Deploying Transit Signal Priority Systems

Size: px
Start display at page:

Download "Deploying Transit Signal Priority Systems"

Transcription

1 Deploying Transit Signal Priority Systems Christopher Poe, Ph.D., P.E. Assistant Agency Director ITS Annual Meeting Austin, September 5, 2008

2 Acknowledgements n DART - Abed Abukar, Chris Patrick, and Koorosh Olyai n City of Dallas - Mark Titus and Beth Ramirez n Consulting Team g Teal Engineering g DKS Associates g Telvent Farradyne

3 Presentation Outline n Overview of Project n Transit Perspective n Traffic & Signal Perspective n Lessons Learned n Next Steps

4 Project Overview n n n n DART Green Line g Opening Sept 14, 2009 g Radio spots currently running Draft LRT Schedule Developed g LRT headways in downtown will be to 2.5 min in the peak period Transit Signal Priority at intersections to maintain headways City Traffic Signal System g 170 Controllers g BiTran firmware (v. Dallas 255)

5 DART Light-Rail System

6 TSP Terminology n Pre-emption g truncate pedestrians and service train movement n Full Priority g Service pedestrians and then service train movement n Partial Priority Green Band Running g Service pedestrians and service trains within a green band that allows early greens or green extensions

7 Roles and Responsibilities n n DART g g Responsible for providing train detection to the City Traffic Signal System Responsible for the communication of train detection data City of Dallas g Responsible for providing transit priority at the traffic signals, which includes: afield controllers and firmware acentral software for monitoring acommunication between signal controllers acount down timers for train operators

8 Transit Perspective n LRT Construction g LRT tracks & stations g Track junction upgrades g Station upgrades for level boarding n Train Detection & Communication g Magnetometer detection g Wireless communications n Count down timers for train operators

9 Train Detection

10 City Traffic & Signal System n Maintain City Street Coordination n City Upgrading TMC Hardware, Field Controllers, and Controller Firmware g Signals along transit mall = 1% of traffic signal system n Additional Functionality g All-way pedestrian phase ( ped scramble ) g Cross street monitoring / queue detection

11 Traffic System Phases Phase 1 Supports LRT headway schedule Provides early green and green extension Implement for testing March 2009 Installation of train detection Supports countdown timer and basic function report capability Ability to cancel priority requests May require software modification Supports some peer-to-peer communication Phase 2

12 City of Dallas Traffic Signals (15 along LRT corridor)

13 Lessons Learned n Agency Coordination g DART, City, & MPO g Administrative Action Coordination n Solutions = Compromises n Engineering Capacity g Public Agencies g Consultants being ^

14 Lessons Learned (cont.) n Technical Coordination g Detection being ^ g Communication n Integrating & Upgrading Legacy Systems n System Engineering g Concept of Operations g Requirements n Change Management

15 TSP Project High-Level Schedule Flow Chart DART Train Detection Basis of Design Train Detection & Comm Design (7/31/08) Detection System Procurement (6/25 9/9/08) Detection System Installation (9/10/08-3/03/09) Completed In-Progress Remaining Concept of Operations Traffic Signal System Requirements (6/30/08) Define Interim Requirement Subset (9/30/08) Interim Detector and Communication Design (7/1 11/08) Implementation of Design and Timing plans (10/1/08 2/28/09) Initial Testing (March 2009) Full Testing (May 2009) Begin Operations (Sept 2009) Full TSP Operation (2011) City of Dallas Traffic Signal System Retiming (6/3/08 12/31/08) Phase 1 Traffic Signal Retiming Implementation (1/1/09-2/27/09) Phase 2 Retiming Implementation (3/1-5/1/09) Traffic Signal System Specification (10/08) Traffic Signal System Procurement (10/08-04/09) Traffic Signal System Installation 2010 Traffic Signal System Testing 2010

16 Schedule n Train detection design Completed n Start of Construction - September 2008 n End of construction February 28, 2009 n Start of system testing March 1, 2009 n System fully functional August 1, 2009 n Train operator certification August 2009 n Non-revenue service Sept 1-13, 2009 n Low level boarding and VBS are parallel efforts (Completion 2010) n Ultimate TSP December 2011 ITS/Operations Technology

