Pro-Master Ridge Vent Enabling Attic Air to Exit. Moist, Hot Attic Air. Cool, Fresh Air Enters Through Soffit Vents
|
|
- Chad Webster
- 6 years ago
- Views:
Transcription
1 HOW PRO-MSTER RIDGE VENT WORKS: Pro-Master Ridge Vent Enabling ttic ir to Exit Cap Shingle Pro-Master Ridge Vent Shingles Roof Sheathing Moist, Hot ttic ir Cool, Fresh ir Enters Through Soffit Vents PRO-MSTER RIDGE VENT INSTLLTION: 1. Remove ridge cap shingles along entire length of ridge. 2. a) Measure 1 from ridge peak on each side of ridge. For ridge board construction measure 1-1/2 on each side of ridge. b) Snap chalk line along entire length of ridge. c) Leave a minimum of 12 of sheathing closed at each end of ridge. d) Cut opening in sheathing along ridge. DO NOT CUT through roof trusses or ridge board. e) Remove sheathing to create slot. 3. Tack one end of the Pro-Master Ridge Vent (netting side down) over the slot to hold in place at one end of the ridge. Unroll entire length of vent, pull to remove sags and tack in place so vent is snug and centered over slot. If more than one piece of Ridge Vent is needed, simply butt the multiple pieces together and tack in place with a nail. Cover the entire length of the ridge with vent, including the minimum 12 of unslotted ridge. 4. Install ridge cap shingles directly over Pro-Master Ridge Vent. Fasten shingle and Ridge Vent to roof using galvanized roofing nails supplied with the ridge vent. Please follow power nailing and safety instructions enclosed with coil nails or use hand nails provided. To obtain a uniform look and prevent shingle damage, do NOT drive nails through shingle. Note: This product has a net free ventilation area of 15.2 square inches per linear foot. To operate properly, there must be equal or greater soffit ventilation than ridge ventilation. Installation Tips Hip Roof Installation Cut the slot along the ridge to within 12 inches of the end of the ridge. Install Pro-Master Ridge Vent along the entire length of the ridge. Do not cut slots or install Ridge Vent along the hips of the roof. Obstruction long Ridge Cut the slots along the ridge to within 12 inches of each side of the obstruction. Install Pro-Master Ridge Vent along the ridge, butting up against the obstruction. T and L Style Roofs Cut slots along the ridge to within 12 inches of each side of the ridge intersections. First install Pro-Master Ridge Vent along the entire long run of the ridge. Then install it along the short run of the ridge so the ridge vent butts up against the Pro-Master Ridge Vent already installed on the long run. Pro-Master Ridge Vent Technical Specifications - Patent No. 6,343,985 Material Composition: Material is composed of natural fibers on a polyester mat joined with latex binding agents plus carbon black for UV resistance. Codes Met: ICC* (report ESR-1218) Texas Department of Insurance (report RV-33) Miami-Dade, FL (NO No ) UL Class - Ridge Vents (TGEW) Florida Building Code (FL2891) Testing: rchitectural Testing, Inc., York, P SGS U.S. Testing Co., Inc., Hoboken, NJ PRI sphalt Technologies, Tampa, FL ETC Laboratories, NY * The ICC now has the BOC, ICBO and SBCCI merged into the ICC code.
2 PRO-MSTER HIP ROOF INSTLLTION Cut the slot along the ridge to within 12 inches of the end of the ridge. Install Pro-Master Ridge Vent along the entire length of the ridge. Do not cut slots or install Ridge Vent along the hips of the roof. Provide ventilation at soffit on all sides.
