This installation booklet is intended to show the basic information needed to properly install Porcelanosa s Porcelain Façade System.

Size: px
Start display at page:

Download "This installation booklet is intended to show the basic information needed to properly install Porcelanosa s Porcelain Façade System."

Transcription

1

2 This installation booklet is intended to show the basic information needed to properly install Porcelanosa s Porcelain Façade System. Installation training is recommended and provided by Porcelanosa free of charge at our training facility in Paramus, NJ. lways check the web site for the latest technical information, including construction details, test summaries, specifications and more, at Porcelanosafacades.com Porcelanosa Façades Systems must be installed in accordance with the latest published installation instructions. Contact Porcelanosa Facades Technical Department for questions and additional information, at x207.

3

4 The substructure profile system. patented system to provide a thermal break, makes room for insulation materials to meet latest IECC/SHRE requirements for R value and U factors as well as allows the framing tolerances of + or - ¾ ll vertical profiles and fixing clips are powder coated with corrosion resistant proprietary finish t o prevent galvanic reactions with fasteners ll vertical profiles feature a friction surface in order for construction adhesive to properly set in place ll system profile/substructure pieces are essential to the performance of your Porcelanosa Façade and any deferment or fabrication by others will void the warranty The Omega, or hat channel (installed, horizontally into framing members) The T and L profiles (installed vertically over Omega) The ngle brackets used to attach T (vertical joints) and L profiles(anywhere else that T profiles are not used) to the omegas, with a thermal break patented piece to eliminate thermal bridging, installed between the two There are 4 types of Fixing clips, which are used to attach the porcelain panels to the T and L profiles: * The Top/Bottom clip used on the top and bottom rows of porcelain panels * The lateral clip for ends and bumpouts * The staggered clip, when porcelain panels are installed in a staggered bond * nd the central clips, typically at all 4-corner joints H. I. Fasteners One of the unique features of Porcelanosa Porcelain Facades is that we ship all the fasteners to you so you have one less thing to worry about purchasing. We even tell you where to use each fastener in our customized shop drawings for your project. Every fastener is clearly labeled with its application, whether that is omega to stud, omega to concrete, profile to omega, or fixing clip to profile. IMPORTNT NOTE THIS DRWING IS TO BE RED IN CONJUCTOIN WITH DWG 00,002 & 00 Wall sections (stud and solid) and elevation details G. Porcelain Panels The porcelain panels are the star of the installation. These are highly durable, completely water proof, easy to clean, resistant to graffiti, strong, and noncombustible. 2 TYP. JOINT 6" 7 2 The panels are fitted with a fiber-glass mesh for added strength and safety. 6 2 The porcelain panels are specific to each individual project and are precisely cut and kerfed at the factory to fit your project. This will make installation much faster and reduce the amount of cuts needed in the field. DETIL - TYPICL HORIZONTL JOINT *CLDDING SYSTEM TOLERNCE +/- 4" 4 TYP. BUILDUP 4 2" INSULTION 2" SOLID WLL SECTION EXMPLE

5 II. SFETY 5 2" 5" SFETY INSTRUCTIONS FOR CERMIC TILES REST (MX 2") 2 Made from raw materials of mineral origin (mainly clays), which have been mixed with water, dried, formed, and fired in high-temperature kilns. They may have a glaze surface coating that has been fired together with the body. They are used as construction elements to cover façade, wall, and floor surfaces. EMERGENCIES 6 4 OSH: (800) Call OSH to report emergencies, unsafe working 5 conditions, safety and health violations, to file a complaint, 0 or to ask safety and health questions. The 8 Occupational Safety and Health dministration is an agency of the United States Department of Labor The information detailed here is based on our knowledge at the date stated; it refers exclusively to the product indicated and does not constitute a guarantee of particular qualities. The user is responsible for using the product in accordance 7 with the recommendations provided DNGERS 4" 5" 52" STUD WLL SECTION EXMPLE V - TYPICL TOP ENDING DETIL No adverse effects are known for health or the environment of whole tiles. In certain handling processes (cutting, edgegrinding or rectification, disposal, etc.) dust may be produced that could irritate the exposed body parts owing to its abrasive effect. V2 - TYPICL BOTTOM ENDING DETIL The dust released in these operations contains respirable crystalline silica (RCS), whose inhalation could cause acute or chronic silicosis (nodular fibrosis of the lungs), depending on the quantity and exposure time. Epidemiological studies indicate that silicosis is a risk factor for lung cancer. The quantity of RCS contained in the dust that tiles might release during handling varies, since this depends on dust composition and the size of the particles involved (RCS has a particle size below 4 μ). preliminary study conducted on the dust in rectification water shows a respirable crystalline silica percentage far below %. 5

6 B. FIRST ID C. STORGE Ceramic tiles need no specific conditions to assure safe storage and they exhibit no incompatibilities with other products or materials. They have a very long working life since they are not readily degraded. D. DISPOSL Inhalation of dust: Take the affected person outdoors. Give artificial respiration if necessary. Tile wastes are classified as inert materials, so that they can be disposed of at an authorized disposal site in accordance with applicable regulations. E. TRNSPORT Ceramic tiles are considered non-hazardous for transport according to the international criteria on earth, sea, and air transport. F. SFE HNDLING The measures described refer to processes that involve the production of dust and/ or breaking of tiles, such as cutting and rectification. Contact with eyes: Hold the eyes open and wash with abundant water. Ingestion of dust: Highly unlikely route. The product is neither toxic nor is it retained in the intestinal tract. GENERL MESURES Have good ventilation in the workplace. void dust formation and dispersal. It is recommended that wet working methods should be used that reduce or avoid dust production. If this cannot be avoided, there should be a localized extraction system or the material should be handled in a closed system. Regularly collect the dust that forms by suction or wet cleaning mechanisms. PERSONL PROTECTION During tile handling. Use gloves to prevent possible cuts and scratches. Safety footwear to prevent possible foot injury because of tiles falling on feet. During processes that produce dust. Respiratory protection, safety glasses, and suitable clothing to prevent exposure to dust. It is recommended to consult suppliers of individual protective equipment (IPE) to determine the most appropriate IPE as a function of the workplace and dust concentration. Contact with skin: Wash with soap and water. In the case of a cut, proceed according to the seriousness of the injury. FIRE PREVENTION Ceramic tiles are non-combustible. Observe standard fire protection regulations. ENVIRONMENT PROTECTION Clean possible discharges and emissions taking into account the applicable limit values. 6

7 III. RECOMMENDED TOOLS Porcelanosa Porcelain Facades can be more easily installed with the tools listed below. Having these on hand will make for a faster and easier installation. LSER LEVELS CLMPING TOOLS SFETY ITEMS BETING TOOLS HND TOOLS HND LEVELS ND DJUSTMENT TOOLS ELECTRIC TOOLS 7

8 IV. INSTLLTION = 2 9 6" (599 MM) 6 REST REST 6. Preparing the substrate (planning, layout, etc.) REST Check to ensure that the façade support coincides with that specified in the project. Please notify the General Contractor ND PORCELNOS Installation Manager immediately if V7 55 the substrate wall at the jobsite is different to what it specified and shown in the shop drawings. Check to ensure that the support or installation base is stable and not likely to become deformed V4 or cracked. 55 The support VOLUME must 2 be subject to vertical deviation of no H H more /8 every ft, and horizontal deviation of no V more than /8 for every 6 ft. 55 P - VOLUME 2 Determine the final level of the façade with respect P4 - VOLUME 2 (599 MM) = 2 9 6" (599 MM) 4" FULL PROFILE 4" REST BUIDUP 4 2" 2'-7 4" 8" 8" BUIDUP 4 2" H2 50 BUIDUP 4 2" 4 EQ 8" EQ 7" 9'-" 5" P 40 '-4" '-4 6" 8'- 5 8" P 45 to overhangs, cantilevered elements or any item that protrudes beyond its vertical plane. Take structural joints into account, and consider V the use of P4 45 expansion joints. Check to ensure that the supporting and V2 anchoring elements of the substructure of the façade conform to the required technical specifications. V V5 55 EX.FINISH FLOOR 00'-0" Check that the actual measurements of the façade coincide with those shown on the plans. If they do not, amend the modulation documents and façade-installation plans accordingly. Determine the reference or setting out point/s of the façade. SIM.V 55 V V4 REST 6" 6" REST REST 4" V7 V2 55 P4 40 8" EQ 7" 8" EQ 7" VOLUME 2 H 50 P - VOLUME 2 5'- 6" 5'- 6" STRUCTURE SETTING OUTPUT EXMPLE BUIDUP 4 2" V4 55 H 50 EX.FINISH FLOOR 00'-0" V6 55 9'-" 4 EQ 5" 6" 4" V REST 4" FULL PROFILE 4" V4 '-6 4" 8'- 8" P7 45 P8 45 EX.FINISH FLOOR 00'-0" P4 - VOLUME 2 H4 50 BUIDUP 4 2" H2 50 BUIDUP 4 2" 68'-9 8" V5 55 SIM.V 55 SIM.V4 55 P7 - VOLUME BUILDUP 4" SIM.H7 50 P7 40 M) = 2 9 6" (599 MM) H4 50 V5 55 V6 SIM.V " 6" REST REST 4" 8" EQ 7" 8" EQ 7" PNEL SETTING OUTPUT EXMPLE H4 50 Using the reference point of the façade as a starting V6 55 point, and on the basis of its modulation documents, P7 - VOLUME mark the support to show the position of the substructure profiles. Distance of 66 cm 5'-4 2" V5 55 BUILDUP 9'-" 4" 4 EQ Mark the position of the profiles on the surround and at other critical points. 5" 6" 4" SIM.V 55 V4 55 REST 4" FULL PROFILE 4" '-6 4" 8'- 8" P 45 7'-0 5 8" H5 50 BUILDUP 4" P8 - VOLUME IMPORTNT NOTE: PORCELIN PNEL SYS P8 SSUMED TO BE SUPPORTED BY 6 GUGE 40 PROVIDED T MXIMUM 6 O.C. IT IS THE IN RESPONSIBILITY TO ENSURE THT THE CONNE THE PORCELIN PNEL SYSTEM IS TO THE EX.FINISH GUGE FLOORFRMING, ND T THE FREQUENCY LOCTIONS 00'-0" INDICTED IN THIS SHOP DRWING LEGEND EX.FINISH FLOOR level-deviation of each aluminum angle bracket must 00'-0" H5 50 BUILDUP 4" SIM.V4 55 P8 - VOLUME Use the thickness of the thermal-insulating material and the overhang of the façade as a basis for determining the height of the aluminum angle brackets that SIM.H7 P correspond to the different areas of the façade. The not exceed 20-0 mm. '-5 6" 8'-2 6" SUBSTR CMU WLL METL STUD BUILDUP 4 2" BUILDU P - VOLUME 4 BUILDUP 4" 8 P 40 IMPORTNT NOTE: PORCELIN PNEL SYSTEM IS 4" BUILDU SSUMED TO BE SUPPORTED BY 6 GUGE STUDS PROVIDED T MXIMUM 6 O.C. IT IS THE INSTLLER'S RESPONSIBILITY TO ENSURE THT THE CONNECTION OF THE PORCELIN PNEL SYSTEM IS TO THE CORRECT

