The line passing through the two coincident angular markings give us bent sub tool face, i.e. the orientation of our bent sub or mud motor.
|
|
- Kenneth Johnston
- 5 years ago
- Views:
Transcription
1 The line passing through the two coincident angular markings give us bent sub tool face, i.e. the orientation of our bent sub or mud motor.
2 Now our next job is orient our MWD/LWD tool in the direction of bent. Below is a typical BHA arrangement for a 8 1/2" Hole Section :
3 After we are done with adjusting the bent sub to a desired angle, we make up the string stabilizer, the float sub, the UBHO sub and 1 (one in number) NMDC (also called Monel). To know more about Stabilizer, Float Sub and UBHO sub refer my blog post : Stabilizer, Float Sub, UBHO Sub. Now out job is to lower the MWD tool assembly into the NMDC. The MWD tool is run inside the NMDC (Monel). It gets seated in the mule shoe sub (UBHO Sub) which is at the bottom of NMDC. The tool face of MWD usually doesnot remain aligned with the toolface of downhole motor. So as to align the MWD toolface with the toolface of downhole mud motor we practise any one of the following procedure : 1 In this procedure, we get back to the time when we have made up the UBHO sub and the MWD tool has not yet been lowered. The mule shoe sub has an adjustable key. The sleeve with the key can be rotated.
4 The set screw is loosened and the key is alligned with the bent of the downhole mud motor. Once the key is aligned with the bent of the motor, the set screw is tightened. This keeps the key always aligned with the bend provided to the motor. Now the orientation of mule shoe is same as that of the motor bend. The MWD tool is run into the NMDC. The tool has a mule shoe stinger on it. The stinger has a slot and the mule shoe sleeve has a key. When the mule shoe stinger enters the mule shoe sub, it is rotated until it gets lined up with the orientation of the mule shoe sub and the motor. This happens when the slot of the stinger gets seated in key of the UBHO sub. Note : The survey tool can easily be manually rotated until the tool is aligned with the key. Thus now the tool face shown by the MWD tool is also the tool face of the bend of the down hole motor.
5
6 2 In this procedure, we are at the situation when we have lowered the MWD tool in the NMDC and the stinger's slot has got seated in the UBHO sleeve's key. The scribe line at the mule shoe key indicates the tool face of the MWD tool. The scribe line at bend of the downhole motor indicates the toolface of the bent of the motor. Now we check that the two scribe lines (one of the motor and other of the surveying tool i.e. MWD here) are aligned or not. At present condition, we have the following arrangement hanging fron the elevator from top to bottom: NMDC - UBHO Sub - String Stab - Mud Motor - Bit. We lower the present made assembly until UBHO Sub is on man height. At the key of the UBHO sub (i.e. on the scribe line), we make any marking like placing a chalk piece or any pointed visible object which shows us the position of the scribe line/ the UBHO key. Some people tape a laser pointing downwards. Now we lift the made assembly upwards using elevator until we have our bent sub at the man height. We apply slip to make the assembly stationary.
7 Now we look up at our placed marking on the UBHO sub and find its position relative to the bend sub scribe line. (For this, the operator stands closer to the bent sub, looks upward to the made marking and tries to make an imaginary line from the marking to the bent. Magnetic Tool Face It is the direction, in the horizontal plane, the bent sub scribe line is pointing with regard to the north reference (Grid, Mag, or True). Magnetic orientation is used when the inclination of the well bore is less than 5. When the inclination is below this amount, the survey instrument cannot accurately determine the highside of the instrument for orientation purposes. The toolface will be presented in azimuth or quadrant form, referenced to magnetic north. The magnetic toolface reading is whatever magnetic direction the toolface is pointed. Gravity Tool Face It is the angular distance that a bent sub scribe line is turned, about the tool axis, relative to the high side of the hole.
