1 11 Nordic Insulation Symposium Stockholm, June 11-13, 2001 Partial discharge diagnostics on very long and branched cable circuits Nico van Schaik, E. Fred Steennis, Wim Boone and Dick M. van Aartrijk KEMA T&D Power Arnhem, the Netherlands 1. Summary Partial discharge diagnostics is a proven tool to diagnose the condition of cable circuits. However the length to be measured is limited because of attenuation and dispersion of the partial discharge signal and because of its reflections, used as indicator for the location of weak spots. Result is an upper limit up to 4 km circuit length that can be diagnosed. A method to overcome this length limitation is to measure partial discharge signals at both ends simultaneously. This has Figure 1 Defect near the conductor (burned material by repeated partial discharge activity) found in a bitumised joint been realised by means of a patented method. The upper limit for the length is thus increased up to 10 km for point to point connections. To diagnose branched cable circuits, simular problems can be solved with success by application of multi-sensor testing. The method used for long lengths and for branched cable circuit will be discussed in detail. Results will be presented. Besides, attention will be paid to the partial discharge detectability of one specific type of defect, water treeing. 2. Introduction Partial discharge diagnostics on medium-voltage and high-voltage cables are a proven tool to reduce the number of unexpected outages. This paper will focus on partial discharge diagnostics for medium-voltage cables only. One of these methods is called in this paper reflection based pd testing and will be explained more extensively in one of the sections.

2 12 Due to the successful application of the reflection based pd testing, which is applicable to non branched cable circuits with lengths up to 4 km, there was a need to develop a test system that could cover cable circuit lengths up to 8 km or more cable circuits that are branched (mainly for the USA) This was solved, by making a test system where multiple sensors are used. Sensors are placed at each cable circuit end. In a long cable there are two sensors, in a branched cable circuit the number of sensors is three or more. For long cable circuit lengths, the advantage of this method is that a partial discharge does not need to travel up and down the cable before it is measured. For branched cable the multiple reflections on branch connection points do not disturb the partial discharge pulse anymore (like it is doing in the reflection based pd testing method). Each of the sensors measure the partial discharges, and localisation of a partial discharge source is done with help of the difference of arrival times of these partial discharges. The problem of accurate time synchronisation was solved by means of a GPS system added to each sensor, which method is patented. Accurate time synchronisation is needed in order to get a reliable localisation of the partial discharge sources. The test method is called in this paper multi-sensor based pd testing method and will be discussed in more detail in one of the following sections. Important to be mentioned is, that partial discharge testing cannot be used to find all types of heavy water treeing in medium-voltage extruded cables. Some more background information will be given in the following section. Also, new extruded cables normally do not show partial discharge activity if the cable was screened on partial discharges before delivery as is usually done during routine testing. Only extruded cables that have been loaded to extremely high temperatures (for instance at hot-spots) may have voids or loose screens and therefore may show partial discharge activity indeed. Bus this is not often seen. Therefore, the focus of partial discharge testing on medium-voltage cables is on accessories for extruded cable circuits cable and accessories for paper insulated lead covered cable circuits 3. Water treeing and partial discharges Because there is some confusion among experts and cable network owners world-wide about the effectiveness of partial discharge testing in the case of an extruded cable with water trees, our opinion on this matter will be given here.

3 13 A water tree is a well-known degradation process of extruded cables, especially in older cables that do not have any water (tree) protection. The background of water tree growth will not be discussed here, many references deal with this subject [1]. There is some agreement, that a water tree is a kind of chemical corrosion of the polymer. It is important to realise that even a large water tree is not a conductor, but still an insulating material (of inferior quality). Consequently, the electric stress enhancement at a tip of a water tree is Figure 2 One large and two small very limited. Therefore, water trees can vented water trees in an extruded cable, bridge the whole insulation of a cable no voids could be found that may without giving a breakdown immediately. generate partial discharges. There are no voids in the water tree that are available or large enough to give rise to partial discharges. A typical large water tree as found in the insulation of a steam-cured 10 kv cable is shown in Figure 2. For these reasons, a field test in many cases will not show up partial discharge activity even for cables with large water trees..but, such water trees are very dangerous. They suddenly can initiate an electrical tree, especially during an over-voltage. Such electrical trees do grow very fast and within minutes they bridge the whole insulation and cause cable breakdown. During this process of growth of the electrical tree, partial discharges are generated which indeed can be measured. However, such discharges are only found at the last stage of life of a cable and for a real Tip of a vented diagnostic test they do not represent the early Figure 3 tree with an electrical tree warning needed. An experiment in the laboratory revealed such a situation. Various 10 m service aged cable samples with large water trees were subjected to a test voltage, starting at the working voltage 1 Uo (which is defined as the system voltage between the conductor and neutral wire). During the increase of the test voltage (with a ramp of about 1 Uo per 5 minutes) the partial discharges were measured. In all cable samples, partial discharges appeared between 2 Uo and 4 Uo. In some cables, the test voltage level was reduced to a level where the partial discharges just did not disappear and it was found

