1 Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017

2 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout the state. Overview and Performance Measures Project overview and challenges Project Stakeholders Project Schedule Before Example ICM Triggers ICM Response Plans After Action meetings Summary / Next Steps 2

3 Overview What is Integrated Corridor Management? Better-informed travelers Optimization of existing infrastructure ICM Dynamic management of supply relative to demand Improved situational awareness Enhanced response and control 3

4 CMS plans ELCS Request Overview Lane Closure System LCS Ramp Meter Information System RMIS FMS Freeway Mgmt System Freeway Congestion Freeway Incidents Travel Times Planned Events CCTV Imagery CMS Status REMS Regional Event Mgmt System CHP Transit Express Lanes Congestion Pricing Arterial Construction RAMS Regional Arterial Mgmt System Arterial Congestion Intersection status System alarms Local traffic advisories Arterial Travel Time System 511 ATTS Weather NWS CPS Intelligent Virtual Corridor TMC (User Screen) XML Data (3 rd Party Applications) RTMS Congestion Pricing System Toll Travel Times Events Regional Transit Mgmt System Bus AVL Schedule Adherence Selected Stop/Route Data Panic alarms SPS Smart Parking System NPS Network Prediction System RTSS Real-Time Simulation System 4

5 Overview-Other ICM Projects Dallas, TX San Diego, CA Integrated operational systems Increased park and ride capacity and parking management system Decision support system Responsive traffic signal system Arterial street monitoring Traveler information Coordinated incident management HOV/HOT lane strategy Route and mode diversion Coordinated incident management Freeway coordinated ramp metering Congestion pricing on managed lanes Decision support system Congestion avoidance rewards Traveler information Transit signal priority Signal coordination on arterials with freeway ramp metering Physical bus priority on arterials Increased HOV occupancy requirements 5

6 Overview-Lessons Learned from Other Projects Big investment in Decision Support System, but underutilized in operations Need more operational integration among partners Need integrated traveler info website, but agencies want to maintain their own Consider ICM-Lite (i.e., diversion routes, travel times for alternate routes) Need TMC staff willing to change the way they do business and travelers willing to change their behavior DSS needs to operate faster than real time, be able to account for multiple scenarios occurring simultaneously and predict 30 min into the future Response plans need to be updated frequently 6

7 Performance Measures Performance Measure Definition Travel Time Reliability Corridor Throughput Signal Timing Efficiency Traffic Diversion ICM Response Plan Deployment Cost Effectiveness Public Perception Travel Time Index - a measure of congestion and conveys how much to multiply the ideal free flow travel time by to estimate the expected travel time for a certain route. VMT (or People Throughput) at an acceptable Level of Service (LOS D or better) during an incident. Queue Wait Time at US 74 Intersections (i.e., % of time stopped) or % Arrivals on Green during an incident. Number of travelers using traveler information systems who divert off of I-85 onto alternative routes (e.g., US 74). Number of times ICM response plans are correctly deployed on a monthly basis. Benefit Cost Ratio considering travel time & delay, emissions, fuel consumption, and safety benefits. Awareness of ICM and perceived benefits (survey based). 7

8 Previous Efforts-NCDOT Manual signal timing efforts Hurricane Evac. timing plans Construction Projects Incident detour plans along interstates 8

9 I-85 ICM Project Overview Project Vicinity: 20 miles on I-85-Gaston and Mecklenburg Counties; Limits on I-85 include roadway between exits 10 and 33; Location came up in the top 10 bottleneck report recently Signals : 94 signals on US-74 and on the ramps/loops from I-85-most of them isolated Focus: I-85 Diversion to US 74 with Signal Timing Optimization & Coordination Documentation: Each ICM step, process, trigger, response plan, performance measure I-85 Crashes: Crashes occur along I-85 in project vicinity on regular basis 9

10 I-85 ICM Project Overview IMAP Coverage Currently IMAP (Incident Management Assistance Patrol) coverage extends to US 321. Existing Incident Scenario-Response Process Detect and verify incident; notify State Highway Patrol, IMAP and other stakeholders; activate appropriate DMSs; populate TIMS and 511 systems; TMC monitoring; then return to default travel time messaging on DMSs after the event is over. TIM Meetings NCDOT Metrolina TMC currently conducts quarterly TIM meetings with the State Highway Patrol; Counties; Cities of Charlotte, CMPD, Belmont and Gastonia; emergency responders; wrecker services; and other NCDOT departments. Metrolina TMC The Metrolina TMC operates Monday Friday between 5:30am and 9:15pm. During nights and weekends the STOC takes over Metrolina operations. 10

11 I-85 ICM Project Challenges Uncoordinated Signals: There are signals in the corridor that are uncoordinated and need to tie into current systems for the I-85 ICM project using wireless communications. CCTV Coverage: Existing CCTV cameras, plus the proposed additional CCTV cameras to be installed on I-85 and US-74 should provide adequate coverage of the I-85 corridor. DMSs: Existing ones on I-85 and two additional ones on I-85 Dynamic Trailblazer signs: 51 needed along US-74 for the alternative routes Law Enforcement Coordinate with the law enforcement Software Automated process to communicate with DMSs, Signals, CCTV cameras and others Funding New to NC, funding through CMAQ?