8 If the inclination of the well bore is above 5 to 8, then the gravity toolface can be used. The toolface will be referenced to the highside of the survey instrument, no matter what the hole direction of the survey instrument is at the time. The toolface will be presented in a number of degrees either right or left of the highside. GTF orientation is represented by figure below :
9
ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD
ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD George Karimi Kenya Electricity Generating Company Limited Geothermal
More informationPACIFIC LASER SYSTEMS. HVL100 Procedures
PACIFIC LASER SYSTEMS HVL100 Procedures A. Setting Up for Level Calibration of Horizontal Lines, Plumb and Down pg. 2 B. Setting Up for Vertical Line Calibration pg. 4 C. Setting Up for Square Calibration
More informationMWD Standard Directional MWD Service
MWD Standard Directional MWD Service Provides reliable Directional MWD measurements in hole sizes down to 5-7/8 diameter. (9-1/2-4-3/4 Collar Sizes). Transmits: Hole Inclination, Azimuth, Tool Face & Circulating
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationPOP PLUS / SPIDER SET-UP INSTRUCTIONS
POP PLUS / SPIDER SET-UP INSTRUCTIONS 1 Place system frame on floor with screws indicating top. Expand upwards & outwards and secure frame connectors. Pop-Up display systems are made to be set-up and taken
More informationINSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world
energy for a better world INSTALLATION INSTRUCTIONS TRI-VENT The photovoltaic mounting system for trapezoidal sheet roofs Quick and easy installation Riveting instead of glueing Securing without screws
More informationMeasurement While Drilling! An Overview!
Measurement While Drilling! 13 An Overview! Introduction to Well Engineering - 13 - Measurement While Drilling 1 Contents 1. Introduction 3 2. MWD Systems 4 2.1 Power Sources 7 3. MWD - Directional Tools
More informationDowelling joints with VS 600
No. 112 Dowelling joints with VS 600 A Description Dowelling joints with round dowels (in addition to flat dowels) are part of the standard wood joints in furniture manufacture. This joint is very stable.
More informationUsing Magnetic MWD near Existing Casing
Using Magnetic MWD near Existing Casing Neil Bergstrom, Senior Technical Advisor Magnetic Variation, LLC (MagVAR) Denver, Colorado USA 1 Magnetic Variation Services, LLC and SURCON, LLC MagVAR creates
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: C Approved By: Quality Engineer Date: 201-1-9 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationNon-Magnetic Spacing with Axial corrections
Dallas, USA Slide 1 Non-Magnetic Spacing with Axial corrections How close can I get the MWD sensor to the bit? A guide to methodology Neil Bergstrom, P.E. Speaker Information Neil Bergstrom, P.E. Senior
More informationStrata. urniture. Mission Rim Instructions. Parts in the Arm Box: Parts in the Body Box:
1A Watch our assembly videos at www.strataf.com/videos.html Parts in the Arm Box: Arm - Outside View Arm - Inside View Corbels x 4 1B Parts in the Body Box: Back Deck x 1 Seat Deck x 1 with the Feet attached
More informationAssembly Instructions for model: VMPR1
Assembly Instructions for model: VMPR1 Congratulations on your purchase! The VMPR1 ceiling mount provides a unique, simplified method of ceiling mounting inverted LCD/DLP projectors. Its low profile design
More informationINS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System
Ceiling Mount Track System 10.26.2016 Specifications Ceiling Post: Unassembled 2-7/8 Assembled 1-11/16 7/8 7-9/16 5-7/8 3/8 2 Tubes 1/2 2-3/8 5 Parts and Tools Tools Needed Tape Measure Pencil Drill with
More informationIN OUT. Pantograph support for video-wall. Omb 's high-end solution for professional results
