UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.
|
|
- Stephanie Harmon
- 6 years ago
- Views:
Transcription
1 PAGE-1 UPDATED REV.5 BLACK WIDOW Detailed installation manual
2 PAGE-2 UPDATED SpiderRax, Inc. REVISION PAGE Installation Manual For BW-S, BW-B,BW-F DATE PAGES REASON OLD LEVEL NEW LEVEL 10/08/ Technical data box added REVISION 1 REVISION 2 10/08/2014 ALL All page numbers have changed REVISION 1 REVISION 2 11/5/2014 ALL S-hook and base plate changed REVISION 2 REVISION 3 2/3/2015 ALL All page numbers have changed REVISION 3 REVISION 4 2/3/ Design Specs. added REVISION 3 REVISION 4 2/3/ Design Specs. updated REVISION 3 REVISION 4 2/3/ Index updated REVISION 3 REVISION 4 2/10/2015 ALL Updated product description REVISION 4 REVISION 5
3 PAGE-3 UPDATED INDEX Page 1...Cover Page 2....Revision page Page 3 Index Page 4... Design Specifications Page Introduction Page 6 Tool list & step overview Page Assembly Page Layout procedures Page 17. Tile removal Page 18.Attachment Page 19...Tile cutting Page 20.. Tile replacement Page Panel installation Page Grounding Page Stud Attachment Page 30 Quality inspection & final clean up
4 PAGE-4 UPDATED BLACK WIDOW Design Specifications Design Load: 30Psf Torque 20 ft-lbs. Fuse rating: 20A Max number of modules and connections per ground lug: 10 Frame thickness: (35mm-40mm)( )
5 PAGE-5 UPDATED SPIDER RAX BLACK WIDOW INSTALLATION MANUAL APPLICATION: TILE ROOF The BLACK WIDOW pv mounting system is designed to reduce material cost and pre-installation requirements. The BLACK WIDOW mounting system is pre-assembled upon delivery. This system requires no rails and no studs which dramatically decreases shipping and installation cost. WARNING All SPIDER RAX products are designed and tested to withstand all regional specifications when installed correctly. Failure to install SPIDER RAX products correctly may decrease performance of the installation. To be used only in combination with modules that include the Black Widow rack system in their installation manual. SAFETY All local safety requirements should be followed when installing all SPIDER RAX products. All tools, equipment, and roofing materials should be located safely and secured at all times during installation to avoid falling object hazards. All tools/equipment should be inspected prior to installation to ensure proper operational use. This installation guide is intended for professional pv installers with a background in construction principles.
6 PAGE-6 UPDATED TOOL LIST Cordless impact wrench with ¼ adapter fitting 1 / 4 socket 9 / 16 deep socket Corded/cordless angle grinder 4 ½ masonry cutting wheel Tape measure Lumber crayon Silicon gun & outdoor silicone Chalk line & string line OVERVIEW 1) Black Widow mount assembly 2) Marking panel & footing layout 3) Tile removal 4) Attachment of BLACK WIDOW mounting system 5) Tile cutting 6) Tile replacement 7) Final positioning & panel installation 8) Grounding 9) Quality inspection & final clean up
7 PAGE-7 UPDATED Step 1: Black Widow assembly Parts required for step 1 1. One base plate. FM-C2007S (Aluminum) 2. One s-hook. BW-C3021S (Aluminum) 3. One rail. TR-C3022S (Aluminum)
8 PAGE-8 UPDATED One Bottom clamp. MC-C3011S (Aluminum) 5. One top clamp. TC-C2002S (Aluminum) 6. One 3/8 x 3 hex bolt. FS-C38300S (Stainless steel) 7. One 3/8 x 1 hex bolt FS-C38100S (Stainless steel)
9 PAGE-9 UPDATED One 3/8 x ¾ hex bolt. FS-C38075S (Stainless steel) 9. Three 3/8 serrated flange nut. FN-F38S (Stainless steel) 10. Three 3/8 star washers. FW-S38S (Stainless steel) 11. Two No. 4 x 3/16 screw (sub-assembled) (Stainless steel)
10 PAGE-10 UPDATED Select one base plate. Part Select one S-Hook and position the S-Hook over the base plates track. Measure the height of the tiles that are going to be used and use the appropriate S-Hook fitting. Select one 3/8 serrated flange nut and place it in the center of the base plate. Select one 3/8 x 3/4 hex bolt fitted with a star washer. Place the bolt through the S-Hook fitting and thread the bolt until hand tight. Once in place the S-Hook will slide along the track for lateral adjustment. Part 2 Part 1
11 PAGE-11 UPDATED Select one rail and insert a one serrated flange nut in the bottom channel on the grooved side of the rail. Select one 3/8 star washer and one 3/8 x 1 hex bolt and join the two pieces together. Place the hex bolt through the slot located on the top of the S-Hook and thread the bolt on the flange nut to join the s-hook and the solar rail. Part 7, 10 Part 9 Part 8,9,10 Part 2 Part 1