12 I-85 ICM Project Stakeholders NCDOT Divisions 10, 12 including IMAP Design Units Metrolina and State Wide TMC s State Highway Patrol FHWA Transportation (various local entities) Emergency responders (State and Local) 12

13 I-85 ICM Project Schedule-Highlights Stakeholder meetings completed Working on CMAQ application for funding ICM Scenarios developed Training and SOPs need to be developed ICM Implementation -Fall of

14 Before Case I-85 NB between Exits 26-27, August 25, 2016 Tractor-trailer drove off embankment at approx. 1:30 PM Interstate eventually shut down with detour established 14

15 Detour Route Exit 26 NB, left at signal to NC 7 EB, right at signal to Belmont-Mt Holly Rd, left at signal to US 74 EB, left at signal to NC 273, right at signal back to I-85 NB 15

16 16 Congestion map 2:05 PM

17 17 Congestion Map 2:48 PM

18 18 Congestion Map 6:23 PM

19 ICM Triggers I-85 Full Closure (Directional or Both Directions) I-85 Lane Blocking Events (Minimum of One Lane Open) I-85 Queue Length (> 1 mile by Direction) Actual vs Expected Travel Speeds (> 2x for 30 minute minimum) Traffic Density (> 40 vehicles / mile for 30 minute minimum) Safety Hazard (Primary and/or Secondary Crashes) Special Events 19

20 ICM Response Plans-Full Closure-Steps Notification process Decision made on ICM implementation ICM signal timing plan implemented I-85 DMS signs, dynamic trailblazers on US-74 and others activated Regular updates and alert when incident is cleared ICM deactivated 20

21 I-85 Alternative Plans 12 Alternative plans were developed 6 for the NB direction on I-85 6 for the NB direction on I-85 21

22 After Action Reviews and Assessments Synopsis of Event Incident Time Line Review of Responders Actions (Arrivals and Departures) TMC Actions Discussions (Communication, Equipment and Resource Issues) Lessons Learned 22

23 Summary/Next Steps Stakeholder Meetings CMAQ Application-Secure Funding SOPs and Training Modules ITS Design and Construction ICM Implementation-Fall of

24 ICM is a traffic management tool in addition to the incident management tool to manage traffic proactively around the incidents Jennifer Portanova, PE, CPM 24

25 Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017

Assessing the Performance of Integrated Corridor Management (ICM) Strategies

Assessing the Performance of Integrated Corridor Management (ICM) Strategies Assessing the Performance of Integrated Corridor Management (ICM) Strategies Matt Burt, Battelle Research and Evaluation Session, NATMEC 2012 June 7, 2012 1 Presentation Outline The U.S. DOT ICM Program

More information

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

Integrated Corridor Management. Brian Cronin USDOT ITS Joint Program Office October 14, 2014

Integrated Corridor Management. Brian Cronin USDOT ITS Joint Program Office October 14, 2014 Integrated Corridor Management Brian Cronin USDOT October 14, 2014 ICM Program Objectives 1. Demonstrate and evaluate pro-active integrated approaches, strategies, and technologies for efficient, productive,

More information

Integrated Corridor Management (ICM) Planning Study. MPO Presentation September 8, 2016

Integrated Corridor Management (ICM) Planning Study. MPO Presentation September 8, 2016 Integrated Corridor Management (ICM) Planning Study MPO Presentation September 8, 2016 ICM Grant Background On February 26, 2015, the Broward MPO was awarded a grant by FHWA in the amount of $180,000 for

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

OPAC Adaptive Engine Pinellas County Deployment

OPAC Adaptive Engine Pinellas County Deployment OPAC Adaptive Engine Pinellas County Deployment Farhad Pooran Telvent Transportation North America Baltimore Regional Traffic Signal Forum May 25, 2011 Presentation Agenda Adaptive control systems - expected

More information

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231)

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) Impacts of Traveler Information on the Overall Network FINAL REPORT Prepared by September 2012 i 1. Report No. ENT-2012-2 2. Government Accession

