11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 19 3, $,3,3 SITE $31, Campus Total, $,3,13 Category: Building Exterior Entrance Entrance Control - Audio and Video 1 EA $ Exterior Doors - Exterior Steel Door 1 EA $, Exterior Doors - Transom Lite EA $1, Exterior Stairs - Concrete LF $, Foundation Lighting Roof System Foundation - Concrete LF Superstructure - Metal Deck/ Concrete Topping, SF Exterior Lighting - Parapet or Roof Mounted EA $, Exterior Lighting - Parapet or Roof Mounted EA $, Exterior Lighting - Wall Mounted EA $,99 Coping - Metal 1 LF $, Downspouts - Interior Downspouts 9 LF $,9 Roof - Asphalt Gravel Ballast 1, SF $9,1 Roof - Asphalt Gravel Ballast, SF $,1 Roof Structure - Steel / Metal Deck/ Concrete Topping, SF Roof Structure - Steel with Clay Tile Arch 1, SF GREE Page 1 of 13 Assessment Date: //1
Category: Building Exterior Roof System 11 W 9th St Chicago, IL 3 Walls Windows Exterior Walls - Precast Panel Wall 1,1 SF $119, Clerestory - Glass Double-Pane SF $9 Guard - Guards perforated SF $9,1 Lintels - Steel LF $1, Windows - Casement Aluminum Double-pane 1,9 SF $1, Windows - Decorative SF Windows - Insulated Panel 1 SF $ Windows - Louver 3 SF $1,1 Building Exterior Subtotal: 9,1 Category: Electrical System Emergency System Automatic Transfer Switch 1 EA $, Emergency A/C Power - Corridors and Stairs,1 SF $1, Emergency A/C Power - Gym,3 SF $1, Emergency A/C Power - Lunchrooms 1, SF $ Emergency Battery Packs - Corridors and Stairs EA $1,1 Emergency Battery Packs - Gym EA Exit Signs - Corridors and Stairs EA $3,1 Exit Signs - Gym EA $,91 Exit Signs - Lunchroom 3 EA $1,3 Security System - Intrusion Detection,3 SF $1,33 Main Service Power Distribution Independent Electrical Service for emergency power 1 EA 3 $1,99 Main Electrical Service - 1 A //3PH 1 EA $,3 Main Electrical Service - 1 to 3 A //3PH 1 EA $11, PA System,3 SF $13, Lighting and Power Panels - 1 A 1 EA $,9 Lighting and Power Panels - 1 A EA GREE Page of 13 Assessment Date: //1
Category: Electrical System Power Distribution 11 W 9th St Chicago, IL 3 Lighting and Power Panels - 1 A EA Lighting and Power Panels - Above 1 A 1 EA Main Distribution Panels - Greater than amp 3 EA Electrical System Subtotal: $, Category: Safty System Fire Alarm Fire Alarm Panel 1 EA $, Fire Alarm Strobe Lights, SF $1,331 Fire Alarm_System, SF $19,91 Safty System Subtotal:, Category: Mechanical System Air Handling Systems Heating Devices Temperature Control Unit Ventilation Roof Top Unit-Single Zone-Roof Mounted- Electric Coil - 11 - tons 1 EA 3 $,3 Roof Top Unit-Single Zone-Roof Mounted- Electric Coil - 1-3 tons 1 EA $, Wall Heater - Electric EA $,1 Wall Heater - Electric 13 EA $,9 Wall Heater - Electric 13 EA $1, Electric Controls, SF Electric Thermostat EA Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor EA $, EA $,1 GREE Page 3 of 13 Assessment Date: //1
