1 1 SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE F.Q. Wei, K. Dreyer, U. Fehlmann, J.L. Pochon and A. Wrulich SLS / Paul Scherrer Institute CH5232 Villigen PSI Switzerland ABSTRACT The Swiss Light Source (SLS) is a dedicated high brightness synchrotron light source currently under construction at the Paul Scherrer Institute (PSI) in Villigen [1]. It will be commissioned in The accelerator complex includes a 2.4 GeV electron storage ring (SR) with 288 m circumference, a full energy injection booster synchrotron (Booster) and a 100 MeV linear pre-accelerator. The general alignment method and first results of the network measurements are presented. A laser tracker LTD500 is mainly adopted for network measurements and the alignment of storage ring components. 1. Introduction The SLS, shown schematically in figure 1, has a 100 MeV linac, transfer lines, a booster with 270 m circumference and the storage ring with 288 m circumference. As a particularity of the SLS design, both booster and storage ring have similar radii, permitting the installation within the same shielding tunnel. The lines marked in green indicate the planned beamlines of the first phase from insertion devices i.e. wigglers, undulators and bending magnets. The lines marked in red indicate possible second phase beam lines. On June , the SLS was officially approved by the Swiss Parliament and the realization phase of the project Fig. 1. SLS layout was started. In July 1998, ground breaking of the SLS building was performed. Only one year after this date, July 1999, the SLS building was ready for machine installation. Figure 2 shows an inside view of the accelerator tunnel. Now the booster supports and the
2 RC2 RC1 D8B5 RC60 RC59 RC3 RC58 D8B4 RC4 RC57 D9I5 RC5 D9I4 D8B3 D9I3 RC56 D7B5 RC6 D9I2 D8B2 RC55 D9I1 D7B4 RC7 D9B5 RW31 D9B4 D9B3 D9B2 D8B1 D7I5 RW32 D9B1 RW30 RC54 RW33 D7B3 RC15 RC16 RC14 D11I5 RC17 RC13 RC18 D11B5 RC12 RC19 D11B4 D11I4 D12I5 RC11 D12I4 RC20 D10B5 D12I3 D11I3 D11B3 D12B5 RC10 D12I2 D12B4 D12B3 D10I5 D10B4 D12I1 D11I2 D11B2 RW40 D12B2 RC9 RW1 D12B1 RW39 RW2 RW3 RS1 D11I1 D11B1 RS41 D10I4 D10B3 RS2 RW4 RS3 RC8 RW38 RS40 RS4 RW37 DS51 DS52 DS50 RS39 DS53 DS49 RW5 DS1 RS38 RB49 RB50 D1I1 D10I3 RS37 RB51 RS5 D10B2 RB48 DS2 RL3 DL2 RB1 RW36 DS48 DS3 RW6 DL3 RB2 RS36 RB47 DS47 RB3 RS6 DS4 RB46 D10I2 D10B1 RW35 DS46 RL2 RB4 RW34 RS31 RW29 RS30 D8B0 RW28 D7I4 RC53 D10I1 RS32 DS40 DS39 DS38 DS37 RS33 DS41 DS36 RS29 RS34 DS42 RB40 RB39 RB38 RB37 RS28 DS35 D7B2 D7I3 RC52 DS43 RB41 RB36 DS34 RS27 RW27 RB42 RB35 RW26 RB43 RB34 DS33 RS26 DS44 D7I2 DS45 RW25 D7B1 RC51 D6B5 RS35 RB33 RB44 DS32 RS25 RB32 RB45 D6B4 RC50 DS31 D7I1 RB31 RL1 RW24 D6B3 RB30 D6I5 RC49 DL1 RS24 RB29 DS30 D6I4 DS29 RW23 D6B2 RS23 RC48 RB28 D6I3 RS22 DS28 RW22 D6B1 D6I2 RC47 RB27 D5B5 RB26 DS27 RC46 D6I1 D5B4 Y RB25 DS26 D5B3 RS21 RW21 RB24 DS25 D5B2 D5I5 RC45 D5I4 DS24 RC44 RB23 RS20 RW20 D5I3 D5B1 RB22 D5I2 DS23 RC43 RB21 D5I1 DS22 RS19 RC42 DS21 RW19 RB20 RS18 RS17 DS20 RW18 D4B5 RC41 RB5 RB19 D4B4 DS5 DS19 RS16 D4B3 RS7 RB6 RB18 RW17 RC21 D4B2 DS6 DS18 RC40 D1I2 D1B1 RW7 RB7 RB17 D4I5 RS8 RW16 DS7 RB16 DS17 D4B1 RB8 RW8 D4I4 RC22 DS8 RB9 RB15 D4I3 D1I3 RS9 DS16 RC39 DS9 RB10 DS15 D4I2 RW9 RB11 RB13 RB14 D1B2 DS10 RB12 DS14 D4I1 RS10 DS11 DS12 DS13 RS14 RS15 RC23 RS13 RC38 RC24 D1I4 D1I5 D2B1 RW10 RS11 RW15 D1B3 RW11 RW12 RS12 RW13 RW14 D3B1 D3I1 D3B2 RC37 D3I2 D3B3 D2B2 D3B4 D3B5 RC25 D1B4 D3I3 RC36 D2B3 D3I4 RC26 D1B5 D2B4 D3I5 RC35 RC27 RC34 D2B5 RC28 RC33 RC29 RC32 RC30 RC31 X 2 support pedestals of the storage ring girders have been aligned. In the passed year a main instrument for survey and alignment, a laser tracker LTD500, was delivered and tested. Using the laser tracker and a precision levelling N3 the tunnel network has been measured twice. The results are good enough for pre-alignment of the machine components. In spite of the tight schedule we are confident to have the first stored beam at the beginning of Wall Reference Floor Reference SR Pedestal Booster Support Fig. 2 Inside view of the SLS tunnel in August SLS Alignment Network Layout The SLS alignment network (Fig. 3) consists of the linac network, the tunnel network and the experimental network. They are separated by the tunnel shielding wall. There are 3 to 4 datum in each network. Those datum were built and measured before construction of the shielding wall and the final floor in January Most of the wall references were mounted on the wall and all the floor references (Fig. 4) were inserted into the final floor in May The linac network Fig. 3. SLS Alignment Network
3 3 consist of 3 floor references and 3 wall references. The tunnel network consists of 102 wall references and 53 floor references. The experimental network consists of 40 wall references and 111 floor references. Most of the floor references of the experimental network are located in parallel lines to the planned beamlines. The floor and wall references are made of bronze CuSu " Target 1.5" Reflector Floor Reference 0.5" Reflector Wall Reference 0.5" Adapter 1.5" Adapter Fig. 4 References, reflectors and adapters 3. Laser Tracker LTD LTD500 Measurement principle The basic measurement principle of the LTD500 is the polar point determination as commonly used in surveying. The sensor unit reads the angles from vertical and in horizontal direction, the Laser interferometer provides high accuracy measurements for the distance. Because interferometer measurement is a counting process, which registers the relative movement of the reflector from an initial distance, a well known starting point (Home Point or 'Bird Bath') must be defined by calibration. As another consequence the laser beam must be reflected continuously to it's source, which is done by tracking the reflector. Tracking is done by the controller unit, which continuously turns the head of the sensor to follow the reflector movement. 