More information

MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE

MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE First Annual 2018 National Mobility Summit of US DOT University Transportation Centers (UTC) April 12, 2018 Washington, DC Research Areas Cooperative

More information

San Antonio Wrong Way Driver Initiative

San Antonio Wrong Way Driver Initiative San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force

More information

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS L.A. Griffin Director of Expressway Operations, Orlando-Orange County Expressway Authority 4974 ORL Tower Road Orlando, FL 32807 (407)

More information

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Presented by: C. William (Bill) Kingsland, Assistant Commissioner, Transportation Systems Management Outline 1. What is

More information

Roadmap to Successful Deployment of Adaptive Systems

Roadmap to Successful Deployment of Adaptive Systems Smart Information for a Sustainable World Roadmap to Successful Deployment of Adaptive Systems Farhad Pooran Telvent Transportation North America Hampton Roads Transportation Operation Sub- Committee June

More information

The GATEway Project London s Autonomous Push

The GATEway Project London s Autonomous Push The GATEway Project London s Autonomous Push 06/2016 Why TRL? Unrivalled industry position with a focus on mobility 80 years independent transport research Public and private sector with global reach 350+

More information

Georgia s Regional Traffic Operations Program

Georgia s Regional Traffic Operations Program Georgia s Regional Traffic Operations Program Shahram Malek, PhD, PE Vice President, ARCADIS US Inc. Regional Traffic Operations Project Manager Koushik Arunachalam, PE Associate Project Manager, ARCADIS

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

CONNECTED VEHICLE-TO-INFRASTRUCTURE INITATIVES

CONNECTED VEHICLE-TO-INFRASTRUCTURE INITATIVES CONNECTED VEHICLE-TO-INFRASTRUCTURE INITATIVES Arizona ITE March 3, 2016 Faisal Saleem ITS Branch Manager & MCDOT SMARTDrive Program Manager Maricopa County Department of Transportation ONE SYSTEM MULTIPLE

More information

1. EXECUTIVE SUMMARY

1. EXECUTIVE SUMMARY 1. EXECUTIVE SUMMARY 1.1 INTRODUCTION This document is the Final Evaluation Report for the Genesis Advanced Traveler Information System (ATIS) Field Operational Test (FOT). This test was co-sponsored by

More information

TRB Innovations in Travel Modeling Atlanta, June 25, 2018

TRB Innovations in Travel Modeling Atlanta, June 25, 2018 Using an Activity-Based Model with Dynamic Traffic Simulation to Explore Scenarios for Private and Shared Autonomous Vehicle Use in Jacksonville with TRB Innovations in Travel Modeling Atlanta, June 25,

More information

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned ARIZONA CONNECTED VEHICLE PROGRAM Arterial Connected Vehicle Test Bed Deployment and Lessons Learned Faisal Saleem ITS Branch Manager & SMARTDrive Program Manager Maricopa County Department of Transportation

More information

USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT

USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT USE OF BLUETOOTH TECHNOLOGY IN TRAFFIC DATA COLLECTION & MANAGEMENT Justin Effinger, EIT Research Assistant/Teaching Assistant Department of Civil Engineering & Mechanics University of Wisconsin Milwaukee

More information

Collin Castle. NOCoE Regional Forum Session 1: Innovation and Emerging Technologies September 13th, 2016

Collin Castle. NOCoE Regional Forum Session 1: Innovation and Emerging Technologies September 13th, 2016 Collin Castle NOCoE Regional Forum Session 1: Innovation and Emerging Technologies September 13th, 2016 Session 1: Innovation & Emerging Technologies Infrastructure Readiness for Connected Vehicles & Traffic

More information

Connected Vehicles and Maintenance Operations

Connected Vehicles and Maintenance Operations Connected Vehicles and Maintenance Operations Presentation to AASHTO SCOM Dean Deeter Athey Creek Consultants Topics Connected Vehicle Priorities Survey Results Connected Vehicle Applications Related to

More information

RECOMMENDATION ITU-R M.1310* TRANSPORT INFORMATION AND CONTROL SYSTEMS (TICS) OBJECTIVES AND REQUIREMENTS (Question ITU-R 205/8)

RECOMMENDATION ITU-R M.1310* TRANSPORT INFORMATION AND CONTROL SYSTEMS (TICS) OBJECTIVES AND REQUIREMENTS (Question ITU-R 205/8) Rec. ITU-R M.1310 1 RECOMMENDATION ITU-R M.1310* TRANSPORT INFORMATION AND CONTROL SYSTEMS (TICS) OBJECTIVES AND REQUIREMENTS (Question ITU-R 205/8) Rec. ITU-R M.1310 (1997) Summary This Recommendation