Category: Mechanical System Unit Ventilation 11 W 9th St Chicago, IL 3 Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor 1 EA $1, Ventilation Exhaust Fans- Indoor - Less than CFM EA $, Exhaust Fans- Indoor - Less than CFM EA $,11 Exhaust Fans- Roof Mounted - 11 - CFM EA $, Exhaust Fans- Roof Mounted - 11 - CFM 1 EA $9 Exhaust Fans- Roof Mounted - - 1 CFM 3 EA $1, Type I Exhaust Hood- Culinary Arts 1 EA $,1 Mechanical System Subtotal:,9 Category: Plumbing System Hot Water Electric Heater - - KW EA $, Electric Heater - - KW 1 EA $ Piping Domestic Piping-Cold Water from Risers to Fixtures, SF $, Domestic Piping-Cold Water Horizontal Lines, SF $9, Domestic Piping-Cold Water Risers, SF $, Domestic Piping-Hot Water from Risers to Fixtures, SF $,3 Domestic Piping-Hot Water Horizontal Lines, SF $, Domestic Piping-Hot Water Return Lines, SF $,33 Domestic Piping-Hot Water Return Risers, SF $,33 Sanitary Piping, SF $3,9 Storm Piping, SF $3,99 Vent Piping, SF Plumbing System Subtotal: $1,93 Category: Classrooms GREE Page of 13 Assessment Date: //1
Category: Classrooms Computer Lab (1 room) 11 W 9th St Chicago, IL 3 Casework 9 LF $,3 Ceiling - Lay-in SF $,33 Chalk Board 1 LF $1,3 Doors - Steel Doors incl hw 1 EA $31 Floor - Tile SF $1,9 Lighting - Lay-in 1 EA $1,19 Walls - Plaster/Drywall 9 SF $,39 Wireless System 1 EA $3 Kindergarten ( rooms) Casework 13 LF $,1 Casework 13 LF $3 Ceiling - Lay-in 3 SF $39 Ceiling - Lay-in 1,9 SF $,3 Chalk Board 3 LF $3,3 Doors - Steel Doors incl hw EA $1, Floor - Tile 99 SF $,1 Floor - Tile 99 SF Lighting - Lay-in EA Marker Board LF $11 Storage/ Closet SF $3 Walls - Plaster/Drywall 1,9 SF $, Work Sink EA $3,1 (1 rooms) Casework 1 LF $3,3 Casework 13 LF $,11 Ceiling - Lay-in 9 SF $1,19 Ceiling - Lay-in 1,3 SF $1,3 Ceiling - Lay-in 1,1 SF $3,9 Chalk Board 1 LF $3,91 Doors - Steel Doors incl hw 1 EA $,11 Floor - Tile 1, SF $3,1 Floor - Tile 1,39 SF Floor - Tile/Sheet 1 SF $9 Lighting - Lay-in EA $,3 Lighting - Lay-in 1 EA Marker Board 3 LF $1 GREE Page of 13 Assessment Date: //1
Category: Classrooms (1 rooms) Science Classroom (1 room) 11 W 9th St Chicago, IL 3 Marker Board LF Storage/ Closet 1 SF $1,1 Storage/ Closet 1 SF $9 Walls - Plaster/Drywall,1 SF $19, Walls - Plaster/Drywall 1,9 SF $3,1 Work Sink EA $3,1 Work Sink EA $1,1 Ceiling - Lay-in SF $33 Ceiling - Lay-in SF $,1 Chalk Board 3 LF $3,3 Doors - Steel Doors incl hw 1 EA $31 Floor - Tile SF $1,3 Lighting - Lay-in 1 EA Walls - Plaster/Drywall SF $,3 Classrooms Subtotal: $1,11 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 1 EA $9 Ceiling - Lay-in 3 SF $3 Ceiling - Lay-in SF $ Ceiling - Lay-in 3,31 SF $9,913 Doors - Steel Doors incl hw 1 EA $,1 Floor - Carpet 93 SF $1, Floor - Tile, SF $,391 Floor - Tile SF Floor - Tile Ceramic/ Porcelain 1 SF $3 Floor - Tile/Sheet SF $ Lighting - Lay-in EA $3 Lighting - Lay-in 1 EA Lighting - Pendent/Surface EA $9 Lighting - Pendent/Surface 1 EA GREE Page of 13 Assessment Date: //1