12 PAGE-12 UPDATED Once the rail is attached to the s-hook, select one bottom clamp and position it on top of the rail. Next select one top clamp and place it in the top mount channel located on the bottom clamp. Select one flange nut and insert it in the top channel of the rail. Select one 3/8 x 3 hex bolt and one 3/8 star washer. Fit the hex bolt with the star washer and insert the bolt through the top and bottom clamp and thread the bolt on the serrated flange nut located in the rail. Part 6, 10 Part 5 Part 4 Part 9
13 PAGE-13 UPDATED STEP 2: Marking panel and footing layout Note: Before applying mounting attachments, drawing a system layout is highly recommended. For our demonstration of the Black Widow installation we will be using a simulation roof. Fire lanes Are not included during this example. If required by regional specifications, account for fire lane and position Your layout accordingly. 2.1 Start at the left/top of the layout and mark the top/left corner of the first panel in the top row. Use a lumber crayon for all marks during step Move to the left/bottom of the layout and mark the bottom/left corner of the first panel in that row.
14 PAGE-14 UPDATED Use a calculator to multiply panel width by the amount of panels going to be used in the row account for a ½ for the top clamps. If your row consist of two panels that are 39.5 mark at 80 at the end of the row. 2.4 Move to the right side of the layout and repeat steps at the distance taken from step Move to the top/left side of the layout and mark the first footing position for the first panel in the top row. The footing mark should be made 6 down from the top edge of the panel mark and in line with the left vertical panel mark.
15 PAGE-15 UPDATED Move to the left/bottom of the layout and mark the first footing position for the first panel in the bottom row. The footing mark should be made 6 up from the bottom edge of panel mark and in line with the left vertical panel mark. 2.7 Chalk line between the top and bottom footing mark and then mark all footing positions on the left side of the layout. Keep in mind that the edge of the footing mark should be 6 from the edge of the panel. 2.8 Move to the right side of the array and repeat step 2.7
16 PAGE-16 UPDATED Make all horizontal footing marks in between the left and right side of the layout Chalk line all vertical and horizontal marks. Upon completion of this step you should have a grid pattern on the roof. This grid will give you all footing positions for the layout.
17 PAGE-17 UPDATED STEP 3: Tile removal 3.1 Remove all tiles marked during layout procedures. 3.2 Set the removed tiles above the missing section of the corresponding tile. This will help keep track of every tile while assuring tiles are not in the way during the rest of installation process. 3.3 In the event tiles are secured by a nail, use silicone to patch all nail holes to ensure water proofing.
18 PAGE-18 UPDATED STEP 4: Attachment of BLACK WIDOW mounting system 4.1 Remove outer film from the adhesive water tight layer located on the base plate. 4.2 Configure the Black widow mount at the bottom of the removed tile. Note: As required by regional specifications apply flashing over the top of the base plate to ensure water proofing. 4.3 Use a cordless impact wrench fitted with a 1 / 4 socket to secure the mount to the roof deck using * (10 x 1 ¼ ) screws included with the Black Widow mount. Torque all screws to 14 ft-lbs. Note: * California: 5 Screws * Florida: 8 Screws * Hawaii: 8 Screws * Texas: 6 Screws
19 PAGE-19 UPDATED STEP 5: Tile cutting 5.1 Use a lumber crayon to mark the portion of the roof tile that will need to be shaved off to allow the tile to set flush when lying down on the s- hook portion of the Black Widow mount. 5.2 Lay the roof tile upside down. Use angle grinder with a 4 ½ masonry cutting wheel so shave off the desired amount of material from tile to prevent an un-even finish. Safety: All protective gear should be worn at all times during step 4.
20 PAGE-20 UPDATED STEP 6: Tile replacement 6.1 Replace roof tile to cover base plate. Note: When all tiles are put back in place, the tiles should appear even and unaltered
21 PAGE-21 UPDATED Step 7: Final positioning & module installation 7.1 Connect a string line between the top/bottom mounts and adjust all mounts in line with the string. 7.2 Adjust all mounts to the desired height using the adjustment bolt located on the front side of the s-hook. 7.3 Starting at the bottom/left of the layout, place one panel between the Black Widow top clamp and bottom clamp.