More information

TMC Simulator for Operator Training Using Micro-Simulation

TMC Simulator for Operator Training Using Micro-Simulation TMC Simulator for Operator Training Using Micro-Simulation Lianyu Chu California Center for Innovative Transportation University of California Berkeley 653 East Peltason Dr Irvine, CA 92697-3600 Tel: (949)824-1876

More information

Traffic Solutions. How to Test FCD Monitoring Solutions: Performance of Cellular-Based Vs. GPS-based systems

Traffic Solutions. How to Test FCD Monitoring Solutions: Performance of Cellular-Based Vs. GPS-based systems Traffic Solutions How to Test FCD Monitoring Solutions: Performance of Cellular-Based Vs. GPS-based systems About Cellint Israel Based, office in the US Main products NetEyes for quality of RF networks

More information

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101

More information

Core Input Files + Engines. Node/Link/Activity Location Demand Type/ Vehicle Type VOT Table/ Emission Table. DTALite. Movement Capacity File

Core Input Files + Engines. Node/Link/Activity Location Demand Type/ Vehicle Type VOT Table/ Emission Table. DTALite. Movement Capacity File Module'1:'Introduction'to'NEXTA/DTALite:'(10AM:10:30'AM)' Twosoftwareapplications:NEXTAasGUIanddatahub;DTALiteasDTAsimulationengine 32_bitvs.64_bit:32_bitforGISshapefileimportingandlegacysupport;64_bitforlargenetwork:(e.g.

More information

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Four Case Studies Agenda Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications: Traffic diversion caused by capacity reduction (Fort Lauderdale, FL) Impacts on traffic due

More information

FORUM MEETING #2: JULY 8-9, 2018; SAN FRANCISCO, CA. Forum on Preparing for Automated Vehicles & Shared Mobility

FORUM MEETING #2: JULY 8-9, 2018; SAN FRANCISCO, CA. Forum on Preparing for Automated Vehicles & Shared Mobility FORUM MEETING #2: JULY 8-9, 2018; SAN FRANCISCO, CA Forum on Preparing for Automated Vehicles & Shared Mobility Forum on Preparing for Automated Vehicles & Shared Mobility Overview of TRB Forum Top Ten

More information

Results of public consultation ITS

Results of public consultation ITS Results of public consultation ITS 1. Introduction A public consultation (survey) was carried out between 29 February and 31 March 2008 on the preparation of the Action Plan on Intelligent Transport Systems

More information

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell

More information

RIVER TO SEA TPO TSM&O MASTER PLAN PHASE

RIVER TO SEA TPO TSM&O MASTER PLAN PHASE RIVER TO SEA TPO TSM&O MASTER PLAN PHASE 2 Prepared for: River to Sea Transportation Planning Organization 2570 W. International Speedway Blvd., Suite 100 Daytona Beach, Florida 32114 Prepared by: Metric

More information

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District 0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS TxDOT Houston District October 10, 2017 PI: XING WU, PHD, PE CO-PI: HAO YANG, PHD DEPT. OF CIVIL & ENVIRONMENTAL

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

City of Surrey Adaptive Signal Control Pilot Project

City of Surrey Adaptive Signal Control Pilot Project City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors

More information

Lincoln County Fire and Rescue Association Standard Operating Guideline (SOG)

Lincoln County Fire and Rescue Association Standard Operating Guideline (SOG) Number: 113 Title: Fire Dispatch Guidelines Purpose: To provide an overview of communications guidelines for fire and rescue departments. 1. Radio Etiquette All Radio users shall comply with all pertinent

More information

DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION

DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION Presented by, R.NITHYANANTHAN S. KALAANIDHI Authors S.NITHYA R.NITHYANANTHAN D.SENTHURKUMAR K.GUNASEKARAN Introduction

More information

COUNTYWIDE TRAFFIC CONTROL DEVICES STUDY

COUNTYWIDE TRAFFIC CONTROL DEVICES STUDY LEE COUNTY COUNTYWIDE TRAFFIC CONTROL PRESENTED TO LEE COUNTY METROPOLITAN PLANNING ORGANIZATION PRESENTED BY VANUS, INC. VANUS December 19, 2008 Overview Purpose Evolution of the Project Master Plan Purpose

More information

Update on Traffic Results and Findings

Update on Traffic Results and Findings Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

Chapter 4a GUIDE SIGNS

Chapter 4a GUIDE SIGNS Sign Designs and Markings Manual (TEM 295-2) Chapter 4a GUIDE SIGNS DIRECTIONAL ( D sign code numbers) Revised January 20, 2012 Guide Signs Directional Page 4a-2 Sign Designs and Markings Manual (TEM 295-2)