3.2 LTD500 Hardware The main components of the LTD500 are the sensor unit, the controller and the application processor (LapTop running Axyz-Software). The sensor unit contains encoders for angle measurement of the two orthogonal axis and a laser interferometer (hetero-dyne type) for distance measurement. The tracking head has direct drive DC motors for remote-controlled rotation around its axis. The sensor unit is connected with two cable to the controller, which contains the system's main electronics i.e. power supply, motor amplifiers, tracker processor running firmware, interferometer counter and LAN connector. This design reduces the number of heating sources inside the sensor unit. For high accuracy measurements as required for the SLS, some extra equipment is recommended. Because the accuracy of distance measurement mainly depends on the environmental conditions and the stability of the laser wavelength, a Meteo-Station
4 4 for registering the environmental conditions and a UPS (Uninterruptible Power Supply) are needed. The UPS keeps the LTD running when the sensor has to be disconnected from the power supply during its movement wich guarantees the stability of laser wavelength for further measurements. It is very useful to place the equipment in a wheel cart (Fig.5), which makes it easier to change the location. Sensor Unit Application Processor Meteo Station Controller UPS Rolls Fig. 5 LTD500 In the SLS tunnel 3.3 Software Components The frontend to the LTD500 is the Windows based Axyz-Software developed by Leica. The Data Manager Module provides data-handling and calculation routines for the coordinates, while the Laser Tracker Module integrates the communication part for the Laser tracker. In combination with an Environmental Monitor for registering the environmental conditions the Axyz-Software is an easy to use Measurement- System. A great advantage is, that Axyz delivers basic statistics and real time coordinates of the reflector position, which is very convenient for network measurement and alignment of the accelerator components for the SLS (Fig. 6).
5 5 Fig.6 Window for stationary Measurement including basic statistics (e.g. 500 Measurements during 5 sec.) 3.4 Accuracy of the Laser Tracker LTD500 The major factor that influences the accuracy of the LTD500 system is the accuracy of the angle measurement. The angular resolution is 0.14 arc sec. By averaging the measurements to a static target the influence of fluctuations in the atmosphere can be reduced. By averaging more than 100 measurements over at least 5 seconds, an accuracy of ± 10 ppm can be achieved. The interferometer's resolution is 1.26 microns. The distance accuracy depends mainly on the accuracy of the measurements of air temperature and air pressure. If the temperature can be measured approximately to an accuracy of ±1 C and the pressure to an accuracy of ± 4 mbar, a relative distance accuracy of ± 2.5 ppm can be assumed. The absolute distance accuracy, if measured with the interferometer, is also influenced by the determination of the initial distance. In most cases the sensor unit's bird bath will be used for this purpose. 3.5 Calibration and Field check of the Laser Tracker Calibration of the Laser Tracker is one of the most important processes to achieve highest possible accuracy. A full calibration, which leads to corrections of the calibration data is performed once a year to determine all 15 tracker alignment parameters. The calibration of the home point (bird bath) distance will be made more frequently. For one part of the calibration an invar ball bar is used (Fig. 7). Intermediate field checks will be done every months or when general working environmental conditions has changed, to check the 3 most important calibration parameters. The field check should be done at the working place under the actual environmental conditions. Laboratories give better results but do not reflect the real world. Fig. 7 Mount ball bar
6 6 3.6 Reflector The accuracy of the reflectors, which are used for the measurements, is another important contribution to the overall accuracy of the measurements. The centre accuracy of Leica reflector optics (Fig. 4) is better than ± 0.01 mm. The ball shape error is less than 0.01 mm. There is a difference of a few microns of the home point distance between the different Leica reflectors. Therefore only one reflector, which has been calibrated, will be used. The reflector is always placed in the same orientation into the bird bath and the points to be measured. In this way the influence of optic centre error and ball shape error can be reduced. 3.7 Referencing to gravity There is no requirement for the LTD500 to be levelled. A network can be referenced to gravity in a number of ways. The following two ways are used in our project: Use of control points to gravity in a levelled coordinate system (11 Datum Points) Precision leveling 4. First results of the tunnel network A precision levelling N3 was D12I2 D12B4 D12B3 used to measure the elevations of D12I1 RW40 D12B2 the tunnel network in May D12B1 RW1 RW2 RW3 All differences in height between RS1 RS41 RW4 RS2 RS3 DS51 RS4 DS52 two adjacent references were DS53 RW5 measured. At the same time the RB50 DS1 RB51 RS5 DS2 RL3 RB1 network was measured with the DS3 RW6 DL3 SV01 RB2 LTD500 and its software Axyz. RB3 RS6 DS4 The measurements were performed RB4 in 53 stations nearby each floor SV02 reference. At least two floor RB5 references and two wall references of each side, forward and backward were measured as shown in figure 10 and figure 11. At that Fig. 10. LTD500 measurement in tunnel time the shielding wall was not completed. Civil engineering work was going on nearby. 12 wall references were missing. Because of the poor environmental conditions the standard deviation of the first measurements was 0.24 mm.