22 PAGE-22 UPDATED Adjust the panels over hang to no more than 12 from center of the mounts top clamp bolt and tighten the top camp to 20 ft-lbs. using a torque wrench or impact wrench fitted with a 9/16 deep socket to secure panel in place. 7.5 Repeat all previous procedures, completing one row of the array at a time until all panels are installed and secured. Adjust accordingly to ensure a square and level finished product.
23 PAGE-23 UPDATED Parts required for ground lug assembly STEP 8: Grounding 1. One ILSCO, Ground Clamp Lug, GBL-4DBT or GBL- 4SS UL2703 listed component. 2. One grounding set screw P/N FS-T One ¼ x ¾ hex bolt P/N FS-C 14075S (Stainless) 4. One ¼ hex nut P/N FN-H14S (Stainless)
24 PAGE-24 UPDATED Two ¼ star washers P/N FW-S14S (Stainless) NOTE: For a system using a non-integral module or panel, the assembly must be mounted over a fire resistant roof covering rated for the application. Any slope less than 5 in/ft (127 mm/305 mm) is required to maintain a fire class rating.
25 PAGE-25 UPDATED Assembly & Attachment 8.1 Select one ground lug and insert one ¼ x ¾ hex bolt into the ground lug on the flat portion of the lug. Part 1 Part Once the bolt is through the lug insert a star washer on the bolt. Part 1,2 Part 5
26 PAGE-26 UPDATED Select one Grounding set screw. Thread the set screw in the ground lug with the slotted portion of the set screw facing out. Part Part 1, 3, 5 Place the ground lug bolt through the grounding hole on the s-hook. Part 1, 2, 3, 5
27 PAGE-27 UPDATED Select the second star washer and place it on the hex bolt. Select one ¼ hex nut and thread the nut clockwise on the bolt until the nut is hand tight. Part 4 Part 5 Part 1, 2, 3, Use a torque wrench and tighten the ¼ hex nut to 12 ft-lbs. This will bond the lug to the footing. Spider-Rax Ground lugs are designed to accept #4, #6, #8, and, #10 bare copper and/or stranded copper. The Black Widow incorporates an integrated ground. This is achieved through abrasion. Only one ground lug and ground wire connection is needed for every 10 modules. A separate ground must be attached after the span of 10 panels. NOTE: Check with local regulations on the minimal size conductor to be used. Part 1, 2, 3, 4, 5
28 UPDATED PAGE-28 Stud Attachment Procedure Note: This procedure is only required in regions that mandate Spider-Rax racking to be installed to a 2 x 4 rafter/truss to meet local regulations. Parts required for stud attachment: 1. One 5/16 x 3 ½ hex head lag bolt. P/N FL-S56S (Stainless steel) 2. One 5/16 star washer. P/N FW-S56S (Stainless steel)
29 UPDATED PAGE-29 Installation Procedures STEP 1. Locate rafter/truss framing and center the base plate over the rafter. Secure the base plate using the provided lag bolt fitted with one star washer. Torque the lag bolt to 15 square ft/lbs. Use four deck screws for additional securement in the pattern shown below. Follow all steps regarding installation in sections 2-7 of the BW installation manual 2x4 Rafter Upon completion of this step the base plate should appear as shown below.
