3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 9 2,93 $2,2,3 Annex 99,28 $8,8 SITE $83,83 Campus Total,32 $3,8, Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA Exterior Doors - Exterior FRP Door 8 EA Exterior Doors - Exterior Steel Door EA Exterior Doors - Transom Lite EA Exterior Stairs - Concrete LF $ Power Door Operator and Controls 3 EA Foundation Lighting Roof System Foundation - Concrete 92 LF Superstructure - Steel,98 SF Exterior Lighting - Wall Mounted EA Coping - Metal, LF $,9 Downspouts - Exterior Downspouts LF $332 Downspouts - Interior Downspouts 88 LF $,28 Roof - Modified Bitumen 2 SF $2,2 Roof - Modified Bitumen 29,9 SF WASHIGTO G ES Page of 8 Assessment Date: /2/2
Building: Main Category: Building Exterior Roof System 3 E th St Chicago, IL Roof Structure - Steel / Metal Deck/ Concrete Topping 29,9 SF Walls Windows Canopy - Concrete/ Stucco 22 SF Exterior Walls - Precast Panel Wall,2 SF $33, Exterior Walls - Precast Panel Wall,38 SF $,2 Exterior Walls - Precast Panel Wall 8,9 SF $2,2 Exterior Walls - Prefabricated Metal Panel Wall 3 SF $,98 Clerestory - Glass Double-Pane SF Curtain wall - Glazed Double Pane 3,32 SF Curtain wall - Insulated Panel,3 SF Curtain wall - Windows,28 SF Guard - Guards perforated 28 SF Skylite - Lexan 32 SF Windows - Casement Aluminum Double-pane SF Building Exterior Subtotal: $32,92 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA 2 $8,2 Emergency Battery Packs - Corridors and Stairs 3 EA $,88 Emergency Battery Packs - Gym 2 EA $ Emergency Battery Packs - Lunchrooms EA $,2 Exit Signs - Corridors and Stairs EA $,99 Exit Signs - Gym 2 EA $3 Exit Signs - Lunchroom EA $898 Security System - CCTV,93 SF $,9 Security System - Intrusion Detection,93 SF $, Main Service Main Electrical Service - A 2/28/3PH EA $3,2 Main Electrical Service - 2 to 3 A 2/28/3PH EA $22,823 PA System,93 SF $8,8 WASHIGTO G ES Page 2 of 8 Assessment Date: /2/2
Building: Main Category: Electrical System Power Distribution 3 E th St Chicago, IL Lighting and Power Panels - A EA $2,99 Lighting and Power Panels - A 3 EA Main Distribution Panels - Greater than amp 2 EA $, Electrical System Subtotal: $23, Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA Fire Alarm Strobe Lights,93 SF $9,39 Fire Alarm_System,93 SF $2,9 Safty System Subtotal: $,38 Building: Main Category: Mechanical System Air Handling Systems Roof Top Unit-Multi Zone-Roof Mounted- Gas Heating Coils - 2-3 tons EA $3, Boiler Systems Heating Devices Mechanical Plumbing Temperature Control Boiler Auxiliary- Electric- Hot Water Boiler - - 2 MBH EA $998 Electric- Hot Water Boiler - - 2 MBH EA $,99 Hot Water Pump EA $3 Cabinet Heaters - With Electric Coil 9 EA $, Fin Tube - Electric LF $,9 Wall Heater - Electric 3 EA $ Wall Heater - Electric EA Hydronic Supply and Return - Galvanized LF DDC System,93 SF $38, WASHIGTO G ES Page 3 of 8 Assessment Date: /2/2