7 7 Before Transformation DS1 DS3 DS5 DS7 DS9 DS11 DS13 DS15 DS17 DS19 DS21 DS23 DS25 DS27 DS29 DS31 DS33 DS35 DS37 DS39 DS41 DS43 DS45 DS47 DS49 DS51 DS53 Y in mm N39905 LTD9905 Base DS After Transformation Y in mm N39905 LT DS1 DS3 DS5 DS7 DS9 DS11 DS13 DS15 DS17 DS19 DS21 DS23 DS25 DS27 DS DS29 DS31 DS33 DS35 DS37 DS39 DS41 DS43 DS45 DS47 DS49 DS51 DS53 Fig. 11. Heights of Floor References before and after transformation in May 1999 Using bundle adjustment orientation function of the Axyz software the network coordinates can be calculated. This relative coordinates are related to the coordinate system of the LTD500 at the first station without relation to gravity. The levelling data were calculated by software Star*net. The calculation results were imported to the LTD500 Axyz reference file. Using the 3D transformation function of Axyz the relative coordinate system is transformed onto the coordinate system defined by the levelling measurements (shown in figure 11). In July 1999 the tunnel shielding wall was completed. All 102 wall references were fixed. The tunnel network was measured again by use of the LTD500. The standard deviation of the second measurements was 0.13 mm. This is strongly improved compared to the first measurements because of the improved environmental conditions. The results of the floor references vertical coordinate are shown in figure12.
8 8 Before Transformation DS1 DS3 DS5 DS7 DS9 DS11 DS13 DS15 DS17 DS19 DS21 DS23 DS25 DS27 DS29 DS31 DS33 DS35 DS37 DS39 DS41 DS43 DS45 DS47 DS49 DS51 DS53 Y in mm LT9905 LTD9907Base DS After Transformation Y in mm LT9905 LT DS1 DS3 DS5 DS7 DS9 DS11 DS13 DS15 DS17 DS19 DS21 DS23 DS25 DS27 DS29 DS31 DS33 DS35 DS37 DS39 DS41 DS43 DS45 DS47 DS49 DS51 DS53-4 DS Fig 12. Heights of Floor reference before and after transformation in July Alignment of the Storage Ring 6.1 Support of the storage ring The SLS storage ring consists of 48 girders. Each girder is supported by 4 pedestals sitting on concrete piers. All the quadrupoles, sextupoles, corrector magnets and BPMs are well fixed on the girder using forced centre mounting systems. All components have a machined mechanical reference surface. The dipole magnets are supported at each end by their two adjacent girders. 3 dipoles link 4 girders as a train link. Each girder can be moved in vertical Fig. 13 Support of the storage ring
9 9 and horizontal directions within a ±3.5 mm range by 5 DC motors. The minimal step width of the mover is about 2 µm. There are 3 M20 screws between the concrete pier and the pedestal for adjustment in the vertical direction within a range of ±15 mm. And plates between mover and pedestal for adjustment in the horizontal direction in a range of ± 10 mm (Fig. 13). 6.2 Component references and reflector adapter Most SLS components use standard reference holes shown in figure 14 and a standard reference adapter shown in figure 4. Each top plate of the pedestal has 3 reference holes. There are 4 reference holes on each girder, 2 reference holes on the top of each quadrupole and sextupole (Fig. 13) and 3 reference holes on the top of each dipole magnet (Fig. 18). The positions of the reference holes have been precisely determined during the magnet field measurement. Fig. 14 Reference hole 6.3 First phase of alignment of the storage ring All the concrete piers were positioned with an accuracy of ± 5 mm during the civil engineering construction. The pedestals will be aligned to their positions with an accuracy of 0.2 mm using the LTD500 and software Axyz. The build function of the software Axyz in LTD 500 (Fig.15 and 16) improves the alignment job dramatically with regard to accuracy and manpower. Fig.15 Alignment with LTD500 Fig.16 Window for Adjustment delivers real time coordinates and deviations to the reference position.
10 10 The dipole magnet will be mounted and aligned on the girders. All the coordinates of the reference holes on girders and magnets will be measured by LTD500 and the best fit results are exported to the control system. The girder itself will be moved by 5 motors in both transverse directions. The tunnel network and positions of all the magnet references will be measured and the girders will be adjusted to their final positions before commissioning of the storage ring. 6.4 Position monitoring system Each girder is equipped with 4 sets of hydrostatic levelling system (HLS). In addition there is a horizontal position system (HPS) under each dipole magnet to measure the horizontal differential position of the two adjacent girders as shown in figure 17. All the zero points of the position monitors can be set after the girders are brought to their final positions. Fig. 17 HLS and HPS 6.5 Second phase of the alignment of the storage ring During commissioning of the storage ring the girder motors will move each girder into the best position. The position monitoring systems will register those best positions of the girders. All references of the storage ring magnets will be measured to get their final coordinates. 6.6 Error budget Our main alignment goal is that the relative transverse directions of the storage ring's magnet components reaches a standard deviation better than 100 µm. The items, which are involved, were designed according to following values: the magnet centre to the girder groove σ 1 = 30 µm the girder groove to the girder reference σ 2 =30 µm the girder reference to the tunnel network σ 3 =25 µm the tunnel network locally σ 4 =80 µm σtotal = σ + σ + σ + σ = 94 µm
11 11 Recently during positioning the supports of the booster and the storage ring the tunnel network was locally measured at more than 30 stations in the last two months. The value was from σ 4 =60 µm to 110 µm. We believe that the final value of the tunnel network locally σ 4 =80 µm will be reached after tunnel is closed completely. 7. Alignment of the Booster The booster is located in the same tunnel as the storage ring. Most of the magnet components are supported by brackets as shown in figure 18. The brackets are fixed on the concrete wall which was carefully erected into its position mostly within ±15 mm in the horizontal plane. A plate can be adjusted about ±25 mm in the horizontal plane. There are 3 screws which support a frame. The frame holds the magnet with 6 screws which allow to adjust the magnet in the horizontal plane. There are 3 reference holes on the top of the magnet. Though the accuracy of the booster magnet positions is not as high as the accuracy of the storage Fig.18 The booster support ring magnets, the same alignment instrumentation LTD500 will be used. Up to now all the frame of the dipole supports are aligned into their positions with a standard deviation of 0.2 mm. 8. Alignment of the beam lines The experimental network was measured in July 1999 using the total station TDA5005. The standard deviation of the measurements was about 0.4 mm. Some additional references of the individual beam line will be added after the detailed designs of each beam line and hutch are made. Most components of the beam lines such as frontends, monochromatrors, mirror boxes, slits and experiment stations have had several reference holes. They can be used for positioning the components with an accuracy of 0.5 mm in respect to the storage ring position. The final alignment will be realised by a simulation laser beam and the synchrotron radiation beam itself.