3 PRO-MSTER TYPICL INSTLLTION: COMP. SHINGLE CP SHINGLE PRO-MSTER 1" SHETHING IR FLOW EXHUST IR UNDERLYMENT SHINGLES RFTER OR TRUSS 10-1/2" wide x 3/4" thick x 20 ft. long or 50 ft. long PRO-MSTER TYPICL INSTLLTION: COMP. SHINGLE W/ RIDGE BORD CP SHINGLE PRO-MSTER SHINGLES EXHUST IR ROOF SHETHING IR FLOW UNDERLYMENT 1" RFTER DETIL RIDGE BORD 10-1/2" wide x 3/4" thick x 20 ft. long or 50 ft. long MERIMX HOME PRODUCTS, INC. 450 RICHRDSON DRIVE LNCSTER, P DTE: PPROVED BY:. SWN DRWN BY: SLHD PRO-MSTER TYPICL INSTLLTION: COMP. SHINGLE PRO-MSTER TYPICL INSTLLTION: COMP. SHINGLE W/ RIDGE BORD
4 PRO-MSTER TYPICL PPLICTION: W/ FLT TILE ROOF FSTENER FELT PPER CP TILE PRO-MSTER EXHUST IR FLT TILE FELT PPER 1-1/2" IR FLOW FLT TILE ROOF CEMENT OR CULKING ROOF CEMENT OR CULKING ROOF SHETHING 3/4" MIN. OPENING REQUIRED FOR PROPER VENTILTION TRUSS OR RFTER 10-1/2" wide x 3/4" thick x 20 ft. roll or 50 ft. roll May require trimming of width depending on tile cap size. MERIMX HOME PRODUCTS, INC. 450 RICHRDSON DRIVE LNCSTER, P DTE: PPROVED BY:. SWN DRWN BY: SLHD PRO-MSTER TYPICL PPLICTION: W/ FLT TILE ROOF
5 PRO-MSTER TYPICL PPLICTION: FLT TILE ROOF W/ RIDGE BORD BLOCKING CP TILE FLT TILE FLSHING PRO-MSTER PRO-MSTER EXHUST IR 1" SLOT 1" SLOT EXHUST IR ICE & WTER UNDERLYMENT ROOF SHETHING IR FLOW IR FLOW RIDGE BORD TRUSS OR RFTER 10-1/2" wide x 3/4" thick x 50 ft. long MERIMX HOME PRODUCTS, INC. 450 RICHRDSON DRIVE LNCSTER, P DTE: PPROVED BY:. SWN DRWN BY: SLHD PRO-MSTER TYPICL PPLICTION: FLT TILE ROOF W/ RIDGE BORD
6 PRO-MSTER TYPICL PPLICTION: BRREL OR S-TILE ROOF FSTENER CP TILE METL IR DM FLSHING DETIL B 3/4" MIN. OPENING REQUIRED FOR PROPER VENTILTION PRO-MSTER ROOF TILE EXHUST IR FELT PPER 3" 1" EXHUST IR ROOF TILE ROOF SHETHING CEMENT MORTR OPTIONL CEMENT MORTR OPTIONL IR FLOW IR FLOW TRUSS OR RFTER 10-1/2" wide x 3/4" thick x 50 ft. long 3/4" 30 4" METL IR DM FLSHING DETIL B 3" MIN. 1/32" MERIMX HOME PRODUCTS, INC. 450 RICHRDSON DRIVE LNCSTER, P DTE: PPROVED BY:. SWN DRWN BY: SLHD PRO-MSTER TYPICL PPLICTION: BRREL OR S-TILE ROOF
7 2" IR FLOW PRO-MSTER TYPICL PPLICTION: STNDING SEM METL ROOFING & HIGH DOME CP HIGH DOME CP TYP. PPLICTION MINIMUM WIDTH SHOWN, CN BE WIDER FINL DOME DESIGN MUST COMPLY WITH LL 3/4" OPENINGS S NOTED FSTENERS 2" MIN. OPENING PRO-MSTER B 3/4" MIN. OPENING EXHUST IR 2" MIN. OPENING STNDING SEM METL ROOF 10-1/2" wide x 3/4" thick x 50 ft. long VRIBLE TO COMPLY WITH MINIMUM OPENING DIMESIONS 90 1/2" B IR DM FLSHING DETIL 2-5/8" 51 MERIMX HOME PRODUCTS, INC. 450 RICHRDSON DRIVE LNCSTER, P DTE: PPROVED BY:. SWN DRWN BY: SLHD PRO-MSTER TYPICL PPLICTION: STNDING SEM METL ROOFING & HIGH DOME CP
8 PRO-MSTER TYPICL PPLICTION: STNDING SEM METL ROOF W/ LOW PROFILE RIDGE CP LOW PROFILE CP PRO-MSTER FSTENERS EXHUST IR 7/8" MIN. OPENING IR FLOW STNDING SEM METL ROOF 1-3/4" MIN. OPENING 10-1/2" wide x 3/4" thick x 20 ft. roll or 50 ft. roll FLSHING DETIL 3-1/2" 3/32" MERIMX HOME PRODUCTS, INC. 450 RICHRDSON DRIVE LNCSTER, P DTE: PPROVED BY:. SWN DRWN BY: SLHD PRO-MSTER TYPICL PPLICTION: STNDING SEM METL ROOF W/ LOW PROFILE RIDGE CP
