1 TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC must be submitted The Questionnaire has been completed by... (name) of the company.... Signature:.... Date:.. Table 1. General Information for the Power Station 1.1 Power Station Name 1.2 Number of generating units 1.3 Total installed capacity of Wind Farm Power Station (MW) Generation Export Connection Capacity Required (MW) Reactive Power Export Connection Capacity Required (MVAR) Table 2. Application for Dedicated or Non-Dedicated connection (Dedicated Connection means satisfying the reliability criteria N-1) Note: For plants with overall licenced capacity over 50MW a dedicated connection is compulsory. Applications to request terms for dedicated connection are also accepted for plants with licenced capacities less than 50MW. The increased connection cost is covered by the applicant. 2.1 Application for non-dedicated connection between the Entry Substation and the Network Substation (YES/ NO) 1 Total licenced capacity (as stated in the Generation Licence) (MW) 2 1
2 2.2 Application for dedicated connection between the Entry substation and the Network Substation (YES/ NO) 2.3 For licenced capacities less than 50MW: State whether you would like to be notified by the TSO for the preliminary connection costs for the two alternatives (dedicated or non-dedicated connection) so you can decide upon this for the type of connection. (YES/ NO) Table 3. Other information to be submitted 3.1 Provide a 1:5000 Survey map, with the location of the facility clearly shaded. 3.2 Provide a plan of the site (1:200 or 1:250) of the proposed facility, indicating the proposed location of generators, transformers, site buildings etc. The plan shall be submitted in hard copy format. A digitised format shall also be submitted if available. 3.3 Provide an electrical single line-diagram of the proposed facility detailing all significant items of plant, i.e: Provide a map Provide a map Provide a Single Line Diagram Numbered generating units Step-up transformers Circuit breakers/ means of isolation/ protection system arrangements Table 4. Information concerning the Generating Units The TSO suggests the installation of synchronous generators. 4.1 Μanufacturer 4.2 Type of generating unit 4.3 Generating unit with Induction Generator (YES/ NO) 4.4 Generating unit with Synchronous Generator (YES/ NO) 4.5 Registered capacity (MW) 4.6 Generator Rating (MVA) 4.7 State if the wind turbines are fixed or variable speed 4.8 State whether the connection of the Wind Farm Power Station to the grid involves a power electronic converter 4.9 Type of aerodynamic control (pitch, stall, ect) 4.10 Wind Turbine short-circuit capacity (MVA) 4.11 Normal maximum reactive capability export (MVAr) 2
3 4.12 Normal maximum reactive capability import (MVAr) 4.13 Turbine Generator Inertia Constant (H) for the entire rotating mass (kws/ kva) 4.14 Reactive power demand at zero output ('no load') (kvar) 4.15 Duration of inrush / starting current (ms) 4.16 Magnitude of inrush / starting current (Amps) 4.17 Description of synchronising process with the network 4.18 Wind Farm Lightning protection and Earthing arrangements 4.19 Describe the process and the compensation devices that will be installed so that the Wind Farm Power Station does not absorb in any case reactive power from the network more than what corresponds to a power factor of Table 5. Information required for each Generator Transformer 5.1 Transformer Rating (MVA) 5.2 Number of windings 5.3 Vector group 5.4 Rated current of each winding (Amps) 5.5 Transformer nominal LV Voltage (kv) 5.6 Transformer nominal HV Voltage (kv) 5.7 Nominal Transformer ratio 5.8 Tapped winding 5.9 Transformer zero sequence impedance Ζ ο at nominal tap (Ohms) Table 6. Information required for the Wind Farm Power Station Step-up Transformer (Medium to High Voltage) of the Wind Farm Power Station 6.1 Transformer Rating (MVA) 6.2 Number of windings 6.3 Vector group 6.4 Rated current of each winding (Amps) 3
4 6.5 Transformer nominal LV Voltage (kv) 6.6 Transformer nominal HV Voltage (kv) 6.7 Nominal Transformer ratio 6.8 Tapped winding 6.9 Transformer ratio at each Transformer tap 6.10 Transformer impedance at each tap (% on rating) 6.11 Transformer zero sequence impedance at nominal tap (Ohms) 6.12 Core type (number of limbs, shell or core type) 6.13 Open-circuit characteristic Provide a graph 6.14 Earthing Arrangements including neutral earthing resistance & reactance Table 7. Generator Forecast and Availability Data 7.1 List the anticipated maximum export level in MW for each calendar month. 7.2 Ιndicate how generation would vary over a typical 24 hour period during the month of maximum export. 7.3 Give details of expected rapid or frequent variations in output, including magnitude, max rate of change expected, frequency and duration. 7.4 Expected Maintenance Requirements (days per year) 7.5 Expected Maintenance (timesheet) (Give periods of maintenance, duration of each period and the expected time of the year that this will take place). Provide a timetable 7.6 Forecast Availability apart from the expected scheduled maintenance requirements Table 8. Metering System and Data Transmission 8.1 According to the Transmission and Distribution Rules, installation of bidirectional metering equipment that will record the Active and Reactive Energy and Power that is exported and/or imported at a metering point is required. (I AGREE/ I DISAGREE) 8.2 According to the Transmission and Distribution Rules, for Very Small Power Stations (for Wind Farm Power Stations these have a capacity less than 5 MW), a telephone connection is required (e.g 4