12 12 9. Acknowledgement The authors would like to thank several colleagues from the mechanic group, the control group and the diagnostic group of the SLS project for their co-operation. We also wish to thank T.Biedermann, now at 'Neugummierungswerk, Pneu Ecker' and many colleagues from 'Bereich Grossforschungsanlagen' of PSI for their participation in the initial survey during the civil engineering construction. We are grateful to R.Ruland from SLAC who diligently proposed the self aligning girder system and contributed to the realization of the hydrostatic levelling system. Our thanks also goes to Prof. W.Schwarz for his comments on the SLS alignment concept. 10. References: [1] A Synchrotron Light Source for Switzerland, SLS Project, Paul Scherrer Institut, Villigen
THE STORAGE RING CONTROL NETWORK OF NSLS-II
THE STORAGE RING CONTROL NETWORK OF NSLS-II C. Yu #, F. Karl, M. Ilardo, M. Ke, C. Spataro, S. Sharma, BNL, Upton, NY, 11973, USA Abstract NSLS-II requires ±100 micron alignment precision to adjacent girders
More informationALIGNMENT METHODS APPLIED TO THE LEP MAGNET MEASUREMENTS. J. Billan, G. Brun, K. N. Henrichsen, P. Legrand, 0. Pagano, P. Rohmig and L. Walckiers.
295 ALIGNMENT METHODS APPLIED TO THE LEP MAGNET MEASUREMENTS J. Billan, G. Brun, K. N. Henrichsen, P. Legrand, 0. Pagano, P. Rohmig and L. Walckiers. CERN, CH-1211 Geneva 23, Switzerland Introduction Electromagnets
More informationAUTOMATION OF 3D MEASUREMENTS FOR THE FINAL ASSEMBLY STEPS OF THE LHC DIPOLE MAGNETS
IWAA2004, CERN, Geneva, 4-7 October 2004 AUTOMATION OF 3D MEASUREMENTS FOR THE FINAL ASSEMBLY STEPS OF THE LHC DIPOLE MAGNETS M. Bajko, R. Chamizo, C. Charrondiere, A. Kuzmin 1, CERN, 1211 Geneva 23, Switzerland
More information3 General layout of the XFEL Facility
3 General layout of the XFEL Facility 3.1 Introduction The present chapter provides an overview of the whole European X-Ray Free-Electron Laser (XFEL) Facility layout, enumerating its main components and
More informationChapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections
Chapter 9 Magnet System This chapter discusses the parameters and the design of the magnets to use at KEKB. Plans on the magnet power supply systems, magnet installation procedure and alignment strategies
More informationLight Source Diagnostics. Hywel Owen ASTEC Daresbury Laboratory
Light Source Diagnostics Hywel Owen ASTEC Daresbury Laboratory This Talk Not a review of light source diagnostics Good summaries at EPAC/PAC/DIPAC, etc. J.Safranek (ICALHEPS 99) J.Clarke (EPAC 94) R.Hettel
More informationRESEARCH DEVELOPMENT OF VIBRATING WIRE ALIGNMENT TECHNIQUE FOR HEPS
RESEARCH DEVELOPMENT OF VIBRATING WIRE ALIGNMENT TECHNIQUE FOR HEPS WU Lei,WANG Xiaolong, LI Chunhua, QU Huamin IHEP,CAS.19B Yuanquan Road,Shijingshan District,Beijing,100049 Abstract The alignment tolerance
More informationExperience with Insertion Device Photon Beam Position Monitors at the APS
Experience with Insertion Device Photon Beam Position Monitors at the APS 27.6 meters (The APS has forty sectors - 1104 meters total circumference) Beam Position Monitors and Magnets in One Sector 18m
More informationExperiences of the QSBPM System on MAX II
Experiences of the QSBPM System on MAX II Peter Röjsel MAX-lab, Lund University, Lund, Sweden Abstract. The MAX II is a third-generation synchrotron radiation source. The first beamline is in operation
More informationNonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs
Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs Alex H. Lumpkin Accelerator Operations Division Advanced Photon Source Presented at Jefferson National Accelerator Laboratory
More informationReview of the magnetic measurement technique (experience of the SLC, LEP, CEBAF)
Review of the magnetic measurement technique (experience of the SLC, LEP, CEBAF) N.A.Morozov Workshop on the TESLA spectrometer, Dubna, 13-14 October 2003 1..Stanford Linear Collider (SLC) To implement
More informationCEBAF Overview June 4, 2010
CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications
More informationLONG-TERM RESULTS OF THE HYDROSTATIC LEVELLING SYSTEM AT THE SWISS LIGHT SOURCE (SLS)
IWAA2004, CERN, Geneva, 4-7 October 2004 LONG-TERM RESULTS OF THE HYDROSTATIC LEVELLING SYSTEM AT THE SWISS LIGHT SOURCE (SLS) Edi Meier *, Fuqiang Wei +, Leonid Rivkin +, Albin Wrulich +, Sasa Zelenika
More informationDesign of control network and survey for CSNS. Accelerator center of IHEP Wang tong, Li bo
Design of control network and survey for CSNS Accelerator center of IHEP Wang tong, Li bo 2012.09.11 Contents 1 Project Overview 2 Design of the Primary Control Network 3 Survey Scheme for the Surface
More informationProposal of test setup
Proposal of test setup Status of the study The Compact Linear collider (CLIC) study is a site independent feasibility study aiming at the development of a realistic technology at an affordable cost for
More informationRe-commissioning the Recycler Storage Ring at Fermilab
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on Accelerator Operations The Fermi National Accelerator
More informationNETWORK MEASUREMENTS AT THE HEAVY ION SYNCHROTRON SIS AT GSI
NETWORK MEASUREMENTS AT THE HEAVY ION SYNCHROTRON SIS AT GSI Peter Vossbeck, Ina Pschorn, Metronom GmbH, Mainz, Germany Gebhard Moritz, Gesellschaft für Schwerionenforschung, Darmstadt, Germany 1. Introduction
More informationFLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously
FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First
More informationSystem Integration of the TPS. J.R. Chen NSRRC, Hsinchu
System Integration of the TPS J.R. Chen NSRRC, Hsinchu OUTLINE I. Main features of the TPS II. Major concerns and intersystem effects of an advanced synchrotron light source III. Subsystems and intersystem
More informationTHz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009
Beam for LCLS Henrik Loos Workshop July 29-31, 29 1 1 Henrik Loos Overview Coherent Radiation Sources Timing THz Source Performance 2 2 Henrik Loos LCLS Layout 6 MeV 135 MeV 25 MeV 4.3 GeV 13.6 GeV σ z.83
More informationVIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian
VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian Yerevan Physics Institute Yerevan Physics Institute S.Arutunian, VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION BIW 2008, Lake Tahoe, USA
More informationVibrating Wire R&D for Alignment of Multipole Magnets in NSLS-II
Vibrating Wire R&D for Alignment of Multipole Magnets in NSLS-II 10 th International Workshop on Accelerator Alignment February 11-15, 2008, Tsukuba, Japan Animesh Jain for the NSLS-II magnet team Collaborators
More informationSummer / Fall 2004 Downtime AEG Week 4 Summary
Summer / Fall 2004 Downtime AEG Week 4 Summary BaBar Monitoring - Monday August 23 o This survey is designed to check the detector after the installation of the brass plates in the lower part of the detector.