Cod. 03460 A USER MANUAL FOR YOUR SAFETY IN OUT Pantograph support for video-wall Omb 's high-end solution for professional results The Omb In Out pantograph support installation and use manual has been
More informationGared Pro-S Portable Backstop
Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION
More informationSPE Ultra Short Radius Drilling Trials in PDO Abdullah Saif Al-Hady/PDO; David LaPrad/Torch International; Anwur Al Sadi/PDO
SPE 81410 Ultra Short Radius Drilling Trials in PDO Abdullah Saif Al-Hady/PDO; David LaPrad/Torch International; Anwur Al Sadi/PDO Copyright 2003, Society of Petroleum Engineers Inc. This paper was prepared
More informationStrata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at
1A Watch our assembly videos at www.strataf.com/videos Parts in the Arm Box: Arm - Outside View Arm - Inside View 1B Parts in the Body Box: Back Deck x 1 Seat Deck x 1 with the Feet attached Back Panel
More informationASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL
ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL January 2013 The SL500A is a square upright glass cabinet with a single hinged lockable door. It has five adjustable shelves plus the base. It also has an optional
More informationSPE MS. Combined Gyroscopic and Magnetic Surveys Provide Improved Magnetic Survey Data and Enhanced Survey Quality Control
1 SPE-194130-MS Combined Gyroscopic and Magnetic Surveys Provide Improved Magnetic Survey Data and Enhanced Survey Quality Control John Weston, Adrián Ledroz Gyrodata Inc. 2 Contents Description of new
More informationa.k.a. casegoods instructions
a.k.a. casegoods instructions a a.k.a. workwall installation IMPORTANT NOTES Failure to install product according to installation instruction will result in loss of warranty. Tools required for assembly
More informationWhen a drilling project is commenced, two goals must be achieved:
Technologies Drilling Technologies Oil well drilling is a complex operation and the drilling industry engages the services of personnel and a complicated array of machinery and materials to drill an oil/gas
More informationSatNOGS. SatNOGS Rotator v3 Mechanical Assembly. This is the assembly guide for the third version of the SatNOGS Rotator.
SatNOGS SatNOGS Rotator v3 Mechanical Assembly This is the assembly guide for the third version of the SatNOGS Rotator. Written By: Pierros Papadeas 2017 satnogs.dozuki.com Page 1 of 19 INTRODUCTION Notes:
More informationLumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:
Lumber Smith Assembly Manual If you are having problems assembling the saw and need assistance, please contact us at: 804-577-7398 info@lumbersmith.com 1 Step 1 Safety Carefully read the Owners Manual.
More informationBox Track INSTALLATION INSTRUCTIONS
Box Track INSTALLATION INSTRUCTIONS BOX TRACK Recommended Tools Level Tape Measure Pencil Drill with 1/8, and 1/4, Drill Bits, Phillips Bit and Slotted Bit Socket Wrench with 9/16 Socket 9/16 and 5/8 Wrench
More informationStrata. urniture. Addison Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at
1A Watch our assembly videos at www.strataf.com/videos.html Parts in the Arm Box: Arm - Outside View Arm - Inside View Corbels x 4 1B Parts in the Body Box: Back Deck x 1 Seat Deck x 1 Back Panel x 1 with
More informationMETALWORKS Concealed. Installation Instructions
METALWORKS Concealed Installation Instructions 1. GENERAL 1.1 Product Description MetalWorks Concealed ceilings consist of perforated and unperforated panels that are downward accessible, and are designed
More informationHow to Operate Hurricane Shutters
How to Operate Hurricane Shutters NOTES for PORTFOLIO: I created this manual as a booklet for a family who could not operate their hurricane shutters without paying for service. To develop the manual,