9 B. Install substructure (omegas) The Omega profiles are made of l-mg-si alloy 6005 coating in accordance to ISO specification. Make sure the water resistive barrier has been properly applied to the substrate prior to Omega installation. Check the stud wall for plumbness prior to chalking line. Ensure you allow for proper hardscape or finished soil grade clearances. CLDDING SYSTEM TOLERNCES * IN-ND-OUT TOLERNCE = +/- /4" (20MM) * IF WLL IS BEYOND SYSTEM MX TOLERNCE, DDITIONL SPCER L-BRCKET MUST BE USED. FÇDE INSTLLER MUST CONSULT WITH PORCELNOS FIGURE : CLDDING SYSTEM TOLERNCES *IN-ND-OUT TOLERNCE SITE SITUTION = +/-- ¾ : WLL (20MM) IS VERTICLLY PLUMBED *IF WLL IS BEYOND SITE SYSTEM SITUTION MX 2: TOLERNCE, WLL CN BE DDITIONL FURTHER OUT SPCER BY /4 L-BRCKET INCH MUST BE USED. FCDE SITE SITUTION INSTLLER : MUST WLL CONSULT CN BE FURTHER WITH PORCELNOS IN BY /4 INCH SITE SITUTION : WLL IS VERTICLLY PLUMBED SITE SITUTION 2: WLL CN BE FURTHER OUT BY ¾ CMU WLL SITE SITUTION : WLL CN BUE STUD FURTHER WLL IN BY ¾ CMU WLL 4"(20MM) MIN. OVERLP STUD WLL 4"(20MM) MIN. OVERLP Fasten the omega profiles in horizontal position (with the help of a laser level) to the substructure according to the project s shop drawings provided. Install the omega profiles next to each other, along the longitudinal axis. Leave a ¾ gap between profiles. FÇDE LINE 9 6" TYP. OVERLP = 9 6" FÇDE LINE 9 6" TYP. OVERLP = 9 6" 2 8" MX. OVERLP = 2 8" 2 8" MX. OVERLP = 2 8" 2 2 4" MIN. OVERLP = 4" 4" MIN. OVERLP = 4" IMPORTNT NOTE: Porcelain Panel system is assumed to be supported by 7 gauge studs provided at maximum 6 O.C. It is the installer s responsibility to ensure that the connection of the porcelain panel system is to the correct gauge framing, and at the frequency and locations indicated in this shop drawing submittal. FIGURE 2: VERTICL PROFILES TO L-BRCKETS METHOD 2: CONTINUOUS FIXING OF VERTICL PROFILES *RECOMMENDED METHOD FOR LOW RISE BUILDINGS NO. OF FIXING POINTS ND LOCTION OF SPCER L-BRCKET *SCREW SPECIFICTION WILL DEPEND ON SUBSTRTE WLL (CONCRETE/CMU) - REFER TO SCREW SCHEDULE DYNMIC FIXING POINT FIXED FIXING POINT (NO MOVEMENT) Once the first horizontal line is installed, the next row of the omega profile must be placed according to shop drawings and never more than 0 o/c. Omega Profiles must be fixed using at least two screws every metal stud. SSUMED One TO BE screw SUPPORTED on BY each 6 GUGE side STUDSof the top PROVIDED T MXIMUM 6 O.C. IT IS THE INSTLLER'S hat profile positioned RESPONSIBILITY within TO ENSURE the THT par THE of CONNECTION ridges. OF The pair THE PORCELIN PNEL SYSTEM IS TO THE CORRECT of the screws must GUGE be FRMING, fixed ND in T line, THE FREQUENCY with the NDlongitudinal axis for the LOCTIONS metal stud INDICTED frame. IN THIS SHOP DRWING SUBMITTL " IMPORTNT NOTE: PORCELIN PNEL SYSTEM IS DYNMIC FIXING POINT DYNMIC FIXING POINT DOUBLE SINGLE OMEG PROFILE TYP. MIN. 4" [20.00] WITH OMEG DOUBLE BRCKET: 2 LT SCREWS SINGLE BRCKET: 2 LT SCREWS *SPCING BETWEEN PROFILES S INDICTED IN THE PROJECT SUBSTRUCTURE DRWINGS. IF NOT NOTED, MINIMUM GP WILL BE /4. *SPCER L-BRCKET TYPE (SINGLE OR DOUBLE) TO FIX PROFILES TO SUBSTRTE WLL S INDICTED IN THE PROJECT SUBSTRUCTURE DRWINGS. " DYNMIC FIXING POINT NCHORING MINIMUM DISTNCE TO EDGE OF WLL *IN CSE THT NEED TO BE LESS, CONSULT WITH PORCELNOS FIXED FIXING POINT VERTICL PROFILES TO BE (NO MOVEMENT) SUPPORTED WITH DYNMIC (SLOTTED HOLE) FIXING POINTS EXCEPT FOR THE UPPER FIXING POINT END OF WLL 9

10 CMU WLL STUD WLL P404 TO BE LOCTED WHERE THERE IS GRETER OVERLP WITH VERTICL PROFILES. SITUTION *ONLY PPLICBLE : GRETER WHEN METHOD OVERLP 2 (CONTINUOUS PROFILE FIXING BOVE OF VERTICL HENCE PROFILES) DHESIVE IS USED TO BE USED ONLY BOVE SITUTION 2: GRETER OVERLP ON PROFILE BELOW HENCE DHESIVE TO BE USED ONLY BELOW OMEG FLNGE OMEG FLNGE INCORRECT INSTLLTION SCREW NOT CENTERED WITH OMEG FLNGE 28 2" MX. DOUBLE STGGERED STGGERED FIXING CLIP SCREWS FIXING CLIP SCREWS 4"(20MM) MIN. OVERLP 6" [.00] TYP JOINT 6" 5 [8.00] 6" [.00] TYP JOINT 5 6" [8.00] SINGLE OMEG PROFILE 4"(20MM) MIN. OVERLP WITH OMEG DOUBLE BRCKET: 2 LT SCREWS SINGLE BRCKET: 2 LT SCREWS MXIMUM VERTICL SPCING BETWEEN NCHORS TO SUBSTRTE WLL LOCTION ND NO. OF FIXING POINTS IN FIXING PLTES * THE FIGURE SME CRITERI 5 - MXIMUM WILL BE USED FOR VERTICL SPCING BETWEEN SPCING L-BRCKETS BETWEEN IN SOLID WLLS. *SPCING NCHORS STGGERED S INDICTED TO IN SUBSTRTE THE PROJECT SUBSTRUCTURE WLL LTERL DRWINGS. IF NOT NOTED, FOLLOW THIS 8" SHOP DRWINGS FIG. - VERTICL PROFILES TO L-BRCKETS 4" MIN. OVERLP = 4" 4" MIN. OVERLP = 4" P404 TO BE LOCTED WHERE THERE IS GRETER OVERLP WITH VERTICL PROFILES. *T *T THIS THIS POINT, POINT, JOINT JOINT BETWEEN BETWEEN TILES TILES WILL WILL BE BE 9MM 9MM ( FIGURE - P-404 LOCTION IN VERTICL PROFILE METHOD 2: CONTINUOUS FIXING OF VERTICL 8") ( 8") SITUTION VERTICL VERTICL : PROFILES GRETER PROFILES TO OVERLP TO BE BE ON PROFILE BOVE HENCE DHESIVE TO BE USED ONLY BOVE IMPORTNT NOTES: FIGURE 6 - SPCING BETWEEN VERTICL PROFILES PROFIL SITUTION SUPPORTED SUPPORTED 2: GRETER WITH WITH DYNMIC DYNMIC OVERLP ON PROFILE BELOW SITUTION HENCE DHESIVE TO BE USED ONLY BELOW NOTE (SLOTTED (SLOTTED HOLE) CCORDING HOLE) FIXING FIXING TO TILE POSITION THIS *SPCING SET OF SHOP *RECOMMENDED BETWEEN DRWINGS VERTICL RE METHOD THE PROFILES PROPERTY FOR LOW S OFINDICTED RISE BUILDINGS IN THE PROJECT SUBSTRUCTURE POINTS POINTS EXCEPT EXCEPT FOR FOR THE THE PORCELNOS. UPPER UPPER FIXING MXIMUM FIXING POINT VERTICL SPCING BETWEEN NCHORS TO SUBSTRTE WLL SPCING DRWING BETWEEN VERTICL PROFILES *ONLY POINT PPLICBLE WHEN METHOD FÇDE LINE 2 (CONTINUOUS FIXING OF VERTICL PROFILES) FÇDE IS LINEUSED IT IS NOT TO BE REPRODUCED, COPIED OR DISCLOSED * THE SME CRITERI WILL BE USED FOR SPCING BETWEEN L-BRCKETS IN SOLID WLLS. *SPCING TO NY IF NOT BETWEEN THIRD NOTED, PRTY, VERTICL MXIMUM NOR TO PROFILES BE SPCING USED S FOR INDICTED WILL NYBE IN 2 THE 9/6 PROJECT (599 MM) SUBSTRUCTURE DRWINGS. P-404 P404 TO BE LOCTED WHERE THERE IS GRETER OVERLP WITH VERTICL PROFILES. UNUTHORIZED IMPORTNT NOTES: PURPOSE WITHOUT WRITTEN IF NOT NOTED, MXIMUM SPCING WILL BE 26 9 (599 MM). *SPCING SITUTION S INDICTED : GRETER IN THE PROJECT OVERLP SUBSTRUCTURE ON SITUTION PROFILE BOVE DRWINGS. HENCE IF DHESIVE NOT NOTED, TO FOLLOW BE USED THIS ONLY BOVE PERMISSION FROM PORCELNOS. NOTE SITUTION SITUTION 2: : GRETER OVERLP ON ON PROFILE BELOW BOVE HENCE HENCE DHESIVE DHESIVE TO TO BE BE USED USED ONLY ONLY BOVE BELOW SITUTION 2: GRETER OVERLP 6" 9 ON PROFILE TYP. BELOW OVERLP HENCE = 6" 9 DHESIVE TO BE USED ONLY 6" 9 BELOW TYP. OVERLP = 6" IMPORTNT NOTE: PORCELIN PNEL SYSTEM IS 9 NOTE THIS SET 2 OF SHOP DRWINGS 26 9 RE MX THE PROPERTY 26 9 MX OF 26 9 MX THIS PORCELNOS. SET OF SHOP DRWINGS RE EXCLUSIVELY FOR THE IT IS PORCELNOS NOT TO BE REPRODUCED, PORCELIN PNEL COPIED EXTERIOR DISCLOSED WLL SSUMED TO BE SUPPORTED BY 6 GUGE STUDS SYSTEM. TO NY THIRD PRTY, NOR TO BE USED FOR NY PROVIDED T MXIMUM 6 O.C. IT IS THE INSTLLER'S NY UNUTHORIZED OTHER DETIL PURPOSE OR COMPONENT WITHOUT NOT PRT WRITTEN OF THE PORCELIN PERMISSION FROM PNEL PORCELNOS. EXTERIOR DYNMIC FIXING WLL POINTSYSTEM RESPONSIBILITY IS TO ENSURE THT THE CONNECTION OF SITUTION THEREFORE SHOWN IN THIS SHOP DRWINGS THE PORCELIN PNEL SYSTEM IS TO THE CORRECT ONLY/MERELY NOTE 2 INDICTIVELY ND IN NO WY IT PROVIDES THIS SET OF OR SHOP REPRESENTS DRWINGS GUIDNCE/INSTRUCTION RE EXCLUSIVELY FOR GUGE FRMING, ND T THE FREQUENCY ND *T THIS POINT, JOINT BETWEEN FOR THE PORCELNOS HOW THIS MIGHT PORCELIN SHOULD PNEL FIXED FIXING BE EXTERIOR POINT BUILT. LOCTIONS PLESE WLL INDICTED IN THIS GP SHOP BETWEEN SYSTEM. DRWING SUBMITTL TILES WILL BE 9MM ( 8") REFER TO THE RELEVNT (NO SHOP MOVEMENT) DRWING PCKGE PROFILES FOR 2 8" MX. OVERLP = 2 8" 2 8" MX. OVERLP = 2 FOR NY COMPONENTS OTHER DETIL ND OR COMPONENT DETILS OUTSIDE NOT PRT THE OF SCOPE THE THERML EXPNSION 8" OF PORCELIN THIS PORCELIN PNEL PNEL EXTERIOR EXTERIOR WLL WLL SYSTEM SYSTEM IS SHOP THEREFORE DRWING SHOWN PCKGE. IN THIS SHOP WHERE DRWINGS THOSE COMPONENTS ONLY/MERELY ND INDICTIVELY DETILS ND RE IN SHOWN, NO WY THEIR IT 2 2 DESIGN, PROVIDES CONSTRUCTION OR REPRESENTS DETIL, GUIDNCE/INSTRUCTION SUPPORT SYSTEM, *T THIS POINT, JOINT BETWEEN SUPPLY FOR HOW ND THIS INSTLLTION MIGHT OR SHOULD WILL BE BUILT. RESPONSIBILITY PLESE TILES WILL BE 9MM ( 8") OF REFER OTHERS TO THE (BY OTHERS). RELEVNT SHOP DRWING PCKGE FOR COMPONENTS ND DETILS OUTSIDE THE SCOPE NOTE OF THIS PORCELIN PNEL EXTERIOR WLL SYSTEM THIS SHOP SET DRWING OF SHOP PCKGE. *T THIS POINT, JOINT BETWEEN DYNMIC DRWINGS FIXING POINT REPRESENT WHERE THOSE OUR TILES WILL BE 9MM ( INTERPRETTION COMPONENTS ND OF THE DETILS PLNS, RE SPECIFICTIONS SHOWN, THEIR ND 8") OUR DESIGN, CONTRCT CONSTRUCTION REQUIREMENTS DETIL, FOR SUPPORT THIS PROJECT. SYSTEM, CMU/METL STUD WLL SUPPLY ND INSTLLTION WILL BE RESPONSIBILITY 4" MIN. OVERLP = 4" 4" MIN. OVERLP = 4" NO. NOTE OF OTHERS FIXING 4 (BY OTHERS). SITUTION 2 POINTS ND LOCTION OF SPCER L-BRCKET PRIOR TO MNUFCTURE OF NY PRODUCT FOR THIS IMPORTNT NOTE: PORCELIN PNEL SYSTEM IS *SCREW JOB, NOTE SPECIFICTION LL DIMENSIONS, WILL METHODS DEPEND OF CONSTRUCTION, SUBSTRTE WLL (CONCRETE/CMU) - REFER TO SCREW SCHEDULE ND THIS EXISTING SET OF CONDITIONS SHOP DRWINGS MUST BE REPRESENT CHECKED ND OUR EN SSUMED TO BE SUPPORTED BY 6 GUGE STUDS INTERPRETTION FIGURE OF THE 7 PLNS, - LOCTION SPECIFICTIONS ND N VERTICL PROFILES LOCTION CORRECTED NO. OF FIXING POINTS *SPCING IN OUR CONTRCT ND OR PPROVED REQUIREMENTS NO. BY OUR FOR OF CUSTOMER. THIS PROJECT. FIXING POINTS FIXING BETWEEN PROFILES PLTES S INDICTED PROVIDED T MXIMUM 6 O.C. IT IS THE INSTLLER'S IN THE PROJECT SUBSTRUCTURE DRWINGS. ROFILES S INDICTED IN THE PROJECT SUBSTRUCTURE DRWINGS. NOTE IF NOT NOTED, MINIMUM GP WILL BE /4. RESPONSIBILITY TO ENSURE THT THE CONNECTION OF FIXING 5 FILES S INDICTED IN THE PROJECT SUBSTRUCTURE PLTES G WILL BE 26 9 NOTE 4 (599 MM). SITUTION DRWINGS. 2 PRODUCT WILL BE SCHEDULED FOR FBRICTION UNTIL PRIOR WE TO MNUFCTURE HVE THE PORCELIN PNEL SYSTEM IS TO THE CORRECT STGGERED BEEN NOTIFIED OF NY IN PRODUCT WRITING FOR BY THIS OUR LTERL ILL BE 2 *SPCER L-BRCKET TYPE (SINGLE OR DOUBLE) 6 9 (599 MM). SITUTION 2 2 CUSTOMER JOB, LL DIMENSIONS, STGGERED THT STGGERED OUR METHODS DRWINGS OF CONSTRUCTION, HVE BEEN LTERL LTERL TO FIX PROFILES TO SUBSTRTE WLL S GUGE FRMING, ND T THE FREQUENCY ND FIXING CLIP SCREWS 2 FIXING INDICTED CLIP SCREWS IN THE PROJECT SUBSTRUCTURE DYNMIC FIXING POINT DRWINGS. MX 26 9 MX LOCTIONS 26 9 PPROVED ND EXISTING CONDITIONS MUST BE CHECKED ND CORRECTED OR FOR FIXING FBRICTION. PPROVL DELYS PPROVED BY OUR CUSTOMER. MX WILL RESULT IN FBRICTION FIXING CLIP CLIP SCREWS DELY. SCREWS 2 FIXING 2 CLIP FIXING SCREWS CLIP SCREWS X 26 9 MX 26 9 MX INDICTED IN THIS SHOP DRWING SUBMITTL NOTE 65 NO PRODUCT WILL BE SCHEDULED FOR FBRICTION LOCTION, SPCING WE SSUME NO RESPONSBILITY S TO ND NO. OF FIXING POINTS OF HORIZONTL PROFILES FIXING MESUREMENT UNTIL WE HVE OR METHODS BEEN DETILS NOTIFIED FFECTING WRITING - NY P404 BY WORK OUR BUT CUSTOMER OUR OWN. THT OUR DRWINGS HVE BEEN *SCREW SPECIFICTION WILL DEPEND ON TYPE OF STUD (METL/WOOD) - REFER TO SCREW SCHEDULE PPROVED FOR FBRICTION. PPROVL DELYS NOTE WILL RESULT 7 IN FBRICTION DELY. WITH OMEG MX 24"@ CMU WLL *T THIS POINT, MIN. JOINT 2-/2"@ BETWEEN CMU WLL LL DIMENSIONS TO BE RE-CHECKED ND VERIFIED IN NOTE ECH STEEL STUD (TYP. 6"O/C) TILES WILL BE ( 8") FIELD/ON-SITE PRIOR TO INSTLLTION. WE T-PROFILE SSUME NO RESPONSBILITY S L-PROFILE TO NOTE MESUREMENT TWO 8" 8WIDTH (PROX) OR COLUMNS DETILS OF P404 FFECTING NY WORK ONE 8" WIDTH (PROX) COLUMN OF P404 DOUBLE BRCKET: 2 LT SCREWS BUT OUR OWN. SINGLE GP BETWEEN THESE DRWINGS RE TO BE RED IN CONJUNCTION GP PROFILES BETWEEN WITH LL OTHER RELEVNT DRWINGS ND NY FOR *T THIS POINT, JOINT BETWEEN SINGLE BRCKET: 2 LT SCREWS NOTE 7 DYNMIC FIXING POINT TILES WILL BE 9MM ( DISCREPNCIES TO BE BROUGHT TO THE TTENTION 8") THERML PROFILES EXPNSION FOR *T THIS POINT, JOINT BETWEEN OF LL THE DIMENSIONS RELEVNT TO ENGINEER. BE RE-CHECKED ND VERIFIED IN DOUBLE OMEG PROFILE THERML EXPNSION TILES WILL BE 9MM ( 8") FIELD/ON-SITE PRIOR TO INSTLLTION. PROX. PERFORMNCE OF P404 NOTE 8 (INCLUDES WSTE FCTOR) FIXED FIXING POINT STRT&ENDING VERTICL PROFILES STRT&ENDING TO BE HLF SCREWS T TOP & BOTTOM FLNGE OF OMEG CHNNEL. THESE DRWINGS STRT RE & TO (NO BE MOVEMENT) RED IN CONJUNCTION STRT & HLF SUPPORTED WITH DYNMIC WITH LL OTHER STRT&ENDING RELEVNT DRWINGS ND NY STRT&ENDING HLF ENDING: FIXING CLIP SCREWS (SLOTTED HOLE) ENDING: FIXING POINTS EXCEPT FOR TUBE THE= 5 FIXING FT CLIP SCREWS DISCREPNCIES ENDING: TO BE BROUGHT FIXING TO CLIP THE SCREWS TTENTION ENDING: FIXING CLIP SCREW NO. OF FIXING POINTS ND LOCTION OF SPCER L-BRCKET OF THE RELEVNT ENDING: STRT: ENGINEER. 4 FIXING MXIMUM CLIP SCREWS VERTICL SPCING UPPER FIXING POINT BETWEEN STRT: ENDING: 2 FIXING NCHORS CLIP SCREWS TO SUBSTRT STRT: 4 FIXING CLIP SCREWS STRT: 2 TUBE FIXING = 0,5 CLIP SCREWS OZ *SCREW SPECIFICTION WILL DEPEND HOLLOW ON SUBSTRTE BLOCK STRT: 4 FIXING CLIP SCREWS STRT: 2 FIXING CLIP SCREWS WLL (CONCRETE/CMU) - REFER TO SCREW SCHEDULE * THE SME CRITERI WILL BE USED FOR SPCING BETWEEN L-BRCKETS IN SOLID WLLS EMBEDMENT: -/4" (WLL THICKNESS OF CMU BLOCK) SPCING: 8" O.C. ON HORIZONTL OMEG FIGURE 4 - NO. OF FIXING POINTS ND LOCTION OF *SPCING S INDICTED IN THE PROJECT SUBSTRUCTURE DRWINGS. IF NOT NOTED, FOLL CORRECT INSTLLTION SPCER SCREW CENTERED L-BRCKET WITH OMEG FLNGE GROUT FILLED (if required by job conitions) WITH OMEG EMBEDMENT: 2-/4" SPCING: 24" O.C. ON HORIZONTL OMEG S - P404 - P " MX. 28 2" MX. DOUBLE BRCKET: 2 LT SCREWS SINGLE BRCKET: 2 LT SCREWS TYP. /4" TYP. /4" REINFORCED CONCRETE EMBEDMENT: 2" SPCING: 24" O.C. ON HORIZONTL OMEG LOCTION ND NO. OF FIXING POINTS IN FIXING PLTES *THE SME FIXING CRITERI CLIP SCREWS WILL BE USED FOR SPCING BETWEEN 2 FIXING L-BRCKETS CLIP SCREWS IN SOLID WLLS *SPCING S INDICTED IN THE PROJECT SUBSTRUCTURE DRWINGS. IF NOT NOTED, FOLLOW THIS 6" [.00] TYP JOINT 6" 5 [8.00] 6" [.00] TYP JOINT 6" 5 [8.00] 6" [.00] 6" [.00] TYP JOINT 6" 5 [8.00] TYP JOINT 5 6" [8.00] LTERL 2 FIXING CLIP SCREWS RCHITECT: SHOP DRWINGS PD INCORPORTED PROJECT NO: STTUS: 8" NCHORING FIGURE MINIMUM 8 - NCHORING DISTNCE MINIMUM TO EDGE DISTNCE OF WLLTO EDGE OF *IN CSE THT WLL NEED TO BE LESS, CONSULT WITH PORCELNOS *IN CSE THT SPCING NEED TO BE LESS, BETWEEN CONSULT WITH PORCELNOS VERTICL PROFILES 8" 28 2" MX. 28 2" MX. 28 2" MX. *SPCING BETWEEN VERTICL PROFILES S INDICTED IN THE PROJECT SUBSTRUCTURE DRWINGS. IF NOT NOTED, MXIMUM SPCING WILL BE 2CMU/METL STUD WLL 6 9 (599 MM). END OF WLL 26 9 MX 26 9 MX 26 9 MX LOCTION ND DIMENSIONS OF FIXING PLTES ND KERF SW CUTS LOCTION ND DIMENSIONS OF FIXING PLTES ND KERF SW CUTS TYP. /4" TYP. MIN. 4" [20.00] 6" [.00] 6" [.00] TYP JOINT 6" 5 [8.00] TYP JOINT 6" 5 [8.00] L-PROFILE L-PROFILE ONE 8" WIDTH (PROX) COLUMN OF P404 ONE 8" WIDTH (PROX) COLUMN OF P404 STRT&ENDING ENDING: FIXING CLIP SCREWS STRT: 4 FIXING CLIP SCREWS 28 2" MX. 28 2" MX. NCHORING PROX. MINIMUM PERFORMNCE DISTNCE OF TO P404 EDGE OF WLL *IN CSE PROX. THT (INCLUDES NEED PERFORMNCE TO BE LESS, WSTE CONSULT FCTOR) WITH PORCELNOS STRT&ENDING OF P404 HLF (INCLUDES WSTE FCTOR) ENDING: FIXING CLIP SCREWS STRT: 2 FIXING CLIP SCREWS TUBE = 5 FT END OF WLL TUBE = 5 0,5 FTOZ CMU/METL STUD WLL TUBE = 0,5 OZ WLL STRT&ENDING 28 2" MX. ENDING: FIXING CLIP SCREWS STRT: 4 FIXING CLIP SCREWS STRT&ENDING HLF ENDING: FIXING CLIP SCREWS STRT: 2 FIXING CLIP SCREWS INVISIBLE FIXING SYSTEM INVISIBLE FIXING SYSTEM d2 0,97" (5mm) d = note* d 0,079" (2mm) d d2 = 0,97" (5mm) GP BETWEEN d4 2,9" (74mm) d = 0,079" (2mm) PROFILES FOR d d5 0,55" (4mm) THERML EXPNSI d4 = 2,9" (74mm) d6 = 0,52" (mm) d4 d5 LOCTION, SPCING ND d5 NO. = 0,55" OF (4mm) FIXING POINTS OF HORIZONT d6 = 0,52" (mm) d6 7/08/ d6 d REVISIONS: d d4 2 2" MIN. d4 NO. DTE d4 DESCRIPTION 7/08/ d = note* note* d5 *SCREW SPECIFICTION WILL DEPEND ON TYPE OF STUD (METL/WOOD) - REFER TO SCRE d6 d= 9,5-2mm depending of size of tile and finish. note* For invisible fixing system d must be d6 minimum MX d= 24"@ 9,5-2mm 0mm. CMU WLL depending of size of tile and ECH finish. STEEL STUD For (TYP. invisible 6"O/C) fixing system d must be 5" MIN. d minimum 0mm. d5 d5 d2 d ISSUED FOR PRICING TYP. /4" 0 REVISIONS: NO. DTE DESCRIPTION 7/08/ SCREWS T TOP & BOTTOM FLNGE OF OMEG CHNNEL. E ISSUED FOR PRICING