30 UPDATED PAGE 30 STEP 9: QUALITY INSPECTION & CLEAN UP 9.1 Once all panels are installed and roof tiles are replaced, apply a firm pull test to ensure all attachments are secured firmly to the roof of the structure. NOTE: It is required to use four Black Widow mounts for every one module. 9.2 Account for all tools and jobsite related material and clean area as necessary. This concludes the installation process of the SPIDER-RAX Black Widow mounting system. Questions or concerns can be answered at Spiderrax.com info@spiderrax.com
BLACK WIDOW COMPOSITE
PAGE-1 UPDATED 3-6-2015 REV.1 BLACK WIDOW COMPOSITE Detailed installation manual PAGE-2 UPDATED 3-6-2015 SpiderRax, Inc. REVISION PAGE Installation Manual For BWC-S, BWC-B,BWC-F DATE PAGES REASON OLD LEVEL
More informationPatented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs
Quick Start Guide Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs R ESPECT T HE R OOF Quick Rack Components & Tools Components are pre-assembled and ready for installation right
More informationSolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List
APPLICATION: The product line provides an easy -to-install and economical solution for a 5, 10 or 15 degree tilted roof mounted system. integrates with Professional Solar s (ProSolar) patented top-down
More informationINSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01
MOUNT INSTALLATION GUIDE PUB5JAN0 SM SOLAR Wrenches and Torque Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationMay 14, Installation Manual
May 14, 2012 Installation Manual Contents MAG TRACKER Components...1 Mount Installation...7 Module Installation & Grounding...11 Maintenance...14 Warranty......14 Contact Information......14 May 14, 2012
More informationINSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15
MOUNT INSTALLATION GUIDE PUB5JUN5 Wrenches and Torque SM SOLAR Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationSolarMount (E)volution
SolarMount (E)volution SOLARMOUNT (E)VOLUTION: THE BEST JUST GOT BETTER. Engineering, Excellence, and Ease. Performance Engineered for versatility and reduced installation time, SolarMount (E)volution
More informationDesk/Wall-Mount Rack
Desk/Wall-Mount Rack Patent(s) Pending Installation Instructions Post P/N: 119-1752 119-1781 119-1782 119-4014 Frame P/N: 119-1591 119-1754 119-1755 Kit Contents (2) Frames (4) Posts Assembly Hardware
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationAWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS
INSTALLATION MANUAL AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS TABLE OF CONTENTS Table of Contents... 3 Components... 4 System Components... 6 Attachment Components... 7 Module Compatibility...
More informationCSS Central Mount System
CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning
More informationPV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual
PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 100 UL Intro/Configuration Series 100 UL Introduction SnapNrack
More informationorientation Conergy SunTop Instructions for professional installation
On-roof Framed modules Portrait orientation Landscape Three-tab Shingle Plain tile Slate Double Roman tile Metal roof Material warranty orientation Conergy SunTop Instructions for professional installation
More informationPV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual
PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 100 UL Intro/Configuration Series 100 UL Introduction SnapNrack
More informationSolar Mounting Solutions. Series 100 Residential Roof Mount System Installation Manual. snapnrack.com Listed PV Mounting System
Solar Mounting Solutions Series 100 Residential Roof Mount System Installation Manual 2703 Listed PV Mounting System An Intro to SnapNrack Series 100 SnapNrack Series 100 PV Mounting System offers a low
More informationFLOE quick attach & standard sectional dock and leg kits
FLOE quick attach & standard sectional dock and leg kits assembly instructions KIT P/N 510-02550-00 X-SHALLOW KIT P/N 510-02551-00 SHALLOW KIT P/N 510-02552-00 MEDIUM KIT P/N 510-02553-00 DEEP WARNING
More informationOctagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly
More informationRayport G Eco Dealer Kit
Rayport G Eco Dealer Kit Installation Guide www.aetenergy.com Supporting a Cleaner, Greener Tomorrow 1. Table of Contents 1. Table of Contents P2 2. Installer Notes P3 3. Parts List P4-7 4. Tool List P8
More informationQuick Hook SB & LB Standard and Low Height Hooks for Bottom Mount Rails
Quick Hook SB & LB Standard and Low Height Hooks for Bottom Mount Rails Installation Instructions Quick Hook SB & LB Instructions for Installing Standard and Low Height Hooks for Bottom Mount Rails Installation
More informationOctagon Vinyl Gazebo Assembly Instructions
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly
More informationQuick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails
Quick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails Installation Instructions Quick Hook SS & LS Instructions for Installing Standard and Low Height Hooks for Side Mount Rails Installation
More informationInstallation Manual for The Asphalt/Bitumen Shingle Roof Hook System
Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System (F-IMG-1534-SolNV) Installation of Asphalt/Bitumen Shingle Roof Hook System Installing Rail / Purlin System Installing Cross Rail System
More informationSILVERBACK INSTALLATION MANUAL
SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...
More informationPole Mount Installation Manual
Pole Mount Installation Manual Thank You for Choosing AIMS Power! 1. AIMS Power is a leading supplier of solar products, specializing in PV mounting systems. We ensure our products are manufactured to
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationIndependent Containment System (ICS)
Installing the Independent Containment System (ICS) Complete these instructions to install the Independent Containment System (ICS). Prerequisites This installation requires a team of at least two people.