More informationInstallation Instructions
Installation Instructions For 4 foot / 1.2m Diameter Ultra-high Performance Antenna Model ADxxG-4-T2 Before Installation, please read the instructions carefully. This instruction guide covers the installation
More informationR.J.W. LTD. Hand CNB USER MANUAL. PLEASE VIEW OUR WEBSITE for consumables & spare parts
6 A. Fitting the Broach 1 Raise the rack & insert the support pin 2 Loosen the top clamp retaining screws and withdraw the top clamp a small amount 3 4 Note: top clamp can be removed and rotated 180 for
More informationRange height adjustable assembly
Table of contents Digital handset operation 3 Height adjustable bench kit 4-5 Cable carrier 6 Ganging tray and ganging rail 7 Height adjustable return frame kit 8 Cable entry pole 9 24 and 30 d worksurfaces
More informationDP-8 H. H. MØRCH. Instructions. Contents of the packing. Spatial requirements. Mounting the bush
DP-8 Instructions H. H. MØRCH Contents of the packing In the packing of the tonearm you will find the arm base in which the bearings are encapsulated in a heavy body. This is the link between the moveable
More informationHow to Install the QuickHang Installation Kit
FOR RESIDENTIL USE: The QuickHang hardware in this kit is designed to work with solid wood and engineered wood joists in residential ceiling applications. KIT INLUDES: (3) 6' Main beams (9) ross tees (9)
More informationDoor window. Front door window, assembly overview
64-50 Door window Front door window, assembly overview 1 - Window channel Pushed onto flange 2 - Door window Removing Page 64-52 Adjusting Page 64-53 3 - Door 4 - Outer window channel Pushed onto flange
More informationFUSELAGE CONSTRUCTION
FUSELAGE CONSTRUCTION Note: prior to building and gluing on the work surface use protective covering on your building surface. (wax paper or clear wrap) Fit the laser cut Fuselage Front and Fuselage Rear
More informationNORMAN SHUTTERS INSTALLATION INSTRUCTIONS. Hang Strip. (Inside Mount 2 Panel) Getting Started
NORMAN SHUTTERS INSTALLATION INSTRUCTIONS Hang Strip (Inside Mount 2 Panel) Getting Started Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6 Philips head driver Make sure
More informationRemoving outter components
Y Axis Motor Replacement Replacing the Y axis motor is a process that requires the individual to be somewhat mechanically inclined and can follow detailed instructions. If any of the following steps are
More informationHDD Training. HDD Equipment and Tooling. Mark Miller, PE Jon Robison, PE
HDD Training HDD Equipment and Tooling Mark Miller, PE Jon Robison, PE HDD Drill Rigs Horizontal Directional Drilling (HDD) drill rigs come in various shapes and sizes. The small drill rigs are usually
More informationVISUAL GUIDE MANUAL DRO INSTALLATION ON LATHE / TURNING MACHINE. By ebay ID: TheDroStore
VISUAL GUIDE MANUAL DRO INSTALLATION ON LATHE / TURNING MACHINE By ebay: TheDroStore info@thedrostore.com 1 2. Basic Installation Principles scale should be centered and be aligned such that it could cover
More informationLANDING GEAR. 1. Fit landing gear into slots on bottom of fuselage.
LANDING GEAR 1. Fit landing gear into slots on bottom of fuselage. 4. Use channel-lock pliers to press blind nuts into position (note: drilled hole should be slightly smaller than shaft of blind nut for
More informationInstalling the 3 Indexer: PRS Standard Tools
888-680-4466 ShopBotTools.com Installing the 3 Indexer: PRS Standard Tools Copyright 2016 ShopBot Tools, Inc. page 1 Copyright 2016 ShopBot Tools, Inc. page 2 Table of Contents Route Cable into Box...5
More informationGATE INSTALLATION INSTRUCTIONS
GATE INSTALLATION INSTRUCTIONS 1) Ensure posts for gate are fully installed. Posts need to be securely fastened to decking or concrete such that they will not sag with weight of the gate. For a single