4 14 that the cable samples broke down within minutes after the first appearance of the partial discharges. In some other cable samples, the first partial discharges were measured with high-frequency sensors on both cable ends and stored in a 500 MHz digitizer. Immediately, after that the test voltage was switched off. The discharging location could be traced with an accuracy of about 1 cm. At this spot, the cable sample was cut and the insulation was subjected to a visual inspection. All locations showed a large water tree and also an electrical tree that not had fully bridged the insulation. It is assumed here that this fast growing electrical tree has produced the partial discharges that was measured just before switching off. An example of a water tree with such an electrical tree is shown in Figure 3. Clearly, the open carbonised black channels from the branching electrical tree can be distinguished from the water treed area (the dark finger in Figure 3 represents one water tree branch). These findings explain what could happen in the field during normal service operation and during partial discharge testing. During normal service operation, over-voltages will create electrical trees at the tips of one or more large water trees. If the extinction voltage of the electrical tree is lower than the following normal operating voltage of the cable, soon the cable will breakdown. If it is higher, new over-voltages will further weaken the cable insulation by repeated growth of the electrical tree until breakdown follows. Anyhow, the cable has become very sensitive for over-voltages, also for those occurring during switching operations. A diagnostic test that has test voltages above the normal working voltage of the cable is therefore a threat for a cable with large water trees. It may create electrical trees or if the electrical trees are already there it will further weaken the cable (causing breakdown during testing or soon after returning to normal service operation). Therefore, such a partial discharge test cannot be seen as a real diagnostic test. On the other had, it can trace water trees that are in their final stage of life. But, many network owners would like to know the cable condition in a stage that is preceding the final stage of life, in order to take timely decisions about proper maintenance actions. Dielectric spectroscopy is a real diagnostic test alternative T2 T3 that has proven to be effective [2]. T1 x 4. Reflection based pd testing defect We come back now to real partial discharge testing, focussing on other types of defects than water trees. Briefly, the reflection based pd testing will be explained here (see also Figure 4). The cable is switched off and is subjected to a Figure 4 Principles of relection based pd testing.

5 15 test voltage. The test voltage source can be for instance 0.1 Hz, an oscillating wave or a power frequency based voltage. There is some dispute going on what the most realistic test voltage is, but far more important is the fact that they all generate partial discharges at defects. KEMA is using or recommending all these test voltage sources as long as it is proven that they are effective in finding specific defects. So far, KEMA s experience is based on a test voltage of 0.1 Hz and some tests with power frequencies. The partial discharge pulses are measured with a sensor, which is normally a capacitive divider. The actual partial discharge source location can be derived from the differences in arrival times (identified in Figure 4 with T1, T2 and T3, corresponding with the first, second and third pulse arrival). The sensors normally operate with a frequency bandwidth between 1 and 10 MHz, which is enough to have a localisation accuracy between 0.5 and 2 %, the actual localisation accuracy is depending strongly on noise conditions, cable type and cable length. For very short cables (10 to 100 m range), it is for instance required to have sensors and digitizers with a bandwidth of 10 to 100 or even 400 MHz in order to reach the same localisation accuracy. Three factors influence the success of a partial discharge test much more than the actual equipment applied. These factors are often neglected too much when discussing the right measuring equipment: the experience of testing technicians in reducing the noise, selecting the right test voltage, knowing how to calibrate and in the end knowing how to interprete the data the co-operation with the network owner, who must be able to inform the measuring technicians about the actual cable length, cable types and accessory types. Moreover, earlier experience is very important for the right diagnosis. For example, if in an oil joint many large partial discharges ( pc or more) are found then this will cover (at least) two different possible defects: a too low oil level (which is not very critical) or water ingress (which is very critical). If in this example in the past several joints in the same circuit did fail due to water ingress, there is now a good reason to assume that the remaining joints will suffer from the same problem, in which case immediate replacement of the joints is needed. a database with knowledge rules, that represents all past experience and that can be used to select possible defects (assuming the circuit data given by the network owner is correct). The database should not contain partial discharge magnitudes only, but also partial discharge intensity information, test voltage level, phase information and if possible also pattern recognition tools. 5. Multi-sensor based pd testing method With sensors on both sides of the cable circuit the cable circuit length that can be diagnosed is in principle doubled due to the fact that partial discharge pulses do not

6 16 have to travel up and down the cable anymore. That means that the cable length that can be diagnosed has increased from 4 to 8 km. But there is another additional advantage, making it possible to diagnose even longer cable circuits. This is the fact that a reflected pulse in the reflection based pd method is sometimes hidden or defect partly hidden by the tail of the 1 2 first pulse that will arrive. And this tail is full with oscillations due to the measuring circuit setup. With two sensors, it is not 1 2 needed to try to identify the time reflected pulse, simply the first Figure 5 system. Multi-sensor based pd testing pulse that will arrive at each sensor contains the information needed. Experience has shown that it is possible to diagnose cable circuits up to 10 km. It must be repeated also here that the actual cable circuit length that can be diagnosed is also depending on practical circumstances such as noise conditions and cable type. An important element in the multi-sensor based pd method is the time synchronisation, for which a GPS system at each sensor is applied. The accuracy is such that it will not harm the Figure 6 The signals from two different sensors, from accuracy that can which the partial discharge location can be found. be reached with the bandwidth of the sensors (1 to 10 MHz) and therefore, the total accuracy of the measuring system is still in the order of 0.5 % to 2 %. Also, the alternative solution, the application of atom-clocks was studied, but it was found that these atom-clocks are very sensitive to mechanical shocks, temperature variations and magnetic fields. Partly this could have been solved, but the sensitivity for the direction of the magnetic field could not easily be overcome. And even then, it was not certain whether the atom-clock would