17 Questions?

Dallas Area Rapid Transit (DART) Traffic Signal Priority (TSP) Project

Dallas Area Rapid Transit (DART) Traffic Signal Priority (TSP) Project Dallas Area Rapid Transit (DART) Traffic Signal Priority (TSP) Project Allan Steele VP/CIO APTA TransITech February 2010 Content About DART The Challenge TSP Goals System Overview TSP Operation Current

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology

Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology Keith Riniker Director of Traffic Engineering & ITS Sabra,

More information

OPAC Adaptive Engine Pinellas County Deployment

OPAC Adaptive Engine Pinellas County Deployment OPAC Adaptive Engine Pinellas County Deployment Farhad Pooran Telvent Transportation North America Baltimore Regional Traffic Signal Forum May 25, 2011 Presentation Agenda Adaptive control systems - expected

More information

Preemption Versus Priority

Preemption Versus Priority Port 1 MMU Preemption Versus Priority BIU Why Interrupt a Signalized Intersection There are several reasons to interrupt a signalized intersection from the normal operation of assigning right-of-way. Some

More information

Transit Signal Priority (TSP) System Replacement Concept Detail and Technical Requirements

Transit Signal Priority (TSP) System Replacement Concept Detail and Technical Requirements Transit Signal Priority (TSP) System Replacement Concept Detail and Technical Requirements Pamela Wrenn, Owen Kehoe, John Toone KC Metro Karl Typolt, Polly Okunieff, Bryan Nace Consultant Team Project

More information

Georgia s Regional Traffic Operations Program

Georgia s Regional Traffic Operations Program Georgia s Regional Traffic Operations Program Shahram Malek, PhD, PE Vice President, ARCADIS US Inc. Regional Traffic Operations Project Manager Koushik Arunachalam, PE Associate Project Manager, ARCADIS

More information

Roadmap to Successful Deployment of Adaptive Systems

Roadmap to Successful Deployment of Adaptive Systems Smart Information for a Sustainable World Roadmap to Successful Deployment of Adaptive Systems Farhad Pooran Telvent Transportation North America Hampton Roads Transportation Operation Sub- Committee June

More information

Agenda. TS2 Cabinet Components and Operation. Understanding a Signal Plan Maccarone. Basic Preemption/Priority

Agenda. TS2 Cabinet Components and Operation. Understanding a Signal Plan Maccarone. Basic Preemption/Priority Morning Traffic Terminology TS2 Cabinet Components and Operation Traffic Signal Phasing Ring Structure Traffic Signal Timing Understanding a Signal Plan Maccarone Controller Programming Afternoon Basic

More information

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Presented by: C. William (Bill) Kingsland, Assistant Commissioner, Transportation Systems Management Outline 1. What is

More information

Transportation Data Potpourri in Frisco

Transportation Data Potpourri in Frisco Transportation Data Potpourri in Frisco TexITE Joint Dallas-Fort Worth Section Meeting May 11, 2018 Curtis Jarecki, P.E. Brian Moen, P.E. City of Frisco Overview Signal Performance Measures Signal Data

More information

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned ARIZONA CONNECTED VEHICLE PROGRAM Arterial Connected Vehicle Test Bed Deployment and Lessons Learned Faisal Saleem ITS Branch Manager & SMARTDrive Program Manager Maricopa County Department of Transportation

More information

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell

More information

WESTERN AVENUE TRAFFIC SIGNAL PRIORITY FEASIBILITY STUDY FINAL

WESTERN AVENUE TRAFFIC SIGNAL PRIORITY FEASIBILITY STUDY FINAL WESTERN AVENUE TRAFFIC SIGNAL PRIORITY FEASIBILITY STUDY Project Summary Report Task 5 Report 21 September 2001 FINAL This document fulfills the requirements of Task 5 in the study scope of work. It combines

More information

1 of REV:0

1 of REV:0 1 of 5 683-10573-0418 This specification sets forth the minimum requirements for purchase and installation of an aboveground Radar Advance Detection Device (RADD) system for a real-time, advance vehicle-detection

More information

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout

More information

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established. SIGNAL PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,

More information

Signal Performance Metrics Charlie Wetzel, PE, PTOE

Signal Performance Metrics Charlie Wetzel, PE, PTOE Signal Performance Metrics Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 1 Who is Seminole County? Small County located just north of Orange County and the City of Orlando Population:

More information

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 ACS-Lite The Next Generation of Traffic Signal Control Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 Outline Background on adaptive traffic signal Systems ACS-Lite Goals Development Functionality