9 PRO-MSTER TYPICL PPLICTION: STNDING SEM ROOF TO WLL WLL METL SIDING PRO-MSTER INSULTION 5-1/4" FLSHING 3/4" EXHUST IR STNDING SEM METL ROOF 1" SLOT IR FLOW RFTER OR TRUSS 10-1/2" wide x 3/4" thick x 20 ft. roll or 50 ft. roll Cut product in half to make 5-1/4" strip. FLSHING DETIL 4 3/4" 3/32" MERIMX HOME PRODUCTS, INC. 450 RICHRDSON DRIVE LNCSTER, P DTE: PPROVED BY:. SWN DRWN BY: SLHD PRO-MSTER TYPICL PPLICTION: STNDING SEM ROOF TO WLL
10 PRO-MSTER ROLLED RIDGE VENT NET FREE RE CHRT: 1:150 RTIO-NO MOISTURE BRRIER 1:150 ratio: Net Free rea Table-Use when no Moisture Barrier is installed. The MINIMUM attic ventilation required by the Building Codes is 1 square foot of total net free area per 150 square feet of attic when no moisture barrier is used. Balanced System requires soffit ventilation in an amount equal to or greater than the amount of ridge ventilation. See soffit vent manufacturer's information on the Net Free rea provided by soffit vent product. ttic Total Ridge Length of Soffit rea NF Ventilation Ridge Vent Ventilation (SF) (SF) NF (SF) (feet) NF (SF) See soffit vent manufacturers instructions for NF calculation.
11 PRO-MSTER ROLLED RIDGE VENT NET FREE RE CHRT: 1:300 RTIO-WITH MOISTURE BRRIER 1:300 ratio: Net Free rea Table-Use when Moisture Barrier is installed The MINIMUM attic ventilation required by the Building Codes is 1 square foot of total net free area per 300 square feet of attic when a moisture barrier is installed. Balanced System requires soffit ventilation in an amount equal to or greater than the amount of ridge ventilation. See soffit vent manufacturer's information on the Net Free rea provided by soffit vent product. ttic Total Ridge Length of Soffit rea NF Ventilation Ridge Vent Ventilation (SF) (SF) NF (SF) (feet) NF (SF) See soffit vent manufacturers instructions for NF calculation.
ROOFING VENTILATION. Euramax Canada, Inc. Pro-Master Ridge Vent. Pro-Master Highpoint Series 5 & 7 Ridge Vents. Standard Box Vents
ROOFING VENTILATION Pro-Master Ridge Vent Pro-Master Highpoint Series 5 & 7 Ridge Vents Standard Box Vents Euramax Canada, Inc. (800) 461-5706 www.euramaxcanada.com RIDGE VENTTM Pro-Master Ridge Vent is
More informationVENTILATION PRODUCTS. (800) Pro-Master Ridge Vents & Standard Box Vents. AccuVent Soffit Insulation Baffle
VENTILATION PRODUCTS Pro-Master Ridge Vents & Standard Box Vents AccuVent Soffit Insulation Baffle Soffit, Fascia and Accessories BERGER BUILDING PRODUCTS, INC. (800) 523-8852 www.bergerbros.com Highpoint
More informationEVALUATION REPORT GAF Materials Corporation 1361 Alps Road, Building 7-3 Wayne, NJ 07470
EVALUATION REPORT GAF Materials Corporation 1361 Alps Road, Building 7-3 Wayne, NJ 07470 EXTERIOR RESEARCH & DESIGN, LLC. 353 CHRISTIAN STREET, UNIT #13 OXFORD, CT 06478 PHONE: (203) 262-9245 FAX: (203)
More informationThis document is provided for guidance only, it is not intended to cover all local code variations.