7 17 be accurate enough. However, both solutions (GPS and atom-clocks) have been patented Figure 7 Discharge map, a paper insulated cable circuit of almost 8 km. Both sensors are connected to a digitizer and PC, which is called sensor-set. Each sensor-set has the ability to trigger independently, but under normal operation conditions they operate in a master slave configuration. On a trigger of the master sensor-set, the connected PC will investigate the received data. If it is recognised as a possible partial discharge, the slave defect 1 2 time Figure 8 Testing set-up for a branched cable network with the multi-sensor based pd method. 3 sensor-set will get a signal so that it will store the data in a certain time frame. In this way, the total amount of received data is minimised to reliable information. All this data is sent via one of the cable phases or with another communication device to the master sensor-set for further analysis. An example of the partial discharge pulses from one source, received at both sensors is given in Figure 6. The further analysis is similar to that of a reflection based pd method. An example of a discharge map for a cable circuit of almost 8 km is given in Figure 7. In this map it is seen that many joints have high partial discharge levels. This is an example of a cable circuits, where the oil filled joints have a too low oil level. After refilling the joints, the partial discharge intensity was clearly reduced. In the case of a branched circuit, the measuring principles are identical to that of a long cable. Figure 8 shows the principle set-up in the case of working with three sensors. In principle, any partial discharge will result in partial discharge voltage pulses at each

8 18 sensor. But each branch will attenuate the pulse due to branch reflections, therefore the total attenuation is strongly depending on the travelling path along the cable for a specific pulse. For each partial discharge, an optimal set of pulses can be selected and with that the discharging location and discharge magnitude can be found. In very complex circuits, with many branches it is better to install a few sensors (three or four) on the end of the longest branches. If in this case discharges are found from a T-splice, in which branch there was not a sensor, this indicates that the branch itself including the T-splice has discharges. But the discharging locations can only be identified if in a second round of testing a sensor is placed at the end of this specific branch too. This pre-selection can be very effective for such complex cable circuits. An example of a relatively simple branched cable circuit, including a summary of the test results, is shown in Figure References [1] R. Ross, Inception and propagation mechanisms of water treeing, IEEE Transactions on Dielectric and Electrical Insulation, Vol. 5, Nr. 5, pp [2] N. van Schaik, P. Wirelius. Dielectric Spectroscopy, the Diagnostic Method for Diagnosing Watertree Deteriorated MV XLPE Cables, ERA 2000 Conference, paper S2P4. Results are shown on the mapping diagram for test #1. All distances are shown from Location A to Location B. Results are shown on the mapping diagram for test #2. All distances are shown from Location A to Location B. 8 kv 4,300 pc 12 kv 7,700 pc Retest or replace the section in 1 year Substation Test #2 Location B Test Cap PD Zone 8 kv 2,100 pc 12 kv 3,300 pc Inspect the splice. Retest the section in 1 year kv 2,100 pc 12 kv 3,500 pc Inspect the splice 8 kv 2,100 pc 12 kv 3,300 pc Inspect the splice kv 3,300 pc 12 kv 6,000 pc Inspect the splice Test #1 Location B Test #2 Location B kv 2,500 pc 12 kv did not increase Retest the section in 1 year Test #1 Location B kv no PD 12 kv 3,000 pc Retest the section in 1 year 8 kv 5,200 pc 12 kv did not increase Inspect the splice Figure 9 Example of a test result of a branched cable circuit

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE Fred STEENNIS, KEMA, (the Netherlands), fred.steennis@kema.com Peter VAN DER WIELEN, KEMA,

More information

Partial Discharge Trends in Medium Voltage Cables measured while in-service with PDOL

Partial Discharge Trends in Medium Voltage Cables measured while in-service with PDOL 1 Partial Discharge Trends in Medium Voltage Cables measured while in-service with PDOL André N. Cuppen, E. Fred Steennis, and Peter C. J. M. van der Wielen, Member, IEEE Abstract-- This paper presents

More information

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May 26 2011 St Pete Beach, Fl HDW ELECTRONICS, INC. THE BEST IN CABLE FAULT LOCATING TECHNOLOGY by Henning Oetjen Frank

More information

SMART CABLE GUARD A TOOL FOR ON-LINE MONITORING AND LOCATION OF PD S AND FAULTS IN MV CABLES ITS APPLICATION AND BUSINESS CASE

SMART CABLE GUARD A TOOL FOR ON-LINE MONITORING AND LOCATION OF PD S AND FAULTS IN MV CABLES ITS APPLICATION AND BUSINESS CASE SMART CABLE GUARD A TOOL FOR ON-LINE MONITORING AND LOCATION OF PD S AND FAULTS IN MV CABLES ITS APPLICATION AND BUSINESS CASE Fred STEENNIS Paul WAGENAARS Denny HARMSEN DNV GL the Netherlands DNV GL the

More information

Aspects of PD interpretation in HV power cables. by Edward Gulski, Piotr Cichecki, Rogier Jongen

Aspects of PD interpretation in HV power cables. by Edward Gulski, Piotr Cichecki, Rogier Jongen Aspects of PD interpretation in HV power cables by Edward Gulski, Piotr Cichecki, Rogier Jongen General There are several aspects having influence on the diagnostic information and the condition judgment

More information

Partial discharge trends in medium voltage cables measured while in-service with PDOL Cuppen, A.N.; Steennis, E.F.; van der Wielen, P.C.J.M.