More information

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions RFP #1587 - CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions 1. Question: Spec requires connects to bitrans, are you going to modify the specs? Answer: City of Culver City s ATCS

More information

Integrated Corridor Management. Brian Cronin USDOT ITS Joint Program Office October 14, 2014

Integrated Corridor Management. Brian Cronin USDOT ITS Joint Program Office October 14, 2014 Integrated Corridor Management Brian Cronin USDOT October 14, 2014 ICM Program Objectives 1. Demonstrate and evaluate pro-active integrated approaches, strategies, and technologies for efficient, productive,

More information

Methodology to Assess Traffic Signal Transition Strategies. Employed to Exit Preemption Control

Methodology to Assess Traffic Signal Transition Strategies. Employed to Exit Preemption Control Methodology to Assess Traffic Signal Transition Strategies Employed to Exit Preemption Control Jon T. Obenberger Dissertation submitted to the faculty of the Virginia Polytechnic Institute and State University

More information

Connected Vehicles and Maintenance Operations

Connected Vehicles and Maintenance Operations Connected Vehicles and Maintenance Operations Presentation to AASHTO SCOM Dean Deeter Athey Creek Consultants Topics Connected Vehicle Priorities Survey Results Connected Vehicle Applications Related to

More information

City of Surrey Adaptive Signal Control Pilot Project

City of Surrey Adaptive Signal Control Pilot Project City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors

More information

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets By: Marty Amundson, PE, TE, PTOE Eugene Bachtinov, P.E. Jonathan Hofert, PE, TE, PTOE Metro Provides Excellence in Service

More information

Communications Design Challenges for the Edmonton North LRT Extension

Communications Design Challenges for the Edmonton North LRT Extension Communications Design Challenges for the Edmonton North LRT Extension Syl Santo, RCDD ITS Designer Stantec Consulting Syl Santo, RCDD 24 years of experience in communications technology Prior experience

More information

The WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG

The WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG The WISE Experience Association of Monterey Bay Area Governments (AMBAG) September 20, 2017 Bhupendra Patel, Ph.D. Director of Modeling, AMBAG Paul Ricotta, P.E. Principal Transportation Engineer, Caliper

More information

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007 Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007 INTRODUCTION Use the following Guidelines in conjunction with the Traffic

More information

Context Aware Dynamic Traffic Signal Optimization

Context Aware Dynamic Traffic Signal Optimization Context Aware Dynamic Traffic Signal Optimization Kandarp Khandwala VESIT, University of Mumbai Mumbai, India kandarpck@gmail.com Rudra Sharma VESIT, University of Mumbai Mumbai, India rudrsharma@gmail.com

More information

ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY

ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY Joseph K. Lam, P.Eng., Managing Director Delcan Corporation 625 Cochrane Drive, Suite 500, Markham, Ontario, Canada, L3R 9R9 Tel: +1-905-943-0521,

More information

An Operational Test of Adaptive Signal Control. Campbell Road Corridor Richardson, Texas

An Operational Test of Adaptive Signal Control. Campbell Road Corridor Richardson, Texas An Operational Test of Adaptive Signal Control Campbell Road Corridor Richardson, Texas September 2011 Robert Saylor and John Black, City of Richardson Operational Test Objectives Install Rhythm adaptive

More information

Assessing the Performance of Integrated Corridor Management (ICM) Strategies

Assessing the Performance of Integrated Corridor Management (ICM) Strategies Assessing the Performance of Integrated Corridor Management (ICM) Strategies Matt Burt, Battelle Research and Evaluation Session, NATMEC 2012 June 7, 2012 1 Presentation Outline The U.S. DOT ICM Program

More information

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor

More information

Traffic Signal System Upgrade Needs

Traffic Signal System Upgrade Needs Traffic Signal System Upgrade Needs Presented to: Dallas City Council November 20, 2013 DEPARTMENT OF STREET SERVICES Purpose The City of Dallas has a program to achieve and maintain street pavement condition

More information

An Overview of TTI Automated and Connected Vehicles Research

An Overview of TTI Automated and Connected Vehicles Research An Overview of TTI Automated and Connected Vehicles Research Michael P. Manser, Ph.D. Human Factors Program Manager Associate Director of Safety Initiatives Center for Transportation Safety Texas A&M Transportation