FULL VERSION Ridge/Hip Installation Guidelines VIPER VENT A Ridge Vent for a Durable Roof VIPERVENT A Roof Exhaust Vent for all types of Roofing VIPER VENT is a patented, light weight, nylon vent developed
More informationInstallation Instructions
Installation Instructions ROLL VENT STANDARD / METRIC Page Installation Considerations 3 Roll Vent Standard General Installation 4 Roll Vent Metric General Installation 5 Steep Pitch Guidelines 6 Asphalt
More informationInstallation Instructions
Installation Instructions SHARK VENT XLP / XTRA Page Installation Considerations 3 Shark Vent XLP & Xtra General Installation 4 Steep Pitch Guidelines 5 Asphalt Shingles Detail 6 Ridge Beam Detail 7 Hip
More information6 STEP INSTALLATION GUIDE BY DCI
6 STEP INSTALLATION GUIDE BY DCI STEP 1 (Ensure metal drip edge was previously installed.) Begin by cutting a slit 1 wide (or a series of 1 ¾ holes 3 on center) into the roof decking 6 to 7 up from the
More informationInstallation Instructions
Installation Instructions RAPID RIDGE STANDARD / 7 / METRIC Page Installation Considerations 3 Rapid Ridge Standard General Installation 4 Rapid Ridge Metric General Installation 5 Rapid Ridge 7 General
More informationInspire Aledora Slate Application Guidelines
July 2014 Inspire Aledora Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,
More informationInstallation Instructions
Installation Instructions XTRACTOR VENT X18 / X18 XTRA / XLP Page Installation Considerations 3 X18 and X18 Xtra General Installation 4 XLP General Installation 5 Steep Pitch Guidelines 6 Asphalt Shingles
More informationHipMaster Installation Instructions
Mid-America, Plus and HipMaster Installation Instructions New applications for metal, slate and wood shingle roofs (see page 7) CAUTION: Before beginning installation read all general guidelines, special
More informationInspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square
December 2017 Classic Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,
More informationInstallation Instructions
Installation Instructions XTRACTOR VENT X18 / X18 XTRA / XLP Page X18 and X18 Xtra General Installation 2 XLP General Installation 3 Asphalt Fiberglass Shingles Detail 4 Ridge Beam Detail 5 Hip Roof Detail
More informationRIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER
INSTALLATION INSTRUCTIONS RIDGEMASTER PLUS CAUTION Before beginning installation read all general guidelines, special notes and installation steps thoroughly and be sure to check and follow all your local
More informationSECTION HERITAGE SERIES LAMINATED FIBERGLASS ASPHALT SHINGLES
This three-part specification is for design professionals for use as a guide and must be edited to delete information and instructions not required on a particular project. Delete the specifier notes in
More informationInstallation Instructions
Installation Instructions SLICKER MAX RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Top of Wall Detail 5 Bottom of Wall Detail 6 Wall Corner Detail
More informationFlorida Building Code Online Page 1 of 2 BCIS Home Log In User Registration Hot Topics Submit Surcharge Stats & Facts Publications FBC Staff BCIS Site Map Links Search Product Approval USER: Public User
More informationASPHALT T E C H N O L O G I E S
ASPHALT T E C H N O L O G I E S Evaluation of Active Ventilation Products Inc. Aura-D (AV-24) Ventilator in Accordance With FLORIDA BUILDING CODE PROTOCOL TAS 100(A)-95 TEST PROCEDURE FOR WIND AND WIND
More informationPROJECT INSTRUCTIONS Roofing
PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not
More informationA201 3 PROPOSED SOUTH ELEVATION SCALE: PROPOSED EAST ELEVATION SCALE: EXISTING EAST ELEVATION EXISTING SOUTH ELEVATION WEST WORKSHOP
WEST WORKSHOP Residential Designer Kurt West P: 202-957-0933 E: kurt@westworkshop.com NOTE: INSTALL NEW ROOFING -REPLACE ALUM DRIP EDGES -REPLACE ICE/WATER SHIELD AT EAVES AND VALLEYS -INSTALL SYNTHETIC
More informationSmartVent Eave Edge Installation Instructions
SmartVent Eave Edge Installation Instructions STEP 1: Cut a slit 1 wide (or a series of 1 ¾ holes at 3 on center) into the roof decking 6 to 7 up from the drip edge. SmartVent is rated 9NFA. Ensure drip
More informationA BREATH OF FRESH AIR VENTILATION PRODUCTS. CoolRidge Xtractor Vent XLP Turbo Roll Vent Rapid Ridge QuickVent
A BREATH OF FRESH AIR VENTILATION PRODUCTS CoolRidge Xtractor Vent XLP Turbo Roll Vent Rapid Ridge QuickVent VENTILATION PRODUCTS SECTIONAL RIDGE VENT WITH EXTERNAL BAFFLES Injection-molded polypropylene
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF 1 CAMPUS DRIVE PARSIPPANY, NEW JERSEY 07054
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1475 Reissued 10/2017 This report is subject to renewal 10/2019. DIVISION: 07 00
More informationHERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD
Application Instructions for FORMERLY 30 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationPREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF EVALUATION SUBJECT:
0 ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org Most Widely Accepted and Trusted ESR-1475 Reissued 10/2017 Revised 12/12/2018 This report is subject to renewal 10/2019.