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationINSTALLATION INSTRUCTIONS
www.marwincompany.com Kit Number Door Height Rough Opening Height KD200BB68 80 84 ½ KD200BB70 84 88 ½ KD200BB80 96 100 ½ INSTALLATION INSTRUCTIONS 200BB SERIES KD POCKET DOOR FRAME FOR 2 X 4 STUD WALLS
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationSpiderbeam Balun Construction Guide
BALUN CONSTRUCTION GUIDE Ver. 1.0 1 The components of the Balun Kit are in a plastic bag. Most of the components are inside the plastic case of the balun. The aluminum U-profile and the RG-142 Teflon Coax
More information1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.
AERIAL VIEW Array Information PV Modules Racking Manufacturer Hyundai Gamechange Racking Model HiS-S325TI 5-Degree GC Grid-Lite Dimensions." x 39.29" x.9" Weight 5. lbs Quantity 224 224 modules at 325W
More informationSRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted
SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted 509 West Monroe Street Highland, IL 62249 Phone: (618) 654-2184 Fax: (618) 654-9199 Tools Needed For Installation 1. ¾
More informationAssembly Instructions for Model: VMPL3
Assembly Instructions for Model: VMPL3 Thank you for choosing a Sanus Systems VisionMount Wall Mount. The VMPL3 is designed to hold 27-84 Flat Panel LCD or Plasma Displays weighing up to 280 lbs. It will
More information19" EIA SRD Swing Rack Installation Instructions
19" EIA SRD Swing Rack Installation Instructions 1-866-TRY-GLCC (879-4522) PREFACE This manual is provided to prevent service personnel from committing an act that results in the risk of fire, electric
More informationAssembly Instructions
10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions
More informationConnect Transit Shelter
Tools Required *denotes special tools required Connect Shelter, 8ft Connect Shelter, 12ft *Soft, non abrasive protective surface such as a furniture blanket *Source of compressed air (for thorough dust
More informationGlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationLOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page
LOFT DOOR HANGER Page 1 Specifications 2 7/16" 3/8" 1-1/2 1-3/4 Ø3 3 7/8" 11-1/16 Page 2 Parts and Tools Tools Needed Tape Measure Pencil Drill with 1/8, 1/4 and 3/8 bits, 1 spade bit and Phillips bit
More informationRoll In W/L Dock PAGE 1
Roll In W/L Dock PAGE 1 1 2 3/8 X 1 CARRIAGE BOLT SS 3/8 FLANGE NUT BRASS 3 4 1/2-13 X 1.25 SQ BOLT SS 1/2 SQ NUT BRASS 5 3/8-16 X 2.5" BOLT SS PAGE 2 6 7 BRACE BRKT SINGLE AXLE TUBE 8 9 3" AXLE WASHER
More informationInstallation Instructions for Solar Snow Pad (SSP-T-3)
Installation Instructions for Solar Snow Pad (SSP-T-3) Warning- Do not use this product on solar arrays where the calculated array snow loads exceed 50 pounds per square foot (psf). Most solar panels are
More information1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.
AERIAL VIEW Array Information PV Modules Racking Manufacturer NEO Solar Gamechange Racking Model D6M-B4A 23-Degree MaxSpan Dimensions Weight 77.0"x39.1"x1.57" 56.2 lbs Quantity 5184 407 Ground learance
More informationMTS-SP100. RENOGY Pole Mount System E Philadelphia St, Ontario, CA Version: 1.2
MTS-SP100 RENOGY Pole Mount System 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.2 Important Safety Instructions Please save these instructions. This manual contains important safety,
More informationINSTALLATION GUIDE FRAME MICRORAIL PUB2017JUL18
MICRORAIL INSTALLATION GUIDE TABLE OF CONTENTS A- TOOLS & SPECIFICATIONS B- SYSTEM COMPONENTS C- SYSTEM COMPONENTS D- SYSTEM COMPONENTS E - SYSTEM LAYOUT F- THERMAL EXPANSION LIMITS G- FLASHING & SLIDERS
More informationRayport G Eco Dealer Kit
Rayport G Eco Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-7 3. Tool List.... P8 4. Assembly.... P9-19 www.aetenergy.com Supporting a Cleaner, Greener Tomorrow
More informationEquilibrium. Conference Table. Installation Instruction. Revision B 11/07/16
Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete
More informationCall (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.