More information

M-0418 REV:0

M-0418 REV:0 1 of 5 This specification sets forth the minimum requirements for purchase and installation of an aboveground Radar Detection Device (RDD) system for a real-time, stop bar vehicle-detection system that

More information

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S WHITE PAPER BENEFITS OF OPTICOM GPS Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S 2 CONTENTS Overview 3 Operation 4 Advantages of Opticom GPS 5 Opticom GPS

More information

Portable Signals: INDOT Design Guidance and Specifications

Portable Signals: INDOT Design Guidance and Specifications : INDOT Design Guidance and Specifications Joe Bruno, P.E. Traffic Administration, INDOT March 7, 2017 Presentation Overview Background Design Manual 83-5.0 and Design Memo 16-06 Cost and Pay Item Info

More information

July/August/September Traffic Adaptive Installation Preparation, July-September 2017

July/August/September Traffic Adaptive Installation Preparation, July-September 2017 V July/August/September 2017 1. Traffic Adaptive Installation Preparation, July-September 2017 The Traffic Operations group intends to kick-off their traffic adaptive trial installation in October 2017.

More information

MT-4E P25 Voting / Simulcast Training Course Outline

MT-4E P25 Voting / Simulcast Training Course Outline MT-4E P25 Voting / Simulcast Training Course Outline Introduction: offers a three-day training course that covers the P25 Standards and the MT-4E Voting / Simulcast Radio System product line. The Codan

More information

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms INTRODUCTION Use the following Guidelines in conjunction with the ITS & Signals Scope of work provided in the Project Scoping

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

CONTROLLER SPECIFICATION.

CONTROLLER SPECIFICATION. colin.subryan@tfl.gov.uk Colin Subryan Principal Engineer, Transport for London, Traffic Directorate Telephone 0203 054 2530 Email colin.subryan@tfl.gov.uk Management of a team with responsibility for

More information

Service Recommendations

Service Recommendations Berkshire Regional Transit Authority REGIONAL TRANSIT PLAN Service Recommendations May 2015 Outline Introduction Study Process Service Recommendations Public comments Questions 2 Introduction URS Team

More information

FM 691 CORRIDOR STUDY

FM 691 CORRIDOR STUDY FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008 Agenda Project Overview US 75/FM 691 Interchange US 75 Ramping Alternatives FM 691 Corridor Typical Sections Extension to SH 289

More information

Frequently Asked Questions

Frequently Asked Questions The Synchro Studio support site is available for users to submit questions regarding any of our software products. Our goal is to respond to questions (Monday - Friday) within a 24-hour period. Most questions

More information

Accelerated Bridge Construction (ABC) and the Utah Experience

Accelerated Bridge Construction (ABC) and the Utah Experience Accelerated Bridge Construction (ABC) and the Utah Experience by Kris Peterson, P.E., UDOT Mary Lou Ralls, P.E., Ralls Newman, LLC AASHTO Subcommittee on Construction Annual Meeting Computers and Technology

More information

Joint OCTEC / ITS-CA Southern Section Luncheon Meeting. February 22, 2018

Joint OCTEC / ITS-CA Southern Section Luncheon Meeting. February 22, 2018 Joint OCTEC / ITS-CA Southern Section Luncheon Meeting February 22, 2018 Advanced Transportation Controller (ATC) How did we get here?...where are we going? Introduction OCTA has a county wide traffic

More information

DALE KELLER, P.E. ASSHTO COD JUNE 14, 2018 NEVADA DOT

DALE KELLER, P.E. ASSHTO COD JUNE 14, 2018 NEVADA DOT Interactive Visualization DALE KELLER, P.E. ASSHTO COD JUNE 14, 2018 NEVADA DOT 1 Interactive Visualization AII Overview The AASHTO Innovation Initiative (AII) advances innovation from the grassroots up:

More information

Area Traffic Control System (ATCS)

Area Traffic Control System (ATCS) Area Traffic Control System (ATCS) 1. Introduction: Area Traffic Control System is an indigenous solution for Indian Road Traffic, which optimizes traffic signal, covering a set of roads for an area in

More information

Constructing a Traffic Control Process Diagram

Constructing a Traffic Control Process Diagram 22 Constructing a Traffic Control Process Diagram The purpose of this assignment is to help you improve your understanding of the operation of an actuated traffic controller system by studying eight cases

More information

San Antonio Wrong Way Driver Initiative

San Antonio Wrong Way Driver Initiative San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force