More information

MODULE 10: INTELLIGENT TRANSPORTATION SYSTEMS: SMART WORK ZONES LESSON 1: WORK ZONE SAFETY

MODULE 10: INTELLIGENT TRANSPORTATION SYSTEMS: SMART WORK ZONES LESSON 1: WORK ZONE SAFETY MODULE 10: INTELLIGENT TRANSPORTATION SYSTEMS: SMART WORK ZONES LESSON 1: WORK ZONE SAFETY Connected vehicle (CV) safety applications are designed to increase awareness of what is happening in the environment

More information

True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154

True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154 1 Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154 Presentation to the 18 th World Congress on Intelligent Transport Systems Technical

More information

NX8R D I G I T A L M E S SA G E P L A Y ER P A G E 1 O F

NX8R D I G I T A L M E S SA G E P L A Y ER P A G E 1 O F Installation Operation Maintenance Instructions NX8R DIGITAL MESSAGE PLAYER PAGE 1 OF 28 NX8R Digital Message Player Instruction Manual Copyright 1983-2015 - Information Station Specialists, Inc. - All

More information

Wildland Residents Association, Inc. San Marcos Pass Volunteer Fire Department

Wildland Residents Association, Inc. San Marcos Pass Volunteer Fire Department Wildland Residents Association, Inc. San Marcos Pass Volunteer Fire Department By Michael S. Williams President-Executive Director BACKGROUND Recent developments in the commercial broadcasting business

More information

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S WHITE PAPER BENEFITS OF OPTICOM GPS Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S 2 CONTENTS Overview 3 Operation 4 Advantages of Opticom GPS 5 Opticom GPS

More information

update update Presented by Alpesh Patel Cambridge Systematics January 30, 2018 CRAFT Cambridge Systematics, Inc. Alpesh Patel presented to

update update Presented by Alpesh Patel Cambridge Systematics January 30, 2018 CRAFT Cambridge Systematics, Inc. Alpesh Patel presented to update update presented to CRAFT presented by Cambridge Systematics, Inc. January 30, 2018 January 30, 2018 1 Alpesh Patel Cambridge Systematics Presented by Alpesh Patel Self-Driving Vehicles Autonomous

More information

PHASE ONE PROJECT REPORT

PHASE ONE PROJECT REPORT MOORHEAD AREA INTEGRATED TRAIN DETECTION AND TRAFFIC CONTROL SYSTEM PHASE ONE PROJECT REPORT December 2000 Prepared for: Minnesota Department of Transportation Office of Advanced Transportation Systems

More information

Single Point Urban Interchange (SPUI) with Signals

Single Point Urban Interchange (SPUI) with Signals 1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large

More information

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007

ACS-Lite. The Next Generation of Traffic Signal Control. Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 ACS-Lite The Next Generation of Traffic Signal Control Eddie Curtis, FHWA HOTM / Resource Center February 28, 2007 Outline Background on adaptive traffic signal Systems ACS-Lite Goals Development Functionality

More information

Diversion Analysis. Appendix K

Diversion Analysis. Appendix K Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,

More information

Next Generation Traffic Control with Connected and Automated Vehicles

Next Generation Traffic Control with Connected and Automated Vehicles Next Generation Traffic Control with Connected and Automated Vehicles Henry Liu Department of Civil and Environmental Engineering University of Michigan Transportation Research Institute University of

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. The Making of a Smart City Eric Plapper 2015 HDR, Inc., all rights reserved. Transportation Trends Defining a Smart City Example Deployments How to Get Started Transportation

More information

PennDOT District 6-0 Signal Retiming Initiative The Route 611 Story

PennDOT District 6-0 Signal Retiming Initiative The Route 611 Story PennDOT District 6-0 Signal Retiming Initiative The Route 611 Story Presented By David Adams, PE PennDOT District 6-0 John Albeck, PE, PTOE Albeck Gerken, Inc. PennDOT District 6-0 PennDOT Ownership by

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY

ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY ADAPTIVE TRAFFIC SIGNAL CONTROL PILOT PROJECT FOR THE CITY OF SURREY Joseph K. Lam, P.Eng., Managing Director Delcan Corporation 625 Cochrane Drive, Suite 500, Markham, Ontario, Canada, L3R 9R9 Tel: +1-905-943-0521,

More information

Traffic Incident Detection Enabled by Large Data Analytics. REaltime AnlytiCs on TranspORtation data