Partial discharge trends in medium voltage cables measured while in-service with PDOL Cuppen, A.N.; Steennis, E.F.; van der Wielen, P.C.J.M. Partial discharge trends in medium voltage cables measured while in-service with PDOL Cuppen, A.N.; Steennis, E.F.; van der Wielen, P.C.J.M. Published in: Proceedings of the IEEE PES Transmission and Distribution

More information

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE Z.Liu, B.T.Phung, T.R.Blackburn and R.E.James School of Electrical Engineering and Telecommuniications University of New South Wales

More information

INSULATION DIAGNOSIS OF HIGH VOLTAGE POWER CABLES

INSULATION DIAGNOSIS OF HIGH VOLTAGE POWER CABLES INSULATION DIAGNOSIS OF HIGH VOLTAGE POWER CABLES Edward GULSKI, Delft University of Technology, (The Netherlands), e.gulski@tudelft.nl Johan J SMIT, Delft University of Technology, (The Netherlands),

More information

PD Testing Considerations for MV Plant Cables

PD Testing Considerations for MV Plant Cables PD Testing Considerations for MV Plant Cables Cable Testing Philosophy Damage Mistake Aging Repair Manufacturing Transportation Installation Operation Power frequency 50/60 Hz Power frequency 50/60 Hz

More information

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES

SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES SENSITIVITY ASPECTS OF ON-LINE PD DIAGNOSIS OF MV POWER CABLES Frank WESTER, Edward GULSKI, Johan SMIT, Edwin GROOT*, Mark VAN VLIET* Delft University of Technology The Netherlands * NUON The Netherlands

More information

Why partial discharge testing makes good sense

Why partial discharge testing makes good sense Why partial discharge testing makes good sense PD measurement and analysis have proven to be reliable for detecting defects in the insulation system of electrical assets before major damage or a breakdown

More information

Directional Sensing for Online PD Monitoring of MV Cables Wagenaars, P.; van der Wielen, P.C.J.M.; Wouters, P.A.A.F.; Steennis, E.F.

Directional Sensing for Online PD Monitoring of MV Cables Wagenaars, P.; van der Wielen, P.C.J.M.; Wouters, P.A.A.F.; Steennis, E.F. Directional Sensing for Online PD Monitoring of MV Cables Wagenaars, P.; van der Wielen, P.C.J.M.; Wouters, P.A.A.F.; Steennis, E.F. Published in: Nordic Insulation Symposium, Nord-IS 05 Published: 01/01/2005

More information

PARTIAL DISCHARGE LOCATION Selected Topics

PARTIAL DISCHARGE LOCATION Selected Topics PARTIAL DISCHARGE LOCATION Selected Topics M.S. Mashikian IMCORP ICC Meeting - Fall 2000 TOPICS TESTING PHILOSOPHY Excitation Voltage Test Voltage Level METHOD OF REFLECTOMETRY METHOD OF ARRIVAL TIME TESTING

More information

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics Dominique Bolliger, Ph.D. HV TECHNOLOGIES, Inc. Manassas, VA, USA d.bolliger@hvtechnologies.com Abstract In

More information

BEST PRACTICES FOR OFFLINE DIAGNOSIS OF MV CABLES

BEST PRACTICES FOR OFFLINE DIAGNOSIS OF MV CABLES BEST PRACTICES FOR OFFLINE DIAGNOSIS OF MV CABLES HEIN PUTTER Productmanager cable testing and -diagnosis Megger Site Germany 1 13 th Insucon conference 16-18 th Mai 2017, Birmingham, UK Agenda Introduction

More information

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables 21, rue d Artois, F-75008 PARIS AUCKLAND 2013 http : //www.cigre.org Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables Michael Krüger, Rene Hummel, Stefan Böhler, OMICRON Austria

More information

Investigation of PD Detection on XLPE Cables

Investigation of PD Detection on XLPE Cables Investigation of PD Detection on XLPE Cables Hio Nam O, T.R. Blackburn and B.T. Phung School of Electrical Engineering and Telecommunications The University New South Wales, Australia Abstract- The insulation

More information

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV Paul P. SEITZ, Seitz Instruments AG, (Switzerland), pps@seitz-instruments.ch Ben QUAK, Seitz Instruments AG, (Switzerland),

More information

USING DAMPED AC VOLTAGES

USING DAMPED AC VOLTAGES MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States

More information

Assuring the Reliability of Critical Power Cable Systems

Assuring the Reliability of Critical Power Cable Systems Assuring the Reliability of Critical Power Cable Systems Presented by: Benjamin Lanz Manager of Application Engineering IMCORP Power Cable Reliability Consulting & Diagnostics Some of the technologies

More information

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY Lorenzo PERETTO Luigi FODDAI Simone ORRU Luigi PUDDU Altea Switzerland ENEL Italy ENEL Italy REPL Italy lperetto@alteasolutions.com

More information

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento Sept. 22-24, 28, Florence, Italy EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS C. Ceretta, R. Gobbo, G. Pesavento Dept. of Electrical Engineering University of

More information

An Overview of Diagnostic Testing of Medium Voltage Power Cables John Densley

An Overview of Diagnostic Testing of Medium Voltage Power Cables John Densley An Overview of Diagnostic Testing of Medium Voltage Power Cables John Densley ArborLec Solutions Inc. CIGRE WG 21:04 in 1994 Purpose of diagnostic test is: To evaluate and locate degradation phenomena

More information

Investigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages

Investigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages Investigations on a Combined Resonance/VLF HV Test System Partial Discharge (PD) characteristics at VLF and DAC voltages F. Petzold, H.T. Putter, D. Götz, H. Schlapp, S. Markalous SebaKMT GmbH Baunach/Radeburg,