Building: Main Category: Mechanical System Temperature Control 3 E th St Chicago, IL Thermostats - DDC EA $33,8 Ventilation Exhaust Fans- Roof Mounted - - CFM EA $,2 Exhaust Fans- Roof Mounted - - CFM EA $2,92 Exhaust Fans- Roof Mounted - Less than CFM EA 3 $,92 Exhaust Fans- Roof Mounted - Less than CFM 3 EA $889 Type I Exhaust Hood- Kitchen EA 3 $28,2 Type II Exhaust Hood- Warming Kitchen EA $92 Mechanical System Subtotal: $83,9 Building: Main Category: Plumbing System Hot Water Electric Heater - 2 - KW 2 EA $,3 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures,93 SF $,998 Domestic Piping-Cold Water Horizontal Lines,93 SF $3,3 Domestic Piping-Cold Water Risers,93 SF $,22 Domestic Piping-Hot Water from Risers to Fixtures,93 SF $8, Domestic Piping-Hot Water Horizontal Lines,93 SF $,22 Domestic Piping-Hot Water Return Lines,93 SF $,8 Domestic Piping-Hot Water Return Risers,93 SF $,8 Sanitary Piping,93 SF Storm Piping,93 SF Vent Piping,93 SF Pumps - Sump-Duplex EA $,38 Plumbing System Subtotal: $,88 Building: Main Category: Classrooms WASHIGTO G ES Page of 8 Assessment Date: /2/2
Building: Main Category: Classrooms Music Room ( room) 3 E th St Chicago, IL Ceiling - Lay-in SF $2,32 Chalk Board 8 LF $,3 Doors - Steel Doors incl hw EA $3 Floor - Carpet SF $,28 Lighting - Lay-in 2 EA $,28 Marker Board 8 LF Walls - Metal Panel 8 SF $,2 Pre School (2 rooms) Ceiling - Lay-in,92 SF $, Chalk Board 38 LF $3,89 Doors - Steel Doors incl hw EA $,2 Doors - Store Front 2 EA $2, Floor - Carpet 9 SF $,928 Floor - Tile/Sheet 9 SF $9 Lighting - Lay-in 2 EA $2,9 Marker Board 3 LF Storage/ Closet SF $9 Walls - Metal Panel,8 SF $3,22 Work Sink 2 EA $3, (2 rooms) Casework 3 LF $,393 Casework LF $3,3 Casework LF $2 Ceiling - Lay-in 9 SF $,38 Ceiling - Lay-in 3,29 SF $,228 Ceiling - Lay-in,2 SF Chalk Board 3 LF $,9 Doors - Steel Doors incl hw EA $,8 Doors - Wood Doors inclu hw EA $3,3 Floor - Carpet,22 SF $93,98 Floor - Carpet, SF $2,9 Floor - Tile/Sheet, SF $, Lighting - Chandelier, Incandescent 2 EA $,3 Lighting - Lay-in 28 EA $29, Marker Board 29 LF Storage/ Closet,23 SF $8,9 WASHIGTO G ES Page of 8 Assessment Date: /2/2
Building: Main Category: Classrooms (2 rooms) 3 E th St Chicago, IL Walls - Metal Panel 8,3 SF $39, Walls - Tile Ceramic/ Porcelain SF $2 Work Sink EA $8,9 Work Sink EA $, Classrooms Subtotal: $82,3 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in SF $22 Ceiling - Lay-in 3,39 SF $9,2 Doors - Steel Doors incl hw 2 EA 2 Doors - Wood Doors inclu hw 8 EA $,8 Floor - Carpet 322 SF 3 $2,9 Floor - Carpet 2,32 SF $,32 Floor - Tile/Sheet 8 SF $88 Floor - Tile/Sheet 9 SF $98 Lighting - Lay-in 3 EA $,2 Lighting - Lay-in EA Lighting - Pendent/Surface EA $83 Storage/ Closet 8 SF $38 Storage/ Closet 2 SF Walls - Concrete Block 3 SF $89 Walls - Masonry 38 SF $,9 Walls - Metal Panel, SF $3,8 Walls - Metal Panel SF Gymnasia Ceiling - Exposed 3,2 SF $9, Doors - Steel Doors incl hw 9 EA $2,9 Floor - Tile/Sheet 3,2 SF $33, Lighting - Metal Halide/ High Pressure Sodium 2 EA $, Scoreboards EA $2,2 Sound System EA $, Storage/ Closet 8 SF $,3 WASHIGTO G ES Page of 8 Assessment Date: /2/2