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationROOFING City of Grand Rapids Building Safety Division
ROOFING City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Grand
More informationPREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD
Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR
More informationROOFING APPLICATION STANDARD (RAS) No. 130
ROOFING APPLICATION STANDARD (RAS) No. 130 1. Scope 1.1 This application Standard provides the minimum installation criteria for wood shingles and shakes. 2. Definitions 2.1 For definitions of terms used
More informationProducts. & Applications
Easy Installation One person can easily install the handy four-foot COR-A-VENT sections. All you need is a hammer, circular saw, chalk line, utility knife, tape measure and a caulking gun. Here s an installation
More informationTapersawn Shake Installation Instructions
Smart-Shingle TM System Tapersawn Shake Installation Instructions INSTALLATION GUIDE MARKS Shake-Strip 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More informationHatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles
CertainTeed Applicator s Manual Hatteras s 14 YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles HATTERAS SHINGLES Hatteras shingles are a premium oversize (18" x 36") roofing
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More informationA P P L I C A T I O N I N S T R U C T I O N S
1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE
More informationROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION
ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION 1. 2. 3. Scope 1.1 This application standard provides the minimum installation criteria for wood
More informationInstallation Manual. Future Roof Shingle / Slate Products
Installation Manual Future Roof Shingle / Slate Products REVISED 14/09/2010 Future Roof Shingle Installation Manual is a component of Future Roof, Inc. and as such is intended to be used with Future Roof
More informationThe proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage.
The proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage. LANDMARK SERIES DESIGNER ROOFING SHINGLES Landmark, shown in Silver
More informationBitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION
Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION WHY VENTILATE A SHINGLE ROOF? Unventilated shingle roofs will cause high temperatures inside. This will age the shingles much quicker
More information1.04 QUALITY ASSURANCE
SECTION 07312 ARCHITECTURAL ASPHALT SHINGLES PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationShapes Siding. Perfection Shingles. Chalk Line
Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter
More informationStormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK
StormMaster Slate General Instructions IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM
More informationDIRECTIONS FOR APPLICATION
Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 12, 2017 the Denver 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted. Under the
More informationMIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)
MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590
More informationLaminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual
CertainTeed Shingle Applicator s Manual Laminated Shingles 12 Landmark Series and Landmark TL YOUR OBJECTIVE: To learn the correct procedure for installing Laminated shingles. LANDMARK SERIES AND LANDMARK
More informationICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1790 Reissued September 1, 2012 This report is subject to renewal September 1, 2013. A Subsidiary of the International Code Council
More informationApplication Guidelines - Shake General Information
Application Guidelines - Shake General Information No Special Tools Required hand fastened or fastened with a pneumatic nail gun utility knife or a standard circular saw tape measure, pry bar, tin snips
More informationMAGNUM. I N S P E C T I O N S Inc. ROOF Walked on roof, crawled attic where accessible.
Name removed METHOD OF INSPECTION: ROOF Walked on roof, crawled attic where accessible. MAIN ROOF COVERING SECONDARY ROOF COVERING Cement Tile: Strip Shingle: XX Tar and Gravel: Roll Roofing: Wood Shingle:
More informationBest Barns USA Assembly Book Revised November 3, 2016
Best Barns USA Assembly Book Revised November 3, 2016 the Aspen II 12' x 8' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive, Greenville, PA 16125 This manual is copyrighted. Under the
More informationFlorida Building Code Online
Florida Building Code Online http://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wgevxqwtdquo2ybw7bm... Page 1 of 2 6/15/2016 BCIS Home Log In User Registration Hot Topics Submit Surcharge Stats &
More informationInstallation Instructions
Installation Instructions SLICKER CLASSIC RAINSCREEN Page List of Approved Compatible Products 2 Nail Selection Guide 3 General Installation 4 Insulation Board Installation 5 EIFS Installation 6 Top of
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 19, 2017 Garage Door by Owner the Tahoe 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.