Traffic Incident Detection Enabled by Large Data Analytics. REaltime AnlytiCs on TranspORtation data Traffic Incident Detection Enabled by Large Data Analytics REaltime AnlytiCs on TranspORtation data Authors Forrest Hoffman (standing) and Bill Hargrove sit "inside" the computer they constructed from

More information

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC. NCTCOG Regional Travel Model Improvement Experience in 2009 and Data Management Presented to TMIP VMTSC December 7, 2009 Presenters Kathy Yu Senior Modeler Arash Mirzaei Manager Model Group Behruz Paschai

More information

Raising Awareness of Emergency Vehicles in Traffic Using Connected Vehicle Technologies

Raising Awareness of Emergency Vehicles in Traffic Using Connected Vehicle Technologies Raising Awareness of Emergency Vehicles in Traffic Using Connected Vehicle Technologies Larry Head University of Arizona September 23, 2017 1 Connected Vehicles DSRC 5.9 GHz Wireless Basic Safety Message

More information

Title- RADIO PROTOCOL FOR EMERGENCY INCIDENTS CLASSIFICATION POLICY STATEMENT

Title- RADIO PROTOCOL FOR EMERGENCY INCIDENTS CLASSIFICATION POLICY STATEMENT Department of Emergency Response And Communications Cortland County 911 Public Safety Building; Suite 201 54 Greenbush Street Cortland, New York 13045 200-002 Title- RADIO PROTOCOL FOR EMERGENCY INCIDENTS

More information

The Tri-State Transit Authority

The Tri-State Transit Authority The Tri-State Transit Authority Finding Creative Pockets for Funding By: Paul Davis, General Manager and CEO 8/11/2016 Tri-State Transit Authority 1 Goals 1. Give SUN attendees history of TTA & overview

More information

Managing traffic through Signal Performance Measures in Pima County

Managing traffic through Signal Performance Measures in Pima County CASE STUDY Miovision TrafficLink Managing traffic through Signal Performance Measures in Pima County TrafficLink ATSPM Case Study Contents Project overview (executive summary) 2 Project objective 2 Overall

More information

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Louisiana Transportation Conference Traffic Engineering Session 2 February 27, 2018, Baton Rouge, Louisiana UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Mark Taylor, P.E., PTOE

More information

Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta

Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Application of Dynamic Traffic Assignment (DTA) Model to Evaluate Network Traffic Impact during Bridge Closure - A Case Study in Edmonton, Alberta Peter Xin, P.Eng. Senior Transportation Engineer Policy

More information

City of St. Petersburg Planning & Visioning Commission October 11, 2011

City of St. Petersburg Planning & Visioning Commission October 11, 2011 Pinellas Alternatives Analysis Speakers Bureau City of St. Petersburg Planning & Visioning Commission October 11, 2011 Pinellas Alternatives Analysis Project Purpose A study identifying transit options

More information

GALVESTON - BOLIVAR FERRY SYSTEM. ITS Implementations

GALVESTON - BOLIVAR FERRY SYSTEM. ITS Implementations GALVESTON - BOLIVAR FERRY SYSTEM ITS Implementations Presentation Outline ITS Implementations at the Galveston Ferry History of the Galveston Ferry System Closed Circuit Television Cameras Communications

More information

Inter- and Intra-Vehicle Communications

Inter- and Intra-Vehicle Communications Inter- and Intra-Vehicle Communications Gilbert Held A Auerbach Publications Taylor 5* Francis Group Boca Raton New York Auerbach Publications is an imprint of the Taylor & Francis Croup, an informa business

More information

RFID TECHNOLOGY FOR AVI: FIELD DEMONSTRATION OF A WIRELESS SOLAR POWERED E-ZPASS 1 TAG READER

RFID TECHNOLOGY FOR AVI: FIELD DEMONSTRATION OF A WIRELESS SOLAR POWERED E-ZPASS 1 TAG READER RFID TECHNOLOGY FOR AVI: FIELD DEMONSTRATION OF A WIRELESS SOLAR POWERED E-ZPASS 1 TAG READER Jeffrey Wojtowicz, Ruth I. Murrugarra, Bryan Bertoli, William Wallace Center for Infrastructure and Transportation

More information

Guy FREMONT Innovative Solutions Manager

Guy FREMONT Innovative Solutions Manager 1 Cooperative Systems: how can community networks improve road safety? Guy FREMONT Innovative Solutions Manager The Sanef Group o Concessionaire of 2 toll networks, representing 1757 km in operation: Sanef:

More information

THE FUTURE OF DATA AND INTELLIGENCE IN TRANSPORT

THE FUTURE OF DATA AND INTELLIGENCE IN TRANSPORT THE FUTURE OF DATA AND INTELLIGENCE IN TRANSPORT Humanity s ability to use data and intelligence has increased dramatically People have always used data and intelligence to aid their journeys. In ancient