Call (770) 777 7007 Structural Deck Support System: Product Numbers: H1-GQ, H2-GCL (Also applies to H1-GK and H2-GCR) STEP 1: Following the spacing guidelines per the deck design and joist layout, mark
More informationMONKEY BARS OVERHEAD RACK INSTALLATION
MONKEY BARS OVERHEAD RACK INSTALLATION Thank you for purchasing the New Monkey Bars Overhead storage rack. The most innovative overhead rack on the market WARNING THE PROPER INSTALLATION OF THIS STORAGE
More informationROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL
ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL CONTENTS DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 0. ATTACH BASES 3 1. PLACE RAILS 3 2. SECURE LUG 4 3. CLAMP MODULES 4 EXPANSION
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationSTRATUS SHELTER. Take bike parking to new heights
Take bike parking to new heights The Stratus Shelter is a striking bike shelter option for any transit station, university campus, or multi-family residential building project. It is constructed of American
More informationPV MOUNTING SYSTEM INSTALLATION MANUAL
PV MOUNTING SYSTEM INSTALLATION MANUAL The ROOF TRAC PV mounting system makes the installation of PV modules for rooftop installations easy, safe and attractive. The patented (pat #6,360,491) PV support
More information10 Octagon Cedar Gazebo Assembly Instructions
10 Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/22/09 10 Cedar Gazebo Assembly Instructions
More informationFlush Mount Kit. SunEarth Flush Mount Kit Installation Manual. SunEarth Flush Mount Kit. Asphalt Shingle Roofing
Flush Mount Kit SunEarth Flush Mount Kit Installation Manual Thank you for purchasing the SunEarth flush mount kit. The flush mount kit (MTG-EC-FM) is our simplest and least expensive mounting system.
More informationCHEVY SuperBracket Mounting Kit #0826
CHEVY SuperBracket Mounting Kit #0826 #1200 SuperGlide (16K) #0800 SuperGlide (20.5K) Gross Trailer Weight (Maximum) Vertical Load Weight (Max. Pin Weight) 16,000 lbs. 4,000 lbs. Gross Trailer Weight (Maximum)
More informationCTTR Tire Rack Required tools
CTTR Tire Rack Required tools Torque wrench, ratchet, 9/16 socket, tape measure, and square edge. ASSEMBLY REQUIREMENTS *Torque all T-bolt nuts to 35-40 foot pounds. Failure to follow the assembly instructions
More informationUnirac Installation Manual
Tile Roof Hook Universal Mount Unirac R Pub 120803-1ii August 2012 A HILTI GROUP COMPANY Unirac welcomes input concerning the accuracy and user-friendliness of this publication. Please write to publications@unirac.com.
More informationInstallation Instructions for the AlphaDeck Staging System
Installation Instructions for the AlphaDeck Staging System Step 1 - Preparation A. Before setting up your system, determine the location where the stage will be installed and locate all the parts you will
More informationATLANTIS RAIL Contact Information
ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing
More informationAceClamp A2 Solar Kit Patent # US Installation Instructions for attaching the
AceClamp A2 Solar Kit Patent # US 8505864 Installation Instructions for attaching the AceClamp A2 Solar Kit Please read carefully before installing. SunModo is proud to offer the AceClamp A2 Solar Kit
More informationOn-Roof Mounting Sets for Flat-Plate Collectors
Engineering Submittal Sheet Installation sets for collectors Fig. 1 Installation set for 2 collectors 1 basic installation set, 1 extension installation set Basic installation set for each collector array
More informationROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL
ROOF MOUNT 4008083 *Class A* Fire Rated INSTALLATION MANUAL Contents DISCLAIMER 1 RATINGS 1 CHECKLIST 2 PRIMARY COMPONENTS 3 1. ATTACH BASES 3 2. PLACE RAILS 3 3. SECURE LUG 4 4. CLAMP MODULES 4 EXPANSION
More informationOutline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions
www.we-llc.com Outline Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions Bonding & Grounding Grounding Terms Equipment Grounding: The National Electrical
More informationWood Deck Anchor. Instructions READ CAREFULLY Garrymore Ln Missoula, MT
Wood Deck Anchor 9889 Garrymore Ln Missoula, MT 59808 888-687-3552 +1-406-549-0769 www.aquacreek.com Instructions PART #: F-40220-AT1 Pro Pool Lift - Weight Capacity (450 LBS) / Max Setback (19 ) Pro Pool
More information7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER
ASSEMBLY INSTRUCTIONS FOR 7 X 10 X 6 AND 7 X 16 X 6 ATV SPORT SHELTER ACTUAL FRAME SIZES: 7 X 9-1 1/2 X 6 AND 7 X 13-7 1/2 X 6 AND 12 X 10 X 6 AND 12 X 16 X 6 ATV SPORT SHELTER ACTUAL FRAME SIZES: 12 X