11 CMU/METL STUD WLL SPCING BETWEEN VERTICL PROFILES *SPCING BETWEEN VERTICL PROFILES S INDICTED IN THE PROJECT SUBSTRUCTURE DRWINGS. IF NOT NOTED, MXIMUM SPCING WILL BE (599 MM). FIGURE 9 - LOCTION, SPCING ND NO. OF FIXING POINTS OF HORIZONTL PROFILES LOCTION, SPCING ND NO. OF FIXING POINTS OF HORIZONTL PROFILES MX MX 24"@ 24"@ CMU CMU WLL WLL MIN. MIN. MIN. 2-/2"@ 2-/2"@ CMU CMU CMU WLL GP BETWEEN ECH ECH STEEL STEEL STUD STUD (TYP. (TYP. PROFILES FOR THERML EXPNSION SCREW NOT CENTERED ENDING: WITH OMEG FIXING FLNGE CLIP SCREWS STRT: 4 FIXING CLIP SCREWS FIXING METHODS - P404 T-PROFILE T-PROFILE TWO /8 WIDTH (PPROX) TWO COLUMNS 8" WIDTH (PROX) OF P-404 COLUMNS OF P404 8" 8" MX MX MX *SCREWS SPECIFICTION WILL DEPEND ON TYPE OF STUD (METL/WOOD) - REFER TO *SCREW *SCREW SCREW SPECIFICTION SCHEDULE WILL WILL DEPEND DEPEND ON ON TYPE TYPE OF OF STUD STUD (METL/WOOD) - REFER REFER TO TO SCREW SCREW SCHEDULE SCHEDULE LOCTION ND NO. OF FIXING POINTS IN FIXING PLTES STGGERED FIXING CLIP SCREWS SCREWS SCREWS T T TOP TOP & BOTTOM BOTTOM FLNGE FLNGE OF OF OF OMEG OMEG OMEG CHNNEL. CHNNEL. CHNNEL OMEG FLNGE CORRECT INSTLLTION SCREW CORRECT SCREW CENTERED INSTLLTION CENTERED WITH WITH OMEG OMEG FLNGE FLNGE SCREW CENTERED WITH OMEG FLNGE OMEG FLNGE INCORRECT STRT&ENDING INSTLLTION SCREW INCORRECT SCREW NOT NOT CENTERED INSTLLTION CENTERED WITH WITH OMEG OMEG FLNGE FLNGE FIGURE 0 - FIXING METHODS - P404 L-PROFILE L-PROFILE ONE /8 WIDTH (PPROX) COLUMNS ONE 8" WIDTH (PROX) OF P-404 COLUMN OF P404 8" TYP. /4" LTERL 2 FIXING CLIP SCREWS HOLLOW HOLLOW BLOCK BLOCK EMBEDMENT: EMBEDMENT: -/4" -/4" (WLL (WLL THICKNESS OF OF CMU BLOCK) EMBEDMENT: /4 (WLL THICKNESS OF CMU BLOCK) SPCING: SPCING: 8" 8" O.C. O.C. ON ON HORIZONTL HORIZONTL OMEG OMEG SPCING: 8 O.C. ON HORIZONTL OMEG GROUT FILLED (if required by job conditions) GROUT FILLED (if (if required required by by job job conitions) EMBEDMENT: conitions) EMBEDMENT: 2 /4 EMBEDMENT: 2-/4" 2-/4" SPCING: SPCING: SPCING: 24 O.C. 24" 24" ON O.C. O.C. ON HORIZONTL ON HORIZONTL OMEG OMEG REINFORCED CONCRETE REINFORCED CONCRETE EMBEDMENT: EMBEDMENT: 2 EMBEDMENT: 2" 2" SPCING: SPCING: SPCING: 24 O.C. 24" 24" ON O.C. O.C. ON HORIZONTL ON OMEG STRT&ENDING HLF ENDING: FIXING CLIP SCREWS STRT: 2 FIXING CLIP SCREWS PROX. PERFORMNCE OF P404 (INCLUDES WSTE FCTOR) PPROX. PERFORMNCE OF P-404 (INCLUDES WSTE FCTOR) TUBE = 5 FT TUBE = 0,5 OZ TUBE = 5 FT TUBE = 0,5 OZ LOCTION ND DIMENSIONS OF FIXING PLTES ND KERF SW CUTS C. Insulation Install LOCTION ND NO. OF FIXING POINTS IN FIXING PLTE STGGERED FIXING CLIP SCREWS LTERL 2 FIXING CLIP SCREWS Please note, the use of insulation is not required for installing Porcelanosa Porcelain Facades and is strictly at the discretion of the building designer. FIXING METHODS - P404 T-PROFILE T-PROFILE L-PROFILE L-PROFILE TWO Ensure TWO 8" WIDTH (PROX) COLUMNS OF P404 ONE 8" WIDTH (PROX) COLUMNS OF P404 ONE at minimum -/4 8" WIDTH (PROX) COLUMN OF P404 8" WIDTH (PROX) COLUMN OF P404 (0mm) air space between the back of the porcelain STRT&ENDING and the insulation STRT&ENDING material, HLF ENDING: FIXING CLIP SCREWS ENDING: FIXING CLIP SCREWS in order to ensure that STRT: natural 4 FIXING CLIP upward PROX. SCREWS PERFORMNCE convection OF OF P404 STRT: 2 takes FIXING CLIP SCREWS (INCLUDES WSTE FCTOR) place behind the cladding material. TUBE = 5 5 FT FT TUBE = 0,5 0,5 OZ OZ The type, thickness and characteristics of the thermalinsulating material are to be defined in terms of the project. Lay 8" 8" the thermal-insulating 8" 8" 8" 8" material in accordance with the instructions provided by the supplier. We recommend the following with respect to the substructure of the facade: LOCTION ND DIMENSIONS OF FIXING PLTES ND KERF SW CUT Projected polyurethane (PU): Lay the insulating material after installation of the aluminum angle brackets and the profiles corresponding to the INVISIBLE FIXING SYSTEM d = note* substructure. Porcelanosa recommends keeping the d2 = 0,97" (5mm) d = 0,079" (2mm) plastic film in the profiles until d the projection of the d4 = 2,9" (74mm) d5 = 0,55" (4mm) insulation is finished to keep REVISIONS: the surface d6 = clean. 0,52" (mm) This d4 d5 will prevent cleaning work and the P-404 NO. DTE DESCRIPTION note* will work d6 d6 in perfect condition. 7/08/ d= 9,5-2mm depending of size of tile and finish. For invisible fixing system d must be minimum 0mm. d2 d d Polystyrene (PS) panels: Lay the insulating material d4 d5 before the installation of the aluminum angle brackets corresponding to the substructure. Check to ensure that the layer of thermal insulating KEYPLN: material is continuous, and that there are no thermal bridges still to be dealt with. FIGURE - LOCTION ND DIMENSIONS OF FIXING PLTES ND KERF SW CUTS INVISIBLE FIXING SYSTEM d6 d d4 d4 d5 d5 d2 d note* d= 9,5-2mm depending on size of tile and finish. For invisible fixing system, d must be minimum 0mm. d The omega profile must be fastened to the stud wall, at each stud location using the screws as specified in shop drawings, and provided with your shipment. ll self-drilling screws must have EPDM sealing washers. Typically these are included with your material order. d6 D. ngle Brackets The angle brackets are used to secure the vertical profiles to the horizontal omega profiles. The brackets d = note* d2 = 0,97" (5mm) are the element used to adjust the lead of the facade. d = 0,079" (2mm) The size of these will be indicated in the shop drawings, d4 = 2,9" (74mm) d = note* d5 = 0,55" (4mm) but may vary depending on whether the building is d2 = 0.97 (5mm) d6 d = = 0,52" (mm) (2mm) plumb. The size of the brackets changes in steps of d4 = 2.9 (74mm) note* d5 = 0.55 (4mm) /4. d= d6 9,5-2mm = 0.52 depending (mm) of size of tile and finish. For invisible fixing system d must be minimum 0mm. There are two types of angle brackets used in every installation: The primary brackets, which are typically SHEET TITTLE: used only at the top of a vertical profile, and secondary BSIC RULES profiles, which are used everywhere else. Please refer to your shop drawings for vertical profile and bracket type and placement. lso indicated in the shop drawings how many screws, and where they are installed. It is very important to check this point and SCLE: install the screws as indicated in the shop drawings so that the system works correctly NTS in the expansions. DRWN BY: JCS CHECKED BY: IV SHEET NO: REVISION:

12 There must be a minimum ¾ overlap between the angle bracket and the profile. Make sure all vertical profiles are level, aligned and in the same plane. F. Porcelain Panels The secondary brackets will be placed everywhere that a primary bracket is not used. The shape of the aluminum angle brackets alternates in line with the flange of the supporting anchoring element. When installing directly to a solid wall, CMU or brick, anchor the aluminum angle bracket at a joint between bricks. Your Porcelanosa Porcelain Facade System comes with special, patented thermal break pieces that are installed between the angle brackets and the omega profile, in order to prevent a thermal bridge. E. T and L (Vertical) Profiles The vertical profiles serve as the base for the ceramic panel installation. They come in two shapes: The T and the L. The T vertical profile is used at every vertical joint between ceramic panels. The L profiles are used as additional supports anywhere the T vertical profiles are not used and for inside and outside corners, bumpouts, etc. You must reference your project-specific shop drawings to denote the following: Location of each type of profile on the wall Which way the L profiles are facing (which depends on the angle bracket placement) Location of the bottom of each profile (prior to installation) Taking the time to mark the omegas at the angle bracket locations as to which way the L profiles are facing will make it easier to install. Porcelanosa Porcelain Facade System features a double anchor system which provides maximum wind resistance. First, the chemical anchoring, which also helps to dampen vibrations at high altitudes consist of a line of polyurethane construction adhesive p-404, provided with your shipment (refer to installation instructions below). Secondly, the system also features mechanical anchoring in the form of corrosion-resistant, Stainless-steel fixing clips.. Cutting panels, Kerf Cut instructions Panels will be delivered already cut to size for most areas of the project. Please check your project-specific shop drawings prior to cutting any panels as they may already be assigned to other areas or elevations. In full size typically or 2 standard sizes. This is a cladding system that allows for easy dimensional adjustment of panels at the jobsite, avoiding the need for verified in field dimensions prior to start with shop drawings, saving time. lso, since the design is optimized and the façade uses as many full panels as possible, the need for field cutting and kerf-cutting panels will be minimized. These instructions pertain to panel and kerf-cuts that are unavoidable on site in order to fit around certain corners, windows, bumpouts, or as specified in the shop drawings, or where building significantly differs from shop drawings. Please contact the Porcelanosa Facades technical department with any questions regarding field panel cutting and kerf-cutting/slotting. You must cut the porcelain panels using an electric ceramic wet saw such that the saw: Feature a continuous cutting band. re suitable for tile thicknesses under (25 mm) 2

13 re available for the following diameters: 7, 9, 2 and 4 (80, 20, 00, and 50 mm) Provide water cooling 2. Starter clip Position a straight edge horizontally at the startingpoint of the façade. Screw the leading stainless-steel fixing clips to the profiles. When working with a lateral leading element, use the lateral fixing clip. pply a line of p-404 to the vertical profile. Place the porcelain panel, with the corresponding slot and offset, onto the flange of the stainless steel fixing clip, and press it down while the polyurethane mastic is still not set. You can also cut the panels with a manual ruby machine. This cutting requires less time, and can be done with a more economical machine. However, the quality of this cut is inferior, and we would have to review the edge of the piece with a sander to make it aesthetically correct. lso it is necessary to take into account that with this machine is difficult to obtain a totally straight cut. a) Kerf saw cuts in porcelain tiles Kerf saw cuts, placed along the edges of porcelain panels provide the space for placement of the fixing clips. These are the key to the hidden fastening system on the Porcelanosa Porcelain Facade System. The number and type of slots depends on the porcelain panel dimensions and the design of the project. Check to ensure that the panel is securely stuck to the profile, and that it is level with respect to the façade..vertical and horizontal panel joints Once the panels are installed the joints must be aligned and of a same size throughout the facade. The fixing clips provide the horizontal joint, and with the help of a rubber hammer we will hit the panels to make small adjustments. To facilitate the installation, Porcelanosa provides plastic spacer/shims with the corresponding measurement to the typical joint of each project. Use these in order to have the proper joint spacing and leave them in place until the polyurethane adhesive (p404) is dry. The kerf saw cut characteristics, as well as its tolerances, are listed in ppendix I of the on-site cutting and kerf saw cutting manual. s mentioned above most panels will come cut from the factory and ready to install, but in some areas such as bumpouts, windows, doors, inside corners and such, there may be the need to cut the panels on site to allow for fixing clip attachment to the structure. Porcelanosa US sells a customized biscuit joiner that has been retrofitted with a water pump to provide a wet saw environment and allow for safety when cutting the porcelain. See photo below for reference.

14 p-404 adhesive. lcohol or cetone. Caulking gun, tip and wedges. Check expiration date. Check the container is in good condition. 4. p-404 instructions PPLICTION OF P-404 FOR VF Installation guide pplication of p-404 for VF n of p-404 for VF Step 4. Clean Substrate Step. Precautions in Extreme Weather Step The 4. Clean substrate Substrate must be completely clean and dry. Step. Materials pplication Required: of p-404 adhesive requires no special precautions between ºF (5-5 ºC). It The substrate must be completely clean and dry. Installation p-404 adhesive. It is recommended is recommended guide to clean to the clean substrate the with substrate alcohol/acetone alcohol/acetone and dry afterwards. and dry afterwards. with Step. Materials Required: Step 2. Check Condition lcohol or Below/above cetone. this temperature, the use of thermal protective p-404 adhesive. Check expiration date. Caulking bags lcohol or gun, is cetone. tip mandatory and wedges. until the moment before its application. In order to keep the adhesive is good working conditions, Check it the container is in good condition. Caulking gun, is highly tip and recommended wedges. to maintain it warm inside the thermal bags between uses. Step. Materials Required: Step 2. p-404 Check adhesive. Condition Step 2. Check lcohol Condition or cetone. Check expiration Caulking expiration date. gun, tip date. and wedges. Check the container is in good condition. Installation guide Check the container is in good condition. Step 2. Check Condition Check expiration date. Check the container is in good condition. Step 5. Instruction to Cut Tip Step The 5. Instruction tip must be to cut Cut at Tipa straight angle for a hole precisely The tip must 0.4 be diameter cut at an straight (0 mm). angle for a hole precisely of 0.4in diameter (0 mm). Step 6 c cau Th wh Step. Precautions in Extreme Weather pplication of p-404 adhesive requires no special precautions between ºF (5-5 ºC). Below/above this temperature, the use of thermal protective bags is mandatory until the moment before its application. In order to keep the adhesive is good working conditions, it is highly recommended to maintain it warm inside the thermal bags between uses. Step 4. Clean Substrate The substrate must be completely clean and dry. It is recommended to clean the substrate with alcohol/acetone and dry afterwards. ecial precaual protective application. conditions, it side the ther- Step. Precautions in Extreme Weather Step. Precautions in Extreme Weather Step 4. Clean Substrate Step pplication 4. Clean pplication Substrate of p-404 of p-404 adhesive adhesive requires requires no special no precau- special The substrate Step must be 6. completely Instruction clean and to dry. pply the dhesive The precautions substrate must between between completely ºF clean ( F 5 and ºC). dry. (5-5 C). It is recommended to clean the substrate with alcohol/acetone and dry to pply the dhesive It Step is recommended 5. Instruction Below/above to clean to this temperature, the Cut substrate Tip the with use alcohol/acetone Below/above and The Step 6. Instructions of thermal protective afterwards. continuous bead of adhesive must be applied with bags dry tip afterwards. is must mandatory this be cut temperature, until an the straight moment the angle before use its for application. of a hole thermal precisely continuous bead of adhesive must be applied with the the caulking fun at an angle as shown above. protective of In 0.4in order diameter bags to keep is the (0 mandatory adhesive mm). is good until working the conditions, moment it caulking gun at an angle as shown above. is highly recommended to maintain it warm inside the thermal bags between uses. which equates The minimum before its application. The minimum bead of adhesive bead is of 0.4in adhesive in diameter is (0 0.4 mm) diameter Step (0mm) to Extent which feet of of pplication equates profile/cartridge. to 4.92 feet of profile/ In order to keep the adhesive in good working cartridge. The adhesive must be applied all along the length of the panel and must overlap with the fixing plate as shown above. condition, it is highly recommended to maintain it warm inside the thermal bag between uses. 4 Step 8. For ob Th sai