More information

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables William Higinbotham, Neil Davies and Victor Chan EA Technology LLC, New Jersey; USA, EA Technology Pty Ltd, Brisbane Australia; EA

More information

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages

Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages Long lengths transmission power cables on-site testing up to 500 kv by damped AC voltages Paul P. SEITZ, Ben QUAK, Seitz Instruments AG, Niederrohrdorf, Switzerland, pps@seitz-instruments.ch Edward GULSKI,

More information

Extending the Functionality of On-line PD Monitoring Equipment for MV Power Cables

Extending the Functionality of On-line PD Monitoring Equipment for MV Power Cables 24 th Nordic Insulation Symposium on Materials, Components and Diagnostics 152 Extending the Functionality of On-line PD Monitoring Equipment for MV Power Cables Y. Li 1, P.A.A.F. Wouters 1, P. Wagenaars

More information

Electrical Equipment Condition Assessment

Electrical Equipment Condition Assessment Feature Electrical Equipment Condition Assessment Using On-Line Solid Insulation Sampling Importance of Electrical Insulation Electrical insulation plays a vital role in the design and operation of all

More information

Cable diagnostic in MV underground cable networks

Cable diagnostic in MV underground cable networks Cable diagnostic in MV underground cable networks Theoretical background and practical application VLF testing tan delta loss factor measurement Partial discharge localization and measurement Author: Tobias

More information

Partial Discharge Patterns in High Voltage Insulation

Partial Discharge Patterns in High Voltage Insulation 22 IEEE International Conference on Power and Energy (PECon), 2-5 December 22, Kota Kinabalu Sabah, Malaysia Partial Discharge Patterns in High Voltage Insulation Hazlee Illias, Teo Soon Yuan, Ab Halim

More information

OFFLINE PD DIAGNOSTICS USING SEVERAL EXCITATION VOLTAGES

OFFLINE PD DIAGNOSTICS USING SEVERAL EXCITATION VOLTAGES OFFLINE PD DIAGNOSTICS USING SEVERAL EXCITATION VOLTAGES Hein PUTTER Frank PETZOLD Philipp LEGLER Megger Germany Megger Germany Megger - Germany hein.putter@megger.com frank.petzold@megger.com philipp.legler@megger.com

More information

OPTIMIZATION OF ON-SITE PD MEASUREMENTS AND EVALUATION OF DIAGNOSTIC PARAMETERS FOR ASSESSING CONDITION OF DISTRIBUTION CABLE SYSTEM ELPIS J SINAMBELA

OPTIMIZATION OF ON-SITE PD MEASUREMENTS AND EVALUATION OF DIAGNOSTIC PARAMETERS FOR ASSESSING CONDITION OF DISTRIBUTION CABLE SYSTEM ELPIS J SINAMBELA 1 OPTIMIZATION OF ON-SITE PD MEASUREMENTS AND EVALUATION OF DIAGNOSTIC PARAMETERS FOR ASSESSING CONDITION OF DISTRIBUTION CABLE SYSTEM A thesis submitted to the Faculty of Electrical Power Engineering

More information

MONTRANO. Continuous monitoring system for power transformers

MONTRANO. Continuous monitoring system for power transformers MONTRANO Continuous monitoring system for power transformers Condition monitoring to extend transformer life Knowing the dielectric condition of insulation is vital Dielectric flashover of insulation in

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge The University of New South Wales School of Electrical Engineering and Telecommunications High Voltage Systems ELEC9712 Appendix Partial Discharge Content Introduction Quantities measured Test circuits

More information

CONDITION ASSESSMENT OF XLPE MV CABLE JOINTS BY USING AN INSULATION TESTER

CONDITION ASSESSMENT OF XLPE MV CABLE JOINTS BY USING AN INSULATION TESTER CONDITION ASSESSMENT OF XLPE MV CABLE JOINTS BY USING AN INSULATION TESTER Henrik ENOKSEN Espen EBERG Sverre HVIDSTEN SINTEF Energy Research - Norway SINTEF Energy Research - Norway SINTEF Energy Research

More information

High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland

High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland High Voltage Diagnostics Sarl 4, Rue de Lac CH 1897 Le Bouveret Switzerland Company HV Diagnostics Sarl is a Swiss based company in the field of high voltage test equipment for cable testing and diagnosis.

More information

The importance of partial discharge testing throughout the development and operation of power transformers

The importance of partial discharge testing throughout the development and operation of power transformers The importance of partial discharge testing throughout the development and operation of power transformers Ulrike Broniecki OMICRON Energy Solutions GmbH, Berlin Power transformers are exposed to intense

More information

PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES

PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES Engr. IÑIGO V. ESCOPETE, JR. ITC Level 2 Certified Thermographer PHIL-NCB NDT-UT Level 2 Partial Discharge testing is a Condition Based Maintenance tool

More information

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. THE POWER OF LIFE WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk. Mr. Neal Yang Pro.E.E. Engineer About Us The flaw of dielectric material

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM D. Clark¹ R. Mackinlay² M. Seltzer-Grant² S. Goodfellow² Lee Renforth² Jamie McWilliam³ and Roger

More information

PD Solutions. On-Line PD Measurement Devices

PD Solutions. On-Line PD Measurement Devices On-Line PD Measurement Devices 1. Longshot Device (see Figure 1) The measurement system applied is based around the wideband (0-400 MHz) HVPD- Longshot partial discharge test unit which utilizes a high-speed

More information

Estimating the Impact of VLF Frequency on Effectiveness of VLF Withstand Diagnostics