More informationBest Barns USA Assembly Book Revised October 24, 2017
Best Barns USA Assembly Book Revised October 24, 2017 Garage Door by Owner the Tahoe 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised July 6, 2015 Garage Door by Owner Tahoe-R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual
More informationInstallation Manual. For Gerard Shingle Products
Installation Manual For Gerard Shingle Products Gerard Shingle Installation Manual is a component of Gerard roofing products and as such is intended to be used with Gerard products only. All information
More informationSG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application
1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF 1 CAMPUS DRIVE PARSIPPANY, NEW JERSEY 07054
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3267 Reissued 12/2017 This report is subject to renewal 12/2019. DIVISION: 07 00
More informationTuff Rib Panel Installation Specifications
Tuff Rib Panel Installation Specifications ROOF APPLICATION: Roof slope must be a minimum of a 2/12 pitch to use this product. For slopes lower than a 3/12 pitch, lap sealant is suggested on the side laps
More informationInterlock Slate / Cedar Specification Manual. Lifetime Roofing Systems
Interlock Slate / Cedar Specification Manual Interlock Roofing Interlock Slate / Cedar is a four way interlocking aluminum roofing system. Each one is coated with the Alunar Coating System, embedded with
More informationBest Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017
Assembly Book Best Barns USA Revised September 19, 2017 the Millcreek 12'x 16' Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted Under the
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER:
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1717 Reissued 12/2017 This report is subject to renewal 12/2018. DIVISION: 07 00
More informationArmourvent Multi application guide
application guide CONTENTS Why ventilate a shingle roof 2 A balanced system: the key to proper roof ventilation 3 Calculating the net free area of vent openings 4 Installation of IKO 6 Ridge vent installation
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised December 6, 2013 the Denver-R 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 19, 2017 the Millcreek 12'x 20' Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted Under the
More information1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights
1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and s These 1 Exam Prep Tabs are based on the National Roofing Contractors Association (NRCA) manual listed below: Steep-Slope Roof Systems
More informationBest Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017
Best Barns USA Assembly Book revised February 15, 2017 Regency Deluxe 8' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive, Greenville, PA 16125 This manual is copyrighted. Under
More informationGeneral Spec Sheet: 18 x 24 (457mm x 610mm) Vent
General Spec Sheet: 18 x 24 (457mm x 610mm) Vent The 18 x 24 (457mm x 610mm) Vent is a functional and decorative vent designed to provide unforced free air flow ventilation of attics or similar spaces
More informationBarrel Vault Counter Batten and Batten
Barrel Vault Counter Batten and Batten INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation
More informationMulti-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"
N DaVinci Shake Multi-Width Shake Single-Width Shake INSTALLATION GUIDE DaVinci polymer shakes are carefully engineered to provide the authentic look of hand-split shakes with dramatically increased durability
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised February 4, 2016 the Millcreek-R 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More information3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25
3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 1 Directions For Applying Malarkey 3-Tab Shingles GENERAL INSTRUCTIONS Install Malarkey 3-tab shingles according to building code and local amendments.
More informationthe Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April
Best Barns USA Assembly Book Revised April 28 2015 the Greenbriar 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationMAXISHINGLE LAP SIDING INSTALLATION GUIDE
MAXISHINGLE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations
More informationIRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE
8 5/8" A) 1 5/8" 5/8" 1 10" 10 1 5 50" 9 7/8" IRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE 1/8" 1 B) 3/8" 2 7/8" 1 3/8" 3/8" 3/8" 3/8" 1" 1 5/8" 1 5/8" 1 2 1 8.3" 3/4" Overall Length 52 Length
More informationb) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the
PART 1 GENERAL 1) DESCRIPTION a) CertainTeed Symphony TM composite slate is an innovative roofing product that simulates the appearance, texture, and contours of traditional natural slate. It is a carefully
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 19, 2017 the Woodville 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted. Under
More informationSECTION ASPHALT SHINGLES
SECTION 073110 - ASPHALT SHINGLES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Asphalt shingles. 2. Felt underlayment. 3. Self-adhering sheet underlayment. 4. Ice Shield Underlayment
More informationGlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing
GlassMaster General Instructions - Ardmore, OK & Hampton, GA (For Metric Size Franklin, OH Instructions Click Here) IMPORTANT: THE STATEMENTS EXPRESSED ON THIS WRAPPER ARE THE RECOMMENDATIONS FOR THE APPLICATION
More informationSECTION ASPHALT SHINGLES
SECTION 07311 ASPHALT SHINGLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Asphalt shingle roofing. 2. Flexible sheet membranes for eave protection, underlayment, and valley protection. 3. Associated
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised February 4, 2016 the Millcreek-R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationPBR Panel Installation Specifications
4906 St. Stephens Rd. 5780 Hwy 90 W Eight Mile, Al 36613 Theodore, AL 36590 251 456 2254 251 653 1550 251 457 2254(F) 251 653 1514(F) PBR Panel Installation Specifications ROOF APPLICATION: Roof slope
More informationESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years.