More informationMounting a BalanceBox 400 to a brick wall
Unpack the BalanceBox 400 and remove the Wall frame cover and its bag of screws. Slide the cover out at the top. NOTE: the cover is NOT included with the BalanceBox 400H LOCK SCREW HOLE MOBILE STAND MOUNTING
More informationHow to Install Custom Real Wood and Faux Wood Blinds
Before you begin your installation: READ ALL INSTALLATION INSTRUCTIONS! Make sure that you have all tools and hardware needed for installation. Check the installation surface (wall, ceiling, or window
More information3.2.3 Rear Door Window and Quarter Window Carrier Assembly
Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without
More informationMay 14, Installation Manual
May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012
More informationCOACT MEDIA UNIT ASSEMBLY WITH X9 OPEN SHELF STORAGE OPTION PART # INSTALLATION INSTRUCTIONS
PART # 1609103 MEDIA UNIT ASSEMBLY WITH X9 OPEN SHELF STORAGE OPTION 1. Begin by placing the back panel on a flat non-marring surface, making sure the pre-drilled holes are facing up. Next, position the
More informationSTEINBERGER TRANSTREM (TYPE 2) TECHNICAL DOCUMENT
STEINBERGER TRANSTREM (TYPE 2) TECHNICAL DOCUMENT These instructions apply to newer style TransTrems only (non-threaded ball type or modified threaded ball type). For purposes of discussion, these TransTrems
More information3. X-axis assembly. 3. X-axis assembly. Written By: Jakub Dolezal manual.prusa3d.com/ Page 1 of 13
3. X-axis assembly Written By: Jakub Dolezal 2018 manual.prusa3d.com/ Page 1 of 13 Step 1 Tools necessary for this chapter Needle-nose pliers for zip tie trimming. 2.5mm Allen key for M3 screws 2mm Allen
More informationRANGE DIGITAL HANDSET OPERATION. 1. Panel. 2. Initialization Procedure. 3. Move Up & Down. 4. Set Memory Positions. 5. Move to the Memorized Positions
INSTRUCTION SHEET #2577INS PART #1730534 DIGITAL HANDSET OPERATION OPERATION INSTRUCTIONS 1. Panel 1 Button: Preset 1 2 Button: Preset 2 3 Button: Preset 3 S Button: Select Display: Reads in 1 / 2 " Increments
More informationSURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE
1 SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE F.Q. Wei, K. Dreyer, U. Fehlmann, J.L. Pochon and A. Wrulich SLS / Paul Scherrer Institute CH5232 Villigen PSI Switzerland ABSTRACT The Swiss Light Source
More informationonlinecomponents.com
Figure 1 PRO CRIMPER III Hand Crimping Tool Assembly 58603 1 consists of Die Assembly 58603 2 and PRO CRIMPER III Hand Tool Frame 354940 1. The die assembly consists of crimping dies and a locator assembly.
More informationBHA & DRILLING PARAMETERS DESIGN FOR DEVIATION CONTROL IN MENENGAI DIRECTIONAL WELLS (ARGeo C6 31 st Oct. 6 th Nov. 2016)
BHA & DRILLING PARAMETERS DESIGN FOR DEVIATION CONTROL IN MENENGAI DIRECTIONAL WELLS (ARGeo C6 31 st Oct. 6 th Nov. 2016) Abraham W. Khaemba Denis M. Onchiri Outline Introduction Menengai Wells Design
More informationThe Useless Machine. Parts Only - Build Guide v0001
TM The Useless Machine Parts Only - Build Guide v0001 For the best outcome, follow each step in order. We recommend reading this guide entirely before you get started. Tools required: One phillips screwdriver,
More informationEngineering Working Drawings Basics
Engineering Working Drawings Basics Engineering graphics is an effective way of communicating technical ideas and it is an essential tool in engineering design where most of the design process is graphically
More informationRead these instructions thoroughly before crimping any contacts.
PRO CRIMPER III Hand Crimping Tool Assembly 58583 1 consists of Die Assembly 58583 2 and PRO CRIMPER III Hand Crimping Tool Frame 354940 1. The die assembly consists of crimping dies and a locator assembly.