15 The leveling wedges are another element of support to the installer during the installation of the system. This item must be used during the installation, and makes the panels align and do not protrude more than another. s much as possible, they should be kept in the facade as long as possible, this will help the panels not to move during installation, and while the p-404 adhesive is completely dry. (28 days). Step 7. Extent of pplication The adhesive must be applied to all along the length of the panel and must overlap with the fixing plate as shown above. Step 8. Ensure Quality of Installation For the highest quality of installation, the use of wedges is obligatory. The minimum time for the wedges to stay is 24h. With this said, the longer the wedges stay in place, the better. It takes approximately 28 days for the p-404 to cure. Be sure to check expiration date on the p-404 tubes, as they have about a one-year shelf life. 5. Rest of courses (end points) The leveling wedges are already installed from the first row, in the vertical joints. Depending on the layout, insert the lateral or central stainless-steel fixing clips into the ceramic panels of the previous row. Screw the stainless-steel fixing clip to the profile. pply a line of polyurethane mastic p-404 to the vertical profile. Place the ceramic panel, with the corresponding slot and offset, onto the flange of the stainless steel fixing clip, and press it down before the p-404 sets. Check to ensure that the panel is securely stuck to the profile, and that it is level with respect to the façade. Insert a wedge into the self-leveling crosspieces of the previous row, and adjust accordingly. Once the second row is complete, insert the self-leveling cross-pieces, and start to install the rest of the façade. 5

16 6. Termination (with roof cap, open, and as coping) Configure the surrounds and openings of windows in accordance with the directions issued by site management. Check for leaks at the joints between the surrounds and the façade. Check the joints between the façade and the remaining sealing elements. Once the last row is in place, install the terminal element of the façade. We recommend the use of an aluminum profile with weatherproof finish. TERMINTION WITH METL FLSHING/COPING, BY OTHERS TERMINTION WITH TILE 6

17 *THESE SHOP DRWINGS REPRESENT OUR INTERPRETTION OF THE PLNS ND SPECIFICTIONS, ND OUR CONTRCT REQUIREMENTS FOR THIS PROJECT. *PRIOR TO MNUFCTURE OF NY PRODUCT FOR THIS JOB, LL DIMENSIONS, METHODS OF CONSTRUCTION, ND EXISTING CONDITIONS MUST BE CHECKED ND CORRECTED OR PPROVED BY OUR CUSTOMER. *NO PRODUCT WILL BE SCHEDULED FOR FBRICTION UNTIL WE HVE BEEN NOTIFIED IN WRITING BY OUR CUSTOMER THT OUR DRWINGS HVE BEEN PPROVED FOR FBRICTION. PPROVL DELYS WILL RESULT IN FBRICTION DELY. *WE SSUME NO RESPONSBILITY S TO MESUREMENT OR DETILS FFECTING NY WORK BUT OUR OWN. *LL DIMENSIONS TO BE RE-CHECKED ND VERIFIED IN FIELD/ON-SITE PRIOR TO INSTLLTION. *ITEMS INCLUDING, BUT NOT LIMITED TO, INSULTION, FLSHING, WTERPROOFING, DMP-PROOFING, SELNT, WEEPS, ETC. RE BEYOND THE SCOPE OF PORCELNOS ND MY NOT BE SHOWN ON THESE DETILS. REFER TO THE CONTRCT DOCUMENTS FOR SUCH ITEMS. *THESE DRWING RE TO BE RED IN CONJUNCTION WITH LL OTHER RELEVNT DRWINGS ND NY DISCREPNCIES TO BE BROUGHT TO THE TTENTION OF THE RELEVNT ENGINEER. 9. STEEL SC L-SPCE 7. Doors and Windows. EXTERIOR SHETING 4 2. EXTERIOR OTHERS*. IR BRR 4. WINDOW T.O.C. FLOOR SLB 6TH FLOOR 7 5. HILTI KB L-SPCE 6. HILTI KW FIX MET *** 7. ELCO ULT OMEG P WLL 8. HILTI KW L-SPCE 2 0. METL S USED TO 7. WOOD ST USED TO LUMINUM. SINGLE/D 4. SINGLE (44"). CHE OF BRC TYP. BUILDUP 7" 5. DOUBLE (44"). CHE OF BRC INSULTION 2" MIN. 8" 6. THERML CVITYW 7. LT SCREW x 0.87; T L-BRCK 8 8. POWDER 00x60x POWDER (6"x2 9 8"x B.O.C. B/PORCELIN 25 2" TYP. JOINT 6" TYP. JOINT 6" BLCK P 2. LUMINUM 22. FIXING CL 0.55; TO PROFILES 2. INVISIBLE PLTE;TY 24. INVISIBLE TYP. 5MM 25. INVISIBLE 26. INVISIBLE PLTE.TY 27. PORCEL REN; B WINDOW HED EXMPLE 28. PORCEL REN; B *NOTE SUPPLIED BY **NOTE 2 LL SPCER L FOR +/- /4" WLL. IT IS IDENTIFY S S LRGER THN COMMUNICTE ***NOTE NOTES CROSS OR NOT U DETIL - TYPICL WINDOW 6TH FLOOR (HED) *CLDDING SYSTEM TOLERNCE +/- 4" TYP. BUILDUP 8" TYP. BUILDUP 8" TYP. JOINT 6" 5 TYP. JOINT 6" " 8" JMB TYP. BUILDUP 4 2" issue date ISSUED FOR COMMENT 6/06/7 ISSUED FOR COMMENT 6/06/24 ISSUED FOR COMMENT 6/08/7 ISSUED FOR COMMENT 6/09/ important note TYP. JOINT 6" 5 TYP. JOINT 6" 5 2" shop drawings review 4 2" JMB drawing reviewed by:... B C date reviewed IOR SOLID WLL: CMU & REINFORCED CONCRETE; BY OTHERS* 2. VPOR/IR BRRIER; BY OTHERS* WINDOW RETURN EXMPLE WINDOW/DOOR/... SYSTEMS; BY OTHERS* UP 2 2" I HIT-HY 70 (EPOXY), HIT-5.8 8"x42" (NCHOR D) & HIT-SC 6X85 (SLEEVE); TO BE USED ON CMU WLL I KB TZ SCREW /8 x-/4 ;TO BE USED ON REINFORCED CONCRETE WLL 7" E LUMINUM SPCER L-BRCKET; TYP. LENGHT (52"). CHECK SPECIFIC WLL BUILDUP TO USE DEQUTE SIZE OF BRCKET.** E LUMINUM SPCER L-BRCKET; TYP. LENGHT (52"). CHECK SPECIFIC WLL BUILDUP TO USE DEQUTE SIZE OF BRCKET.** L INSULTION SPECIFICLLY ENGINEERED FOR CVITY WLL PPLICTIONS; BY OTHERS* SCREW TO BE USED FOR FIXING VERTICL PROFILES TO SPCER L-BRCKETS WDER COTED (BLCK) LUMINUM T-PROFILE, 00x60x2.7MM ( 5 6"x2 8"x8"), M (8 8") LONG EQ.TYP EQ.TYP WDER COTED (BLCK) LUMINUM L-PROFILE, 40x60x2.7MM (6"x2 9 8"x8"), M (88") LONG G CLIP SCREW TO BE USED FOR FIXING, FIXING PLTES TO VERTICL PROFILES ISIBLE POWDER COTED (BLCK) STGGERED STINLESS STEEL FIXING PLTE.TYP. 5MM ( 6")JOINT VISIBLE POWDER COTED (BLCK) LTERL ESS STEEL FIXING PLTE. TYP. 5MM ( 6")JOINT ISIBLE POWDER COTED (BLCK) STRT/END FIXING PLTE K POLYURETHENE STRUCTURL SILICON P-404. CORNING 795 SILICONE TO BE USED IN LL NDOW HED DETILS INSTED OF P-404. (REFER TO DETIL 85 B) CELIN PNEL TYPE : 474"x 2 5 8"; URBTEK COLLECTION; COLOR STREET C V.I.F. TYP. JOINT 6" " TYPICL EST ELEV. 6 2" INSULTION 2" 2" 4" 4" CELIN PNEL TYPE B: 474"x 6"; URBTEK COLLECTION; COLOR STREET C CELIN PNEL TYPE B: 474"x 22"; URBTEK COLLECTION; COLOR STREET C 20.LUMINUM FLSHING; BY OTHERS* VISIBLE POWDER COTED (BLCK) CENTRL ESS STEEL FIXING PLTE. TYP. 5MM ( 6")JOINT TYP. JOINT 6" TYP. BUILDUP 8" TYP. BUILDUP 8" *SUPPLIED ND INSTLLED BY OTHERS PCER L-BRCKETS INCLUDED IN THIS PCKGE OR +/- /4" TOLERNCE OF SUBSTRTE WLL. ESPONSBILITY OF GENERL CONTRCTOR TO Y UNEVENCY OF BCKUP WLL LRGER THN THE TOLERNCE WITHIN THE SYSTEM. DETIL B - TYPICL WINDOW JMB T EST ELEVTION *RETURN & EXISTING WLL TO BE LIGNED. TYPICL. EXCEPT IN SOFFITS. *TOLERNCE BETWEEN & WLL TO BE DEFINED BY OTHERS. TYPICL. WINDOW RETURN + MITER EXMPLE CLDDING SYSTEM TOLERNCE +/- 4" 7