More informationANALYSIS OF 3RD OCTAVE BAND GROUND MOTIONS TRANSMISSION IN SYNCHROTRON RADIATION FACILITY SOLARIS Daniel Ziemianski, Marek Kozien
ANALYSIS OF 3RD OCTAVE BAND GROUND MOTIONS TRANSMISSION IN SYNCHROTRON RADIATION FACILITY SOLARIS Daniel Ziemianski, Marek Kozien Cracow University of Technology, Institute of Applied Mechanics, al. Jana
More informationLaser Trackers for Production of Automotive Tooling
Case Study Laser Trackers for Production of Automotive Tooling PICO EUROPE designs, manufactures, installs and commissions automotive production lines worldwide for many automotive manufacturers including
More informationHIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION
HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION K.V. Zolotarev *, A.M. Batrakov, S.V. Khruschev, G.N. Kulipanov, V.H. Lev, N.A. Mezentsev, E.G. Miginsky, V.A. Shkaruba,
More informationMEASUREMENT OF BEAM LOSSES USING OPTICAL FIBRES AT THE AUSTRALIAN SYNCHROTRON
MEASUREMENT OF BEAM LOSSES USING OPTICAL FIBRES AT THE AUSTRALIAN SYNCHROTRON E. Nebot del Busto (1,2), M. J. Boland (3,4), E. B. Holzer (1), P. D. Jackson (5), M. Kastriotou (1,2), R. P. Rasool (4), J.
More informationDesign of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec.
Design of the magnets for the MAX IV project Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, 01-04 Dec. 2014 MAX IV 3 GeV ring magnets key aspects: Relatively small magnet aperture
More information12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT. Upgrade Hall A
12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT Upgrade Hall A Version 1.2 July 28, 2010 DESIGN SOLUTIONS DOCUMENT Upgrade Hall A APPROVALS Approved by: 12 GeV Upgrade Control Account Manager, Hall A
More informationA Study of undulator magnets characterization using the Vibrating Wire technique
A Study of undulator magnets characterization using the Vibrating Wire technique Alexander. Temnykh a, Yurii Levashov b and Zachary Wolf b a Cornell University, Laboratory for Elem-Particle Physics, Ithaca,
More informationNano Beam Position Monitor
Introduction Transparent X-ray beam monitoring and imaging is a new enabling technology that will become the gold standard tool for beam characterisation at synchrotron radiation facilities. It allows
More information7. Michelson Interferometer
7. Michelson Interferometer In this lab we are going to observe the interference patterns produced by two spherical waves as well as by two plane waves. We will study the operation of a Michelson interferometer,
More informationPhysics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7
Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,
More informationActivities on Beam Orbit Stabilization at BESSY II
Activities on Beam Orbit Stabilization at BESSY II J. Feikes, K. Holldack, P. Kuske, R. Müller BESSY Berlin, Germany IWBS`02 December 2002 Spring 8 BESSY: Synchrotron Radiation User Facility BESSY II:
More informationAgilent 10717A Wavelength Tracker
7I Agilent 10717A Wavelength Tracker MADE Description Description The Agilent 10717A Wavelength Tracker (see Figure 7I-1) uses one axis of a laser measurement system to report wavelength-of-light changes,
More informationL-742 Ultra-Precision Roll Alignment System for Printing Presses/Paper Machines
ujijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijijiji Application Notes Roll Alignment System Recommendations Printing Presses/Paper
More informationStretched Wire Test Setup 1)
LCLS-TN-05-7 First Measurements and Results With a Stretched Wire Test Setup 1) Franz Peters, Georg Gassner, Robert Ruland February 2005 SLAC Abstract A stretched wire test setup 2) has been implemented
More informationAgilent 10705A Single Beam Interferometer and Agilent 10704A Retroreflector
7B Agilent 10705A Single Beam Interferometer and Agilent 10704A Retroreflector Description Description The Agilent 10705A Single Beam Interferometer (shown in Figure 7B-1) is intended for use in low-mass
More informationInfrared Single Shot Diagnostics for the Longitudinal. Profile of the Electron Bunches at FLASH. Disputation
Infrared Single Shot Diagnostics for the Longitudinal Profile of the Electron Bunches at FLASH Disputation Hossein Delsim-Hashemi Tuesday 22 July 2008 7/23/2008 2/ 35 Introduction m eb c 2 3 2 γ ω = +
More informationProduction Measurements of Magnets for the NSLS-II Storage Ring*
Production Measurements of Magnets for the NSLS-II Storage Ring* Animesh Jain Superconducting Magnet Division Brookhaven National Laboratory, Upton, NY 11973 17 th International Magnetic Measurement Workshop
More informationPHYS 3153 Methods of Experimental Physics II O2. Applications of Interferometry
Purpose PHYS 3153 Methods of Experimental Physics II O2. Applications of Interferometry In this experiment, you will study the principles and applications of interferometry. Equipment and components PASCO
More informationA Facility for Accelerator Physics and Test Beam Experiments