5 ISDN, GSM or analogue connection) for transmission of data from the Power Station to the Energy Control Centre of the TSO at the end of the day. (I AGREE/ I DESAGREE) 8.3 According to the Transmission and Distribution Rules, for Small, Medium and Large Power Stations, (for Wind Farm Power Stations these have a capacity larger than 5 MW), a telecommunication and an RTU is required so that a continuous and even transmission of data (e.g circuit breakers mode, active and reactive power measurements etc.) from the Wind Farm Power Station to the Energy Control Centre of TSO is achieved. (I AGREE/ I DESAGREE) Table 9. Other Requirements. Provide Certificate according to IEC The characteristics of the electric power produced shall be compatible to the specifications for the Transmission and Distribution System Performance as determined in the Transmission and Distribution Rules. (YES/ NO) 9.2 The Independent Power Producer shall provide assurance that the installations are compatible to International Standards of Electromagnetic Compatibility (YES/ NO) 9.3 Provide a certificate according to IEC , Wind Turbine Generator Systems, Part 21: Measurement and Assessment of Power Quality Characteristics of Grid Connected Wind Turbines. Provide a certificate 5
Initial Application Form for Connection of Distributed Generation (>10kW)
Please complete the following information and forward to Vector Contact Details Primary Contact (who we should contact for additional information) Contact person Company name Contact numbers Daytime: Cell
More informationIDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)
IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationImpact Assessment Generator Form
Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationWFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS
WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE
More informationNORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:
NORTH CAROLINA INTERCONNECTION REQUEST Utility: Designated Contact Person: Address: Telephone Number: Fax: E-Mail Address: An is considered complete when it provides all applicable and correct information
More informationForm B. Connection Impact Assessment Application Form Distribution System
Form B Connection Impact Assessment Application Form Distribution System This Application Form is for Generators applying for Connection Impact Assessment ( CIA ). It is important that the Generator provides
More informationConnection Impact Assessment Application Form
Connection Impact Assessment Application Form This Application Form is for Generators applying for a Connection Impact Assessment (CIA). In certain circumstances, London Hydro may require additional information
More informationOPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS
OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED
More informationRemotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application
General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application
More informationINTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY
INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY Internal Use Only Date Received Time Received Received By: 1. The undersigned Interconnection Customer submits this request to interconnect its Large
More informationAPPENDIX 1 to LGIP INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY
APPENDIX 1 to LGIP INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY 1. The undersigned Interconnection Customer submits this request to interconnect its Large Generating Facility with Transmission
More informationRevision Control. 0 18/07/2012 Initial Document Creation. STAKEHOLDERS The following positions shall be consulted if an update or review is required:
Standard: Technical Requirements for Bumpless Transfer of Customer Load between Embedded Generators and the Distribution Network Standard Number: HPC-9OJ-13-0001-2012 * Shall be the Process Owner and is
More informationGENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW
GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945
More informationOwner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:
Interconnection of a Customer-Owned Renewable Generation System of Greater than 100 KW and Less than or Equal to 1 MW to the LCEC Electric Grid Tier 3 Application and Compliance Form Instructions: Complete
More informationIssued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY
WN U-60 Attachment C to Schedule 152, Page 1 SCHEDULE 152 APPLICATION FOR INTERCONNECTING A GENERATING FACILITY TIER 2 OR TIER 3 This Application is considered complete when it provides all applicable