More informationInstallation Guide. Mounting Kit for Mounting Philips Avalon CTS Cordless Fetal Transducer System on Wall, 2'' Post, Rail, or Slide-on Mounting Plate
Installation Guide Mounting Kit for Mounting Philips Avalon CTS Cordless Fetal Transducer System on Wall, 2'' Post, Rail, or Slide-on Mounting Plate The purpose of this guide is to: 1. Describe mounting
More informationBIKE FILE (301)
B IK E F I L E High Efficiency The Bike File is our most space efficient u-lock compatible product. Sturdy sliding hangers allow nine bikes to be securely stored in an eight-foot section while allowing
More informationINSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,
INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: 2010-2014 CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: 32-21020, 32-21025 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 CONTOUR BAR TORQUE WRENCH 2 1
More informationFlush Mount. SunEarth Flush Mount Installation Manual. SunEarth Flush Mount. Asphalt Shingle Roofing
Flush Mount SunEarth Flush Mount Installation Manual Thank you for choosing the SunEarth flush mount method. It provides a strong durable solution for mounting SunEarth collectors parallel to the roof
More informationSINGLE TRACK BYPASS (patent pending) barn door hardware
SINGLE TRACK BYPASS (patent pending) barn door hardware Installation Manual What is included in your kit: Part number Part name Quantity 1 Inner door hanger 2 2 Outer door hanger 2 3 5/16 x 1.5 lag bolts
More informationEZ Tile Hook System. SunModo PV Rack Mount System UL2703 Compliant
SunModo PV Rack Mount System UL2703 Compliant Pub. D10007-V005 Copyright 2016 Please read carefully before installing Product is tested to and recognized to UL 2703 standards for safety grounding and bonding
More informationKOLO SHELTER Installation Instructions Parts List
Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14
More information3,500/4,500lb. Vertical Cable Feighner Lift
3,500/4,500lb. Vertical Cable Feighner Lift CAUTION - PUT SAFETY FIRST 1. Before attempting to install or operate this lift, study and fully understand the proper operating procedures and safety precautions
More informationNX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP
6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE
More informationBaby Grande or Grande Crank Shade with Cables and Housing Installation Instructions
Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit Screwdriver (Flat & Phillips) Measuring Tape Pencil 4 Level Plumb Line ¼ Masonry
More informationUPM 6X Custom. UPM 6X CUSTOM Standard stock Tee socket sized for 5" schedule 40 or 80 Pipe. Page 1 of 8
Page 1 of 8 UPM 6X Custom A. TEE SOCKET: 6 O.D. PIPE SOCKET TO FIT OVER 5 SCHEDULE 40 or 80 STEEL PIPE B. CROSS PIECE: 2 X 2 X 3/16, LENGTH DEPENDENT ON MODULE USED, SQUARE TUBE 2 PLACES C. LONGITUNDINAL:
More informationMobileTrak5 Installation Instructions
MobileTrak5 Installation Instructions PLEASE OPEN ALL BOXES & CHECK TO MAKE SURE YOU HAVE ALL PIECES REQUIRED READ ALL INSTRUCTIONS BEFORE STARTING Tools Required for Assembly 7/16, 1/2 Wrench Phillips
More informationHOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE
Check parts against this list before starting assembly. Refer to illustrations on pages 6 and 7 to view house parts. If any shortages are found, refer to Packing Slip for claim instructions. Item 3 5 6
More informationTREX PERGOLA INSTALLATION INSTRUCTIONS
RECOMMENDED TOOLS/SUPPLIES: Pencil 4' Level Measuring Tape Framing Square/Speed Square 8' High Step Ladder (Two recommended) Hacksaw or Bolt Cutters Socket Wrench with 9/16" Socket and 3/4" Deep Socket
More informationRoof Mount Ground Mount Specialised Clamps Spares Application Notes
DPA Solar Racking Solutions Solar PV Racking Catalogue Roof Mount Ground Mount Specialised Clamps Spares Application Notes www.dpasolar.com.au 1300 447 500 Rails & Splices Page 3 Mid & End Clamps Page
More informationBaby Grande or Grande Crank Shade with Cables and Housing Installation Instructions
Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit Screwdriver (Flat & Phillips) Measuring Tape Pencil 4 Level Plumb Line ¼ Masonry
More informationInstallation Manual XRL Solar Rail System
Installation Manual XRL Solar Rail System Solar Mounting Solutions June 2009 www.ironridge.com 2009 IronRidge, Inc. All Rights Reserved Version 1.0 2 XRL Solar Rail System Installation Guide Introduction
More informationNext Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.