A Facility for Accelerator Physics and Test Beam Experiments Experimental Program Advisory Committee Roger Erickson for the SABER Design Team December 4, 2006 The Problem: FFTB is gone! The Final Focus
More informationRotating Coil Measurement Errors*
Rotating Coil Measurement Errors* Animesh Jain Superconducting Magnet Division Brookhaven National Laboratory, Upton, NY 11973, USA 2 nd Workshop on Beam Dynamics Meets Magnets (BeMa2014) December 1-4,
More informationStatus of the Electron Beam Transverse Diagnostics with Optical Diffraction Radiation at FLASH
Status of the Electron Beam Transverse Diagnostics with Optical Diffraction Radiation at FLASH M. Castellano, E. Chiadroni, A. Cianchi, K. Honkavaara, G. Kube DESY FLASH Seminar Hamburg, 05/09/2006 Work
More informationAn Optical Characteristic Testing System for the Infrared Fiber in a Transmission Bandwidth 9-11μm
An Optical Characteristic Testing System for the Infrared Fiber in a Transmission Bandwidth 9-11μm Ma Yangwu *, Liang Di ** Center for Optical and Electromagnetic Research, State Key Lab of Modern Optical
More informationGrounding for EMC at the European XFEL
Grounding for EMC at the European XFEL Herbert Kapitza, Hans-Jörg Eckoldt, Markus Faesing Deutsches Elektronensynchrotron (DESY) D-22603 Hamburg, Germany Email: herbert.kapitza@desy.de Abstract The European
More informationRotary Encoder System Compact Model Range
we set the standards RIK Rotary Encoder System Compact Model Range 2 Incremental rotary encoder Features Compact design, consisting of scanning head with round cable, 15pin D-sub connector and grating
More informationRadiation characteristics of a dipole antenna in free space
Department of Electrical and Electronic Engineering (EEE), Bangladesh University of Engineering and Technology (BUET). EEE 434: Microwave Engineering Laboratory Experiment No.: A1 Radiation characteristics
More informationInstallation of the Optical Replica Synthesizer (ORS) at FLASH
Installation of the Optical Replica Synthesizer (ORS) at FLASH Who and What? G. Angelova, V. Ziemann- Task: Modulator and radiator undulators, participating in the Theoretical simulations with Genesis
More informationAutomatic Laser-Controlled Erection Management System for High-rise Buildings
Automation and Robotics in Construction XI D.A. Chamberlain (Editor) 1994 Elsevier Science B.V. All rights reserved. 313 Automatic Laser-Controlled Erection Management System for High-rise Buildings Tadashi
More informationOverview of performance and improvements to fixed exit double crystal monochromators at Diamond. Andrew Dent, Physical Science Coordinator, DLS
Overview of performance and improvements to fixed exit double crystal monochromators at Diamond Andrew Dent, Physical Science Coordinator, DLS Overview Diffraction limit Geometric magnification Source
More informationFiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab
Fiducialization of Superconducting Radio Frequency Cryomodules at Jefferson Lab C. J. Curtis, J. Dahlberg, W. Oren, J. Preble, K. Tremblay. Thomas Jefferson National Accelerator Facility, Virginia, U.S.A.
More informationThe LaserTRACER. Calibration and Testing with Sub-Micron accuracy. Accuracy for measuring machines and machine tools an.
The LaserTRACER Calibration and Testing with Sub-Micron accuracy Accuracy for measuring machines and machine tools an The LaserTRACER The Etalon solution TRAC-CAL for Error Mapping and Compensation TRAC-CHECK
More informationUsing Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY
Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at FLASH @ DESY N. Baboi, DESY, Hamburg for the HOM team : S. Molloy 1, N. Baboi 2, N. Eddy 3, J. Frisch 1, L. Hendrickson
More informationSPEAR 3 - THE FIRST YEAR OF OPERATION*
SLAC-PUB-11679 SPEAR 3 - THE FIRST YEAR OF OPERATION* R. Hettel for the SSRL ASD, SSRL/SLAC, Stanford, CA 942, U.S.A. Abstract The first electrons were accumulated in the newly completed 3-GeV SPEAR 3
More informationFast Optical Form Measurements of Rough Cylindrical and Conical Surfaces in Diesel Fuel Injection Components
Fast Optical Form Measurements of Rough Cylindrical and Conical Surfaces in Diesel Fuel Injection Components Thomas J. Dunn, Robert Michaels, Simon Lee, Mark Tronolone, and Andrew Kulawiec; Corning Tropel
More informationSUB-PICOSECOND OPTICAL PULSES AT THE SLS STORAGE RING
SUB-PICOSECOND OPTICAL PULSES AT THE SLS STORAGE RING G. Ingold, A. Streun, B. Singh, R. Abela, P. Beaud, G. Knopp, L. Rivkin, V. Schlott, Th. Schmidt, H. Sigg, J.F. van der Veen, A. Wrulich, Paul Scherrer
More informationHerwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction
THE LEP PROJECT - STATUS REPORT Herwig Schopper CERN 1211 Geneva 23, Switzerland Introduction LEP is an e + e - collider ring designed and optimized for 2 100 GeV. In an initial phase an energy of 2 55
More informationVertical Shaft Plumbness Using a Laser Alignment System. By Daus Studenberg, Ludeca, Inc.