Building: Main Category: Rooms (Other Than Classrooms) Gymnasia 3 E th St Chicago, IL Walls - Metal Panel,32 SF $39,9 Kitchen Library Ceiling - Lay-in,22 SF Doors - Steel Doors incl hw 3 EA $93 Floor - Tile Quarry,22 SF $2,93 Lighting - Lay-in 2 EA Serving Line 2 LF $,28 Storage/ Closet 28 SF $928 Walls - Metal Panel 9 SF $, Casework 8 LF Ceiling - Lay-in 2, SF $, Doors - Steel Doors incl hw 8 EA $2,8 Floor - Carpet 2, SF $8,39 Lighting - Lay-in EA $,9 Walls - Metal Panel,8 SF $3,3 Lunch & Multipurpose Room Mechanical/ Service Rooms Ceiling - Lay-in 2, SF $, Doors - Steel Doors incl hw 8 EA $2,8 Floor - Tile/Sheet 2, SF $2,2 Lighting - Lay-in EA $,99 Serving Line 2 LF $,28 Walls - Metal Panel, SF $,9 Boiler Room 232 SF $,2 Janitor's Closet 28 SF $2 Mechanical/ Service Rooms,8 SF $8,29 Storage Room 9 SF $, Restroom Accessories 3 SF $8,9 Accessories,9 SF $2,99 Ceiling - Lay-in SF $982 Ceiling - Lay-in,2 SF $, Ceiling - Lay-in 32 SF Doors - Steel Doors incl hw 3 EA $93 WASHIGTO G ES Page of 8 Assessment Date: /2/2
Building: Main Category: Rooms (Other Than Classrooms) Restroom 3 E th St Chicago, IL Doors - Transom Window 2 SF $3 Doors - Wood Doors inclu hw EA $,2 Floor - Tile Ceramic/ Porcelain 2, SF $,28 Floor Drain EA $,9 Hand Dryer 9 EA $2, Lavatory EA $,32 Lavatory EA $9,38 Lavatory EA $,9 Lighting - Lay-in 9 EA $2,2 Lighting - Lay-in EA Lighting - Pendent/Surface 9 EA $, Partitions 2 EA $3,93 Partitions EA $ Partitions EA $, Partitions EA Urinals EA $2,32 Urinals 3 EA Walls - Concrete Block,3 SF $,2 Walls - Metal Panel 3,9 SF $2,238 Walls - Plaster/Drywall 33 SF $9 Walls - Tile Ceramic/ Porcelain 3 SF $8,88 Walls - Tile Ceramic/ Porcelain,9 SF $3, Walls - Tile Ceramic/ Porcelain 2 SF Water Closet 3 EA $,32 Water Closet 29 EA $9,3 Rooms (Other Than Classrooms) Subtotal: $8,99 Building: Main Category: Building Interior Corridor Ceiling - Lay-in 2, SF $,8 Ceiling - Lay-in,3 SF $9,9 Doors - Steel Doors incl hw EA $,8 Drinking Fountains - Single Water Cooler 2 EA $33 Floor - Carpet 8,8 SF $8,3 WASHIGTO G ES Page 8 of 8 Assessment Date: /2/2
Building: Main Category: Building Interior Corridor 3 E th St Chicago, IL Lighting - Lay-in 8 EA $2,89 Walls - Concrete Block,3 SF $3,88 Walls - Metal Panel, SF $3, Stairs Vertical Conveyance Ceiling - Lay-in 39 SF $,83 Floor - Terrazzo 39 SF $3,3 Handrails LF $2 Lighting - Lay-in 8 EA $92 Stairs - Terrazzo 22 LF $2,339 Walls - Metal Panel 2,22 SF $,93 Elevator - Hydraulic Elevator EA $9,238 Building Interior Subtotal: $222, Total Building Cost $2,2,3 Building: Annex Category: Building Exterior Entrance Entrance Control - Audio and Video EA $2 Exterior Doors - Exterior Steel Door EA $2,3 Foundation Lighting Roof System Foundation - Concrete 8 LF Superstructure - Slab on Grade,28 SF Exterior Lighting - Wall Mounted 9 EA $2,99 Chimney - Metal Flue 2 LF $,898 Downspouts - Exterior Downspouts 8 LF $2,92 Roof - Metal,2 SF $28, Roof Structure - Steel / Metal Deck/ Concrete Topping,2 SF WASHIGTO G ES Page 9 of 8 Assessment Date: /2/2
Building: Annex Category: Building Exterior Walls 3 E th St Chicago, IL Canopy - Metal SF $,289 Exterior Walls - Brick,98 SF $3,93 Exterior Walls - Concrete Block 3 SF $2,8 Exterior Walls - Prefabricated Metal Panel Wall, SF $,33 Windows Curtain wall - Louver SF $2,3 Curtain wall - Louver 2 SF $8, Guard - Guards perforated,9 SF $9,39 Lintels - Steel 232 LF Windows - Sash Aluminum Double-pane,9 SF $,339 Building Exterior Subtotal: $3,9 Building: Annex Category: Electrical System Emergency System Automatic Transfer Switch EA Emergency A/C Power - Corridors and Stairs 2,9 SF Exit Signs - Corridors and Stairs EA 2 $3,23 Security System - Intrusion Detection,28 SF $3,9 Main Service Power Distribution Independent Electrical Service for emergency power EA Main Electrical Service - 8 A and 2/28/3PH EA $3, PA System,28 SF $, Lighting and Power Panels - A EA Electrical System Subtotal: $,888 Building: Annex Category: Safty System Fire Alarm Fire Alarm Panel EA WASHIGTO G ES Page of 8 Assessment Date: /2/2