More informationConnection Impact Assessment Application
Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,
More informationSummary of Relaying Reviews Reporting
Revised Attachment B (Agenda Item 6) Summary of Relaying Reviews -- 12-31-04 Reporting This form shall be used without modification to provide a summary of relaying reviews performed by each Transmisission
More informationADVANCED CONTROLS FOR MITIGATION OF FLICKER USING DOUBLY-FED ASYNCHRONOUS WIND TURBINE-GENERATORS
ADVANCED CONTROLS FOR MITIGATION OF FLICKER USING DOUBLY-FED ASYNCHRONOUS WIND TURBINE-GENERATORS R. A. Walling, K. Clark, N. W. Miller, J. J. Sanchez-Gasca GE Energy USA reigh.walling@ge.com ABSTRACT
More informationCompany Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design
Company Directive POLICY DOCUMENT: SD4/7 Relating to 11kV and 6.6kV System Design Policy Summary This document describes the standard requirements for the design of the 11kV and 6.6kV systems. Reference
More informationENGINEERING DATA SUBMITTAL For the Interconnection of Generation System
WHO SHOULD FILE THIS SUBMITTAL: Anyone in the final stages of interconnecting a Generation System with Nodak Electric Cooperative, Inc. This submittal shall be completed and provided to Nodak Electric
More informationPART 1 OWNER/APPLICANT INFORMATION
CALHOUN COUNTY ELECTRIC COOP. ASSN. Application for Operation of Customer-Owned Generation This application should be completed as soon as possible and returned to the Cooperative in order to begin processing
More informationCourse ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation
Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission
More informationLevel 6 Graduate Diploma in Engineering Electrical Energy Systems
9210-114 Level 6 Graduate Diploma in Engineering Electrical Energy Systems Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler,
More informationDemand Customer Connection Connection Application Form to the Transmission System
Demand Customer Connection Connection Application Form to the Transmission System April 2016 Introduction This application form (version 1.2) outlines the information EirGrid requires to progress an application
More informationOPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS
OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND
More informationGENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW
GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW Electric Utility Contact Information DTE Energy Interconnection Coordinator One Energy Plaza, SB
More informationTable of Contents. Introduction... 1
Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...
More informationSOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems
SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems This application should be completed as soon as possible and returned to the Cooperative in order to
More informationGeneration Interconnection Study Data Sheet Synchronous Machines
FOR INTERNAL USE ONLY GTC Project Number: Queue Date: Generation Interconnection Study Data Sheet Synchronous Machines Customers must provide the following information in its entirety. GTC will not proceed
More informationEASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation
EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation This application is to be completed and returned to the Cooperative member service representative in order to begin
More informationAPPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION
APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION This application should be completed and returned to in order to begin processing the request for interconnecting as required by
More informationDistributed Generation Application Form (Generation of Greater than 20 kw to 15 MW)
Distributed Generation Application Form (Generation of Greater than 20 kw to 15 MW) PSC-6028 R(03-04-04) Name & Address Distributed By Name & Address Supplied By Public Service Commission of Wisconsin
More informationAPPENDIX B: Generation Interconnection Application Form
2 APPENDIX B: Generation Interconnection Application Form WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect with Xcel Energy (Local electric utility)
More informationIf any queries arise ESB Networks DAC can be contacted at or
esbnetworks.ie FORM NC5 EMBEDDED GENERATION FACILITIES Application for a New Connection FOR OFFICIAL USE ONLY B.P. No: MPRN: Introduction This application form outlines the information ESB Networks DAC
More information, ,54 A
AEB5EN2 Ground fault Example Power line 22 kv has the partial capacity to the ground 4,3.0 F/km. Decide whether ground fault currents compensation is required if the line length is 30 km. We calculate
More informationCompany Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System
Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels
More informationHigh Wind Speed Shutdown / Power Available
High Wind Speed Shutdown / Power Available Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.