Estimating the Impact of VLF Frequency on Effectiveness of VLF Withstand Diagnostics Estimating the Impact of VLF on Effectiveness of VLF Withstand Diagnostics Nigel Hampton (1), Jean Carlos Hernandez-Mejia (2), Marina Kuntsevich (3), Joshua Perkel (1), Vivek Tomer (3) 1 - NEETRAC, Atlanta,

More information

Practical aspects of PD localization for long length Power Cables

Practical aspects of PD localization for long length Power Cables Practical aspects of PD localization for long length Power Cables M. Wild, S. Tenbohlen University of Stuttgart Stuttgart, Germany manuel.wild@ieh.uni-stuttgart.de E. Gulski, R. Jongen onsite hv technology

More information

IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY

IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY Avinash Raj 1, Chandan Kumar Chakrabarty 1, Rafidah Ismail 1 and Basri Abdul Ghani 2 1 College of Engineering, University Tenaga

More information

Statistical Characteristics of Partial Discharge Caused by Typical Defects in Cable Joint under Oscillating Voltage

Statistical Characteristics of Partial Discharge Caused by Typical Defects in Cable Joint under Oscillating Voltage Journal of Energy and Power Engineering 9 () 3-3 doi:.7/93-897/.3. D DAVID PUBLISHIG Statistical Characteristics of Partial Discharge Caused by Typical Defects in Cable Joint under Oscillating Voltage

More information

Cable fault location in power cables. Systematics for cable testing, diagnosis and cable fault location

Cable fault location in power cables. Systematics for cable testing, diagnosis and cable fault location Cable fault location in power cables Systematics for cable testing, diagnosis and cable fault location CABLE JOINTS, CABLE TERMINATIONS, CABLE GLANDS, CABLE CLEATS FEEDER PILLARS, FUSE LINKS, ARC FLASH,

More information

BY JASON SOUCHAK, Megger

BY JASON SOUCHAK, Megger IMPROVING SYSTEM RELIABILITY WITH OFFLINE PD TESTING BY JASON SOUCHAK, Megger Partial discharge (PD) testing is a new generation of diagnostic testing for medium- and high-voltage underground power cable

More information

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets Abstract: For decades it has been recognized that partial discharge assessment is an excellent method

More information

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors IRIS POWER TGA-B Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors We have not found another test method that produces as much decision support data for generator

More information

MV Power Cable Diagnostics by Frequency Domain Spectroscopy. Peter Werelius Programma Electric AB

MV Power Cable Diagnostics by Frequency Domain Spectroscopy. Peter Werelius Programma Electric AB MV Power Cable Diagnostics by Frequency Domain Spectroscopy Peter Werelius Programma Electric AB Frequency Domain Spectroscopy Measurements of insulation capacitance and losses in a frequency interval

More information

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate

More information

Software System for Finding the Incipient Faults in Power Transformers

Software System for Finding the Incipient Faults in Power Transformers Software System for Finding the Incipient Faults in Power Transformers Nikolina Petkova Technical University of Sofia, Department of Theoretical Electrical Engineering, 1156 Sofia, Bulgaria Abstract In

More information

MV Power Cable Testing Training

MV Power Cable Testing Training MV Power Cable Testing Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Since power cables are used

More information

Dielectric response and partial discharge measurements on stator insulation at varied low frequency. Nathaniel Taylor

Dielectric response and partial discharge measurements on stator insulation at varied low frequency. Nathaniel Taylor Dielectric response and partial discharge measurements on stator insulation at varied low frequency Nathaniel Taylor Rotating Electrical Machines : The Stator and its Windings turbo-generator motor hydro-generator

More information

Field Experiences. Partial Discharge Diagnosis on MV Cables. Philipp Legler. XVI. Szigetelésdiagnosztikai Konferencia (

Field Experiences. Partial Discharge Diagnosis on MV Cables. Philipp Legler. XVI. Szigetelésdiagnosztikai Konferencia ( Field Experiences Partial Discharge Diagnosis on MV Cables Philipp Legler Technical Support Applications Engineer (Megger Site Germany) XVI. Szigetelésdiagnosztikai Konferencia (19. - 20.10.2016, Sümeg)

More information

Basics of Partial Discharge. Prepared for 2015 Phenix RSM Meeting January 2015

Basics of Partial Discharge. Prepared for 2015 Phenix RSM Meeting January 2015 Basics of Partial Discharge Prepared for 2015 Phenix RSM Meeting January 2015 Definitions and History Standard Definitions Fundamentally, what is a Partial Discharge An electric discharge which only partially

More information

VLF. DAC tandelta. Partial Discharge. Experience the world of Megger electrical testing

VLF. DAC tandelta. Partial Discharge. Experience the world of Megger electrical testing Cable Testing & Diagnostics Solutions for Medium Voltage Networks (1 kv - 36 kv) VLF Partial Discharge DC DAC tandelta Cable Testing Cable Diagnostics? There are two main applications for cable testing:

More information

Diagnostic testing of cast resin transformers

Diagnostic testing of cast resin transformers Paper of the Month Diagnostic testing of cast resin transformers Author Michael Krüger, OMICRON, Austria michael.krueger@omiconenergy.com Christoph Engelen, OMICRON, Austria christoph.engelen@omicronenergy.com

More information

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager Doble Solutions for Partial Discharge Greg Topjian Solutions Manager 617-393-3129 gtopjian@doble.com Why do we need to conduct PD measurements PD a major cause of early failure for HV insulation. Partial