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 11 W 9th St Chicago, IL 3 Power Distribution EA $1,9 Storage/ Closet SF $, Walls - Plaster/Drywall, SF $1, Work SInk 1 EA Gymnasia Kitchen Library Ceiling - Exposed 3,33 SF $,9 Ceiling - Lay-in SF $, Ceiling - Plaster/Drywall 13 SF $1,1 Doors - Steel Doors incl hw EA $1, Floor - Tile,311 SF $19,3 Lighting - Lay-in EA $1 Lighting - Pendent/Surface EA $3,3 Stage SF $9,9 Stage Curtain EA Stage Lighting System 1 EA $1,39 Stage-Stairs - Tile LF $1,9 Storage/ Closet 1 SF $,1 Walls - Plaster/Drywall,931 SF $1,39 Ceiling - Lay-in 1 SF $, Doors - Steel Doors incl hw 3 EA $93 Floor - Tile/Sheet 1 SF $1 Floor - Tile/Sheet 1 SF $3, Lighting - Lay-in EA Lighting - Pendent/Surface EA $ Serving Line 13 LF $ Storage/ Closet 3 SF $9 Walls - Plaster/Drywall 913 SF $, Casework LF $1,1 Ceiling - Lay-in 3 SF $39 Ceiling - Lay-in 1,1 SF $3,3 Doors - Steel Doors incl hw EA Floor - Tile 1,1 SF Lighting - Lay-in EA $,3 Storage/ Closet 3 SF $, GREE Page of 13 Assessment Date: //1
Category: Rooms (Other Than Classrooms) Library 11 W 9th St Chicago, IL 3 Walls - Plaster/Drywall, SF $, Locker/Shower Room Ceiling - Lay-In SF $333 Ceiling - Lay-In SF $11 Doors - Steel Doors incl hw 1 EA $1,1 Floor - Tile Ceramic/ Porcelain 31 SF $,9 Floor Drain 1 EA $,9 Lighting - Lay-in EA $9 Lighting - Pendent/Surface EA $3 Showers EA $1, Walls - Plaster/Drywall SF $1,33 Walls - Tile Ceramic/ Porcelain 1 SF $, Lunch & Multipurpose Room Ceiling - Lay-in 3 SF $ Ceiling - Lay-in 1, SF $,3 Doors - Steel Doors incl hw 3 EA $93 Floor - Tile/Sheet 1, SF $1, Lighting - Lay-in EA Serving Line LF $9 Walls - Plaster/Drywall 1,31 SF $3, MDF_IDF AC Unit 1 EA $9 Doors - Steel Doors incl hw 1 EA $31 Finishes 1 SF $1, Ventilation and Cooling 1 EA $1, Mechanical/ Service Rooms Boiler Room SF $1, Janitor's Closet 3 SF $,313 Janitor's Closet SF $ Mechanical/ Service Rooms 1 SF $3,3 Storage Room SF $,3 Restroom Accessories 1,3 SF $1,11 Accessories 1 SF Ceiling - Lay-in 9 SF $1,31 GREE Page of 13 Assessment Date: //1
Category: Rooms (Other Than Classrooms) Restroom 11 W 9th St Chicago, IL 3 Ceiling - Lay-in 39 SF $,1 Ceiling - Lay-in 1, SF $,9 Doors - Steel Doors incl hw EA $,9 Doors - Steel Doors incl hw EA $, Floor - Tile SF $13 Floor - Tile Ceramic/ Porcelain 3 SF $,31 Floor - Tile Ceramic/ Porcelain 1, SF $3,3 Floor Drain EA $,1 Hand Dryer 1 EA $3 Hand Dryer EA Lavatory EA $,1 Lighting - Lay-in EA $3 Lighting - Lay-in 1 EA Lighting - Pendent/Surface 13 EA $1,11 Lighting - Pendent/Surface EA Partitions 1 EA $, Partitions EA Student Lockers - One