Building: Annex Category: Safty System Fire Alarm 3 E th St Chicago, IL Fire Alarm Strobe Lights,28 SF $, Fire Alarm_System,28 SF $, Sprinkler System Sprinkler Heads,28 SF Sprinkler Piping,28 SF Wet Sprinkler System,28 SF Safty System Subtotal: $3, Building: Annex Category: Mechanical System Air Handling Systems Make Up Air Unit- Indoor Mounted- Hot Water Coils - Less than cfm EA $3,3 Boiler Systems Heating Devices Mechanical Plumbing Temperature Control Boiler Auxiliary- on Condensing Hot Water - 2-3 MBH 2 EA $,93 Chemical Pot Feeder EA $2 Combustion Dampers EA 3 $,3 Combustion Dampers 2 EA $88 Glycol Feed System EA 2 $, Hot Water Pump 2 EA $8 on Condensing- Flexible Tube- Atmospheric- Hot Water Boiler - 2-3 MBH 2 EA $,99 Cabinet Heaters - With Hot Water Coil EA $2,2 PTAC - Electric Heating and Self Contained Cooling EA Unit Heater - Hot Water 2 EA $8 Hydronic Supply and Return - Steel 2 LF Electric Controls,28 SF Electric Thermostat EA Unit Ventilation Unit Ventilators- Floor Mounted- Hot Water w/ DX Cooling Coil & w/ Self Contained Compressors EA $2, WASHIGTO G ES Page of 8 Assessment Date: /2/2
Building: Annex Category: Mechanical System Unit Ventilation 3 E th St Chicago, IL Ventilation Exhaust Fans- Roof Mounted - - 8 CFM 2 EA $,8 Exhaust Fans- Roof Mounted - - CFM EA $92 Mechanical System Subtotal: $39,338 Building: Annex Category: Plumbing System Hot Water Gas Heater - 3 - BTU/HR EA $3 Piping Domestic Piping-Cold Water Horizontal Lines,28 SF Domestic Piping-Hot Water Horizontal Lines,28 SF Domestic Piping-Hot Water Return Lines,28 SF Sanitary Piping,28 SF Storm Piping,28 SF Vent Piping,28 SF Plumbing System Subtotal: $3 Building: Annex Category: Classrooms ( rooms) Casework LF $3,3 Ceiling - Lay-in 3 SF $,8 Ceiling - Lay-in,99 SF $23, Ceiling - Plaster/Drywall 83 SF $3,2 Chalk Board LF $9,8 Doors - Steel Doors incl hw EA $3,3 Floor - Tile/Sheet 88 SF $8, Floor - Tile/Sheet 2,9 SF $3,2 Floor - Tile/Sheet,22 SF $,2 Lighting - Lay-in 93 EA $, WASHIGTO G ES Page 2 of 8 Assessment Date: /2/2
Building: Annex Category: Classrooms ( rooms) 3 E th St Chicago, IL Marker Board LF $ Marker Board 2 LF Student Lockers - Two Tiers 9 EA Walls - Concrete Block 2 SF $, Walls - Concrete Block 3, SF Walls - Masonry 38 SF Walls - Plaster/Drywall, SF Classrooms Subtotal: $8, Building: Annex Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in 8 SF $, Doors - Steel Doors incl hw 2 EA 2 Floor - Tile/Sheet 8 SF $9 Lighting - Lay-in 3 EA $3 Lighting - Lay-in 2 EA Walls - Concrete Block 9 SF Walls - Plaster/Drywall 2 SF MDF_IDF AC Unit EA $9 Doors - Steel Doors incl hw EA Finishes 3 SF Ventilation and Cooling EA Mechanical/ Service Rooms Boiler Room 3 SF $3, Mechanical/ Service Rooms 32 SF $2,22 Restroom Accessories, SF $38, Accessories SF $8 Accessories SF $ Ceiling - Plaster/Drywall, SF $3,9 Ceiling - Plaster/Drywall 88 SF WASHIGTO G ES Page 3 of 8 Assessment Date: /2/2