More information

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

1X-Advanced: Overview and Advantages

1X-Advanced: Overview and Advantages 1X-Advanced: Overview and Advantages Evolution to CDMA2000 1X QUALCOMM INCORPORATED Authored by: Yallapragada, Rao 1X-Advanced: Overview and Advantages Evolution to CDMA2000 1X Introduction Since the first

More information

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG) GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) TO ARLINGTON COUNTY GOVERNMENT (ACG) Effective Date: February 15, 2016 Prepared by: Arlington

More information

Northwest Rail Corridor Update

Northwest Rail Corridor Update Northwest Rail Corridor Update Governments Team February 13, 2009 1 Meeting Agenda 1. Program Updates 1. RTD FasTracks Program Update 2. Annual Program Evaluation 2. NWR EE Updates 1. New USACE Representative

More information

Evaluation of Actuated Right Turn Signal Control Using the ITS Radio Communication System

Evaluation of Actuated Right Turn Signal Control Using the ITS Radio Communication System 19th ITS World Congress, Vienna, Austria, 22/26 October 2012 AP-00201 Evaluation of Actuated Right Turn Signal Control Using the ITS Radio Communication System Osamu Hattori *, Masafumi Kobayashi Sumitomo

More information

Update on Traffic Results and Findings

Update on Traffic Results and Findings Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes

More information

Field Testing and Evaluation of a Wireless-Based Transit Signal Priority System

Field Testing and Evaluation of a Wireless-Based Transit Signal Priority System Field Testing and Evaluation of a Wireless-Based Transit Signal Priority System Final Report Prepared by: Chen-Fu Liao Gary A. Davis Minnesota Traffic Observatory Department of Civil Engineering University

More information

Sensor Networks Architecture for Vehicles and Pedestrians Traffic Control

Sensor Networks Architecture for Vehicles and Pedestrians Traffic Control BULETINUL STIINTIFIC al Universitatii Politehnica din Timisoara, ROMANIA, Seria AUTOMATICA si CALCULATOARE SCIENTIFIC BULLETIN of Politehnica University of Timisoara, ROMANIA, Transactions on AUTOMATIC

More information

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road)

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road) Adaptive Signal System Mt. Juliet, TN SR-171 (Mt. Juliet Road) Project Background Project Location Mt. Juliet, TN: 2015 Census: 28,159 Doubled since 2000 Immediately east of Metro Nashville Mt. Juliet

More information

MT-4E Analog and P25 Digital Training Course Outline

MT-4E Analog and P25 Digital Training Course Outline MT-4E Analog and P25 Digital Training Course Outline Introduction: offers a two-day training course that covers the P25 Standards and the MT-4E Radio System product line. A third day may be added to the

More information

True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154

True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154 1 Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154 Presentation to the 18 th World Congress on Intelligent Transport Systems Technical

More information

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES ITS California Technical Session 9 - Innovative Technology for Local Cities Thursday, October 16, 2014 Mark Taylor, P.E., PTOE Traffic Signal Operations Engineer

More information

CTA Blue Line Forest Park Branch Feasibility/Vision Study

CTA Blue Line Forest Park Branch Feasibility/Vision Study CTA Blue Line Forest Park Branch Feasibility/Vision Study Overview of the Blue Line Feasibility / Vision Study!! PURPOSE! Determine long-term vision! Coordinate transit & highway improvements!! PROCESS!

More information

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS HIGHWY 55 PEDESTRIN CROSSINGS» This graphic depicts walking distances to proposed signalized intersections along Olson Highway if existing unsignalized crossings are closed. Farwell Mpls College Prep Charter

More information

Real-Time Spectrum Management for Wireless Networks

Real-Time Spectrum Management for Wireless Networks Real-Time Spectrum Management for Wireless Networks Dan Stevenson, Arnold Bragg RTI International, Inc. Research Triangle Park, NC Outline Problem statement Disruptive idea Details: approach, issues, architecture

More information

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Jamie Mackey, P.E., PTOE Utah Department of Transportation Statewide Signal Engineer jamiemackey@utah.gov NOCoE Webinar Are Your Traffic Signals Ready

More information

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Four Case Studies Agenda Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Traffic diversion caused by capacity reduction (Fort Lauderdale, FL) Impacts on traffic due