18 *THESE SHOP DRWINGS REPRESENT OUR INTERPRETTION OF THE PLNS ND SPECIFICTIONS, ND OUR CONTRCT REQUIREMENTS FOR THIS PROJECT. *PRIOR TO MNUFCTURE OF NY PRODUCT FOR THIS JOB, LL DIMENSIONS, METHODS OF CONSTRUCTION, ND EXISTING CONDITIONS MUST BE CHECKED ND CORRECTED OR PPROVED BY OUR CUSTOMER. *NO PRODUCT WILL BE SCHEDULED FOR FBRICTION UNTIL WE HVE BEEN NOTIFIED IN WRITING BY OUR CUSTOMER THT OUR DRWINGS HVE BEEN PPROVED FOR FBRICTION. PPROVL DELYS WILL RESULT IN FBRICTION DELY. *WE SSUME NO RESPONSBILITY S TO MESUREMENT OR DETILS FFECTING NY WORK BUT OUR OWN. *LL DIMENSIONS TO BE RE-CHECKED ND VERIFIED IN FIELD/ON-SITE PRIOR TO INSTLLTION. *ITEMS INCLUDING, BUT NOT LIMITED TO, INSULTION, FLSHING, WTERPROOFING, DMP-PROOFING, SELNT, WEEPS, ETC. RE BEYOND THE SCOPE OF PORCELNOS ND MY NOT BE SHOWN ON THESE DETILS. REFER TO THE CONTRCT DOCUMENTS FOR SUCH ITEMS. *THESE DRWING RE TO BE RED IN CONJUNCTION WITH LL OTHER RELEVNT DRWINGS ND NY DISCREPNCIES TO BE BROUGHT TO THE TTENTION OF THE RELEVNT ENGINEER. 8. Corners The installation of the corners, are the most critical point of the projects. It is the area where the system allows less play, and is the zone in which we must install the most perfect sub-structure possible if we want the aesthetic and structural finish is correct. b. Inside ll shop drawings include pages with the specific detail of corner construction. a. Outside WITH DWG 002,00 & 004. EXTERIOR SOLID WLL: CMU & REINFORCED CONCRETE; BY OTHERS* 2. VPOR/IR BRRIER; BY OTHERS*. WINDOW/DOOR/... SYSTEMS; BY OTHERS* 4. HILTI HIT-HY 70 (EPOXY), HIT-5.8 8"x42" (NCHOR ROD) & HIT-SC 6X85 (SLEEVE); TO BE USED ON CMU WLL 5. HILTI KB TZ SCREW /8 x-/4 ;TO BE USED ON REINFORCED CONCRETE WLL 6. SINGLE LUMINUM SPCER L-BRCKET; TYP. LENGHT 40MM (52"). CHECK SPECIFIC WLL BUILDUP TO USE DEQUTE SIZE OF BRCKET.** 7. DOUBLE LUMINUM SPCER L-BRCKET; TYP. LENGHT 40MM (52"). CHECK SPECIFIC WLL BUILDUP TO USE DEQUTE SIZE OF BRCKET.** 8. THERML INSULTION SPECIFICLLY ENGINEERED FOR CVITY WLL PPLICTIONS; BY OTHERS* 9. LT SCREW TO BE USED FOR FIXING VERTICL PROFILES TO SPCER L-BRCKETS 0. POWDER COTED (BLCK) LUMINUM T-PROFILE, 00x60x2.7MM ( 5 6"x2 8"x8"), M (8 8") LONG. POWDER COTED (BLCK) LUMINUM L-PROFILE, 40x60x2.7MM (6"x2 9 8"x8"), M (88") LONG 2. FIXING CLIP SCREW TO BE USED FOR FIXING, FIXING PLTES TO VERTICL PROFILES. INVISIBLE POWDER COTED (BLCK) STGGERED STINLESS STEEL FIXING PLTE.TYP. 5MM ( 6")JOINT 4. INVISIBLE POWDER COTED (BLCK) LTERL STINLESS STEEL FIXING PLTE. TYP. 5MM ( 6")JOINT TYP. ENTRNCE 4" 5. INVISIBLE POWDER COTED (BLCK) STRT/END FIXING PLTE RIOR STUD WLL: DRY WLL, METL/WOOD 8" STUDS, TING; BY OTHERS *** RIOR SOLID WLL: CMU/REINFORCED CONCRETE; BY RS* RRIER CORSE; BY OTHERS* OW SYSTEM; BY OTHERS* KB SCREW /8 x-/4 ; TO BE USED TO FIX CER BRCKET TO REINFORCED CONCRETE WLL *** KWIK SCREW HUS-EZ ¼ x 2-5/8 ; TO BE USED TO ETL PROFILE TO REINFORCED CONCRETE WLL & CMU 4 7 V.I.F. 6. BLCK POLYURETHENE STRUCTURL SILICON P-404. DOW CORNING 795 SILICONE TO BE USED IN LL WINDOW HED DETILS INSTED OF P-404. (REFER TO DETIL 85 B) 7. PORCELIN PNEL TYPE : 474"x 2 5 8"; URBTEK COLLECTION; COLOR STREET C 8. PORCELIN PNEL TYPE B: 474"x 6"; URBTEK COLLECTION; COLOR STREET C INSULTION 2" TYP. JOINT 6" ULTRCON Ø5/6" x 2-/4"; TO BE USED TO FIX PROFILE TO REINFORCED CONCRETE WLL & CMU KWIK SCREW HUS-EZ ¼ x ; TO BE USED TO FIX CER BRCKET TO BRICK MSONRY WLL *** L SCREW; HILTI S-MD 2-24 x 2 ; TO BE USED TO FIX CER BRCKET TO STEEL STRUCTURE *** L STUD SCREW; HILTI SS-MD 2 4 x 2-/2 ; TO BE TO FIX METL PROFILE TO METL STUD WLL *** STUD SCREW; SIMPSON SDS SS ¼X2"; TO BE 6 TO FIX METL PROFILE TO WOOD STUD WLL *** INUM OMEG PROFILE 20x40MM ( 6"x52"); M(88") LONG E/DOUBLE THERML ISOLTOR (PLSTIC PD) E LUMINUM SPCER L-BRCKET; TYP. LENGHT 20MM CHECK SPECIFIC WLL BUILDUP TO USE DEQUTE SIZE CKET.** LE LUMINUM SPCER L-BRCKET; TYP. LENGHT 20MM CHECK SPECIFIC WLL BUILDUP TO USE DEQUTE SIZE CKET.** ML INSULTION SPECIFICLLY ENGINEERED FOR YWLL PPLICTIONS 2"; BY OTHERS* REW; ETNCO SELF-DRILLING SCREW DIN 7504 K Ø0.22 7; TO BE USED TO FIX VERTICL PROFILES TO SPCER CKETS ER T COTED MEZZ (BLCK) LUMINUM MECHNICL T-PROFILE, FLOOR 0x2.7MM ( 5 6"x2 8"x8"), M (88") LONG ER COTED (BLCK) LUMINUM L-PROFILE 40x60x2.7MM 2 8"x8"), M (88") LONG K BEYOND POLYURETHENE PROPERTY STRUCTURL SILICON-P-404 LINE. INUM FLSHING/TRIM; BY OTHERS* G CLIP SCREW; ETNCO SELF-DRILLING SCREW Ø0.6 x TO EPT BE USED IN TO SOFFITS. FIX FIXING PLTES TO VERTICL ILES Y OTHERS. TYPICL. IBLE/VISIBLE CENTRL STINLESS STEEL FIXING E;TYP. 5MM ( 6")JOINT IBLE/VISIBLE LTERL STINLESS STEEL FIXING PLTE. 5MM ( 6")JOINT TYP. BUILDUP 7" 6" TYP. JOINT 2 INSULTION 2" MIN. 8" 6 5 8" *SUPPLIED ND INSTLLED BY OTHERS 4" 4" " **LL SPCER L-BRCKETS INCLUDED IN THIS PCKGE LLOW FOR +/- /4" TOLERNCE OF SUBSTRTE WLL. IT IS RESPONSBILITY OF GENERL CONTRCTOR TO IDENTIFY UNEVENCY OF BCKUP WLL LRGER THN THE TOLERNCE WITHIN THE SYSTEM. 7 7 MIN. 8" 9 9. PORCELIN PNEL TYPE B: 474"x 22"; URBTEK COLLECTION; COLOR STREET C 20.LUMINUM FLSHING; BY OTHERS* 2. INVISIBLE POWDER COTED (BLCK) CENTRL STINLESS STEEL FIXING PLTE. TYP. 5MM ( 6")JOINT INSULTION 2" TYP. BUILDUP 7" TYP. MECH. FLOOR 5" DETIL B - TYPICL INTERNL CORNER T MEZZ MECHNICL FLOOR INTERIOR CORNER EXMPLE *TYPICL BUILDUP 5" T MECHNICL FLOOR & 4" T ENTRNCE *UNDER NO CIRCUMSTNCE THE CLDDING WILL PROJECT BEYOND PROPERTY LINE *L-BRCKET DECRESSES TO THE NEXT SIZE DOWN - 8" T MECHNICL FLOOR BUILD UP & TO 2 8" T ENTRNCE BUILD UP IBLE/VISIBLE STRT/END FIXING PLTE IBLE/VISIBLE STGGERED STINLESS STEEL FIXING E.TYP. 5MM ( 6")JOINT ELIN PNEL TYPE.; 200x294 (474"x 6") 9 DOVER ; BY PORCELNOS 26 8 ELIN PNEL TYPE.2; 200x596 (474"x2 6") 7 DOVER ; BY PORCELNOS BY OTHERS ER L-BRCKETS INCLUDED IN THIS PCKGE LLOW /4" IN-ND-OUT- TOLERNCE OF THE SUBSTRTE IS RESPONSBILITY OF FÇDE INSTLLER TO S SOON S POSSIBLE UNEVENCY OF BCKUP WLL HN THE TOLERNCE WITHIN THE SYSTEM ND TE TO SUPPLIER TYP. JOINT 6" OSSED OUT INDICTES COMPONENTS NOT PPLICBLE OT USED IN THIS PROJECT EXTERIOR CORNER EXMPLE 5/04/2 5/06/0 5/06/7 807 important note DETIL B - TYPICL CORNER DETIL (EXTERIOR) shop drawings review drawing reviewed by:... B C date reviewed 8 job title NEW RESIDENTIL BUILDING 0 EST 6 STREET NEW YORK / NY 0065 architect MNUEL GLS, I reference CONTRCT drawing title HORIZONTL DETILS MEZZ MECHNICL FLOOR drawn JC checked IV scale FULL E HLF C drawing no. rev. D

19 issue dates ISSUED FOR COMMENT 4/2/04 ISSUED FOR COMMENT 4/2/9 ISSUED FOR COMMENT 5/02/20 ISSUED FOR COMMENT 5/0/7 ISSUED FOR COMMENT ISSUED FOR COMMENT 5/04/2 5/06/0 5/06/7 important note *THESE SHOP DRWINGS REPRESENT OUR INTERPRETTION OF THE PLNS ND SPECIFICTIONS, ND OUR CONTRCT REQUIREMENTS FOR THIS PROJECT. *PRIOR TO MNUFCTURE OF NY PRODUCT FOR THIS JOB, LL DIMENSIONS, METHODS OF CONSTRUCTION, ND EXISTING CONDITIONS MUST BE CHECKED ND CORRECTED OR PPROVED BY OUR CUSTOMER. *NO PRODUCT WILL BE SCHEDULED FOR FBRICTION UNTIL WE HVE BEEN NOTIFIED IN WRITING BY OUR CUSTOMER THT OUR DRWINGS HVE BEEN PPROVED FOR FBRICTION. PPROVL DELYS WILL RESULT IN FBRICTION DELY. *WE SSUME NO RESPONSBILITY S TO MESUREMENT OR DETILS FFECTING NY WORK BUT OUR OWN. *LL DIMENSIONS TO BE RE-CHECKED ND VERIFIED IN FIELD/ON-SITE PRIOR TO INSTLLTION. *ITEMS INCLUDING, BUT NOT LIMITED TO, INSULTION, FLSHING, WTERPROOFING, DMP-PROOFING, SELNT, WEEPS, ETC. RE BEYOND THE SCOPE OF PORCELNOS ND MY NOT BE SHOWN ON THESE DETILS. REFER TO THE CONTRCT DOCUMENTS FOR SUCH ITEMS. *THESE DRWING RE TO BE RED IN CONJUNCTION WITH LL OTHER RELEVNT DRWINGS ND NY DISCREPNCIES TO BE BROUGHT TO THE TTENTION OF THE RELEVNT ENGINEER. shop drawings review drawing reviewed by:... B C 4" 4" date reviewed job title NEW RESIDENTIL BUILDING 0 EST 6 STREET NEW YORK / NY 0065 architect MNUEL GLS, I reference drawing title drawn JC checked IV scale FULL E HLF C drawing no. r c. Field Mitered d. Sloped Grade/Roof Rake IMPORTNT NOTE THIS DRWING IS TO BE T.O.PNEL RED IN CONJUCTOIN WITH DWG 002,00 & 004 CLDDING SYSTEM TOLERNCE +/- 4" H2 50 5'-5 7 8" 95 4" 2" 4" 2. '-4 4" 4'-8 2" 7 8" V 55. EXTERIOR SOLID WLL: CMU & REINFORCED CONCRETE; BY OTHERS* 2. VPOR/IR BRRIER; BY OTHERS*. WINDOW/DOOR/... SYSTEMS; BY OTHERS* 4. HILTI HIT-HY 70 (EPOXY), HIT-5.8 8"x42" (NCHOR ROD) & HIT-SC 6X85 (SLEEVE); TO BE USED ON CMU WLL 5. HILTI KB TZ SCREW /8 x-/4 ;TO BE USED ON REINFORCED CONCRETE WLL 6. SINGLE LUMINUM SPCER L-BRCKET; TYP. LENGHT 40MM (52"). CHECK SPECIFIC WLL BUILDUP TO USE DEQUTE SIZE OF BRCKET.** 7. DOUBLE LUMINUM SPCER L-BRCKET; TYP. LENGHT 40MM (52"). CHECK SPECIFIC WLL BUILDUP TO USE DEQUTE SIZE OF BRCKET.** 8. THERML INSULTION SPECIFICLLY ENGINEERED FOR CVITY WLL PPLICTIONS; BY OTHERS* V SOFFIT ELEVTION 8" 2'-9 5 8" 92 '-9" B B B 2. EQ.TYP '- 4" 7" V 55 EQ.TYP H2 50 T.O.PNEL B.O.PNEL S SOUTH ELEVTION EXTERNL CORNER - TYPE B.O.PNEL REFER TO DWG 004 TYP. JOINT 6" REST TYPICL BUILDUP 7" 75 INSULTION 2" TYPICL EST ELEV. 6 2" LONGER FLNGE OF 4'-96" L-PROFILE TO BE LID VERTICLLY SIDE ELEVTION 4 4" V4 55 2" 9. LT SCREW TO BE USED FOR FIXING VERTICL PROFILES TO SPCER L-BRCKETS 0. POWDER COTED (BLCK) LUMINUM T-PROFILE, 00x60x2.7MM ( 5 6"x2 8"x8"), M (8 8") LONG. POWDER COTED (BLCK) LUMINUM L-PROFILE, 40x60x2.7MM (6"x2 9 8"x8"), M (88") LONG 2. FIXING CLIP SCREW TO BE USED FOR FIXING, FIXING PLTES TO VERTICL PROFILES. INVISIBLE POWDER COTED (BLCK) STGGERED STINLESS STEEL FIXING PLTE.TYP. TERRCE GROUND 5MM ( 6")JOINT 4. INVISIBLE POWDER COTED (BLCK) LTERL STINLESS STEEL FIXING PLTE. TYP. 5MM ( 6")JOINT 5. INVISIBLE POWDER COTED (BLCK) STRT/END FIXING PLTE B.O.PNEL 6. BLCK POLYURETHENE STRUCTURL SILICON P-404. DOW CORNING 795 SILICONE TO BE USED IN LL WINDOW HED DETILS INSTED OF P-404. (REFER TO DETIL 85 B) GROUND 7. PORCELIN PNEL TYPE : 474"x 2 5 8"; URBTEK COLLECTION; COLOR STREET C 8. PORCELIN PNEL TYPE B: 474"x 6"; URBTEK COLLECTION; COLOR STREET C 9. PORCELIN PNEL TYPE B: 474"x 22"; URBTEK COLLECTION; COLOR STREET C 20.LUMINUM FLSHING; BY OTHERS* 4'-0 7 8" 6" V.I.F. TYP. JOINT 6" V TYP. JOINT 6" 2 8" 5'-04" 75 4'-0 7 8" TYPICL EST ELEV. 6 2" H 50 INSULTION 2" 2" 4" 4" EST ELEVTION EXTERIOR CORNER + MITER EXMPLE DETIL - TYPICL CORNER BETWEEN SOUTH&EST ELEVTION *TYPICL BUILDUP 62" T EST ELEVTION *UNDER NO CIRCUMSTNCE THE CLDDING WILL PROJECT BEYOND PROPERTY LINE. *L-BRCKET DECRESSES TO THE NEXT SIZE DOWN - 44" 2. INVISIBLE POWDER COTED (BLCK) CENTRL STINLESS STEEL FIXING PLTE. TYP. 5MM ( 6")JOINT *SUPPLIED ND INSTLLED BY OTHERS **LL SPCER L-BRCKETS INCLUDED IN THIS PCKGE LLOW FOR +/- /4" TOLERNCE OF SUBSTRTE WLL. IT IS RESPONSBILITY OF GENERL CONTRCTOR TO IDENTIFY UNEVENCY OF BCKUP WLL LRGER THN THE TOLERNCE WITHIN THE SYSTEM. SLOPED GRDE EXMPLE 2 SIDE ELEVTION DETIL B - TYPICL WINDOW JMB T EST ELEVTION *RETURN & EXISTING WLL TO BE LIGNED. TYPICL. EXCEPT IN SOFFITS. *TOLERNCE BETWEEN WINDOW & WLL TO BE DEFINED BY OTHERS. TYPICL CLDDING SYSTEM TOLERNCE +/- 4" HORIZONTL DETILS 809 ISSUED FOR COMMENT CONTRCT