ABSTRACT Vertical Shaft Plumbness Using a Laser Alignment System By Daus Studenberg, Ludeca, Inc. Traditionally, plumbness measurements on a vertical hydro-turbine/generator shaft involved stringing a
More informationLHC TRANSVERSE FEEDBACK SYSTEM: FIRST RESULTS OF COMMISSIONING. V.M. Zhabitsky XXI Russian Particle Accelerator Conference
LHC TRANSVERSE FEEDBACK SYSTEM: FIRST RESULTS OF COMMISSIONING V.M. Zhabitsky XXI Russian Particle Accelerator Conference 28.09-03.10.2008, Zvenigorod LHC Transverse Feedback System: First Results of Commissioning
More informationHexGen HEX HL Hexapod Six-DOF Positioning System
HexGen HE300-230HL Hexapods and Robotics HexGen HE300-230HL Hexapod Six-DOF Positioning System Six degree-of-freedom positioning with linear travels to 60 mm and angular travels to 30 Precision design
More informationLCLS-II SXR Undulator Line Photon Energy Scanning
LCLS-TN-18-4 LCLS-II SXR Undulator Line Photon Energy Scanning Heinz-Dieter Nuhn a a SLAC National Accelerator Laboratory, Stanford University, CA 94309-0210, USA ABSTRACT Operation of the LCLS-II undulator
More informationPhoton Diagnostics. FLASH User Workshop 08.
Photon Diagnostics FLASH User Workshop 08 Kai.Tiedtke@desy.de Outline What kind of diagnostic tools do user need to make efficient use of FLASH? intensity (New GMD) beam position intensity profile on the
More informationMagnetic measurement system for superconducting final focus quadrupoles for SuperKEKB
Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB Y. Arimoto (KEK) IMMW 20 @ Diamond Light Source 2017/Jun/8 SuperKEKB Final focus magnet system Magnetic field measurement
More informationFive years of operational experience with digitally controlled Power Supplies for beam control at the Paul Scherrer Institut (PSI)
Five years of operational experience with digitally controlled Power Supplies for beam control at the Paul Scherrer Institut (PSI) Keywords F. Jenni, R. Künzi, A. Lüdeke 1, L. Tanner 2 PSI, Paul Scherrer
More informationHexGen HEX HL Hexapod Six-DOF Positioning System
HexGen HE300-230HL Hexapods and Robotics HexGen HE300-230HL Hexapod Six-DOF Positioning System Six degree-of-freedom positioning with linear travels to 60 mm and angular travels to 30 Precision design
More informationCommissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008
Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)
More informationCommissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System
Commissioning of National Synchrotron Light Source-II (NSLS-II) Fast Orbit Feedback System 15 th ICALEPCS 2015, Melbourne, Australia K. Ha, Y. Tian, L. Yu, W. Cheng, L. Dalesio W. Levine, University of
More informationVUV-FEL User workshop, August 23-24, 2004
Layout of the user facility Kai Tiedtke Kai Tiedtke, HASYLAB@ VUV-FEL User workshop, August 23-24, 2004 Kai.Tiedtke@desy.de Kai Tiedtke, HASYLAB@ Outline Photon beam transport Layout of the experimental
More informationHexGen HEX HL Hexapod Six-DOF Positioning System
HexGen HE300-230HL Hexapods and Robotics HexGen HE300-230HL Hexapod Six-DOF Positioning System Six degree-of-freedom positioning with linear travels to 60 mm and angular travels to 30 Precision design
More informationMEASURING MACHINES. Pratt & Whitney METROLOGY LABORATORY. Measurement Systems, Inc.
METROLOGY LABORATORY Pratt & Whitney Measurement s, Inc. METROLOGY LABORATORY The Standard of Accuracy Pratt & Whitney Metrology Laboratory Machines are the standard to which all other gages are held subordinate.
More informationINTERPLANT STANDARD - STEEL INDUSTRY
INTERPLANT STANDARD - STEEL INDUSTRY IPSS SPECIFICATION OF SENSOR MEASUREMENTS OF LENGTH OF ROLLED MATERIALS IPSS: 2-07-037-13 (First Revision) Corresponding Indian Standard does not exist Formerly-: IPSS:
More informationNew Instrumentation technologies
New Instrumentation technologies Daniel Naterop, Solexperts Ltd. Switzerland Technologies used for other application than for geotechnical instrumentation have been recently used successfully for civil
More informationInvestigations of Digital Levels for High Precision Measurements
Investigations of Digital Levels for High Precision Measurements Georg L. Gassner, Robert E. Ruland, Brendan Dix Abstract At SLAC (Stanford Linear Accelerator Center) a fully automated vertical comparator
More informationRoman Pots. Marco Oriunno SLAC, PPA. M.Oriunno, SLAC
Roman Pots Marco Oriunno SLAC, PPA The Roman Pot technique 1. The Roman Pot, an historically successful technique for near beam physics: ISR, SPS, TEVATRON, RICH, DESY 2. A CERN in-house technology: ISR,
More informationXFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension
XFEL Cryo System Possible extension 1 st stage Project X Collaboration Meeting, FNAL September 8-9, 2010 (XFEL WP10 & WP13) Outline 2 XFEL accelerator structure TESLA technology Basic cryogenic parameters
More informationPHYS2090 OPTICAL PHYSICS Laboratory Microwaves
PHYS2090 OPTICAL PHYSICS Laboratory Microwaves Reference Hecht, Optics, (Addison-Wesley) 1. Introduction Interference and diffraction are commonly observed in the optical regime. As wave-particle duality
More informationDEVELOPMENT OF OFFNER RELAY OPTICAL SYSTEM FOR OTR MONITOR AT 3-50 BEAM TRANSPORT LINE OF J-PARC
Proceedings of IBIC01, Tsukuba, Japan DEVELOPMENT OF OFFNER RELAY OPTICAL SYSTEM FOR OTR MONITOR AT 3-50 BEAM TRANSPORT LINE OF J-PARC M. Tejima #, Y. Hashimoto, T. Toyama, KEK/J-PARC, Tokai, Ibaraki,
More informationAn Overview of MAX IV Insertion Devices & Magnetic Measurement System. Hamed Tarawneh On behalf of Insertion Devices Team
An Overview of MAX IV Insertion Devices & Magnetic Measurement System Hamed Tarawneh On behalf of Insertion Devices Team MAX IV IDs & MagLab 1 Outlook: MAX IV Facility. ID Magnet Lab @ MAX IV. IDs @ 3
More informationLCLS UNDULATOR COMMISSIONING, ALIGNMENT, AND PERFORMANCE *