More information

PD Monitoring of MV/HV Power Cables December 2016

PD Monitoring of MV/HV Power Cables December 2016 PD Monitoring of MV/HV Power Cables December 216 Malcolm Seltzer-Grant m.seltzer-grant@hvpd.co.uk Introduction to HVPD Our global presence Introduction to HVPD Ltd HVPD are experts in the growing industry

More information

INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES

INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES Gonzalo MAIZ, Iberdrola Distribución, (Spain), gmaiz@iberdrola.es Armando RODRIGO, Instituto

More information

Cable testing and diagnostics

Cable testing and diagnostics Cable testing and diagnostics To ensure the flow Cost-optimised maintenance through cable diagnostics The sheath and cable testing supports you in assessing whether a cable system is safe and ready to

More information

Return to Session BREAKDOWN CAUSED BY ABRUPT DC-VOLTAGE GROUNDING OF XLPE CABLE INSULATION ABSTRACT KEYWORDS INTRODUCTION

Return to Session BREAKDOWN CAUSED BY ABRUPT DC-VOLTAGE GROUNDING OF XLPE CABLE INSULATION ABSTRACT KEYWORDS INTRODUCTION BREAKDOWN CAUSED BY ABRUPT DC-VOLTAGE GROUNDING OF XLPE CABLE INSULATION Erling ILDSTAD, NTNU, (Norway), Erling.Ildstad@elkraft.ntnu.no Mildrid SELSJORD, SINTEF Energy Research, (Norway), Mildrid.Selsjord@sintef.no

More information

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets Who we are TECHIMP is one of the leading providers of Condition Assessment Services Data Acquisition and Test Equipment

More information

The Application of Partial Discharge Measurement and Location on CGIS

The Application of Partial Discharge Measurement and Location on CGIS International Journal on Electrical Engineering and Informatics Volume 4, Number 3, October 2012 The Application of Partial Discharge Measurement and Location on CGIS Min-Yen Chiu¹, Keng-Wei Liang¹, Chang-Hsing

More information

Online Localisation of Partial Discharge Using Pulse Propagation Parameters in Medium Voltage Cable Network

Online Localisation of Partial Discharge Using Pulse Propagation Parameters in Medium Voltage Cable Network 2015 17th UKSIM-AMSS International Conference on Modelling and Simulation Online Localisation of Partial Discharge Using n Parameters in Medium Voltage Cable Network Tauqeer Ahmed Shaikh, Abdulrehman Al-Arainy,

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

PD Diagnostic Applications and TechImp solutions

PD Diagnostic Applications and TechImp solutions PD Diagnostic Applications and TechImp solutions Condition Assessment Solutions for Electrical Systems. PD based innovative tools for the Condition Based Maintenance. MD-04.05.004 - rev. 00-29/08/2006

More information

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 75 CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 5.1 INTRODUCTION Partial Discharge (PD) detection is an important tool for monitoring insulation conditions in high voltage (HV) devices in power systems.

More information

Partial Discharge Theory, Modeling and Applications To Electrical Machines

Partial Discharge Theory, Modeling and Applications To Electrical Machines Partial Discharge Theory, Modeling and Applications To Electrical Machines V. Vahidinasab, A. Mosallanejad, A. Gholami Department of Electrical Engineering Iran University of Science and Technology (IUST)

More information

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM,

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM, ONLINE OFFLINE VERSUS FEATURE PARTIAL DISCHARGE TESTING FOR CABLE ASSESSMENT B Y WIL L IAM H IG INBOT H AM, EA Technology, LLC Medium voltage cables have three distinct phases to their lifecycle: (1) new

More information

CONDITION MONITORING OF MEDIUM VOLTAGE ELECTRICAL CABLES BY MEANS OF PARTIAL DISCHARGE MEASUREMENTS

CONDITION MONITORING OF MEDIUM VOLTAGE ELECTRICAL CABLES BY MEANS OF PARTIAL DISCHARGE MEASUREMENTS 136 CONDITION MONITORING OF MEDIUM VOLTAGE ELECTRICAL CABLES BY MEANS OF PARTIAL DISCHARGE MEASUREMENTS H. van Jaarsveldt* and R. Gouws** School of Electrical, Electronic and Computer Engineering, North-West

More information

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING Andreas F.X. WELSCH*, Siegfried A. RUHLAND* *AREVA Sachsenwerk GmbH - Germany andreas.welsch@areva-td.com

More information

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. IRIS POWER PDTracII Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear. We have not found another test method that produces as much

More information

WIRE AND CABLE ENGINEERING GUIDE

WIRE AND CABLE ENGINEERING GUIDE Excerpt From Prysmian s WIRE AND CABLE ENGINEERING GUIDE Page 1 of 8 CABLE TESTING Testing represents an integral part in the life of a cable. A cable will be subjected to multiple tests in its lifetime

More information

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS

PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS PULSE-SEQUENCE ANALYSIS OF PARTIAL DISCHARGES IN POWER TRANSFORMERS Anne Pfeffer 1*, Stefan Tenbohlen 1 and Stefan Kornhuber 2 1 Institute of Power Transmission and High Voltage Technology, Pfaffenwaldring

More information

PARTIAL DISCHARGE MEASUREMENT

PARTIAL DISCHARGE MEASUREMENT PARTIAL DISCHARGE MEASUREMENT Partial Discharges are small electrical sparks which occur predominantly at insulation imperfection. It is the phenomenon which occurs in the insulation on application of