ICC-ES Evaluation Report ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:
More informationTimberline Majestic 30 High Definition Shingles Brochure. Updated: 6/09
Timberline Majestic 30 High Definition Shingles Brochure Updated: 6/09 Quality You Can Trust Since 1886... from North America s Largest Roofing Manufacturer Visit www.gaf.com The Premium Look Of A Luxury
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised October 11, 2018 the Woodville 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted. Under
More informationIRONWOOD SHAKE & FLASHING SPECIFICATIONS
3 1-51 3-3/4 1 IRONWOOD SHAKE & FLASHING SPECIFICATIONS 6 1-13- 1-1-1/4 2-1.5 Drip Edge 2.5 Drip Edge 2-7/8 1-1-1/4 3/4 1 2-1 IRONWOOD SHAKE Overall Length 51 Length of Coverage 48 Width of Coverage 1
More informationApplication Guidelines - Slate General Information
No Special Tools Required Application Guidelines - Slate General Information hand fastened or fastened with a pneumatic nail gun utility knife or a standard circular saw tape measure, pry bar, tin snips
More information8x8 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationBARRELL VAULT BATTENLESS
i BARRELL VAULT BATTENLESS INSTALLATION GUIDE INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Gerard Barrel Vault battenless
More informationTimberline ArmorShield II Brochure
Timberline ArmorShield II Brochure Updated: 4/11 Quality You Can Trust... from North America s Largest Roofing Manufacturer! Impact Resistant Shingles Potential Insurance Savings And Extra Protection With
More informationES Report GAF-Elk Shingle Roof Covering Systems ESR-1475
ES Report GAF-Elk Shingle Roof Covering Systems ESR-1475 Product Evaluation Updated: 4/08 Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer ESR-1475 Reissued April 1,
More informationThe Sealed Attic System with. DuPont Tyvek AtticWrap INSTALLATION USING DRAPE METHOD
The Sealed Attic System with TM TM DuPont Tyvek AtticWrap INSTALLATION USING DRAPE METHOD Air flow Tyvek AtticWrap drapes between rafters We recommend that the first two courses of DuPont TM Tyvek be installed
More informationMetroCOTTAGE Shingle
Batten-less Installation Sept. 14, 2017 INSTALLATION WARNING! These install details are provided to demonstrate a recommended installation method for Metro Roof panels and accessories. used in the United
More informationHow To Install Asphalt Shingles. Part 1 of 3: Preparing the Roof. Tutorial
Tutorial How To Install Asphalt Shingles Installing new shingles yourself can save considerable time and money, and you can follow the same steps they do to achieve the same professional look. Re-doing
More information2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ
1 Rafter Size Spacing Allowable span 24" 11'-9" 24" 2x6 14'-1" 2x4 12" 15'-6" 12" 24" 14'-10" 24" 2x8 18'-2" 2x6 12" 20'-5" 12" 24" 18'-2" 24" 2x10 22'-3" 2x8 12" 25'-8" 12" 24" 21'-0" 24" 2x12 25'-9"
More informationthe Greenbriar 12' x 16' Best Barns USA Assembly Book Revised June 4, 2013
Best Barns USA Assembly Book Revised June 4, 2013 the Greenbriar 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationC e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)
C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l Grand Manor 16 and Carriage House YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products. These shingles
More informationLP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information
Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture A B A - Open / Closed (Page 5) B - Vented (Page 6) ON SITE STORAGE Store off the ground well supported, on a flat well-drained
More information