T WO - T I E R B IK E LO C K E R Next Level Security We take long-term bicycle storage to new heights with the new Dero Two-Tier Bike Locker. It is easy to load and provides a space-saving solution to
More information10 x 10 Flat Top Two Tone Pergola
0 x 0 Flat Top Two Tone Pergola Models: Bordeaux ASSEMBLY GUIDE OPTIONAL ACCESSORIES Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post) Bolt Down Bracket Kit ( for Pergola) Ver.0-00
More informationMTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.
MTS-ACB RENOGY Photovoltaic Module Adjustable Curved Bracket 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.0 Important Safety Instructions Please save these instructions. This manual
More information00108/00110 INSTRUCTION MANUAL
00108/00110 INSTRUCTION MANUAL Removable and Adjustable Mudflap System IMPORTANT! Exhaust Systems Note: Any modifications to the factory installed exhaust system may void your manufacturer s warranty.
More informationPole Mounting System Installation Manual
Pole Mounting System Installation Manual Thank You For Choosing Hopergy! Why Hopergy 1. Hopergy is a professional supplier, specialising in PV mounting systems. We have experienced engineers and strong
More informationModular XP Ramp Assembly Manual
Modular XP Manual 1 Contents Overview... 2-5 1.1 Tools required...6 1.2 Hardware list...6 Ramp & Platform Standard Parts 2.1 Ramp Parts...7 2.2 Platform Parts...8 2.3 Standard Platform Configurations...
More informationINSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world
energy for a better world INSTALLATION INSTRUCTIONS TRI-ROOF The flexible roof integration system Compatible for framed module types* Simple exchange of modules Replaces existing roofing Special profiles
More information19" EIA SRD Swing Rack Installation Instructions
19" EIA SRD Swing Rack Installation Instructions (UL60950-1/UL2416 SRD Series Equipment Rack) 1-866-TRY-GLCC (879-4522) PREFACE This manual is provided to prevent service personnel from committing an act
More informationGared Pro-S Portable Backstop
Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION
More informationFLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS
FLOE DOCK FURNITURE ASSEMBLY INSTRUCTIONS KIT P/N 510-00400-02 KIT P/N 510-00405-02 KIT P/N 510-00406-02 KIT P/N 510-00410-02 WARNING IT IS THE INSTALLER S RESPONSIBILITY TO PROPERLY INSTALL this chair
More informationSteep-Slope ApplicAtionS
Steep-Slope ApplicAtionS GreenFasten GF1 PRODUCT GUIDE Exploded Product View/B.O.M. 1 Installation Instructions 2 Cut Sheets 3 Specifications 4 Test Data 5 Price List 6 Exploded Product View, Bill of Materials
More informationINS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System
Ceiling Mount Track System 10.26.2016 Specifications Ceiling Post: Unassembled 2-7/8 Assembled 1-11/16 7/8 7-9/16 5-7/8 3/8 2 Tubes 1/2 2-3/8 5 Parts and Tools Tools Needed Tape Measure Pencil Drill with
More informationMTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.
MTS-ZB RENOGY Photovoltaic Module Z-Bracket Mounting System 2775 E Philadelphia St, Ontario, CA 91761 1-800-330-8678 1 Version: 1.0 Important Safety Instructions Please save these instructions. This manual
More informationRockwell 4-in-1 Sliding Door
Rockwell 4-in-1 Sliding Door ASSEMBLY INSTRUCTIONS ROCKWELL 4-IN-1 SLIDING DOOR Recommended Tools Drill with Phillips Bit Socket Wrench with 7/16 Socket Rubber Mallet Adjustable Square ROCKWELL 4-IN-1
More informationGroundControl. Follow instructions contained in this manual. Incorrect installation could result in serious injury or damage to property.
GroundControl TM use supplied hardware Use only hardware supplied in your GroundControl kit or supplied by an authorized YAKIMA dealer. Use of unauthorized parts in the GroundControl system could result
More information10x10 Trellis Pergola
0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................
More informationRayport G Eco Ballasted
Rayport G Eco Ballasted Dealer Kit Installation Guide Contents 1. Installer Notes..... P2 2. Parts List........ P3-6 3. Tool List.... P7 4. Assembly.... P8-16 www.aetenergy.com Supporting a Cleaner, Greener
More informationSILVERBACK INSTALLATION MANUAL
SILVERBACK INSTALLATION MANUAL S-SERIES SOLAR RACKS T OLL FREE 877-765-2759 WWW.SILVERBACKSOLAR.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...
More information