20 9. Penetrations/Signage 42" T.O.SUBSTRTE 2'-82 " TYP. JOINT 6 " " T.O. INTERIOR CEILING 2'-0" " 4 CUT 8" " TYP. JOINT 6 " TYP. JOINT 6 " TYP. JOINT 6 " CUT 0. Soffit 6" TYP. JOINT 6 " 5 " BUILDUP 4" T.O. FINWLL SYSTEM 2'-4 /2" TYP. BUILDUP 42 " TYP. BUILDUP 42" 0 TYP. BUILDUP 4 " 2 TYP. BUILDUP 42" TYP. BUILDUP 42 " 9 TYP. JOINT 6 " " TYP. JOINT 6 " TYP. JOINT 6 " 8 " 6" 5" 28 2 T.O.SUBSTRTE 8'-0" " " " ST FLOOR 0'-0" 2 B.O.PNEL BY OTHERS 2 24 TYP. BUILDUP 42 " ". EXTERIOR STUD WLL: DRY WLL, ME SHETING (SINGLE); BY OTHERS* 2. EXTERIOR SOLID WLL: REINFORCED CO BY OTHERS* 9" TYP. JOINT 6 " TYP. JOINT 6 ". DMP-PROOF CORSE (DPC); BY OTHER 4. WINDOW & DOOR SYSTEMS; BY OTHER 5. HILTI KB /8"Ø x -/4" SS04; TO FIX SUPPORT BRCKETS TO REINFORCE WLL *** 6. HILTI KWIK SCREW HUS-EZ ¼ x 2-5/ USED TO FIX METL PROFILE TO REINF CONCRETE WLL & CMU *** 7. HILTI HIT-HY 70 (EPOXY), HIT-5.8 8"x4 ROD) & HIT-SC 6X85 (SLEEVE); TO B FIX L-SPCER BRCKET TO CMU WLL 8. ELCO ULTRCON SCREW 2-/4" - 5/6 MIN 24" O.C. HORIZONTLLY CHNNEL; MIN EDGE DISTNCE 2,5" ; T FIX OMEG PROFILE TO CONCRETE WL 9. STEEL SCREW; HILTI S-MD 2-24 x 2 USED TO FIX L-SPCER BRCKET TO S STRUCTURE *** 9 52 " '-7" (V.I.F.) GUTTER; BY OTHERS 2 0. HILTI SELF-DRILLING SCREW S-MD5S SS04. TO BE USED TO FIX OMEG PR METL STUD WLL (TO BE USED ONLY INTERIOR) " T.O.SUBSTRTE 2'-0". LUMINUM OMEG PROFILE 20x40MM ( M(88 ") LONG BUILDUP 4" T.O. FINWLL SYSTEM 2'-4 /2" 4. SINGLE/DOUBLE THERML ISOLTOR (P TYP. JOINT " " 6 6 T.O. PNEL ELCO DRIL FLEX SCREW /4-20 x 2 /2 STLGRD; TO BE USED TO FIX OMEG METL STUD WLL WHEN LONGER PEN NEEDED (TO BE USED T EVERY EXTER 2. WOOD STUD SCREW; SIMPSON SDS 252 TO BE USED TO FIX METL PROFILE TO WLL *** TYP. JOINT 6 " 5" " 9 TYP. JOINT 6 " *NOTE SUPPLIED BY OTHERS **NOTE 2 LL SPCER L-BRCKETS INCLUDED IN THIS PCK INSTLLER TO IDENTIFY S SOON S POSSIBLE U 4 ***NOTE NOTES CROSSED OUT INDICTES COMPONENTS NOT IMPORTNT NOTE: THIS CURRENT SET OF SHOP DRW SYSTEM. NY OTHER DETIL OR COM SHOWN IN THIS SHOP DRWINGS GUIDNCE/INSTRUCTION FOR HOW TH PCKGE FOR COMPONENTS ND DET DRWING PCKGE. WHERE THOSE C SYSTEM, SUPPLY ND INSTLLTION SOFFIT EXMPLE IMPORTNT NOTE: IF NOT NOTED TYP. BUILDUP 42 " issue dates ISSUED FOR COMMENT important note ISSUED FOR COMMENT B ISSUED FOR COMMENT C ISSUED FOR COMMENT D *THESE SHOP DRWINGS REPRESENT OUR INTERPRETTION OF THE PLNS ND SPECIFICTIONS, ND OUR CONTRCT REQUIREMENTS FOR THIS PROJECT. *PRIOR TO MNUFCTURE OF NY PRODUCT FOR THIS JOB, LL DIMENSIONS, METHODS OF CONSTRUCTION, ND EXISTING CONDITIONS MUST BE CHECKED ND CORRECTED OR PPROVED BY OUR CUSTOMER. *NO PRODUCT WILL BE SCHEDULED FOR FBRICTION UNTIL WE HVE BEEN NOTIFIED IN WRITING BY OUR CUSTOMER THT OUR DRWINGS HVE BEEN PPROVED FOR FBRICTION. PPROVL DELYS WILL RESULT IN FBRICTION DELY. *WE SSUME NO RESPONSBILITY S TO MESUREMENT OR DETILS FFECTING NY WORK BUT OUR OWN. *LL DIMENSIONS TO BE RE-CHECKED ND VERIFIED IN FIELD/ON-SITE PRIOR TO INSTLLTION. *ITEMS INCLUDING, BUT NOT LIMITED TO, INSULTION, FLSHING, WTERPROOFING, DMP-PROOFING, SELNT, WEEPS, ETC. RE BEYOND THE SCOPE OF PORCELNOS ND MY NOT BE SHOWN ON THESE DETILS. REFER TO THE CONTRCT DOCUMENTS FOR SUCH ITEMS. *THESE DRWING RE TO BE RED IN CONJUNCTION WITH LL OTHER RELEVNT DRWINGS ND NY DISCREPNCIES TO BE BROUGHT TO THE TTENTION OF THE RELEVNT ENGINEER. shop drawings review job title drawing reviewed by:... B 20 C date reviewed drawing title RCHITECTURL DETILS VERTICL OFFICE LOBBY (INTERIOR & PORTL) PCIFIC CENTER LOS NGELES, C architect reference drawn checked scale PRELIMINRY JC IV HLF E C

21 V. CLENING ND MINTENNCE. Initial cleaning of the façade Once all the construction activities and works are finished, that may produce dirt or residue and therefore affect the appearance of the façade: Clean with pressurized water and dry with a clean cloth. In the case of stains that resist normal washing, clean again with water and mild soap. Never use abrasive elements or detergents that are different from those indicated. Use qualified personnel and appropriate tools. Before the initial cleaning, check the information contained in certificates, technical data sheets, and packaging. B. Regular cleaning The direct contact of the façade with the air and therefore with environmental pollution, as well as with any kind of vapor, gas, liquid, or element coming from the building or the outside, can produce dirt deposits that can affect the appearance of the façade. Since PORCELNOS Group s STON-KER slabs are characterized by their zero absorption (less than 0.5%), dirt does not penetrate, it only remains on the slab surface. Clean with pressurized water and dry with a clean cloth. In the case of stains that resist normal washing, clean again with water and mild soap. Do not use solvents or concentrated acid detergents. Never use detergents containing hydrogen fluoride (HF) in their composition. Do not use detergents containing waxes in their composition. Never use abrasive elements that may scratch the ceramic slabs. The cleaning frequency will depend on the degree of soiling, being 5 to 0 years for areas with average pollution, and around two years for areas where pollution is high. C. Cleaning paint residues or graffiti Façades are subject to vandal attacks with paint stains or graffiti. Since PORCELNOS Group s STON-KER slabs are characterized by their zero absorption (less than 0.5%), dirt does not penetrate, it only remains on the slab surface. Use acetone, or alcohol as cleaning product and apply with an absorbent cloth or nonabrasive white fiber scourer. D. Cleaning rust stains Rust stains can accumulate naturally on the façade slabs. Clean with water and mild soap with an absorbent cloth or nonabrasive white fiber scourer. E. Removal of dirt from rainwater The ventilated façade characteristics limit the dirt deposited from rain water. In the case of rains that drag contaminants present in the air or leachate from the building itself, dirt may accumulate in some specific points of the façade such as window sills, crowning trims, and corners. Clean with pressurized water and dry with a clean cloth. F. Cleaning the air chamber The air chamber existing between the ventilated façade and the substrate is essential for the improvement of the building s thermal conditioning. In order to make air convection easier inside and avoid the formation of thermal bridges, it shall be checked regularly to make sure there are no elements inside. Remove any dirt build-up inside the chamber with pressured air or water. This process is especially important in areas where there is a risk of insects, such as wasps or bees, birds, and small mammals nesting inside it. In these cases, it is highly recommended to include anti-fauna barriers and meshes at the façade bottom. 2

22 VI. PNEL REPLCEMENT Should Porcelanosa porcelain panels break during the installation process or beyond, they can be replaced in an isolated manner without having to remove the entire row or wall. Please contact Porcelanosa Facade Technical Department for assistance and BEFORE removing any panels from your project. Damage to the façade VII. CONTCT INFO, SCHEDULE UDITS, ETC. Porcelanosa Porcelain Facade technical department is available to answer your technical questions. Please contact us for questions regarding estimation, installation, to request a training or in general regarding the product. To contact the Porcelanosa Facade Technical Department please call: x207 Porcelanosa Porcelain Facades are designed to stand the movements and strains expected specifically for each project, and thus it does not require any specific maintenance. However, in the case of: Cracks, fissures, or breakage of ceramic pieces. Loss of verticality or displacement of pieces with respect to their position on the façade. Damage, loss of verticality, or detachments of structure elements of the façade. Damage, loss of verticality, or detachments of dressing elements, crowning pieces, or trims of the ventilated façade. Water leaks through joints between the ventilated façade and other elements of the façade. Please contact the Porcelanosa Porcelain Facade Technical Department. Do not manipulate the façade structure or slabs without technical supervision from the Technical Department Job Site Recommendations for Damage Prevention Do not rest any element or structure not included in the project on the façade. Do not manipulate the façade structure or slabs without technical supervision from the Technical Department Before doing any drilling or machining, check with the ceramic manufacturer. 22

23 2

24 ESR-4 FL-2906 W W W. P O RCE L N OS F C DE S.COM

INSTALLATION INSTRUCTIONS FOR CECO DOOR FLOOD RESISTANT DOOR AND FRAME ASSEMBLIES

INSTALLATION INSTRUCTIONS FOR CECO DOOR FLOOD RESISTANT DOOR AND FRAME ASSEMBLIES INSTLLTION INSTRUCTIONS FOR CECO DOOR FLOOD RESISTNT DOOR ND FRME SSEMBLIES GENERL The installation of flood resistant door and frame assemblies differs significantly from that of standard door and frame

More information

Installation Guide - Evolution Series Wood Siding

Installation Guide - Evolution Series Wood Siding Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration

More information

Cladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable.

Cladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable. Cladding Quick Installation Guide HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable. Installation instructions This document is a step by step guide

More information

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA 7/16 PETRARCH ARCHITECTURAL WALL PANELS APPLIED OVER A STUDWALL BY MEANS OF A FIELD ASSEMBLED BACK FASTENED SYSTEM DESIGN CONCEPT 7/16 panels may be installed

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

KuraStone TM Installation Guide

KuraStone TM Installation Guide Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8 [161.9mm] PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE P-RSAN-INT INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS

More information

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING TABLE OF CONTENTS This installation guide provides detailed step-by-step instructions for do-it-yourself projects. We invite you to read it carefully and

More information

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

Shapes Siding. Perfection Shingles. Chalk Line

Shapes Siding. Perfection Shingles. Chalk Line Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE SIDING INSTALLATION GUIDE CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,

More information

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

Adorn Mortarless Stone Veneer Installation Natural Concrete Products Adorn Mortarless Stone Veneer Installation Adorn Mortarless Stone Veneer can be used on new or existing construction. Adorn is nailed or screwed onto the wall; therefore no brick ledge is required. Adorn

More information

DW HORIZONTAL INSTALLATION

DW HORIZONTAL INSTALLATION AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S

More information

Connect Transit Shelter

Connect Transit Shelter Tools Required *denotes special tools required Connect Shelter, 8ft Connect Shelter, 12ft *Soft, non abrasive protective surface such as a furniture blanket *Source of compressed air (for thorough dust

More information

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 QCI0274 QCI5274 REV. Rev. 1 0 Page Page 1 1 Date Certified: Certified 06/16/2016 10/01/10 Parts List with wall mount hinges ITEM NO. Part # DESCRIPTION

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8 [161.9mm] PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS. CONTAINED

More information

Heavy Wall Applied Stop Tube Frame and Door Installation

Heavy Wall Applied Stop Tube Frame and Door Installation INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation Read all instructions before beginning installation. These instructions are provided to help prevent installation problems

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly

More information

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.