More information

Fundamentals of Partial Discharge in the Context of Field Cable Testing Key words: Partial discharge, power cable, electrical testing

Fundamentals of Partial Discharge in the Context of Field Cable Testing Key words: Partial discharge, power cable, electrical testing Fundamentals of Partial Discharge in the Context of Field Cable Testing Key words: Partial discharge, power cable, electrical testing Steven Boggs, University of Connecticut and University of Toronto John

More information

A New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol

A New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol A New Approach for Transformer Bushing Monitoring Emilio Morales Technical Application Specialist Qualitrol Abstract Transformer bushings are one of the most critical components of a transformer. Up to

More information

Name: Craig Goodwin. Company Name: HV Diagnostics Inc

Name: Craig Goodwin. Company Name: HV Diagnostics Inc Name: Craig Goodwin Company Name: HV Diagnostics Inc Trip Out of Cable Circuit: Over Current, Ground Fault, Differential protection or Fuse blows. Try to establish if the cable has in fact failed or has

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Using optical couplers to monitor the condition of electricity infrastructure S.G. Swingler, L. Hao, P.L. Lewin and D.J. Swaffield The Tony Davies High Voltage Laboratory, University of Southampton, Southampton

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

PHG 70 TD PD / PHG 80 TD PD

PHG 70 TD PD / PHG 80 TD PD PHG 70 TD PD / PHG 80 TD PD BAUR VLF test and diagnostics system Functions Universal test and diagnostics system flexible, modular, extendable Cutting-edge testing and diagnostics technology: VLF truesinus

More information

HV AC TESTING OF SUPER-LONG CABLES

HV AC TESTING OF SUPER-LONG CABLES HV AC TESTING OF SUPER-LONG CABLES Stefan SCHIERIG, (Germany), schierig@highvolt.de Peter COORS, (Germany), coors@highvolt.de Wolfgang HAUSCHILD, IEC, CIGRE, (Germany), hauschild@highvolt.de ABSTRACT The

More information

Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results

Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results 2016 International Conference on Electrical Engineering and Automation (ICEEA 2016) ISBN: 978-1-60595-407-3 Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results Cristian DAN

More information

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer Scientific Journal of Impact Factor(SJIF): 3.134 International Journal of Advance Engineering and Research Development Volume 2,Issue 7, July -2015 e-issn(o): 2348-4470 p-issn(p): 2348-6406 Comparison

More information

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems

Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Practical Experience in On-Line Partial Discharge Measurements of MV Switchgear Systems Z. Berler, I. Blokhintsev, A. Golubev, G. Paoletti, V. Rashkes, A. Romashkov Cutler-Hammer Predictive Diagnostics

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

Siemens Transformer Technology Seminar Low Partial Discharge Transformers

Siemens Transformer Technology Seminar Low Partial Discharge Transformers West Coast Technical Meeting Pomona CA, May 24-25, 2016 Siemens Transformer Technology Seminar Siemens AG Transformers siemens.com/answers Low Partial Discharge Page 2 Why highlight Low Partial Discharge

More information

Fault location on power cables. Fault location on power cables

Fault location on power cables. Fault location on power cables Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 1. Introduction Fault location on communication and power cables

More information

Partial Discharge, Survey or Monitor?

Partial Discharge, Survey or Monitor? July 2014 Partial Discharge, Survey or Monitor? 24-7 Partial Discharge monitoring is the ultimate tool for finding insulation weaknesses before they fail. Introduction It s well established that Partial

More information

Breakdown Behaviour of Damaged Low-Voltage Cables: Laboratory Experiments and Field Experience

Breakdown Behaviour of Damaged Low-Voltage Cables: Laboratory Experiments and Field Experience Breakdown Behaviour of Damaged Low-Voltage Cables: Laboratory Experiments and Field Experience B. Kruizinga 1, P.A.A.F. Wouters 1, E.F. Steennis 1,2 1) Eindhoven University of Technology, The Netherlands

More information

The Generators and Electric Motor Monitoring and Diagnostics Systems

The Generators and Electric Motor Monitoring and Diagnostics Systems The Generators and Electric Motor Monitoring and Diagnostics Systems MDR and PGU-DM 1 The «MDR» - Motor Diagnostics Relay the Universal System for Insulation Monitoring in Electric Machines PD-Monitor

More information

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES D. Götz*, H.T. Putter* *Megger Germany INTRODUCTION High voltage termintions are essential components in high voltage cable

More information

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology Condition Assessment of High Voltage Insulation in Power System Equipment R.E. James and Q. Su The Institution of Engineering and Technology Contents Preface xi 1 Introduction 1 1.1 Interconnection of

More information

Simulation Model of Partial Discharge in Power Equipment

Simulation Model of Partial Discharge in Power Equipment Simulation Model of Partial Discharge in Power Equipment Pragati Sharma 1, Arti Bhanddakkar 2 1 Research Scholar, Shri Ram Institute of Technology, Jabalpur, India 2 H.O.D. of Electrical Engineering Department,

More information

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR Neil DAVIES and Chris LOWSLEY EA Technology Ltd. - United Kingdom Neil.Davies@eatechnology.com INRODUCTION The trend for extending

More information

ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS

ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS Pantelis D. AGORIS 1, Sander MEIJER 1, Edward GULSKI 1, Johan J. SMIT 1, A. Jos L.M. KANTERS 2 1 Delft University of Technology - The Netherlands 2 TenneT

More information