Tier EA $ Urinals 1 EA $,9 Urinals 1 EA $1,3 Urinals EA $, Walls - Plaster/Drywall,1 SF $1, Walls - Plaster/Drywall 19 SF Walls - Vinyl Coated Gypsum Panel 3 SF $1,1 Water Closet 31 EA $1,1 Rooms (Other Than Classrooms) Subtotal: $33,9 Category: Building Interior Corridor Ceiling - Lay-in SF $1,33 Ceiling - Lay-in,1 SF $1, Doors - Steel Doors incl hw 13 EA $3,913 Drinking Fountains - Double Fountain 3 EA $1, Floor - Tile Ceramic/ Porcelain SF $1, GREE Page 9 of 13 Assessment Date: //1
Category: Building Interior Corridor 11 W 9th St Chicago, IL 3 Floor - Tile/Sheet 1 SF $ Floor - Tile/Sheet 1,1 SF $,9 Floor - Tile/Sheet 3,3 SF $1, Lighting - Lay-in 1 EA $,3 Lighting - Lay-in 1 EA Walls - Plaster/Drywall 3 SF $,9 Walls - Plaster/Drywall,91 SF $,39 Stairs Ceiling - Lay-in SF $1,339 Ceiling - Plaster/Drywall 9 SF $,31 Floor - Terrazzo 3 SF $,9 Floor - Tile SF $13 Floor - Tile Ceramic/ Porcelain 19 SF $,99 Handrails 19 LF $1, Lighting - Lay-in EA $1 Lighting - Lay-in EA Stairs - Terrazzo 3 LF $3, Walls - Plaster/Drywall 3,31 SF $9,1 Building Interior Subtotal: $,1 Total Building Cost $,3,3 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin 1 EA $,1 Civil/ Drainage - Catch Basin EA $,3 Civil/ Drainage - Site Manhole EA $,9 Fencing - Chain Link LF $1,3 Fencing - ew Standard Ornamental 3 LF $1, Landscape - Grass,3 SF $3,91 GREE Page 1 of 13 Assessment Date: //1
11 W 9th St Chicago, IL 3 SITE Category: Site Landscape Parking Lot Playground Sidewalks Signage Landscape - Hardscape- Concrete 3 SF 3 Landscape - Hardscape- Concrete SF $1, Parkway trees 1 EA Planting Beds/ Area 1, SF $,99 Play Area - Asphalt/ Hardscape SF $ Play Area - Asphalt/ Hardscape 1, SF $139,11 Surface - Asphalt 1,39 SF $, Equipment - School Age -1 1 EA $,3 Surface - Square Rubber Mats, SF $,3 Sidewalks - Internal Walks LF $ Sidewalks - Internal Walks LF $1 Sidewalks - Perimeter Sidewalks SF $3,1 Sidewalks - Perimeter Sidewalks, SF $,3 Flag Pole - Flag Pole 1 EA $1, Marquee - Free Standing Back Lighted 1 EA Monument - Building Mounted Cut Letter Sign EA Site Subtotal: $31, Total Site Cost $31, Campus Total ² ³ $,3,13 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. GREE Page 11 of 13 Assessment Date: //1
11 W 9th St Chicago, IL 3 ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. GREE Page 1 of 13 Assessment Date: //1
11 W 9th St Chicago, IL 3 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Computer Lab Kindergarten Kindergarten Science Classroom Special Education Kindergarten Kindergarten 1st Floor 1st Floor 1st Floor 1st Floor 1st Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor nd Floor 31 13 1 11 1 1 3 9 31 3 33 3 3 3 39 31 1 31 1 1 1 139 1 3 9 319 3 33 39 3 3 3 3 1 999 999 1 9 9 9 9 31 9 1 1 1 1 1 9 1 1 1 1 3 3 3 3 33 3 3 GREE Page 13 of 13 Assessment Date: //1