More informationSummer Junior Fellowship Experience at LUMS. Maliha Manzoor 13 June 15 July, 2011 LUMS Summer Internship
Summer Junior Fellowship Experience at LUMS Maliha Manzoor 13 June 15 July, 2011 LUMS Summer Internship Internship Schedule June 13-17: 2D and 3D drawings in AutoCAD June 20-24: 2D and 3D drawings in AutoCAD
More informationRESolution V2 Manual
RESolution V2 Manual Note for the German Manual: Yellow Bottle thick CA Pink Bottle Med CA Blue tube 5 minute Epoxy Green tube 90 Minute Epoxy Construction of the Fuselage Step 1: Cover the plan with a
More informationHigh Rise Sit-Stand Desk Converter
High Rise Sit-Stand Desk Converter Assembly Instructions for Model DC350 Patent No. 9,332,839 PRE-ASSEMBLY Please read all instructions before beginning assembly. We strongly recommend you watch the video
More information#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS
Thank you for purchasing this quality product. A list of PARTS and INSTRUCTIONS is included to assist you. Unpack and identify all parts included on the Parts List and Hardware List. If parts are missing,
More information2010 MWD/LWD Services Directory
2010 MWD/LWD Services Directory Directional Service line (s) Tool OD, in. Length, ft Max. DLS, 100 ft (sliding, rotation) APS Technology (Rental Division) Brian A. Stroehlein 7 Laser Lane Wallingford,
More informationC-Series & S-Series Classic Frame with Transom (Single or Pair)
1. TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Safety Glasses Screw gun #2 Screwdriver tip #3 Screwdriver tip Philips Head screwdriver (Used to move frame on wall using oval slots on
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationAdjusting Ibanez SR405QM Truss Rod
Adjusting Ibanez SR405QM Truss Rod High tension caused by the strings can cause the wood of the fret board to bow. This bowing can become so extreme it becomes difficult or impossible to play on due to
More information# in 1 Metal Worker Auxiliary Operating Instructions
340 Snyder Avenue, Berkeley Heights, NJ 07922 www.micromark.com MMTechService@micromark.com Tech Support: 908-464-1094, weekdays, 1pm to 5 pm ET #86556 3 in 1 Metal Worker Auxiliary Operating Instructions
More informationInstallation Guide. Ceiling Suspended Acoustical Panels
Installation Guide Ceiling Suspended Acoustical Panels Before Getting Started Check Your Panels Make sure you received everything you ordered. Please let us know if you have any questions or concerns by
More informationPage 1 of 5 Instructions for Fitting Lower Grille to S Type Jaguar. Part Code 9048
Page 1 of 5 Instructions for Fitting Lower Grille to S Type Jaguar. Part Code 9048 To fit this grille you will need: Torch, 10mm spanner, 10mm socket with extension, T30 torx bits, Screwdrivers, Pliers,
More informationUsing a Howie Glatter Laser for Collimation of the Altair Deepfield RC
Using a Howie Glatter Laser for Collimation of the Altair Deepfield RC Background Collimating a Richey Cretien scope is fundamentally different to collimating a Newtonian or SCT. For optimum performance,
More informationSteel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)
Steel Solutions USA 602 E. Walnut Street Watseka, IL 60970 p: (888) 875-5004 f: (815) 432-3364 sales@steelsolutionsusa.com Published February 2011 2011 Steel Solutions USA. All rights reserved. version
More informationDozuki. Written By: Dozuki System. Guide to calibrating the Haas wireless intuitive probing system. How to Calibrate WIPS
Dozuki How to Calibrate WIPS Guide to calibrating the Haas wireless intuitive probing system. Written By: Dozuki System 2017 www.dozuki.com Page 1 of 22 INTRODUCTION Getting Started On initial setup or
More informationDue to possible damage in shipping, the vertical stop assembly has been removed from this machine.
Due to possible damage in shipping, the vertical stop assembly has been removed from this machine. To assemble, insert the threaded rod through the shroud opening in the top of the machine. Start the four
More informationTHE SIX SIMPLE MACHINES
Simple Machines A machine is a device that helps make work easier to perform. (Remember, Work = Force X Distance). A machine makes work easier to perform by accomplishing one or more of the following functions:
More informationGuide for using HddSurgery head change tool:
Page 1 of 15 Guide for using HddSurgery head change tool: HDDS Sea 7200.12/.11/.10+ p1 Set (1 platter) Page 2 of 15 Table of contents: 1. Introduction.. page 3 2. HddSurgery head change tools page 4 3.