More information

An Overview of TTI Automated and Connected Vehicles Research

An Overview of TTI Automated and Connected Vehicles Research An Overview of TTI Automated and Connected Vehicles Research Michael P. Manser, Ph.D. Human Factors Program Manager Associate Director of Safety Initiatives Center for Transportation Safety Texas A&M Transportation

More information

4G Broadband: Bridging to Public Safety Land Mobile Networks

4G Broadband: Bridging to Public Safety Land Mobile Networks Andrew Seybold, Inc., 315 Meigs Road, A-267, Santa Barbara, CA 93109 805-898-2460 voice, 805-898-2466 fax, www.andrewseybold.com 4G Broadband: Bridging to Public Safety Land Mobile Networks June 2, 2010

More information

understanding real-time traffic information

understanding real-time traffic information understanding real-time traffic information Welcome Congratulations on choosing navigation with SUNA Traffic Channel. SUNA Traffic Channel is a service that broadcasts real-time traffic information directly

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

HOW ITS IS. Beyond Border: Leading the Way 19TH ANNUAL CONFERENCE AND EXHIBITION. the

HOW ITS IS. Beyond Border: Leading the Way 19TH ANNUAL CONFERENCE AND EXHIBITION. the 19TH ANNUAL CONFERENCE AND EXHIBITION SEPT. 30 OCT. 2, 2013 SAN DIEGO MARRIOTT MISSION VALLEY PRELIMINARY PROGRAM the Beyond Border: HOW ITS IS Leading the Way PROGRAM Overview TIME 12:00 p.m.-5:00 p.m.

More information

Adaptive Signal Control in Tyler Texas

Adaptive Signal Control in Tyler Texas Kirk Houser City of Tyler Kent Kacir - Siemens Adaptive Signal Control in Tyler Texas June 16, 2007 Amarillo, TX Agenda Transportation Planning and City Comprehensive Plan Description of the Corridor Operational

More information

Methodology to Assess Traffic Signal Transition Strategies. Employed to Exit Preemption Control

Methodology to Assess Traffic Signal Transition Strategies. Employed to Exit Preemption Control Methodology to Assess Traffic Signal Transition Strategies Employed to Exit Preemption Control Jon T. Obenberger Dissertation submitted to the faculty of the Virginia Polytechnic Institute and State University

More information

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor

More information

Freeway Performance Measurement System (PeMS)

Freeway Performance Measurement System (PeMS) CALIFORNIA PATH PROGRAM INSTITUTE OF TRANSPORTATION STUDIES UNIVERSITY OF CALIFORNIA, BERKELEY Freeway Performance Measurement System (PeMS) Chao Chen California PATH Research Report UCB-ITS-PRR-2003-22

More information

Connected Car Networking

Connected Car Networking Connected Car Networking Teng Yang, Francis Wolff and Christos Papachristou Electrical Engineering and Computer Science Case Western Reserve University Cleveland, Ohio Outline Motivation Connected Car

More information

Context Aware Dynamic Traffic Signal Optimization

Context Aware Dynamic Traffic Signal Optimization Context Aware Dynamic Traffic Signal Optimization Kandarp Khandwala VESIT, University of Mumbai Mumbai, India kandarpck@gmail.com Rudra Sharma VESIT, University of Mumbai Mumbai, India rudrsharma@gmail.com

More information

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute Model Deployment Overview Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute Test Conductor Team 2 3 Connected Vehicle Technology 4 Safety Pilot Model Deployment

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013 This independent report of findings, including data entry and analysis of all the consultation

More information

EFFECTIVE DATE: 01/01/2002 REFERENCES: RELATED DIRECTIVES: RESCINDS:

EFFECTIVE DATE: 01/01/2002 REFERENCES: RELATED DIRECTIVES: RESCINDS: DIVISION: Communications DATE OF ISSUE: 01/01/2002 EFFECTIVE DATE: 01/01/2002 NO: Section 7 SUBJECT: PAGING SYSTEM DISTRIBUTION: AMMENDS: REFERENCES: RELATED DIRECTIVES: RESCINDS: POLICY STATEMENT: The

More information

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road)

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road) Adaptive Signal System Mt. Juliet, TN SR-171 (Mt. Juliet Road) Project Background Project Location Mt. Juliet, TN: 2015 Census: 28,159 Doubled since 2000 Immediately east of Metro Nashville Mt. Juliet