Building: Annex Category: Rooms (Other Than Classrooms) Restroom 3 E th St Chicago, IL Doors - Steel Doors incl hw 2 EA 2 Floor - Tile Ceramic/ Porcelain 3 SF $,23 Floor - Tile Ceramic/ Porcelain 3 SF Floor - Tile/Sheet 88 SF $88 Floor Drain EA $,23 Hand Dryer 2 EA $,8 Hand Dryer 2 EA $ Hand Dryer 2 EA Lavatory 8 EA $2, Lighting - Lay-in EA $,9 Lighting - Lay-in 2 EA Partitions 2 EA $3,3 Urinals EA $2, Walls - Concrete Block 8 SF $2,92 Walls - Concrete Block,2 SF Water Closet EA $,8 Rooms (Other Than Classrooms) Subtotal: $3,98 Building: Annex Category: Building Interior Corridor Ceiling - Lay-in, SF $, Ceiling - Plaster/Drywall 2 SF $,8 Doors - Steel Doors incl hw 8 EA $2,8 Drinking Fountains - Double Water Cooler EA $3 Floor - Tile Quarry 2 SF $,3 Floor - Tile/Sheet, SF $,9 Lighting - Lay-in 2 EA $2,98 Walls - Concrete Block 2,28 SF $,9 Building Interior Subtotal: $,8 Total Building Cost $8,8 WASHIGTO G ES Page of 8 Assessment Date: /2/2
3 E th St Chicago, IL SITE Category: Site Civil/Drainage Fencing Landscape Parking Lot Playground Sidewalks Civil/ Drainage - Catch Basin EA Civil/ Drainage - Site Manhole EA Fencing - Chain Link 33 LF $2,2 Fencing - Chain Link 8 LF $,28 Fencing - ew Standard Ornamental 2 LF $,2 Fencing - ew Standard Ornamental 2 LF $, Benches EA $3 Landscape - Grass 32, SF $8,82 Landscape - Grass 2, SF $2,3 Landscape - Hardscape- Concrete 2,2 SF $2, Landscape - Hardscape- Pavers 9 SF $,9 Parkway trees 3 EA Planting Beds/ Area SF $3 Planting Beds/ Area,9 SF Play Area - Asphalt/ Hardscape 2, SF $,8 Play Area - Asphalt/ Hardscape 3, SF $32, Trash Receptacles 2 EA $2 Walking Path - Crushed Stone, SF $2,93 Concrete Curbs LF Interior Plantings LF Surface - Asphalt,89 SF $28,29 Trash Enclosure - Chain Links 8 SF $,2 Vehicular Screening 8 LF $, Equipment - Pre K 3- EA $,233 Equipment - School Age -2 EA Surface - Square Rubber Mats, SF $2,99 Sidewalks - Internal Walks 238 LF $2,89 Sidewalks - Perimeter Sidewalks,2 SF $8,98 Sidewalks - Perimeter Sidewalks,38 SF $3, WASHIGTO G ES Page of 8 Assessment Date: /2/2
3 E th St Chicago, IL SITE Category: Site Signage Flag Pole - Flag Pole EA $, Marquee - Free Standing Back lighted w/ LED EA Monument - Building Mounted Cut Letter Sign EA Site Subtotal: $83,83 Total Site Cost $83,83 Campus Total ² ³ $3,8, ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. WASHIGTO G ES Page of 8 Assessment Date: /2/2
3 E th St Chicago, IL Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Music Room Pre School Pre School Pre School Pre School Kindergarten Kindergarten Office st Floor 3 8 9 2 2 22 23 2 2 2 2 28 29 2 2 22 23 2 2 2 28 3 8 9 2 23 22 23 2 23 22 233 22 2 2 2 2 23 2 2 22 28 993 993 2 32 22 9 9 9 2 88 9 8 9 2 2 2 8 88 88 38 328 2 2 2 2 8 8 8 8 2 2 2 2 2 2 8 99 2 2 9 9 99 99 99 99 33 3 3 3 3 23 23 2 23 2 3 2 2 2 2 2 23 2 2 2 2 2 3 2 Annex 3 3 32 33 3 3 3 3 8 88 83 88 88 88 88 88 2 2 2 2 2 2 2 2 8 88 WASHIGTO G ES Page of 8 Assessment Date: /2/2
3 E th St Chicago, IL Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Annex 38 39 3 88 88 3 2 2 2 WASHIGTO G ES Page 8 of 8 Assessment Date: /2/2