ rolls up) ¼ rolls in middle of the lines. ¼ roll ¼ roll Al radii are equal.

P-13.11: Pull-Push-Pull Humpty Bump with ¼ roll up, ¼ roll down (Option : Consecutive two ¼ rolls up) ¼ rolls in middle of the lines. ¼ roll ¼ roll Al radii are equal.

P-13.11: Pull-Push-Pull Humpty Bump with ¼ roll up, ¼ roll down (Option : Consecutive two ¼ rolls up) Option two ¼ rolls

P-13.11: Pull-Push-Pull Humpty Bump with ¼ roll up, ¼ roll down (Option : Consecutive two ¼ rolls up) Option 2 / 4 roll

P-13.11: Cuban 8 with integrated rolls on top 90 of both part loops Full roll integrated Full roll integrated 90 90

P-13.11: Cuban 8 with integrated rolls on top 90 of both part loops The rolls must be fully integrated on the circular flight path of the loops. Roll rate constant. 90 90 All radii are equal.

P-13.12: ½ Loop

P-11.13: Square Loop with ½ roll on each line ½ roll (4) ½ roll (3) ½ roll (1) ½ roll (2)

P-11.13: Square Loop with ½ roll on each line ½ roll (4) ½ rolls in middle of the lines. ½ roll (3) ½ roll (1) All roll rates are equal. All radii are equal. ½ roll (2)

P-13.14: Figure 9, with consecutive two ½ rolls Two ½ rolls

P-13.14: Figure 9, with consecutive two ½ rolls ½ rolls in middle of the line. All radii are equal. Two ½ rolls

P-13.15: Roll combination with consecutive ½ roll, roll, ½ roll in opposite direction ½ roll ½ roll Full roll

P-13.15: Roll combination with consecutive ½ roll, roll, ½ roll in opposite direction ½ roll ½ roll Full roll Part rolls must have the same roll rate. No lines between between the rolls.

P-13.16: ½ Loop on Corner with ¼ roll ¼ knife edge loop, ¼ roll ¼ roll 45 ¼ roll 45

P-13.16: ½ Loop on Corner with ¼ roll ¼ knife edge loop, ¼ roll ¼ roll 1 / 4 rolls in middle of the lines. ¼ roll All radii are equal.

P-13.17: Figur Z with consecutive four 1 / 8 rolls Four 1 / 8 rolls

P-13.17: Figur Z with consecutive four 1 / 8 rolls Lines between part rolls must be short and of equal length. All radii are equal. 45

Landing procedure ( not judged, not scored ) The direction of the landing may be different to the take off. wind 120 0 Security line

Bob Skinner Thank you! Peter Uhlig, April 2011