More information

Designing Service Coverage and Measuring Accessibility and Serviceability

Designing Service Coverage and Measuring Accessibility and Serviceability Designing Service Coverage and Measuring Accessibility and Serviceability INFORMS Annual Meeting San Francisco, CA November 9-12, 2014 EunSu Lee, Ph.D., GISP, CPIM, CSCP Agenda Introduction Objectives

More information

The WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG

The WISE Experience. Association of Monterey Bay Area Governments (AMBAG) September 20, Bhupendra Patel, Ph.D. Director of Modeling, AMBAG The WISE Experience Association of Monterey Bay Area Governments (AMBAG) September 20, 2017 Bhupendra Patel, Ph.D. Director of Modeling, AMBAG Paul Ricotta, P.E. Principal Transportation Engineer, Caliper

More information

Signal Performance Metrics Charlie Wetzel, PE, PTOE

Signal Performance Metrics Charlie Wetzel, PE, PTOE Signal Performance Metrics Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 1 Who is Seminole County? Small County located just north of Orange County and the City of Orlando Population:

More information

Use of Probe Vehicles to Increase Traffic Estimation Accuracy in Brisbane

Use of Probe Vehicles to Increase Traffic Estimation Accuracy in Brisbane Use of Probe Vehicles to Increase Traffic Estimation Accuracy in Brisbane Lee, J. & Rakotonirainy, A. Centre for Accident Research and Road Safety - Queensland (CARRS-Q), Queensland University of Technology

More information

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger PIARC WG5 Complex Underground Road Networks Part A Case Studies - appendices Appendix 3.1 - CANADA / Québec Montréal tunnels Ville-Marie & Viger 1. SUMMARY The Ville-Marie and Viger tunnel complex is part

More information

Robert Armstrong, Director of Development & Environmental Services. Water Meter Replacement Update

Robert Armstrong, Director of Development & Environmental Services. Water Meter Replacement Update Date Monday, February 12, 2018 From Subject Report No. DES2018-10 Robert Armstrong, Director of Development & Environmental Services Water Meter Replacement Update Roll No. N/A Recommendation That Committee

More information

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

A Fuzzy Signal Controller for Isolated Intersections

A Fuzzy Signal Controller for Isolated Intersections 1741741741741749 Journal of Uncertain Systems Vol.3, No.3, pp.174-182, 2009 Online at: www.jus.org.uk A Fuzzy Signal Controller for Isolated Intersections Mohammad Hossein Fazel Zarandi, Shabnam Rezapour

More information

HOT Enforcement. Prospects for an Automated Solution. Ginger Goodin, P.E. Texas Transportation Institute

HOT Enforcement. Prospects for an Automated Solution. Ginger Goodin, P.E. Texas Transportation Institute HOT Enforcement Prospects for an Automated Solution Ginger Goodin, P.E. Texas Transportation Institute Automated Vehicle-Occupancy Verification Technologies Study HOV Pooled Fund Study California Georgia

More information

ASSESSING THE POTENTIAL FOR THE AUTOMATIC DETECTION OF INCIDENTS ON THE BASIS OF INFORMATION OBTAINED FROM ELECTRONIC TOLL TAGS

ASSESSING THE POTENTIAL FOR THE AUTOMATIC DETECTION OF INCIDENTS ON THE BASIS OF INFORMATION OBTAINED FROM ELECTRONIC TOLL TAGS ASSESSING THE POTENTIAL FOR THE AUTOMATIC DETECTION OF INCIDENTS ON THE BASIS OF INFORMATION OBTAINED FROM ELECTRONIC TOLL TAGS Bruce Hellinga Department of Civil Engineering, University of Waterloo, Waterloo,

More information

Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017

Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017 Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017 Prepared for: East West Gateway Council of Governments Background. Motivation Process to Create

More information

South Jersey Real-Time Motorist Information System

South Jersey Real-Time Motorist Information System FHWA-NJ-2004-007 South Jersey Real-Time Motorist Information System FINAL REPORT June 2004 Submitted by Dr. Kaan Ozbay,* Ph.D. Associate Professor Bekir Bartin,* M.Sc. Graduate Research Assistant * Department

More information

A Newsletter From The Center For Integrated Transportation Systems Management

A Newsletter From The Center For Integrated Transportation Systems Management THE TRANSPORTER A Newsletter From The Center For Integrated Transportation Systems Management LOW PROFILE WIRELESS TRAFFIC SENSORS FOR ENHANCED VEHICLE FEATURE EXTRACTION Summer 2010 INSIDE COVER STORY

More information

Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection

Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection Clark Letter*, Lily Elefteriadou, Mahmoud Pourmehrab, Aschkan Omidvar Civil

More information