More information

SIGNAL TIMING MANUAL. NCHRP Report 812. Second Edition

SIGNAL TIMING MANUAL. NCHRP Report 812. Second Edition SIGNAL TIMING MANUAL Second Edition Slides Courtesy of the Transportation Research Board, National Acknowledgments Team Members & Panel Members Tom Urbanik, Kittelson & Associates, Inc. Alison Tanaka,

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. The Making of a Smart City Eric Plapper 2015 HDR, Inc., all rights reserved. Transportation Trends Defining a Smart City Example Deployments How to Get Started Transportation

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION ISO/TS 19091 First edition 2017-03 Intelligent transport systems Cooperative ITS Using V2I and I2V communications for applications related to signalized intersections Systèmes intelligents

More information

Self-Organizing Traffic Signals for Arterial Control

Self-Organizing Traffic Signals for Arterial Control Self-Organizing Traffic Signals for Arterial Control A Dissertation Presented by Burak Cesme to The Department of Civil and Environmental Engineering in partial fulfillment of the requirements for the

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS A Thesis Proposal By Marshall T. Cheek Submitted to the Office of Graduate Studies Texas A&M University

More information

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE Dennis Gratton Manager, Rail planning, Rail Implementation Office & Annie Hillis Public Art Coordinator, Rail Implementation Office November 7, 2013 OVERVIEW

More information

REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS

REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS December 2018 Revision Letter September 2018 Revision Letter September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter Signature

More information

Measuring Crossing Times of Passenger Vehicles Using Bluetooth Technology at U.S. Mexico Border

Measuring Crossing Times of Passenger Vehicles Using Bluetooth Technology at U.S. Mexico Border Center for International Intelligent Transportation Research Measuring Crossing Times of Passenger Vehicles Using Bluetooth Technology at U.S. Mexico Border CITY OF EL PASO CIUDAD JUAREZ CROSS BORDER MOBILITY

More information

LTE Direct Overview. Sajith Balraj Qualcomm Research

LTE Direct Overview. Sajith Balraj Qualcomm Research MAY CONTAIN U.S. AND INTERNATIONAL EXPORT CONTROLLED INFORMATION This technical data may be subject to U.S. and international export, re-export, or transfer ( export ) laws. Diversion contrary to U.S.

More information

Next Generation of Adaptive Traffic Signal Control

Next Generation of Adaptive Traffic Signal Control Next Generation of Adaptive Traffic Signal Control Pitu Mirchandani ATLAS Research Laboratory Arizona State University NSF Workshop Rutgers, New Brunswick, NJ June 7, 2010 Acknowledgements: FHWA, ADOT,

More information

Training for New Technologies

Training for New Technologies Training for New Technologies Be prepared when your organization meets the pressures of implementing new technologies. Panelists will discuss lessons learned when designing, developing and implementing

More information

Section 106 of the National Historic Preservation Act Consulting Parties Meeting March 8, 2018

Section 106 of the National Historic Preservation Act Consulting Parties Meeting March 8, 2018 Section 106 of the National Historic Preservation Act Consulting Parties Meeting March 8, 2018 Where Have We Been? Purpose of the meetings in March/May 2015 and August 2016: Ensure that the consulting

More information

rocket D I S H AirMax Carrier Class 2x2 PtP Bridge Dish Antenna Datasheet Models: RD-2G-24, RD-3G-26, RD-5G-30, RD-5G-34 Ultimate in RF Performance

rocket D I S H AirMax Carrier Class 2x2 PtP Bridge Dish Antenna Datasheet Models: RD-2G-24, RD-3G-26, RD-5G-30, RD-5G-34 Ultimate in RF Performance AirMax Carrier Class 2x2 PtP Bridge Dish Antenna Models: RD-2G-24, RD-3G-26, RD-5G-3, RD-5G-34 Ultimate in RF Performance Integrated Mount lets you easily snap Rocket M into place Incredible Range and

More information

PHASE ONE PROJECT REPORT

PHASE ONE PROJECT REPORT MOORHEAD AREA INTEGRATED TRAIN DETECTION AND TRAFFIC CONTROL SYSTEM PHASE ONE PROJECT REPORT December 2000 Prepared for: Minnesota Department of Transportation Office of Advanced Transportation Systems

More information

WEB I/O. Wireless On/Off Control USER MANUAL

WEB I/O. Wireless On/Off Control USER MANUAL Wireless On/Off Control Technical Support: Email: support@encomwireless.com Toll Free: 1 800 617 3487 Worldwide: (403) 230 1122 Fax: (403) 276 9575 Web: www.encomwireless.com Warnings and Precautions Warnings