LCLS UNDULATOR COMMISSIONING, ALIGNMENT, AND PERFORMANCE * H.-D. Nuhn # for the LCLS Commissioning Team, SLAC National Accelerator Laboratory, Stanford, CA 94309, U.S.A. Abstract The LCLS x-ray FEL has
More informationOrbit Stability Challenges for Storage Rings. Glenn Decker Advanced Photon Source Beam Diagnostics March 8, 2012
Orbit Stability Challenges for Storage Rings Glenn Decker Advanced Photon Source Beam Diagnostics March 8, 2012 Outline Beam stability requirements RF beam position monitor technology NSLS II developments
More informationPACIFIC LASER SYSTEMS. HVL100 Procedures
PACIFIC LASER SYSTEMS HVL100 Procedures A. Setting Up for Level Calibration of Horizontal Lines, Plumb and Down pg. 2 B. Setting Up for Vertical Line Calibration pg. 4 C. Setting Up for Square Calibration
More informationGlobal Position Feedback in SR Sources
SLS-TME-TA-2002-0212 12th August 2002 Global Position Feedback in SR Sources V. Schlott Abstract Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland Beam stability and orbit control represent key
More informationA Prototype Wire Position Monitoring System
LCLS-TN-05-27 A Prototype Wire Position Monitoring System Wei Wang and Zachary Wolf Metrology Department, SLAC 1. INTRODUCTION ¹ The Wire Position Monitoring System (WPM) will track changes in the transverse
More informationTEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS
IWAA2004, CERN, Geneva, 4-7 October 2004 TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS Andreas Herty, Hélène Mainaud-Durand, Antonio Marin CERN, TS/SU/MTI, 1211 Geneva 23, Switzerland 1. ABSTRACT
More informationA DUAL-RECEIVER METHOD FOR SIMULTANEOUS MEASUREMENTS OF RADOME TRANSMISSION EFFICIENCY AND BEAM DEFLECTION
A DUAL-RECEIVER METHOD FOR SIMULTANEOUS MEASUREMENTS OF RADOME TRANSMISSION EFFICIENCY AND BEAM DEFLECTION Robert Luna MI Technologies, 4500 River Green Parkway, Suite 200 Duluth, GA 30096 rluna@mi-technologies.com
More informationLab 12 Microwave Optics.
b Lab 12 Microwave Optics. CAUTION: The output power of the microwave transmitter is well below standard safety levels. Nevertheless, do not look directly into the microwave horn at close range when the
More informationOperation of a Single Pass, Bunch-by-bunch x-ray Beam Size Monitor for the CESR Test Accelerator Research Program. October 3, 2012
Operation of a Single Pass, Bunch-by-bunch x-ray Beam Size Monitor for the CESR Test Accelerator Research Program October 3, 2012 Goals Goals For This Presentation: 1.Provide an overview of the efforts
More informationMeasurement and compensation of displacement errors by non-stop synchronized data collection
Measurement and compensation of displacement errors by non-stop synchronized data collection Charles Wang and Gianmarco Liotto Optodyne, Inc., Compton, California, USA Email: optodyne@aol.com Abstract
More informationAttosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors
Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors V.A. Dolgashev, P. Emma, M. Dal Forno, A. Novokhatski, S. Weathersby SLAC National Accelerator Laboratory FEIS 2: Femtosecond Electron
More informationDEVELOPMENT OF CAPACITIVE LINEAR-CUT BEAM POSITION MONITOR FOR HEAVY-ION SYNCHROTRON OF KHIMA PROJECT
DEVELOPMENT OF CAPACITIVE LINEAR-CUT BEAM POSITION MONITOR FOR HEAVY-ION SYNCHROTRON OF KHIMA PROJECT Ji-Gwang Hwang, Tae-Keun Yang, Seon Yeong Noh Korea Institute of Radiological and Medical Sciences,
More informationNTT DOCOMO Technical Journal. Method for Measuring Base Station Antenna Radiation Characteristics in Anechoic Chamber. 1.
Base Station Antenna Directivity Gain Method for Measuring Base Station Antenna Radiation Characteristics in Anechoic Chamber Base station antennas tend to be long compared to the wavelengths at which
More informationA novel solution for various monitoring applications at CERN
A novel solution for various monitoring applications at CERN F. Lackner, P. H. Osanna 1, W. Riegler, H. Kopetz CERN, European Organisation for Nuclear Research, CH-1211 Geneva-23, Switzerland 1 Department
More informationEnergy Recovery Linac
Frank DiMeo Energy Recovery Linac THE FUTURE GETS BRIGHTER Why an ERL? X-ray beams from charged particle accelerators have become an essential tool in current investigation of all types of materials, from
More informationThe SIRAD irradiation facility at the INFN - Legnaro National Laboratory
The SIRAD irradiation facility at the INFN - Legnaro National Laboratory I. Introduction 2 The INFN - Legnaro National Laboratory (LNL) SIRAD beamline http://www.lnl.infn.it 3 What is SIRAD? SIRAD is the
More informationMaurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator
Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator Every accelerator needs a linac as injector to pass the region where the velocity of the particles increases with energy. At high energies (relativity)
More informationElectrical Field Distribution*
Features l 30 MHz to MHz frequency range l Wide beamwidth illuminates a large uniform area l High power balun handles up to 10 kw RF input power l Tilt-angle, height and polarization are easily adjustable
More informationUndulator K-Parameter Measurements at LCLS
Undulator K-Parameter Measurements at LCLS J. Welch, A. Brachmann, F-J. Decker, Y. Ding, P. Emma, A. Fisher, J. Frisch, Z. Huang, R. Iverson, H. Loos, H-D. Nuhn, P. Stefan, D. Ratner, J. Turner, J. Wu,
More informationSet Up and Test Results for a Vibrating Wire System for Quadrupole Fiducialization
LCLS-TN-06-14 Set Up and Test Results for a Vibrating Wire System for Quadrupole Fiducialization Michael Y. Levashov, Zachary Wolf August 25, 2006 Abstract A vibrating wire system was constructed to fiducialize
More informationJEDI. Status of the commissioning of the waveguide RF Wien Filter
COSY Beam Time Request For Lab. use Exp. No.: Session No. E 005.4 7 Collaboration: JEDI Status of the commissioning of the waveguide RF Wien Filter Spokespersons for the beam time: Ralf Gebel (Jülich)
More information