Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project

Similar documents
Downtown Memphis Review Board Application

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

Construction Phase Project Management and Documentation

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

Aesthetic Steering Committee Meeting No. 8

Innovation Wireless KRONOsync GPS or NTP Wireless Clock System

CONVEYANCE PIPELINE AND PUMP STATION

Bid No. B14-02 Building 100 HVAC Improvements

Merrick Pet Care New Distribution Center Hereford, Texas

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Efficient Tactics of Project Management

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

SARASOTA COUNTY GOVERNMENT

8 th April 2018 ADDENDUM NO. 1

Electronic Plans Management Training. Submitting a Revision to Approved Plans (RTAP) Application & Uploading Drawings

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference

REQUEST FOR PROPOSALS

BUILDING PLANS. BUILDING DEPARTMENT

Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA

REQUEST FOR PROPOSALS Rochester Downtown Alliance Rochester, Minnesota 2013 Transformer Cabinet Mural Project Budget of $500 per large transformer

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04

EL MONTE STATION Call to Artists: Four Artist Opportunities

SECTION SUBMITTAL PROCEDURES

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017

Ductwork Construction Checklist

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

Establishing BIM as the Standard for Collaboration Between Trades Conference 31 January 2017 Joseph R. Ehlers VDC Director

Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference

This Call for Qualifications does not require the preparation of a design proposal.

Community Redevelopment Agency

PROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS 2019 LEGISLATIVE SESSION

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Attachment J-8 Contractor / Supplier Submittal Register

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION. SPECIFICATIONS FOR Interior Painting CONTRACT

10930 W. Sam Houston Parkway N., Suite 900

TG Glazing Design-Build

Residential Room Additions

TO: All Recipients Date: March 20, 2015

The Coffee County Board of Education met in regular session on September 9, 2010 at the Coffee County Board of Education.

Scope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.

Venture Capital Investment Consortium

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

submittals 1s e c t i o n

Addendum No. 4 page 1

Louisville-Southern Indiana Ohio River Bridges Project

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

Tipton Community School Corporation 1051 South Main Street, Tipton, IN 46072

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

HPPM Training. Manager s Call

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

Frequently Asked Questions: United Open Call Artist Information Sessions December 8, 10, and 12, 2018

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

Bid #3990DB - Two Way Motorola Radio System District Wide Upgrade

The attached information contains mandatory requirements and a submission form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

Company. Signed: Date:

Call for Entries 2019/2020 El Paseo Sculpture Exhibition (DEADLINE FOR ENTRIES February 28, 2018)

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

ENTER INTO CONTRACT WITH JOHN R JURGENSEN FOR FY2012 SOUTH LEBANON MASON-MORROW-MILLGROVE ROAD CDBG PHASE II PROJECT

Answer: Qualification statement should be provided with the bid.

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

SECTION SUBMITTAL PROCEDURES

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Neevia docconverter 4.9.9

SECTION OPERATION AND MAINTENANCE DATA

Public Art Opportunity Request for Qualifications & Letter of Interest for Outdoor Latino Heritage Mural

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

NEU Board Meeting Minutes. January 10, Concordia University Brandes Room 2811 NE Holman Street Portland, OR 97211

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

THE BOARD OF DIRECTORS OF THE NORTH KINGS GROUNDWATER SUSTAINABILITY AGENCY JOINT POWERS AUTHORITY MINUTES FOR THE FEBRUARY 23, 2017, at 6:00 P.M.

Welcome to Churchill Knight Umbrella

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Organizational Perspective and Technical Requirements

The Public Library of the Township of Mahwah Minutes of the Board of Trustees Meeting April 19, 2017

Chairman Garcia made a motion to approve the emergency addition as item 10A, seconded by Councilman Merida. The motion was approved unanimously.

REGULAR MEETING OF THE BOARD OF ALDERMEN March 18, 2008

ARB Submittal Package Checklist

A. Affordable Tires (Caring Nurses LLC) - Case# Conditional Use Permit for tire installation and auto repair at rd Avenue North

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

CHESTER COUNTY AREA AIRPORT AUTHORITY MINUTES. May 3, 2011

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

MARCH 21 24, 2018 COLORADO CONVENTION CENTER DENVER, CO

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

SPECIFICATIONS SPECIFICATION TYPES

Electronic Plans Management Training. Upload Drawings

BEDSPREADS BEDSPREADS

MURAL PROJECT CALL FOR ARTISTS

Addendum No. 1 page 1

The Public Library of the Township of Mahwah Minutes of the Board of Trustees Meeting October 19, 2016

SIGN PERMIT APPLICATION

Transcription:

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Bid Date Tuesday February 20, 2018 2:00 PM **No bids will be accepted after 2:00pm Winchester Road Tchulahoma Road Runway Road

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Pre-Bid meeting- 1/25/18 @ 2:00pm Q&A Deadline- 2/9/18 @ 12:00pm Final Addendum- on or before 2/13/18 Bid Day- 2/20/18 @ 2:00pm CPES Approval- 3/2018 Board Approval- 3/15/18 Fully Executed Contract- 3/22/18 Pre-Construction Meeting- 3/29/18 NTP Issued- 4/2/18 *NOTE- this is a general timeline for reference*

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Wage Rate Requirement Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310 Federal Contract Compliance 00651 and 00652 US Department of Labor 167 N. Main Street, Suite 101 Memphis, TN 38103-1814 Phone 901-544-3458 D/M/WBE Requirements - 00445 Joe Claiborne Business Diversity Development DBE Requirement 27% 2491 Winchester Road Memphis, TN 38116 Phone 901-922-2556 Owner-Controlled Insurance Program (OCIP) - 00500 Wes Shelby, John Shorten, Sky Hamilton WillisTowersWatson 4225 Airways Boulevard Memphis, TN 38116 Phone 901-344-1659

General Contract Requirements General Security Requirements 00802 Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310 Project-Specific Security Requirements Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310 Contractor s Project Schedule & Procedures - 01320 Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310 Site Control Dust & Debris Coordination - 01741 Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310

Project Scope of Work Project Phasing and Constraints 1100 Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310 Liquidated Damages- 1100 Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310 Contractor s Access and Staging- Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310 Project Team List Donald Brown MSCAA 2491 Winchester Road Memphis, TN 38116-3856 Phone 901-922-8310

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project Overview Procedures, Protocol, and General Contract Requirements Technical Review Q&A Session

Remember to submit questions via e-mail to mscaa-qa@parsons.com to receive a formal answer. MSCAA will not warranty any other kind of answer. Question deadline: February 9 th at 12:00 PM