More information

Installation Manual for Thermo Panel

Installation Manual for Thermo Panel Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on

More information

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

FITS MUSTEE 32 X 32 SHOWER RECEPTOR

FITS MUSTEE 32 X 32 SHOWER RECEPTOR MUSTEE FIBERGLASS SHOWERWALL FITS MUSTEE 32 X 32 SHOWER RECEPTOR IMPORTANT: SEE BACK PAGE FOR SHOWER DOOR (ENCLOSURE) LISTING Before you assemble and install your MODEL 732 three-piece Molded Fiberglass

More information

MUSTEE FIBERGLASS SHOWERWALL

MUSTEE FIBERGLASS SHOWERWALL MUSTEE FIBERGLASS SHOWERWALL Before you assemble and install your MODEL 736 three-piece Molded Fiberglass Shower Wall unit you will have to prepare the rough-in area, determine which side wall will have

More information

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions 14000 I/O Series Flush Glaze Fabrication and Installation Instructions Last saved on 12/18/2009 Table of Contents GENERAL CONSTRUCTION NOTES...3 EXTRUDED ALUMINUM PARTS...4 ACCESSORIES...5 OVERVIEW...6

More information

Effective February, 2015

Effective February, 2015 Effective February, 2015 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning

More information

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS MUSTEE FIBERGLASS SHOWERWALL INSTALLATION INSTRUCTIONS DIRECT MOUNTING TO STUDWALLS INSTALLATION INSTRUCTIONS 3636C - NEO ANGLE SHOWER RECEPTOR 3636DT - DOUBLE THRESHOLD SHOWER RECEPTOR IMPORTANT: FITS

More information

A-935 RODA WALL MOUNT HINGES

A-935 RODA WALL MOUNT HINGES INSTALLATION INSTRUCTIONS A-935 RODA WALL MOUNT HINGES NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time FRAMELESS DOOR / PANEL CELESTA QCI0274 REV.

More information

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR Phone: (800) 262-5151 Fax: (866) 262-3299 crlaurence.com usalum.com crl-arch.com 11M0292 HANDLING, STORAGE,

More information

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement 1 Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement The following instructions are a supplement

More information

Frameless Inline Door QCI5254

Frameless Inline Door QCI5254 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5254 FRAMELESS DOOR / PANEL QCI5254 REV. 0 Page 1 Cer fied 06/16/2016 Parts List with wall mount hinges *Quanes may vary QCI5254 REV. 0 Page 2 Cer fied

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8 [161.9mm] P-RSS PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE P-RSS INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS

More information

FIXED PANEL SLIDER QCI5241

FIXED PANEL SLIDER QCI5241 INSTALLATION INSTRUCTIONS FIXED PANEL SLIDER QCI5241 FRAMELESS PANEL / DOOR / PANEL FRAMELESS DOOR / PANEL QCI5241 REV. 0 Page 1 Certified 06/16/2016 Parts List *Quantities may vary QCI5241 REV. 0 Page

More information

INSTALLATION MANUAL STORAGE

INSTALLATION MANUAL STORAGE IMVersion 1.1 INSTALLATION MANUAL GENERAL GUIDE: The information in this IM is intended to serve as a general guide to proper installation with no warranties intended or implied. Prime Panels assumes no

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

SLATTEX (Textured Slatwall) INSTALLATION GUIDE

SLATTEX (Textured Slatwall) INSTALLATION GUIDE SLATTEX (Textured Slatwall) INSTALLATION GUIDE Preparing for the Installation: Here are some suggestions to help you to help you simplify the installation process and maximize the beauty of your 3D Textured

More information

Installation instructions for co-extruded louver-board profiles

Installation instructions for co-extruded louver-board profiles Installation instructions for co-extruded louver-board profiles www.silvadec.com / info@silvadec.com / tel.:+33 (0)2.97.45.09.00 TO BE READ CAREFULLY BEFORE INSTALLATION Before starting installation on

More information

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS Table of Contents I. Care and Maintenance... 2 II. Tools / Materials, Sealant Requirements, & Anchor Instructions... 2 III. Structure Verification & Sub-Sillpan Installation... 3 1. Opening Verification...3

More information

Frameless Inline Door With Return QCI5263

Frameless Inline Door With Return QCI5263 INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges

More information

window installation Guide wood FRaMinG New Construction

window installation Guide wood FRaMinG New Construction window installation Guide wood FRaMinG New Construction IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements supersede

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework.

Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. facade Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. Specification and installation guide Presentation of the system VMZ

More information

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS Fence Installation Guide 3', 4' & 6' High INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers

More information

Installation Guidelines

Installation Guidelines Installation Guidelines Tando Building Products provides these instructions as general guidelines only. Tando Building Products neither installs exterior cladding nor has any control over any installation.

More information

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES 1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 9/29/2017 Installation Guideline Disclaimer This document contains general installation

More information

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES 1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 08/31/2018 Installation Guideline Disclaimer This document contains general installation

More information

CONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies

CONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies LaminatorsInc.com CONTENTS 1 Essential Equipment 1 Essential Supplies 2 Panel Preparation 4 Panel Extrusion Preparation 5 Panel Assembly 6 Wall Sheathing Preparation (Over Plywood) 6 Wall Sheathing Preparation

More information

Installation Instructions

Installation Instructions Installation Instructions Roof edge trim profile Series TAG multi-piece aluminium profile Front face height: 250-1050 mm supplied with patented 4F brackets as standard height-adjustable, horizontally moveable,

More information

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

More information

MANUFACTURING INC. Specifications

MANUFACTURING INC. Specifications Page 1 of 4 GENERAL 11 Aluminum security screen doors must be tested by a recognized testing laboratory to conform to SMA 6001-2002 Proposed American National Standard Specifications for Metal Protection

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY P-OS PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE P-OS INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY WITH OPTIONAL S.S. S PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

PANEL INSTALLATION GUIDE

PANEL INSTALLATION GUIDE GUIDE The Manufacturer has provided these instructions as installation guidelines in accordance with ASTM E-330. The manufacturer, however neither installs the panels nor has any control over the installation.

More information

Storefront Installation Guide

Storefront Installation Guide Storefront General Notes: 1. Check Contract Documents and Shop Drawings. Understand and clarify any Field Verify Notes and approvals of drawings and products to be familiar with the project. Installation

More information

Tools required by installer: Materials required by installer:

Tools required by installer: Materials required by installer: Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard

More information

Definitions and Design Considerations... W-CR-2

Definitions and Design Considerations... W-CR-2 General Information SECTION DIRECTORY Definitions and Design Considerations... W-CR-2 Combination Assembly Recommendations and Limitations Typical Sealant... W-CR-4 Single-Unit Opening... W-CR-4 Two-Way

More information

WOODWORKS Walls. Installation Instructions WALL

WOODWORKS Walls. Installation Instructions WALL WALL Systems Between us, ideas become reality WOODWORKS Walls Installation Instructions 1. GENERAL 1.1. Product Description WoodWorks walls consist of 2' x 4', 2' x 8', 2' x 9' or 2' x 10' perforated and

More information

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose

More information

Panel Installation Instructions

Panel Installation Instructions EXTREMELY IMPORTANT INFORMATION PLEASE READ ENTIRE PACKET! Warranty Is Void If Panels Not Installed According to Instructions 1. WARNINGS & SPECIAL NOTES 1.1 Keep panels 24 from Heaters and shield Radiant

More information

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS. RENU PANELING SYSTEM Installation Guide Version 1.0 PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. ALL STATED SIZES ARE NOMINAL DIMENSIONS. Components Trim Track (TT) 1" x 1 3 4" (GER3TTAA): fastens to

More information

Installation Instructions

Installation Instructions Installation Instructions 200 Series Curtainwall 3056 WALKER RIDGE DR. NW, SUITE G WALKER, MI 49544 800-866-2227 dependable@tubeliteinc.com Revised April 2014 dependable@tubeliteinc.com Page 1 TABLE OF

More information

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Things to Know Before You Start Things to Know Before You Start Removal of Old Fenestration Products Ensure any old fenestration

More information

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283 FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283 QCI5283 Page 1 Date Certified: 06/16/2016 Parts List with wall mount clamp ITEM NO. DESCRIPTION QTY. 1 FIXED GLASS PANEL 1 2 WALL MOUNT CLAMP 1 3 U-CHANNEL

More information

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.

More information

Frameless Inline Door QCI5250

Frameless Inline Door QCI5250 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5250 FRAMELESS PANEL / DOOR / PANEL QCI0249 REV. 3 Page 1 Certified 10/12/12 Parts List with pivot hinges *Quantities may vary. QCI0249 REV. 3 Page 2

More information

Sun Windows General Information New Construction Hinged Door Installation Instructions

Sun Windows General Information New Construction Hinged Door Installation Instructions A G H F H H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape F. Apply

More information

FENCE INSTALLATION GUIDE 8 HIGH WALLS

FENCE INSTALLATION GUIDE 8 HIGH WALLS FENCE INSTALLATION GUIDE 8 HIGH WALLS 1.866.648.9336 www.simtekfence.com INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers of SimTek decorative

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2012 Pella Corporation Part Number: 80WH0101 INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Installation Instructions for Typical Wood Frame Construction.

More information

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION HOLLOW METAL DOORS AND FRAMES SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: Include construction details, material

More information

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray. Usage:

More information

STACKING MULTI-SLIDE DOOR SYSTEM

STACKING MULTI-SLIDE DOOR SYSTEM SMSD STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal

More information

Frameless Inline Door QCI5248

Frameless Inline Door QCI5248 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5248 FRAMELESS PANEL / DOOR / PANEL QCI5248 REV. 0 Page 1 Certified 06/16/2016 Parts List with glass to glass hinges *Quantities may vary. **Support Bar

More information

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM S Y S T E M D E T A I L S FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM PAGE TITLE PAGE Table of Contents Fundermax Max Exterior Product Information Design and Installation Information

More information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY HRS-6C PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE HRS-6C INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF

More information

Vinyl Windows Manufactured by VPI Quality Windows

Vinyl Windows Manufactured by VPI Quality Windows Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

Five Star Panel Installation Instructions

Five Star Panel Installation Instructions Five Star Panel Installation Instructions How to Store Five Star Panels You will need to store FIVE STAR PANELS in dry place to prevent staining, deterioration and possibly void all warranties. Stand the

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.

More information

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Sun Windows General Information New Construction Sliding Door Installation Instructions H F A G B D C H F H E H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape

More information

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS. INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS. Installer: DO NOT DISCARD Please leave the Installation Guide

More information

10 x 10 Flat Top Two Tone Pergola

10 x 10 Flat Top Two Tone Pergola 0 x 0 Flat Top Two Tone Pergola Models: Bordeaux ASSEMBLY GUIDE OPTIONAL ACCESSORIES Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post) Bolt Down Bracket Kit ( for Pergola) Ver.0-00

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

Installation Instructions for. Handrail Component System

Installation Instructions for. Handrail Component System Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32

More information

12 x 24 Flat Top Pergola

12 x 24 Flat Top Pergola A S S E M B LY G U I D E OPTIONAL ACCESSORIES: Bolt Down Bracket Kit Privacy Wall (6 for Pergola) Pergola Planter Ver.-75 Ta b l e o f Co n t e n t s PAGE Introduction & Overview......................................................

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary. for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) Thank you for selecting JELD -WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows

More information

ANCHOR PLATE ATTACHMENT STEEL STUD FRAMING OR FURRING CONSTRUCTION WITH ACCESS FROM PANEL SIDE ONLY

ANCHOR PLATE ATTACHMENT STEEL STUD FRAMING OR FURRING CONSTRUCTION WITH ACCESS FROM PANEL SIDE ONLY ANCHOR PLATE ATTACHMENT STEEL STUD FRAMING OR FURRING CONSTRUCTION WITH ACCESS FROM PANEL SIDE ONLY INSTALLATION MATERIALS No. 8 Phillips Head Tek Screws Glazier's horseshoe shaped shims 1/16 inch, 1/8

More information

Mechanical Stone Hanging System. Installation Guide

Mechanical Stone Hanging System. Installation Guide Mechanical Stone Hanging System Installation Guide Precision Wall Systems, Inc. 1821 Levee Street Dallas, Texas 75207 Phone 214.774.4502 Fax 214.432.5063 www.gridworxwalls.com Revised 7/2016 Index Overview

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES GENERL NOTES 162-971 1 OF 12 THESE INSTLLTION INSTRUCTIONS RE SUPPLEMENT TO THE PPROVED SHOP DRWINGS. USE IN CONJUNCTION WITH THOSE DRWINGS. 1 - HNDLING, STORING ND PROTECTING LUMINUM MTERIL. THE FOLLOWING

More information

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND HVAC SYMBOL LEGEND HVAC PIPING AND VALVES LEGEND HVAC GENERAL NOTES SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION PHASING OF WORK HVAC ABBREVIATIONS ABBREVIATION

More information

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation. Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed

More information

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS Page 2-9: Installation Instructions, Figures 1, 2, & 3 Page 10-12: Figures A-1, A-2, & A-3: Installation

More information

Flashing Materials. Rough Opening Preparation

Flashing Materials. Rough Opening Preparation Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or

More information