More information

Technology and Manufacturing Readiness Levels [Draft]

Technology and Manufacturing Readiness Levels [Draft] MC-P-10-53 This paper provides a set of scales indicating the state of technological development of a technology and its readiness for manufacture, derived from similar scales in the military and aerospace

More information

I-5 Bridge Replacement Project

I-5 Bridge Replacement Project I-5 Bridge Replacement Project Joint Interim Committee on Interstate 5 Bridge Replacement Oregon State Capitol Salem, Oregon January 14, 2014 Matthew Garrett, Director Oregon Department of Transportation

More information

MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE

MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE First Annual 2018 National Mobility Summit of US DOT University Transportation Centers (UTC) April 12, 2018 Washington, DC Research Areas Cooperative

More information

City of Orlando Alpha Test July 10, 2000

City of Orlando Alpha Test July 10, 2000 City of Orlando Alpha Test July 10, 2000 Submitted by Naztec, Inc. Naztec, Inc. installed local intersection equipment and StreetWise control system under the City of Orlando s Alpha Test to replace existing

More information

Chapter 6: CPU Scheduling

Chapter 6: CPU Scheduling Chapter 6: CPU Scheduling Silberschatz, Galvin and Gagne 2013 Chapter 6: CPU Scheduling Basic Concepts Scheduling Criteria Scheduling Algorithms Sections from the textbook: 6.1, 6.2, and 6.3 6.2 Silberschatz,

More information

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Louisiana Transportation Conference Traffic Engineering Session 2 February 27, 2018, Baton Rouge, Louisiana UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Mark Taylor, P.E., PTOE

More information

Automatic Intelligent Traffic Control System

Automatic Intelligent Traffic Control System Automatic Intelligent Traffic Control System Harsh Singh Chauhan 1, Devesh Tiwari 2, Devashish 3 1,2,3Dept. of Electronics & Communication Engineering, IMS Engineering College Ghaziabad, U.P, India ---------------------------------------------------------------------***---------------------------------------------------------------------

More information

The Edward V. Lofstrom Collection M/A

The Edward V. Lofstrom Collection M/A The Edward V. Lofstrom Collection M/A 1994.29.01-02 Finding aid prepared by Benjamin C. Skinner This finding aid was produced using the Archivists' Toolkit August 01, 2015 Describing Archives: A Content

More information

REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS. September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter

REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS. September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter 506.08 ADDED DETAIL FOR TRANSITION FROM GR-MGS1 TO WEAK POST GUARDRAIL.

More information

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0 Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation

More information

Chapter 39. Vehicle Actuated Signals Introduction Vehicle-Actuated Signals Basic Principles

Chapter 39. Vehicle Actuated Signals Introduction Vehicle-Actuated Signals Basic Principles Chapter 39 Vehicle Actuated Signals 39.1 Introduction Now-a-days, controlling traffic congestion relies on having an efficient and well-managed traffic signal control policy. Traffic signals operate in

More information

Integrated Corridor Management (ICM) Planning Study. MPO Presentation September 8, 2016

Integrated Corridor Management (ICM) Planning Study. MPO Presentation September 8, 2016 Integrated Corridor Management (ICM) Planning Study MPO Presentation September 8, 2016 ICM Grant Background On February 26, 2015, the Broward MPO was awarded a grant by FHWA in the amount of $180,000 for

More information

2-800 MHz CCCS Sys Extension

2-800 MHz CCCS Sys Extension 2-800 MHz CCCS Sys Extension 1. Program Area: PUBLIC PROTECTION 2. Identify agencies and departments involved. Sheriff-Coroner. 3. Is the Strategic Priority new or previously identified in an earlier Strategic

More information

Lecture 8: Frequency Reuse Concepts

Lecture 8: Frequency Reuse Concepts EE 499: Wireless & Mobile ommunications (082) Lecture 8: Frequency Reuse oncepts Dr. Wajih. bu-l-saud Trunking and Grade of Service (GoS) Trunking is the concept that allows large number of users to use

More information

Instrumentation and Control

Instrumentation and Control Program Description Instrumentation and Control Program Overview Instrumentation and control (I&C) and information systems impact nuclear power plant reliability, efficiency, and operations and maintenance

More information