More informationINS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER
INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER 6-1/2" 5" 2-7/16" 3-7/16" Ø2-7/8" 4-7/8" 11" 2" 3/16" 1/2" HORSESHOE W/ BAR S P ECIFICATIONS PARTS AND TOOLS Tools Needed Tape Measure Pencil
More informationSE5a Instrument Board part 2 - rev 1.1
SE5a Instrument Board part 2 - rev 1.1 Fuel (Petrol) Valve This valve uses two circular name plates, eight brass screws, one black plastic base, copper wire and two black plastic risers. You can pick any
More informationINSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H
INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER 10.6.2016 PARTS INSTALLATION SPECIFICATIONS AND TOOLS INSTRUCTIONS 2-1/4" 2-7/8 11-3/8" 1/4" 2-1/8 PARTS INSTALLATION AND INSTRUCTIONS TOOLS
More informationSERVICE MANUAL FOR HOMELOCK M1034D 2034D 1134DW 1134D
SERVICE MANUAL FOR HOMELOCK M1034D 2034D 1134DW 1134D 11.2000 2.2012 I HOW TO USE THIS MANUAL... 1 II HOW TO ADJUST... 2 1. Height of needle bar... 2 2. Position of the lowerlooper... 3 3. Timing of the
More information400GTO Lubrication Guide
400GTO Lubrication Guide Lubrication Guidelines for the following equatorial mounting: 400GTO Servo with GTOCP2 or CP3 Controller For other 400 models please review other postings as they become available.
More informationRemoving the Z-Axis lead screw
Page 1 of 8 TITLE: Sabre Z-Axis Lead Screw Replacement Procedure Gerber FastFact #: 5048 Supplied by: Gerber Hardware Support Last Modified: June 14, 2007 Summary: Tools used: The following procedure explains
More informationINSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM
SIX INCH ALPHA MODULE INSTALLATION KEWAUNEE SCIENTIFIC CORPORATION SIX INCH ALPHA MODULE ANCHORING SYSTEM After Alpha module has been set in desired location. Adjust the four adjustment bolts until the
More information8.10 Drill Grinding Device
8.10 Drill Grinding Device Special Accessories 1. Introduction Device can accurately grind precision drill and tools, this drill grinding machine system consists of a motor and grinding wheel head composed
More informationMETHOD STATEMENT FOR VERSIJACK PAVER AND BEARER SUPPORT PREPARED BY ELMICH PTE LTD. VJ MStmt Ver2012(Jan) Page 1
METHOD STATEMENT FOR VERSIJACK PAVER AND BEARER SUPPORT PREPARED BY ELMICH PTE LTD VJ MStmt Ver2012(Jan) Page 1 METHOD STATEMENT VERSIJACK Paver and Bearer Support 1. Preparation of Installation Area Mark
More informationStrata. urniture Watch our assembly videos at Denali Arms. Parts in the Arm Box: Hardware in this Box:
1A Denali Arms Watch our assembly videos at www.strataf.com/videos.html Parts in the Arm Box: Arm - Outside View Arm - Inside View 1B Hardware in this Box: (80mm) x 8 Barrel Nuts x 8 x 8 Wood Buttons x
More information1 of 2 3/3/2017 4:49 PM
1 of 2 3/3/2017 4:49 PM Front Door Window, Assembly Overview 1 - Window guide - Inserted on flange 2 - Door 3 - Inner window recess seal - Inserted on flange 4 - Bolt - 20 Nm 5 - Carrier assembly - Window
More informationDIVIDING EQUIPMENT DIVIDING EQUIPMENT
64 DIVIDING EQUIPMENT 65 D-01 UNIVERSAL TILTING ROTARY TABLE Model: HUT-300 QUICK MANUAL INDEXING. Suitable for milling, boring, shaping, drilling, dividing, setting angles and for circular cutting. Tilting
More informationBEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches
Copyright (c) 2007 J D SQUARED INC. www.jd2.com THE BEAST Tube and Pipe Notcher Operating Instructions Notches In Bends Straight Notches Angled Notches PATENT PENDING Offset Notches Assembly After unpacking
More informationINSTRUCTION MANUAL. X-Wedge for LX200 and LX600 telescopes _07028_XWedge_InstructionManual.indd 1