More informationFault Ride Through Technical Assessment Report Template
Fault Ride Through Technical Assessment Report Template Notes: 1. This template is intended to provide guidelines into the minimum content and scope of the technical studies required to demonstrate compliance
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements
Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system
More informationDocument C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting
Document C-29 Procedures for System Modeling: January 5 th, 2016 TFSS Revisions Clean Open Process Posting Prepared by the SS-37 Working Group on Base Case Development for the Task Force on System Studies.
More informationState of North Dakota Engineering data submittal Page 1 For interconnection of distributed generation to Otter Tail Power Company
Engineering data submittal Page 1 WHO SHOULD FILE THIS SUBMITTAL : Anyone in the final stages of in terconnecting a Generation System with Otter Tail Power. This submittal shall be completed and provided
More informationSouthern Company Interconnection Requirements for Inverter-Based Generation
Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationCompany Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes
Company Directive STANDARD TECHNIQUE: SD1E/2 Technical Requirements for Customer Export Limiting Schemes Policy Summary This Standard Technique specifies the requirements for customer owned Export Limitation
More informationShortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer. Anura Perera, Paul Keller
Shortcomings of the Low impedance Restricted Earth Fault function as applied to an Auto Transformer Anura Perera, Paul Keller System Operator - Eskom Transmission Introduction During the design phase of
More informationMEASUREMENT CAMPAIGN AND ASSESSMENT OF THE QUALITY OF SUPPLY IN RES AND DG FACILITIES IN SPAIN
MEASUREMENT CAMPAIGN AND ASSESSMENT OF THE QUALITY OF SUPPLY IN RES AND DG FACILITIES IN SPAIN Eugenio PEREA*, Eduardo ZABALA*, J. Emilio RODRÍGUEZ*, Asier GIL DE MURO*, Hugo GAGO * * * Fundación LABEIN,
More informationPRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76
PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion
More informationHow Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements
How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements Robert Nelson Senior Expert Engineering Manager and Manager of Codes, Standards, and Regulations Siemens Wind Turbines -
More informationGENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 150 KW BUT LESS THAN OR EQUAL TO 550 KW
GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 150 KW BUT LESS THAN OR EQUAL TO 550 KW Electric Utility Contact Information Detroit Edison Company Interconnection
More informationIntermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV)
Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) IRR-DCC-MV 1. Introduction 1 IRR-DCC-MV 2. Scope 1 IRR-DCC-MV 2.1. General 1 IRR-DCC-MV 2.2. Affected
More informationeach time the Frequency is above 51Hz. Continuous operation is required
GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA
More informationCase Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations
Case Study 1 Power System Planning and Design: Power Plant, Transmission Lines, and Substations Lindsay Thompson, 5203120 Presented to Riadh Habash ELG 4125 11/10/2013 1.0 ABSTRACT A power plant delivers
More informationR10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours
Code No: R3 R1 Set No: 1 III B.Tech. II Semester Supplementary Examinations, January -14 POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours Max Marks: 75 Answer any FIVE Questions
More informationBE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %
BE Semester- V (Electrical Engineering) Question Bank (E 605 ELECTRCAL POWER SYSTEM - ) All questions carry equal marks (10 marks) Q.1 Explain per unit system in context with three-phase power system and
More informationRevision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.
Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology
More informationEffects of Harmonic Distortion I
Effects of Harmonic Distortion I Harmonic currents produced by nonlinear loads are injected back into the supply systems. These currents can interact adversely with a wide range of power system equipment,
More informationWIND FARM Flexible AC Transmission Systems
WIND FARM Flexible AC Transmission Systems WIND ENERGY AND GRID INTEGRATION Madrid 24-25 January 2006 Jacques COURAULT Assumption: Wind farm is with Fixed Speed Induction Generator (FSIG) SUMMARY 1/ Wind
More informationTechnical compliance report (TCR) and guidelines. 1. Objective of the TCR (and guidelines) 2. Technical compliance. 3. Content of the TCR
Technical compliance report (TCR) and guidelines 1. Objective of the TCR (and guidelines) Western Power has prepared this technical compliance report (TCR) with guidelines to assist applicants and Users
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements
Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission
More informationApplication for A Sub-harmonic Protection Relay. ERLPhase Power Technologies
Application for A Sub-harmonic Protection Relay ERLPhase Power Technologies 1 Outline Introduction System Event at Xcel Energy Event Analysis Microprocessor based relay hardware architecture Sub harmonic
More informationEUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code)
GC0102 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018 Paragraph No/Title EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS (This contents page does not form part of the Grid Code) Page
More informationEnergy Networks Association
The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date
More informationTasmanian Networks Pty Ltd Guideline. Technical Requirements for the Connection of Embedded Generation
Tasmanian Networks Pty Ltd Guideline Technical Requirements for the Connection of Embedded Generation Revision 08 November 2017 Disclaimer This document has been prepared for the purposes of informing
More informationFault Ride Through Principles. and. Grid Code Proposed Changes
Fault Ride Through Principles and Grid Code Proposed Changes Document identifier: FRT Principles and Proposals Authored by: Jonathan O Sullivan / Alan Rogers Document version: Ver 1.3 Checked by: Anne
More informationTABLE OF CONTENT
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES
More informationWind Power Facility Technical Requirements CHANGE HISTORY
CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical
More informationRequirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH
Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 5th October 2010 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT
More informationELECTRICAL POWER ENGINEERING
Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation
More informationSYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING
SYSTEMS AND COMPONENTS FOR TRANSFORMER TESTING 9.11/2 Transformer Testing n Type tests n Routine tests n Special tests n Applicable for tests on power and distribution transformers in factory and on-site
More informationNetwork Monitoring and Visibility Summary
Network Monitoring and Visibility Summary This article reviews the shortfalls in legacy monitoring and what will be needed to manage the changing nature of the distribution network. This includes a particular
More informationVersion 2.6 October Comments to this document can be forwarded to:
GRID CONNECTION CODE REQUIREMENTS FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.6 October 2012 Comments to this document
More informationCompany Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions
Company Directive STANDARD TECHNIQUE: TP6F/1 Power Measurement Conventions Summary This document specifies the conventions that are used for the direction of Power Flow within Western Power Distribution
More informationDATA REGISTRATION CODE SCHEDULE 1 Page 2 of 15 GENERATING UNIT (OR CCGT MODULE) TECHNICAL DATA POWER STATION NAME: DATA to RTL CUSC Cont ract
DATA REGISTRATION CODE SCHEDULE 1 Page 2 of 15 GENERATING UNIT (OR CCGT MODULE) TECHNICAL DATA POWER STATION NAME: DATE: DATA DESCRIPTION UNITS DATA to RTL Cont ract App. DATA CAT. GENERATING UNIT OR STATION
More informationCork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)
Cork Institute of Technology Bachelor of Science (Honours) in Electrical Power Systems - Award Instructions Answer FIVE questions. (EELPS_8_Y4) Autumn 2008 Electrical Energy Systems (Time: 3 Hours) Examiners:
More informationSimulations of open phase conditions on the high voltage side of YNd05-power plant transformers
Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Disclaimer: All information presented in the report, the results and the related computer program, data,
More information1
Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive
More informationDistribution Code. Approved by CER. Version: 5.0 Date: April Distribution System Operator ESB Networks Limited
Distribution Code Approved by CER Version: 5.0 Date: April 2016 Issued by: Distribution System Operator ESB Networks Limited CONTENTS Page Preface... vii 1. INDUSTRY STRUCTURE... viii 2. USE OF THE DISTRIBUTION
More informationCustomer Standard. Standard for Embedded Generation (5MW and above)
Standard 01188 Version: 1 Released: 1/10/2014 STANDARD FOR EMBEDDED GENERATION (5MW AND ABOVE) Customer Standard Standard for Embedded Generation If this standard is a printed version, to ensure compliance,
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS Puget Sound Energy, Inc. PSE-ET-160.60 October 30, 2007 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 GENERAL
More informationGENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw
GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy
More informationComparison of the Behaviour of Wind Farms and Conventional Power Stations during Grid Failure Conditions
May 4 Comparison of the Behaviour of Wind Farms and Conventional Power Dr. Martin Janßen APCG / 4MJA5_Wind-Farms-IEEE_13-5-4_EN.PPT Overview Introduction Grid Faults Requirements for Grid Stability Fault
More informationGeneration and Load Interconnection Standard
Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5
More informationTECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION
TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION Document 9022 Puget Sound Energy, Inc. PSE-TC-160.70 December
More informationInduction Machine Test Case for the 34-Bus Test Feeder -Distribution Feeders Steady State and Dynamic Solutions
Induction Machine Test Case for the 34-Bus Test Feeder -Distribution Feeders Steady State and Dynamic Solutions Induction Machine Modeling for Distribution System Analysis panel IEEE PES General Meeting
More informationSIMPLE SOLUTIONS FOR IMPROVING LIFE OF BREAKERS USED IN TRANSMISSION AND DISTRIBUTION SYSTEMS
SIMPLE SOLUTIONS FOR IMPROVING LIFE OF BREAKERS USED IN TRANSMISSION AND DISTRIBUTION SYSTEMS Dr. V. R. Kanetkar and Mr. K. E. Shinde Shreem Electric Limited, Jaysingpur Dist. Kolhapur, Maharashtra State
More informationAPPENDIX A MATLAB CODE FOR CALCULATION OF MOTOR TORQUE
APPENDIX A MATLAB CODE FOR CALCULATION OF MOTOR TORQUE Table 1 MATLAB code for calculating motor torque[1] %Definition of Motor Parameters V=4000/sqrt(3); %Phase voltage NoPh=3; %Number of Phase NoPo=2
More informationTransmission Interconnection Requirements for Inverter-Based Generation
Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional
More informationAGN 022 Conditions for Parallel Operation
Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 022 Conditions for Parallel Operation SYNCHRONISATION The parallel operation of Generating Sets is common, to share
More informationAdvanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing
Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear
More informationCONTENTS. 1. Introduction Generating Stations 9 40
CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific
More informationNeed for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design
IEEE PES Transmission and Distribution Conference 2008 Panel Session Large Wind Plant Collector Design Wind Farm Collector System Grounding by Steven W. Saylors, P.E. Chief Electrical Engineer Vestas Americas
More informationDP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation
DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase
More informationTitle Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)
Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control
More informationInfluence of Wind Generators in Voltage Dips
Influence of Wind Generators in Voltage Dips E. Belenguer, N. Aparicio, J.L. Gandía, S. Añó 2 Department of Industrial Engineering and Design Universitat Jaume I Campus de Riu Sec, E-27 Castelló (Spain)
More informationElectrical Theory. Power Principles and Phase Angle. PJM State & Member Training Dept. PJM /22/2018
Electrical Theory Power Principles and Phase Angle PJM State & Member Training Dept. PJM 2018 Objectives At the end of this presentation the learner will be able to: Identify the characteristics of Sine
More informationSTS Fully automatic. Large graphic display. Primary injection testing capabilities: up to 3000 A, with the optional module BUX 3000
STS 4000 Multifunction substation maintenance & commissioning test system for current, voltage and power transformers. Capacitance / Tan Delta diagnostic system with the optional module TD 5000. w w w.
More informationFunctional Specification Revision History
Functional Specification Revision History Revision Description of Revision By Date V1D1 For Comments Yaoyu Huang October 27, 2016 V1 For Issuance Yaoyu Huang November 21, 2016 Section 5.3 updated Transformer
More information