INSTRUCTION MANUAL X-Wedge for LX200 and LX600 telescopes 55-12003_07028_XWedge_InstructionManual.indd 1 8/8/2012 11:07:49 AM X-Wedge AutoStar Instruction #497 HANDBOX Manual X-WEDGE OPERATING MANUAL This
More informationtechnical drawing
technical drawing school of art, design and architecture nust spring 2011 http://www.youtube.com/watch?v=q6mk9hpxwvo http://www.youtube.com/watch?v=bnu2gb7w4qs Objective abstraction - axonometric view
More informationMr.Bulletfeeder by Double-Alpha
Mr.Bulletfeeder by Double-Alpha User Manual US Patent 74975155 and US Patents Pending Thank you for choosing Mr.Bulletfeeder by Double-Alpha! This newly designed product will give you years of reliable
More informationTechNote #34 ROTALIGN
Shaft alignment TechNote #34 ROTALIGN ROTALIGN ment of cardan shafts using Cardan Bracket ALI 2.893SET Introduction This technical note describes the alignment of two machines joined via a cardan spacer
More informationTech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer
Tech Unit No: 0802340000 Revision: A Approved By: Quality Engineer Date: 11-5-2014 Lock-Set Packer Description: The MAP Model Lock-Set Retrievable Casing Packer is a general purpose packer for production,
More informationInstalling Electronic Media Storage Components into Lateral File Cabinets
Steelcase, Inc. Grand Rapids, MI 49501 U.S.A. 1-888-783-3522 Installing Electronic Media Storage Components into Lateral File Cabinets 830-CH-9 830-CH-12 830-CH15 836-CH-9 836-CH-12 836-CH-15 842-CH-9
More informationTOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS
TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR 53-87 FORD FLARESIDE TRUCKS Vise Grip Clamps C-clamps Sharpie Marker Ball Peen Hammer Center Punch 3/8 or 1/2 Drill 5/32, 7/32, 9/32, and 3/8 Drill Bits
More informationDrilling. Drilling is the operation of producing circular hole in the work-piece by using a rotating cutter called DRILL.
Drilling Drilling is the operation of producing circular hole in the work-piece by using a rotating cutter called DRILL. The machine used for drilling is called drilling machine. The drilling operation
More informationSection 9: Standard & Optional Machine Features
Rotary Attachment The optional Rotary Attachment allows you to mark, engrave or cut cylindrical objects. The Rotary Attachment works in both raster and vector modes. Follow the instructions below to install
More information* * 98/9950WDC. Fire-Rated Devices include these. additional components. 1-Point Latch (LBL)
*24739468* 24739468 98/9950WDC Installation Instructions 1-Point Latch (LBL) Fire-Rated Devices include these additional components Metal Edge Wrap required for 60 and 90-minute applications 2-Point Latch
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS 1350 COMBAT SERIES TOILET PARTITIONS IMPORTANT: Review these instructions thoroughly prior to installation. In the United States: BOBRICK WASHROOM EQUIPMENT INC. 200 Commerce
More informationRadiation characteristics of a dipole antenna in free space
Department of Electrical and Electronic Engineering (EEE), Bangladesh University of Engineering and Technology (BUET). EEE 434: Microwave Engineering Laboratory Experiment No.: A1 Radiation characteristics
More informationWILCAP ADJUSTABLE ALIGNMENT PIN
For correct installation of the Alignment pins the following tools will be needed; 1. Dial indicator and magnetic stand. 2. 1/4 or smaller drift and hammer. 3. Dial calipers. 4. 1/4 Allen wrench 5. 9/16
More informationAssembly Instructions for Model: VMPR1
Assembly Instructions for Model: VMPR1 Thank you for choosing a Sanus Systems Model: VMPR1 ceiling mount. The VMPR1 ceiling mount provides a unique, simplified method of ceiling mounting inverted LC/LP
More information